Ro:On 860330,manual Unit Trip Initiated Due to Occurrence of Tube Leak in Southwest Quadrant of Condenser & Safety Injection Occurred.Plant Stabilized & Unusual Event Concluded
ML20155A453
Person / Time
Site: Diablo Canyon  Pacific Gas & Electric icon.png
Issue date: 03/31/1986
From: Thornberry R
PACIFIC GAS & ELECTRIC CO.
To: Briam W
SAN LUIS OBISPO, CA
References
RTR-NUREG-0654, RTR-NUREG-654 NUDOCS 8604080505
Download: ML20155A453 (3)


Text

I PACIFIC OAS AND E LE C T RIC C O M PANY DIABLO CANYON POWER PLANT RO. Box 56. Avila Beach, Cahfornia 93424 -(805) 595-7351 lllllllll R.C. THORNBERRY NANT MANAGER March 31, 1986 Mr. William Briam, Administrator San Luis Obispo County Administrative Office County Government Center San Luis Obispo, CA 93408

Dear Mr Briam:

Pursuant to NUREG-0654, Revision 1, Appendix 1, the following is a sumary report concerning the following Unusual Event at the Diablo Canyon Nuclear Power Plant site.

On March 30,1986, Unit 2 was being maintained at 410 MW while a tube leak repair was being made in the southeast quadrant of the condenser. At 0300 PST a manual unit trip was initiated due to the occurrence of a tube leak in the southwest quadrant of the condenser.

A safety injection occurred at 0301 PST due to a high steam line flow concurrent with a low reactor coolant system temperature average. An Unusual Event was declared by the Shift Foreman at 0301 PST and emergency notifications were begun.

At 0308 PST, March 30, 1986, the safety injection was terminated, the plant stabilized and the Unusual Event was concluded. This event has in no way affected the health and safety of the public and no discharge of radioactive materials was made to the environment.

R. C. Thornberry f RCT:ggd

  • 8604080505 860331 PDR ADOCK 05000275 S PDR i Ml I \

.I

' Mr.. William Briam March 31, 1986

-(

I cc Mr. Benjamin P. Tong, Chief Nuclear Power Plant Planning P. O. Box 9577 l Sacramento, CA 95823 I l

Mr. John B. Martin, Administrator l U. S. Nuclear Regulatory Commission, Region V i 1450 Maria Lane, Suite 210 Walnut Creek, CA 94596-5368 l

Mr. George Whiting, Sheriff I San Luis Obispo County P. O. Box 32

! San Luis Obispo, CA 93401 Mr. George W. Knighton, Chief Licensing Branch No. 3 Division of Licensing Office of Nuclear Reactor Regulation U. S. Nuclear Regulatory Commission Washington, D. C. 20555 Director, Office of Management Information and Program Control U. S. Nuclear Regulatory Commission Washington, D. C. 20555 <

m

'bec RMBaciarelli 8

- t .JCCarroll

.PACrane i

WFujimoto

'Y WJKelly DKennady.

WJKeyworth DMonfried

JDShiffer -

,) RWeinberg .

NRC Resident Inspector ,

RMS  !

4 i

i 1

1 l

j i

l 2

i 4

l l, ,

l i

i i

}

I i

4 f

I

! 4 DC0480 3

_. ..__. _. _ . _ - .- - -_ ..- _..