PACIFIC OAS AND E LE C T R,I 6,jLC_OMPANY
! PH TE LEPHON E jf4h? 78 -4211 77 DE ALE STREET, S AN F R ANCISCO, C AllFORNI A 94106 3P G W)c, 5
-t-P. O. BOX 7442, SAN F R AN CI SCO, C ALIFORNI A 94120 TELEC0flER (415) 543 7813 ROBE RT OH LB AC H C',,
v<e termc*r a=o uneut anoa=cv E*Ia
- a*I m I.a
- .[***
=ff*,
aNs 0ts a
C H A R L E S T. V A N D E U S E N ff f,,
j
("+d
?*;;,:::. *:;;;,*s'
=
((";f***
PHILIP A. C R A N E. J R.
neNRv J. LeeL ANsE
;;;i' U;?;;..,
91.[ *:::;-
- .'::::e*::',n '*
JoNN e a< aeon V..'.lk i..';;..ta.
7:.?l*.; "';......
llll",2 ta".'::
- r 2[:*
A RT H U R L. HILL M A N. J R.
EU'[ "..UI.*[o
's [Es[I,"E..
. EEu o"["[.U.
E[l[Eo"e"$ N~
C H A R L E o w. THiea E L L
"""'**""*'U....so....
PJ.~?l."..?O U.,
s" rl.'.f?ll.";
a v"a D ANIE L E. OtBSON
=
JOSEPHt.MELtY asweeant es=enat cow.wt Jay 28, 1982 Mr. R. II. Engelken, Regional Administrator Region V U.S. Nuclear Regulatory Camtission 1450 Maria Lane, Suite 210 Walnut Creek, CA 94596 Re: Docket 50-275 License No. DPR-76 Diablo Canyon Unit 1 Opecial Report on Non-Functional Fire Barrier Penetration
Dear Mr. Engelken:
Pursuant to Section 6.9.2 of Appendix A of the Technical Specifications to the Diablo Canyon Unit 1 Operating License, this Special Report is submitted concerning a non-functional fire barrier penetration which was not restored to functional status within 7 days, as required by Technical Specification 3.7.10.
Fire Barrier Penetration KK871 located between the Control Room and the Cable Spreading Room became non-functional on April 22, 1982 due to construction activities required to install new conduit between the two rooms.
As required by the Technical Specification Action Statement, a continuous fire watch was established in the Control Roan until the penetration was restored to j
functional status on May 2G, 1982.
1 f
This condition has in no way affected public health and safety.