ML20128P143

From kanterella
Revision as of 11:23, 7 July 2020 by StriderTol (talk | contribs) (StriderTol Bot insert)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
Insp Rept 70-1151/85-03 on 850525-29.No Violations or Deviations Noted.Major Areas Inspected:Licensee Actions on Previous Enforcement Matters & Inspector Followup Items. Proprietary Details Withheld (Ref 10CFR2.790(d) & 73.21)
ML20128P143
Person / Time
Site: Westinghouse
Issue date: 04/17/1985
From: Earnestine Clay, Mcalpine E
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To:
Shared Package
ML19304B367 List:
References
70-1151-85-03, 70-1151-85-3, NUDOCS 8507260338
Download: ML20128P143 (1)


Text

MittlAL TRAN544tfite KRC/ tilt a CONTAih6 2J10 IMPORIAArtopt UNITED STATES

[pKeru '

o NUCLEAR REGULATORY COMMISSION y REGION 11

.g j 101 MARIETTA STREET.N.W.

  • r ATLANTA, GEORGI A 30323

+ . . ;. . * # APR 2 41985 Report No. 70-1151/85-03 Docket No. 70-1151 License No. SNM-1107 Licensee: Westinghouse Electric Corporation Nuclear Fuel Division Columbia, South Carolina 29250 Date of Inspection: March 25 - 29, 1985 Type of Inspection: Unannounced Material Control and Accountability Inspector: A V/17/65 E. L. Clay, Safeguard Eng' eer '

Date Signed Approved by: pa E. J. McAlphe, Chief, MAerial Control and 4[l7/KS Date Signed Accountability Section, Nuclear Materials Safety and Safeguards Branch, Division of Radiation Safety and Safeguards Summary Scope: This routine inspection entailed 41 inspector-hours on site in the areas of licensee actions on previous enforcement matters (92702), and inspector followup items (92701).

Results: No violations or deviations were identified.

8507260338 850424 PDR C

ADOCK 07001151 PDR mitsw immu wouwms CONTAING 3J99 5tFORNIAllpig