ML20195J239

From kanterella
Jump to navigation Jump to search
Partially Withheld Insp Rept 70-1151/98-205 on 981019-23. Violations Noted.Details Withheld,Per 10CFR2.790
ML20195J239
Person / Time
Site: Westinghouse
Issue date: 11/18/1998
From:
NRC OFFICE OF NUCLEAR MATERIAL SAFETY & SAFEGUARDS (NMSS)
To:
Shared Package
ML20138L744 List:
References
70-1151-98-205, NUDOCS 9811240220
Download: ML20195J239 (1)


Text

.

l DEC.ONTROLLED WHEN 2.790 INFORMATION IS REMOVED DOCUMENT TRANSMITTED HEREWITH CONTAINS 2.790 INFORMATION U.S. NUCLEAR REGULATORY COMMISSION OFFICE OF NUCLEAR MATERIAL SAFETY AND SAFEGUARDS Docket No.:

70-1151 License No.:

SNM-1107 l

Report No.:

70-1151/98-205 Safeguards Group.

111 Licensee:

CBS Corporation, acting through its Westinghouse Electric Company Division Commercial Nuclear Fuel Division Columbia Fuel Fabrication Facility Location:

P.O. Box R Columbia, S.C. 29250 Dates:

October 19-23,1998 Inspectors:

W. Smith, MC&A Physical Scientist D. Whaley, MC&A Physical Scientist i-l Approved by:

P. Ting, Chief l

Operations Branch i

Division of Fuel Cycle Safety and Safeguards, NMSS 9811240220 981118 PDR ADOCK 0700 1

C DECONTROLLED WHEN 2.790 INFORMATION IS REMOVED DOCUME,NT TRANSMITTED HEREWITH CONTAINS 2.790 INFORMATION

(

.