ML13154A433

From kanterella
Revision as of 00:15, 16 February 2018 by StriderTol (talk | contribs) (Created page by program invented by StriderTol)
Jump to navigation Jump to search
Callaway Plant - RE-Notification of Inspection (NRC Inspection Report 05000483-13-004) and Request for Information
ML13154A433
Person / Time
Site: Callaway Ameren icon.png
Issue date: 06/03/2013
From: Vincent Gaddy
Operations Branch IV
To: Heflin A C
Union Electric Co
References
IR-13-004
Download: ML13154A433 (7)


See also: IR 05000483/2013004

Text

June 3, 2013

Mr. Adam C. Heflin, Senior Vice President and Chief Nuclear Officer Union Electric Company P.O. Box 620 Fulton, MO 65251

SUBJECT: CALLAWAY PLANT - RE-NOTIFICATION OF INSPECTION (NRC INSPECTION REPORT 05000483/2013004) AND REQUEST FOR INFORMATION

Dear Mr. Heflin:

In a letter, dated May 6, 2013, we informed you that inspectors from the Nuclear Regulatory Commission's (NRC) Region IV office would be onsite to perform the baseline biennial requalification inspection from June 24 through 28, 2013. Callaway Plant has since informed the NRC that their annual requalification operating test cycle will be delayed by approximately seven weeks. This letter establishes new dates for the NRC's onsite inspection and supersedes our letter of May 6, 2013. From August 26 through 30, 2013, inspectors from the NRC's Region IV office will perform the baseline biennial requalification inspection at Callaway Plant using NRC Inspection Procedure 71111.11B, "Licensed Operator Requalification Program." Experience has shown that this inspection is a resource intensive inspection both for the NRC inspectors and your staff. In order to minimize the impact to your onsite resources and to ensure a productive inspection, we have enclosed a request for documents needed for this inspection. These documents have been divided into three groups. The first group (Section A of the enclosure) identifies information to be provided prior to the inspection to ensure that the inspectors are adequately prepared. The second group (Section B of the enclosure) identifies the information the inspectors will need upon arrival at the site. The third group (Section C of the enclosure) identifies the items which are necessary to close out the inspection and are usually sent a few weeks after the team has left the site. It is important that all of these documents are up to date and complete in order to minimize the number of additional documents requested during the preparation and/or the onsite portions of the inspection.

We have discussed the schedule for these inspection activities with your staff and understand that our regulatory contact for this inspection will be Mr. Juan Cortez of your training organization. Our inspection dates are subject to change based on your updated schedule of examination activities. If there are any questions about this inspection or the material requested, please contact Thomas Farina, lead inspector, at 817-200-1117 (thomas.farina@nrc.gov) or Kelly Clayton at (817) 200-1216 (kelly.clayton@nrc.gov). Mr. This letter does not contain new or amended information collection requirements subject to the Paperwork Reduction Act of 1995 (44 U.S.C. 3501 et seq.). Existing information collection requirements were approved by the Office of Management and Budget, control number 3150-0018. The NRC may not conduct or sponsor, and a person is not required to respond to, a request for information or an information collection requirement unless the requesting document displays a currently valid Office of Management and Budget control number.

In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter and its enclosure will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system (ADAMS). ADAMS is accessible from the NRC web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).

Sincerely,/RA/ Vincent G. Gaddy, Chief Operations Branch Division of Reactor Safety Docket: 50-483 License: NPF-30

Enclosure:

Biennial Requalification Inspection Document Request M