ML20133H597

From kanterella
Revision as of 02:27, 4 July 2020 by StriderTol (talk | contribs) (StriderTol Bot insert)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
NPDES Noncompliance Notification:Total Suspended Solids 30-day Weighted Average Discharge Concentration Limit Exceeded for Outfall 002 for Jul 1985.Consulting Firm Contracted to Determine Workable Solutions
ML20133H597
Person / Time
Site: Davis Besse Cleveland Electric icon.png
Issue date: 08/05/1985
From: Storz L
TOLEDO EDISON CO.
To:
OHIO, STATE OF
References
E-2.40.1.1.1, G85-551AL, NUDOCS 8508090413
Download: ML20133H597 (2)


Text

I

/

UXEDO

%mm EDISON E 2.40.1.1.1 August 5, 1985 G85 551AL Ohio Envirottnental Protection Agency Northwest District Office 1035 Devlac Grove Road Bowling Green, Ohio 43402 ATTN: Mr. Bruce Dunlavy

SUBJECT:

Exceedence Notification for NPDES Permit No. 2IB000ll*DD; Davis-Besse Nuclear Power Station

Dear Mr. Dunlavy:

In accordance with the requirements of Part III, Section 12A of NPDES Permit No. 2IB000ll*DD for the Davis-Besse Nuclear Power Station, we wish to notify you of a recent exceedsnce condition.

The Total Suspended Solids (TSS) thirty-day weighted average discharge concen-tration limitation of 30 mg/l was exceeded at outfal1~ 002 (Area Runoff) for the reporting month of July 1985. The Total Suspended Solids discharge concen-tration at Outfall 002 averaged 32 mg/l for the reporting month.

Date Outfall Parameter Analysis July, 1985 002 Total Suspended Solids 32 mg/l Toledo Edison has contracted an independent consulting firm to evaluate the collection efficiency at Outfall 002 and to determine alternatives to reduce Total Suspended Solids concentrations at the discharge of the Davis-Besse Training Center Pond. A prelininary report has been issued and recommended actions to identify potential nolutions are being implemented. Upon com-pletion of this phase, a final report listing a workable solution (s) is ex-pected. Implementation of the solution will soon follow.

If you have any questions regarding this notice, please contact Patrick McCloskey at (419) 249-5000, ex t. 711.

Sincerely, f

dkA, 4 Louis F. Storz Plant Manager Davis-Besse Nuclear Power Station LFS/PJM/yml 8508090413 850805 PDR S ADOCK 05000346 #' 1

pon / 5 g THE TOLEDO EDISON COMPANY EDISON PLAZA 300 MADISON AVENUE TOLEDO, OHIO 43652 l

4 Mr. Brucs Dunlivy

  • Augu't 5, 1985

}" 2:gs 2' bec: J. Williams, Jr.

J. E. Sullivan 4

C. Daft T. Myers

~

E. C.~Novak J. F. Helle J. J. Pfeiffer J. Scott-Wasilk R. Scott D. Briden N

W._ Rogers

-A. Cephart

-R. Klein 3

T 4

f e

d b

4 4

- . , - . -.- , _. .,--.--- ~. _ . ,. - - - -- . -. . , - , .,