NPDES Noncompliance Notification:Approx 815,000 Gallons of Solution Containing Water & Fluorescein Disodium Salt Will Be Discharged from Four Condensers Following Filling to Assist in Location of Cracks &/Or Leaks at Weld PointsML20137Y061 |
Person / Time |
---|
Site: |
Davis Besse |
---|
Issue date: |
11/26/1985 |
---|
From: |
Storz L TOLEDO EDISON CO. |
---|
To: |
Dunlavy B OHIO, STATE OF |
---|
References |
---|
NUDOCS 8512100718 |
Download: ML20137Y061 (2) |
|
|
---|
Category:NPDES NONCOMPLIANCE NOTIFICATION
MONTHYEARML20117H6721996-04-25025 April 1996 NPDES Noncompliance Notification:On 960419 Discovered That Hydrazine Concentration in North Settling Basin Exceeded. Internal Outfall 602 & External Outfall 001 Closely Monitored for Hydrazine ML20064F9781994-03-0101 March 1994 NPDES Discharge Monitoring Rept Re Daily Ph Values Exceeding Maximum Daily Ph Limit of 9.0 Su Due to Unknown Causes. Monitor Ph Values Closely ML20058K0681993-11-24024 November 1993 NPDES Noncompliance Notification:On 931118,daily Outfall 001 Free Chlorine Sample Indicated 0.2 Mg/L Free Chlorine.Caused by Circulating Water Supplying to Much Chlorine.Mod to Plant Will Decrease Chlorine to Svc Water ML20045G3721993-06-18018 June 1993 NPDES Noncompliance Notification:On 930611,discovered That Outfall 601 Total Suspended Solids Value for Wk Exceeded Daily Limit Collected on 930609.Caused by Algae Bloom in Basin.Algae Population in Basin Will Be Monitored ML20141K5061986-01-14014 January 1986 NPDES Noncompliance Notification:On 851207,daily 2 H Discharge Limitation for Free Available Chlorine Exceeded at Outfall 001 ML20137B5221986-01-0404 January 1986 NPDES Noncompliance Notification:On 851209-26, Concentrations for Suspended Solids at Outfall 601 Found in Excess of 45 Mg/L Daily Limit.Caused by Algae die-off within Pond.Corrective Actions Not Stated ML20137Y0611985-11-26026 November 1985 NPDES Noncompliance Notification:Approx 815,000 Gallons of Solution Containing Water & Fluorescein Disodium Salt Will Be Discharged from Four Condensers Following Filling to Assist in Location of Cracks &/Or Leaks at Weld Points ML20133H5971985-08-0505 August 1985 NPDES Noncompliance Notification:Total Suspended Solids 30-day Weighted Average Discharge Concentration Limit Exceeded for Outfall 002 for Jul 1985.Consulting Firm Contracted to Determine Workable Solutions ML20133H1941985-07-29029 July 1985 NPDES Noncompliance Notification:On 850705 & 08,approx 120,000 Gallons Water/Ammonia Solution Discharged to Training Ctr Pond.Caused by Draining of Two Steam Generators.Release Data Encl ML20117G5291985-05-0303 May 1985 NPDES Noncompliance Notification:On 850430,total Suspended Solids 30-day Average Limit Exceeded at Outfall 002.Caused by Strong Westerly Winds & Heavy Rains.Collection Efficiency & Alternatives Being Assessed ML20100G2941985-03-28028 March 1985 NPDES Noncompliance Notification:On 850325,free Available Chlorine Daily Max Limit Exceeded at Outfall 1.Level of 3.0 Mg/L Caused by Improper Operation of Newly Installed Chlorination Valve.Valve Will Be Throttled ML20096B6801984-08-24024 August 1984 NPDES Noncompliance Notification:On 840820,total Suspended Solids Daily Max Limit Exceeded at Outfall 002.Caused by Higher than Normal Windspeeds & Rainfall Prior to Sampling Time.Suspended Solids Back within Daily Limit on 840823 ML20084S4781984-05-15015 May 1984 NPDES Noncompliance Notification:On 840514,daily Max Ph Exceeded at Outfall 002.Caused by West & Southwest Winds Kicking Up Solids from Pond Bottom.Carp Active in Disturbing Pond Bottom While Attempting to Spawn ML20082F6591983-11-17017 November 1983 NPDES Noncompliance Notification:On 831114 & 16,oil & Grease Limits Exceeded at Outfall 604.Caused by Surface Runoff During Heavy Rainfall & Melting Snow.Oil Absorbent Matl Placed within Outfall Areas 604 & 002 1996-04-25
[Table view] Category:TEXT-ENVIRONMENTAL REPORTS
MONTHYEARML20205K8291998-12-31031 December 1998 Annual Exposure Rept for Davis-Besse Nuclear Power Station. with ML20206D2551998-12-31031 December 1998 Annual Radiological Environ Operating Rept for Davis-Besse Nuclear Power Station for 980101-981231 ML20206D2651998-12-31031 December 1998 Radiological Environ Monitoring Program (REMP) for Davis-Besse Nuclear Power Station for 980101-981231 ML20217M5381997-12-31031 December 1997 Annual Radiological Environ Operating Rept, W/Radiological Effluent Release Rept ML20236N4281997-12-31031 December 1997 Corrected Replacement Pages x,88 Through 90 & 108 Through 109 of Davis-Besse Nuclear Power Station 1997 Annual Radiological Environ Operating Rept, Including Radiological Effluent Release Rept ML20199G2991997-10-31031 October 1997 Oct 1997 Wastewater Rept for Davis-Besse Nuclear Power Station,Unit 1 ML20198P4361997-09-30030 September 1997 Sept 1997 Wastewater Rept for Davis-Besse Nuclear Power Station,Unit 1 ML20211E4571997-08-31031 August 1997 Telecommunicated Wastewater Rept for Aug 1997 ML20217N3381997-07-31031 July 1997 Jul 1997 Telecommunicated Hardcopy Wastewater Rept ML20149H1781997-06-30030 June 1997 June 1997 Telecommunicated Hardcopy Wastewater Rept ML20141F2851997-05-31031 May 1997 May 1997 Telecommunicated Hardcopy Wastewater Rept for Davis-Besse Nuclear Power Station,Unit 1 ML20138A9611997-03-31031 March 1997 Mar 1997 Telecommunicated Hardcopy Wastewater Rept for Davis-Besse Nuclear Power Station ML20137C3801997-02-28028 February 1997 Feb 1997 Telecommunicated Hardcopy Wastewater Rept for Davis-Besse Nuclear Power Station,Unit 1 ML20135C3171997-01-31031 January 1997 Jan 1997 Telecommunicated Hardcopy Wastewater Rept for Davis-Besse Nuclear Power Station Unit 1 ML20140D9411996-12-31031 December 1996 Annual Radiological Environ Operating Rept for Davis-Besse Nuclear Power Station for 960101-1231 ML20133P5251996-12-31031 December 1996 Dec 1996 Wastewater Rept for Davis-Besse Nuclear Power Station Unit 1 ML20136G0691996-12-31031 December 1996 1996 Annual Exposure Rept for Davis-Besse Nuclear Power Station ML20132F1891996-11-30030 November 1996 Nov 1996 Wastewater Rept for Davis-Besse Nuclear Power Station,Unit 1 ML20134P0041996-10-31031 October 1996 Wastewater Rept for Davis-Besse Nuclear Power Station Unit 1 for Oct 1996 ML20129C2591996-09-30030 September 1996 Sept 1996 Wastewater Rept for Davis-Besse Nuclear Power Station,Unit 1 ML20129F4781996-08-31031 August 1996 Aug 1996 Wastewater Rept for Davis-Besse Nuclear Power Station ML20129G8541996-07-31031 July 1996 Jul 1996 Telecommunicated Hardcopy Wastewater Rept for Davis-Besse Nuclear Power Station,Unit 1 ML20115F4071996-06-30030 June 1996 Wastewater Discharge Rept for Davis-Besse Nuclear Power Station for June 1996 ML20112J4741996-05-31031 May 1996 Wastewater Rept for May 1996 for Davis-Besse Nuclear Power Station,Unit 1 ML20112B9231996-04-30030 April 1996 Wastewater Rept for Apr 1996 for Dbnps,Unit 1 ML20117H6721996-04-25025 April 1996 NPDES Noncompliance Notification:On 960419 Discovered That Hydrazine Concentration in North Settling Basin Exceeded. Internal Outfall 602 & External Outfall 001 Closely Monitored for Hydrazine ML20107L1081996-03-31031 March 1996 Mar 1996 Wastewater Rept for Davis-Besse Nuclear Power Station ML20101B8281996-02-29029 February 1996 Feb 1996 Wastewater Rept ML20100G2251996-01-31031 January 1996 Wastewater Rept for DBNPS Unit 1 for Jan 1996 ML20108C6131995-12-31031 December 1995 Replacement Pages 128-137 of Davis-Besse Nuclear Power Station 1995 Annual Radiological Environ Operating Rept ML20107C3211995-12-31031 December 1995 1995 Radiological Environ Monitoring Program for Davis- Besse Nuclear Power Station, Final Monthly Progress Rept ML20107C2861995-12-31031 December 1995 1995 Annual Radiological Environ Operating Rept for Davis- Besse Nuclear Power Station ML20095E9431995-11-30030 November 1995 Nov 1995 Wastewater Rept for Davis Besse Nuclear Power Station Unit 1 ML20094J1791995-10-31031 October 1995 Wastewater Rept for Davis-Besse Nuclear Power Station Unit 1 for Oct 1995 ML20093H4001995-09-30030 September 1995 Wastewater Rept for Sept 1995 for Davis-Besse Nuclear Power Station,Unit 1 ML20098A3111995-08-31031 August 1995 Aug 1995 Wastewater Rept for Davis-Besse Nuclear Power Station ML20087G5701995-07-31031 July 1995 Wastewater Rept for Jul 1995 for Davis-Besse Nuclear Power Station,Unit 1 ML20086H2521995-06-30030 June 1995 Wastewater Rept for June 1995 for Davis-Besse Nuclear Power Station ML20085G3691995-05-31031 May 1995 Wastewater Rept for May 1995 for Davis-Besse Nuclear Power Plant ML20080H6321995-01-31031 January 1995 Wastewater Rept for Jan 1995 for Davis-Besse Nuclear Power Station,Unit 1 ML20077R5761994-12-31031 December 1994 Wastewater Rept for Dec 1994 for Davis-Besse Nuclear Power Station,Unit 1 ML20082V4051994-12-31031 December 1994 Annual Radiological Environ Operating Rept ML20078Q5201994-11-30030 November 1994 Wastewater Rept for Nov 1994 for Dbnps,Unit 1 ML20078D9961994-09-30030 September 1994 Wastewater Rept for Davis-Besse Nuclear Power Station Unit 1 for Sept 1994 ML20073B8471994-08-31031 August 1994 Aug 1994 Wastewater Rept for Davis-Besse Nuclear Power Station,Unit 1 ML20072C4131994-07-31031 July 1994 Wastewater Rept for Jul 1994 for Davis-Besse Nuclear Power Station,Unit 1 ML20071H5591994-06-30030 June 1994 Wastewater Rept for June 1994 for Davis-Besse Nuclear Power Station Unit 1 ML20072S8321994-06-30030 June 1994 Radioactive Effluent Release Rept Jul 1993 - June 1994 ML20069N1711994-05-31031 May 1994 Wastewater Rept for Davis-Besse Nuclear Power Station Unit 1 for May 1994 ML20029E5001994-04-30030 April 1994 Apr 1994 Wastewater Rept for Davis-Besse Nuclear Power Station,Unit 1. W/940511 Ltr 1998-12-31
[Table view] |
Text
?
.y Z G1 M TOLEDO Na EDISON-E'2.40.1.1.1 G85 907AL
..-. November 26, 1985 Ohio Environmental Protection Agency-Northwest District Office 1035 Devlac Grove Road Bowling Green, Ohio 43402-ATTENTION: Mr. Bruce Dunlavy 4
Subject:
Notification in Accordance with the Davis-Besse NPDES Permit Number 2IB000ll*DD of a Discharge Containing Water and Fluorescein Disodium Salt Solution to the Davis-Besse Settling Basin #2 and to Final Outfall 001.
Dear Mr. Dunlavy:
~
This letter, in conjunction with the telephone conversation between yourself and Deb Isley of Toledo Edison on November 21, 1985, is being '
sent to notify you of a discharge containing water and fluorescein disodium salt -(fluorescein dye) solution from the Davis-Besse Nuclear Power Station. The quantity to be discharged will be approximately 815,000 gallons of water and fluorescein dye.
The fluorescein ~ dye solution will result from draining the-four condensers at the Davis-Besse Station. Currently, the condensers are dry, but filling will commence on. November 27 1985 to contain approximately 715,000 gallons of demineralized water with approximately fif ty-four (54) pounds of fluorescein disodium salt (fluorescein dye). The dye solution will assist in the location of cracks and/or leaks at.the weld points on
,- the condensers. Upon completion of the inspection of the weld points the
' dye solution will be drained from the condensers and pumped to settling basin #2.on~ December 5, 1985. The inside of the condensers will be rinsed several. times with an approximate total.of 100,000 gallons of demineral-(!~ _ ized water to remove the residual dye and will be pumped to the same basin
.to allow for biodegradation of the dye and then discharged through final Outfall 001 on approximately December 9, 1985.
' ~
8512100718 851126 d ADOCK 05000346 PDR s _. __
eDn
_ _ __ _ _ /y[
THE TOLEDO EDISON COMPANY EDISON PLAZA 300 MADISON AVENUE TOLEDO, OHIO 43G52
4 l
Mr.-Bruce Dunlavy l November 26, 1985 )
Page 2 If you have any questions regarding this notice, please contact Deb Isley or Patrick-McCloskey, Environmental Monitoring at (419) 249-5000, ext.
7562 or 7711.
Yours truly.
-Louis F. Storz-Plant Manager Davis-Besse Nuclear Power Station LFS/DAI/cb/yml cc: R. Scott D. Briden J. Ferguson J. Sullivan '