Category:INSPECTION REPORT
MONTHYEARIR 05000498/19990161999-10-0707 October 1999 Insp Repts 50-498/99-16 & 50-499/99-16 on 990808-0918.No Violations Noted.Major Areas Inspected:Aspects of Licensee Operations,Maint,Engineering & Plant Support IR 05000498/19990151999-09-29029 September 1999 Insp Repts 50-498/99-15 & 50-499/99-15 on 990920-24.No Violations Noted.Major Areas Inspected:Licensed Operators Requalification Program IR 05000199/19990121999-09-14014 September 1999 Insp Repts 50-498/99-12 & 50-199/99-12 on 990816-19.Three Violations Noted & Being Treated as Ncvs.Major Areas Inspected:Access Authorization,Assessment Aids,Security Event Logs & Security Program Audits IR 05000499/19990141999-09-0303 September 1999 Insp Repts 50-499/99-14 & 50-499/99-14 on 990627-0807.NCVs Noted.Major Areas Inspected:Aspects of Licensee Operation, Maint,Engineering & Plant Support IR 05000498/19990081999-08-16016 August 1999 Insp Repts 50-498/99-08 & 50-499/99-08 on 990517-21 & 0607- 10.No Violation Noted.Major Areas Inspected:Corrective Action Program Implementation at Plant IR 05000498/19990131999-07-21021 July 1999 Insp Repts 50-498/99-13 & 50-499/99-13 on 990516-0626. Noncited Violations Noted Re Failure to Follow Procedures by Shift Supervisor Authorizing Deviation from Procedure Used to vacuum-fill RHR Sys & to Follow Plant Startup Procedure IR 05000498/19990111999-06-10010 June 1999 Insp Repts 50-498/99-11 & 50-499/99-11 on 990404-0515.No Violations Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant Support IR 05000498/19990091999-05-25025 May 1999 Insp Repts 50-498/99-09 & 50-499/99-09 on 990503-06.No Violations Noted.Major Areas Inspected:Operational Status of Licensee Emergency Preparedness Program ML20206H6361999-05-0505 May 1999 Insp Repts 50-498/99-06 & 50-499/99-06 on 990221-0403. Non-cited Violations Noted.Major Areas Inspected:Operations, Maintenance,Engineering & Plant Support IR 05000498/19990101999-04-22022 April 1999 Insp Repts 50-498/99-10 & 50-499/99-10 on 990405-09.No Violations Noted.Major Areas Inspected:Review of Licensee Inservice Exam Program Plan & Schedule & Implementation of Program Plan for Facilities IR 05000498/19990071999-04-22022 April 1999 Insp Repts 50-498/99-07 & 50-499/99-07 on 990405-09. Violations Noted.Major Areas Inspected:Radiation Protection Program Focusing on Unit 1 Refueling Outage Activities IR 05000498/19990051999-03-29029 March 1999 Insp Repts 50-498/99-05 & 50-499/99-05 on 990301-05.No Violations Noted.Major Areas Inspected:Engineering IR 05000498/19980191999-03-26026 March 1999 Insp Repts 50-498/98-19 & 50-499/98-19 on 990125-0317. Violations Noted.Major Areas Inspected:Operations & Engineering IR 05000498/19990041999-03-24024 March 1999 Insp Repts 50-498/99-04 & 50-499/99-04 on 990222-25. Violations Noted.Major Areas Inspected:Maint ML20205A1601999-03-24024 March 1999 Insp Repts 50-498/99-04 & 50-499/99-04 on 990222-25. Violations Noted.Major Areas Inspected:Maint IR 05000498/19980171999-03-23023 March 1999 Cancellation of Insp Repts 50-498/98-17 & 50-499/98-17.No Insp Rept Will Be Issued for Util with Listed Number IR 05000498/19990021999-03-16016 March 1999 Insp Repts 50-498/99-02 & 50-499/99-02 on 990110-0220. No Violations Noted.Major Areas Inspected:Licensee Operations, Maint,Engineering & Plant Support IR 05000498/19990031999-03-0404 March 1999 Insp Repts 50-498/99-03 & 50-499/99-03 on 990222-25.No Violations Noted.Major Areas Inspected:Plant Support ML20203D5711999-02-10010 February 1999 Insp Repts 50-498/98-15 & 50-499/98-15 on 990614-1123. Violations Noted.Major Areas Inspected:Review of Circumstances Surrounding 980614 Fire in Potential Transformer & Subsequent Deenergization of Switchgear E1B IR 05000498/19980111999-02-0404 February 1999 Insp Repts 50-498/98-11 & 50-499/98-11 on 981129-990109.No Violations Noted.Major Areas Inspected:Operations, Maintenance,Engineering & Plant Support IR 05000498/19990011999-01-27027 January 1999 Insp Repts 50-498/99-01 & 50-499/99-01 on 990104-07.No Violations Noted.Major Areas Inspected:Insp Reviewed Implementation of Solid Radwaste Mgt & Radioactive Matl Transportation Programs & Plant Support IR 05000498/19980161998-12-24024 December 1998 Insp Repts 50-498/98-16 & 50-499/98-16 on 981207-10.No Violations Noted.Major Areas Inspected:Plant Support, Including Alarm Stations,Security Equipment,Vital Area Barriers & Detection Aids & Security Event Logs IR 05000498/19980101998-12-22022 December 1998 Insp Repts 50-498/98-10 & 50-499/98-10 on 981018-1125.No Violations Noted.Major Areas Inspected:License Operations, Maint,Engineering & Plant Support IR 05000498/19980201998-12-0202 December 1998 Insp Repts 50-498/98-20 & 50-499/98-20 on 981102-05. Violation Noted.Major Areas Inspected:Radiological Controlled Area Access Controls,Radiation Work Permits, Radiological Surveys & pre-job Health Physics Briefings IR 05000498/19980091998-11-12012 November 1998 Insp Repts 50-498/98-09 & 50-499/98-09 on 980906-1017. Violations Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant Support IR 05000498/19980181998-10-21021 October 1998 Insp Repts 50-498/98-18 & 50-499/98-18 Has Been Canceled.No Insp Rept Will Be Issued IR 05000498/19980081998-09-28028 September 1998 Insp Repts 50-498/98-08 & 50-499/98-08 on 980726-0905.No Violations Noted.Major Areas Inspected:Operations, Maintenance,Engineering & Plant Support IR 05000498/19980141998-08-31031 August 1998 Insp Repts 50-498/98-14 & 50-499/98-14 on 980706-23.No Violations Noted.Major Areas Inspected:Engineering IR 05000498/19980131998-08-14014 August 1998 Insp Repts 50-498/98-13 & 50-499/98-13 on 980804-07.No Violations Noted.Major Areas Inspected:Licensee Performance & Capabilities During full-scale,biennial Exercise of Emergency Plan & Implementing Procedures IR 05000498/19980071998-08-11011 August 1998 Insp Repts 50-498/98-07 & 50-499/98-07 on 980614-0725.No Violations Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant Support IR 05000498/19983011998-07-14014 July 1998 Insp Repts 50-498/98-301 & 50-499/98-301 on 980601-04.No Violations Noted.Major Areas Inspected:Examiners Evaluated Competency of 6 Senior Operator Applicants for Issuance of Operating Licenses at Plant,Units 1 & 2 & Operations IR 05000498/19980061998-07-0808 July 1998 Insp Repts 50-498/98-06 & 50-499/98-06 on 980503-0613. Violations Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant Support IR 05000498/19980051998-05-18018 May 1998 Insp Repts 50-498/98-05 & 50-499/98-05 on 980322-0502. Violation Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant Support IR 05000498/19980041998-04-20020 April 1998 Insp Repts 50-498/98-04 & 50-499/98-04 on 980214-0321. Violations Noted.Major Areas Inspected:Operations,Maint, Engineering,Plant Support IR 05000498/19980031998-03-24024 March 1998 Insp Repts 50-498/98-03 & 50-499/98-03 on 980104-0214. Violation Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant Support Re Emergency Facilities IR 05000498/19980121998-03-24024 March 1998 Insp Repts 50-498/98-12 & 50-499/98-12 on 980223-27.No Violations Noted.Major Areas Inspected:Licensee Physical Security Program,Including Review of Access Authorization Program,Testing & Maint & Security Program Plans ML20202D7781998-02-12012 February 1998 Insp Repts 50-498/98-02 & 50-499/98-02 on 980112-15. Violations Noted.Major Areas Inspected:Operations & Plant Support Re Radiation Protection IR 05000498/19970081998-01-23023 January 1998 Insp Repts 50-498/97-08 & 50-499/97-08 on 971116-980103.No Violations Noted.Major Areas Inspected:Operations, Engineering,Maint & Plant Support IR 05000498/19973011997-12-18018 December 1997 Insp Repts 50-498/97-301 & 50-499/97-301 on 971020-1205. Violations Noted.Major Areas Inspected:Competency of 6 RO & 8 SROs for Issuance of Operating Licenses at South Texas Project Facility IR 05000498/19970071997-12-10010 December 1997 Insp Repts 50-498/97-07 & 50-499/97-07 on 971005-1115.No Violations Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant Support IR 05000498/19970061997-12-0808 December 1997 Insp Repts 50-498/97-06 & 50-499/97-06 on 970810-1004. Violations Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant Support IR 05000498/19970251997-11-28028 November 1997 Partially Withheld Insp Repts 50-498/97-25 & 50-499/97-25 on 971103-07 (Ref 10CFR73.21).Major Areas Inspected:Physical Security Program,Maint,Audits,Protected Area Barriers, Testing of Intrusion Detection Sys & Control Equipment IR 05000498/19970261997-11-28028 November 1997 Insp Repts 50-498/97-26 & 50-499/97-26 Has Been Cancelled. No Insp Rept Will Be Issued ML20199J5591997-11-21021 November 1997 Insp Repts 50-498/97-24 & 50-499/97-24 on 970915-1112.No Violations Noted.Major Areas Inspected:Electrical,Mechanical & Instrumentation & Control Calculations to Assess Scope of Design Control Weakness ML20199E1971997-11-14014 November 1997 Rev 1 to Insp Repts 50-498/97-05 & 50-499/97-05 on 970629-0809,correcting Errors in Numbering of Insp Followup Sys Open Items & Some Items Identified in Executive Summary IR 05000498/19970231997-11-12012 November 1997 Insp Repts 50-498/97-23 & 50-499/97-23 on 970811-15,25-29 & 0903-04.No Violations Noted.Major Areas Inspected: Operations,Maint & Engineering IR 05000498/19970211997-10-0101 October 1997 Partially Withheld Insp Repts 50-498/97-21 & 50-499/97-21 on 970902-05 (Ref 10CFR73.21).No Violations Noted.Major Areas Inspected:Physical Security Program,Including Access Authorization.Mgt Support & Security Program Audits IR 05000498/19970191997-09-26026 September 1997 Insp Repts 50-498/97-19 & 50-499/97-19 on 970825-28.No Violations Noted.Major Areas Inspected:Implementation of Liquid & Gaseous Radwaste Effluent Mgt Program IR 05000498/19970131997-09-26026 September 1997 Insp Repts 50-498/97-13 & 50-499/97-13 on 970902-04.No Violations Noted.Major Areas Inspected:Operational Status of Licensee Emergency Preparedness Program IR 05000498/19970201997-09-16016 September 1997 Insp Repts 50-498/97-20 & 50-499/97-20 on 970811-14.No Violations Noted.Major Areas Inspected:Operations Re Annual Operating Requalification Exams 1999-09-03
[Table view] Category:NRC-GENERATED
MONTHYEARIR 05000498/19990161999-10-0707 October 1999 Insp Repts 50-498/99-16 & 50-499/99-16 on 990808-0918.No Violations Noted.Major Areas Inspected:Aspects of Licensee Operations,Maint,Engineering & Plant Support IR 05000498/19990151999-09-29029 September 1999 Insp Repts 50-498/99-15 & 50-499/99-15 on 990920-24.No Violations Noted.Major Areas Inspected:Licensed Operators Requalification Program IR 05000199/19990121999-09-14014 September 1999 Insp Repts 50-498/99-12 & 50-199/99-12 on 990816-19.Three Violations Noted & Being Treated as Ncvs.Major Areas Inspected:Access Authorization,Assessment Aids,Security Event Logs & Security Program Audits IR 05000499/19990141999-09-0303 September 1999 Insp Repts 50-499/99-14 & 50-499/99-14 on 990627-0807.NCVs Noted.Major Areas Inspected:Aspects of Licensee Operation, Maint,Engineering & Plant Support IR 05000498/19990081999-08-16016 August 1999 Insp Repts 50-498/99-08 & 50-499/99-08 on 990517-21 & 0607- 10.No Violation Noted.Major Areas Inspected:Corrective Action Program Implementation at Plant IR 05000498/19990131999-07-21021 July 1999 Insp Repts 50-498/99-13 & 50-499/99-13 on 990516-0626. Noncited Violations Noted Re Failure to Follow Procedures by Shift Supervisor Authorizing Deviation from Procedure Used to vacuum-fill RHR Sys & to Follow Plant Startup Procedure IR 05000498/19990111999-06-10010 June 1999 Insp Repts 50-498/99-11 & 50-499/99-11 on 990404-0515.No Violations Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant Support IR 05000498/19990091999-05-25025 May 1999 Insp Repts 50-498/99-09 & 50-499/99-09 on 990503-06.No Violations Noted.Major Areas Inspected:Operational Status of Licensee Emergency Preparedness Program ML20206H6361999-05-0505 May 1999 Insp Repts 50-498/99-06 & 50-499/99-06 on 990221-0403. Non-cited Violations Noted.Major Areas Inspected:Operations, Maintenance,Engineering & Plant Support IR 05000498/19990101999-04-22022 April 1999 Insp Repts 50-498/99-10 & 50-499/99-10 on 990405-09.No Violations Noted.Major Areas Inspected:Review of Licensee Inservice Exam Program Plan & Schedule & Implementation of Program Plan for Facilities IR 05000498/19990071999-04-22022 April 1999 Insp Repts 50-498/99-07 & 50-499/99-07 on 990405-09. Violations Noted.Major Areas Inspected:Radiation Protection Program Focusing on Unit 1 Refueling Outage Activities IR 05000498/19990051999-03-29029 March 1999 Insp Repts 50-498/99-05 & 50-499/99-05 on 990301-05.No Violations Noted.Major Areas Inspected:Engineering IR 05000498/19980191999-03-26026 March 1999 Insp Repts 50-498/98-19 & 50-499/98-19 on 990125-0317. Violations Noted.Major Areas Inspected:Operations & Engineering IR 05000498/19990041999-03-24024 March 1999 Insp Repts 50-498/99-04 & 50-499/99-04 on 990222-25. Violations Noted.Major Areas Inspected:Maint ML20205A1601999-03-24024 March 1999 Insp Repts 50-498/99-04 & 50-499/99-04 on 990222-25. Violations Noted.Major Areas Inspected:Maint IR 05000498/19980171999-03-23023 March 1999 Cancellation of Insp Repts 50-498/98-17 & 50-499/98-17.No Insp Rept Will Be Issued for Util with Listed Number IR 05000498/19990021999-03-16016 March 1999 Insp Repts 50-498/99-02 & 50-499/99-02 on 990110-0220. No Violations Noted.Major Areas Inspected:Licensee Operations, Maint,Engineering & Plant Support IR 05000498/19990031999-03-0404 March 1999 Insp Repts 50-498/99-03 & 50-499/99-03 on 990222-25.No Violations Noted.Major Areas Inspected:Plant Support ML20203D5711999-02-10010 February 1999 Insp Repts 50-498/98-15 & 50-499/98-15 on 990614-1123. Violations Noted.Major Areas Inspected:Review of Circumstances Surrounding 980614 Fire in Potential Transformer & Subsequent Deenergization of Switchgear E1B IR 05000498/19980111999-02-0404 February 1999 Insp Repts 50-498/98-11 & 50-499/98-11 on 981129-990109.No Violations Noted.Major Areas Inspected:Operations, Maintenance,Engineering & Plant Support IR 05000498/19990011999-01-27027 January 1999 Insp Repts 50-498/99-01 & 50-499/99-01 on 990104-07.No Violations Noted.Major Areas Inspected:Insp Reviewed Implementation of Solid Radwaste Mgt & Radioactive Matl Transportation Programs & Plant Support IR 05000498/19980161998-12-24024 December 1998 Insp Repts 50-498/98-16 & 50-499/98-16 on 981207-10.No Violations Noted.Major Areas Inspected:Plant Support, Including Alarm Stations,Security Equipment,Vital Area Barriers & Detection Aids & Security Event Logs IR 05000498/19980101998-12-22022 December 1998 Insp Repts 50-498/98-10 & 50-499/98-10 on 981018-1125.No Violations Noted.Major Areas Inspected:License Operations, Maint,Engineering & Plant Support IR 05000498/19980201998-12-0202 December 1998 Insp Repts 50-498/98-20 & 50-499/98-20 on 981102-05. Violation Noted.Major Areas Inspected:Radiological Controlled Area Access Controls,Radiation Work Permits, Radiological Surveys & pre-job Health Physics Briefings IR 05000498/19980091998-11-12012 November 1998 Insp Repts 50-498/98-09 & 50-499/98-09 on 980906-1017. Violations Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant Support IR 05000498/19980181998-10-21021 October 1998 Insp Repts 50-498/98-18 & 50-499/98-18 Has Been Canceled.No Insp Rept Will Be Issued IR 05000498/19980081998-09-28028 September 1998 Insp Repts 50-498/98-08 & 50-499/98-08 on 980726-0905.No Violations Noted.Major Areas Inspected:Operations, Maintenance,Engineering & Plant Support IR 05000498/19980141998-08-31031 August 1998 Insp Repts 50-498/98-14 & 50-499/98-14 on 980706-23.No Violations Noted.Major Areas Inspected:Engineering IR 05000498/19980131998-08-14014 August 1998 Insp Repts 50-498/98-13 & 50-499/98-13 on 980804-07.No Violations Noted.Major Areas Inspected:Licensee Performance & Capabilities During full-scale,biennial Exercise of Emergency Plan & Implementing Procedures IR 05000498/19980071998-08-11011 August 1998 Insp Repts 50-498/98-07 & 50-499/98-07 on 980614-0725.No Violations Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant Support IR 05000498/19983011998-07-14014 July 1998 Insp Repts 50-498/98-301 & 50-499/98-301 on 980601-04.No Violations Noted.Major Areas Inspected:Examiners Evaluated Competency of 6 Senior Operator Applicants for Issuance of Operating Licenses at Plant,Units 1 & 2 & Operations IR 05000498/19980061998-07-0808 July 1998 Insp Repts 50-498/98-06 & 50-499/98-06 on 980503-0613. Violations Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant Support IR 05000498/19980051998-05-18018 May 1998 Insp Repts 50-498/98-05 & 50-499/98-05 on 980322-0502. Violation Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant Support IR 05000498/19980041998-04-20020 April 1998 Insp Repts 50-498/98-04 & 50-499/98-04 on 980214-0321. Violations Noted.Major Areas Inspected:Operations,Maint, Engineering,Plant Support IR 05000498/19980031998-03-24024 March 1998 Insp Repts 50-498/98-03 & 50-499/98-03 on 980104-0214. Violation Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant Support Re Emergency Facilities IR 05000498/19980121998-03-24024 March 1998 Insp Repts 50-498/98-12 & 50-499/98-12 on 980223-27.No Violations Noted.Major Areas Inspected:Licensee Physical Security Program,Including Review of Access Authorization Program,Testing & Maint & Security Program Plans ML20202D7781998-02-12012 February 1998 Insp Repts 50-498/98-02 & 50-499/98-02 on 980112-15. Violations Noted.Major Areas Inspected:Operations & Plant Support Re Radiation Protection IR 05000498/19970081998-01-23023 January 1998 Insp Repts 50-498/97-08 & 50-499/97-08 on 971116-980103.No Violations Noted.Major Areas Inspected:Operations, Engineering,Maint & Plant Support IR 05000498/19973011997-12-18018 December 1997 Insp Repts 50-498/97-301 & 50-499/97-301 on 971020-1205. Violations Noted.Major Areas Inspected:Competency of 6 RO & 8 SROs for Issuance of Operating Licenses at South Texas Project Facility IR 05000498/19970071997-12-10010 December 1997 Insp Repts 50-498/97-07 & 50-499/97-07 on 971005-1115.No Violations Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant Support IR 05000498/19970061997-12-0808 December 1997 Insp Repts 50-498/97-06 & 50-499/97-06 on 970810-1004. Violations Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant Support IR 05000498/19970251997-11-28028 November 1997 Partially Withheld Insp Repts 50-498/97-25 & 50-499/97-25 on 971103-07 (Ref 10CFR73.21).Major Areas Inspected:Physical Security Program,Maint,Audits,Protected Area Barriers, Testing of Intrusion Detection Sys & Control Equipment IR 05000498/19970261997-11-28028 November 1997 Insp Repts 50-498/97-26 & 50-499/97-26 Has Been Cancelled. No Insp Rept Will Be Issued ML20199J5591997-11-21021 November 1997 Insp Repts 50-498/97-24 & 50-499/97-24 on 970915-1112.No Violations Noted.Major Areas Inspected:Electrical,Mechanical & Instrumentation & Control Calculations to Assess Scope of Design Control Weakness ML20199E1971997-11-14014 November 1997 Rev 1 to Insp Repts 50-498/97-05 & 50-499/97-05 on 970629-0809,correcting Errors in Numbering of Insp Followup Sys Open Items & Some Items Identified in Executive Summary IR 05000498/19970231997-11-12012 November 1997 Insp Repts 50-498/97-23 & 50-499/97-23 on 970811-15,25-29 & 0903-04.No Violations Noted.Major Areas Inspected: Operations,Maint & Engineering IR 05000498/19970211997-10-0101 October 1997 Partially Withheld Insp Repts 50-498/97-21 & 50-499/97-21 on 970902-05 (Ref 10CFR73.21).No Violations Noted.Major Areas Inspected:Physical Security Program,Including Access Authorization.Mgt Support & Security Program Audits IR 05000498/19970191997-09-26026 September 1997 Insp Repts 50-498/97-19 & 50-499/97-19 on 970825-28.No Violations Noted.Major Areas Inspected:Implementation of Liquid & Gaseous Radwaste Effluent Mgt Program IR 05000498/19970131997-09-26026 September 1997 Insp Repts 50-498/97-13 & 50-499/97-13 on 970902-04.No Violations Noted.Major Areas Inspected:Operational Status of Licensee Emergency Preparedness Program IR 05000498/19970201997-09-16016 September 1997 Insp Repts 50-498/97-20 & 50-499/97-20 on 970811-14.No Violations Noted.Major Areas Inspected:Operations Re Annual Operating Requalification Exams 1999-09-03
[Table view] Category:TEXT-INSPECTION & AUDIT & I&E CIRCULARS
MONTHYEARIR 05000498/19990161999-10-0707 October 1999 Insp Repts 50-498/99-16 & 50-499/99-16 on 990808-0918.No Violations Noted.Major Areas Inspected:Aspects of Licensee Operations,Maint,Engineering & Plant Support IR 05000498/19990151999-09-29029 September 1999 Insp Repts 50-498/99-15 & 50-499/99-15 on 990920-24.No Violations Noted.Major Areas Inspected:Licensed Operators Requalification Program IR 05000199/19990121999-09-14014 September 1999 Insp Repts 50-498/99-12 & 50-199/99-12 on 990816-19.Three Violations Noted & Being Treated as Ncvs.Major Areas Inspected:Access Authorization,Assessment Aids,Security Event Logs & Security Program Audits IR 05000499/19990141999-09-0303 September 1999 Insp Repts 50-499/99-14 & 50-499/99-14 on 990627-0807.NCVs Noted.Major Areas Inspected:Aspects of Licensee Operation, Maint,Engineering & Plant Support PNO-IV-99-037, on 990822,Region IV Dispatched Inspector to STP to Relieve Resident Inspectors & to Provide Assistance to STP Nuclear Operating Co,In Anticipation of Hurricane Bret.Representative Was Also Dispatched to FEMA Region VI1999-08-23023 August 1999 PNO-IV-99-037:on 990822,Region IV Dispatched Inspector to STP to Relieve Resident Inspectors & to Provide Assistance to STP Nuclear Operating Co,In Anticipation of Hurricane Bret.Representative Was Also Dispatched to FEMA Region VI IR 05000498/19990081999-08-16016 August 1999 Insp Repts 50-498/99-08 & 50-499/99-08 on 990517-21 & 0607- 10.No Violation Noted.Major Areas Inspected:Corrective Action Program Implementation at Plant IR 05000498/19993011999-07-26026 July 1999 Exam Repts 50-498/99-301 & 50-499/99-301 on 990706-15.Exam results:17 Applicants Passed Exams & Exhibited No Broad Knowledge or Training Weaknesses IR 05000498/19990131999-07-21021 July 1999 Insp Repts 50-498/99-13 & 50-499/99-13 on 990516-0626. Noncited Violations Noted Re Failure to Follow Procedures by Shift Supervisor Authorizing Deviation from Procedure Used to vacuum-fill RHR Sys & to Follow Plant Startup Procedure IR 05000498/19990111999-06-10010 June 1999 Insp Repts 50-498/99-11 & 50-499/99-11 on 990404-0515.No Violations Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant Support IR 05000498/19990091999-05-25025 May 1999 Insp Repts 50-498/99-09 & 50-499/99-09 on 990503-06.No Violations Noted.Major Areas Inspected:Operational Status of Licensee Emergency Preparedness Program ML20206H6361999-05-0505 May 1999 Insp Repts 50-498/99-06 & 50-499/99-06 on 990221-0403. Non-cited Violations Noted.Major Areas Inspected:Operations, Maintenance,Engineering & Plant Support IR 05000498/19990071999-04-22022 April 1999 Insp Repts 50-498/99-07 & 50-499/99-07 on 990405-09. Violations Noted.Major Areas Inspected:Radiation Protection Program Focusing on Unit 1 Refueling Outage Activities IR 05000498/19990101999-04-22022 April 1999 Insp Repts 50-498/99-10 & 50-499/99-10 on 990405-09.No Violations Noted.Major Areas Inspected:Review of Licensee Inservice Exam Program Plan & Schedule & Implementation of Program Plan for Facilities IR 05000498/19990051999-03-29029 March 1999 Insp Repts 50-498/99-05 & 50-499/99-05 on 990301-05.No Violations Noted.Major Areas Inspected:Engineering IR 05000498/19980191999-03-26026 March 1999 Insp Repts 50-498/98-19 & 50-499/98-19 on 990125-0317. Violations Noted.Major Areas Inspected:Operations & Engineering IR 05000498/19990041999-03-24024 March 1999 Insp Repts 50-498/99-04 & 50-499/99-04 on 990222-25. Violations Noted.Major Areas Inspected:Maint ML20205A1601999-03-24024 March 1999 Insp Repts 50-498/99-04 & 50-499/99-04 on 990222-25. Violations Noted.Major Areas Inspected:Maint IR 05000498/19980171999-03-23023 March 1999 Cancellation of Insp Repts 50-498/98-17 & 50-499/98-17.No Insp Rept Will Be Issued for Util with Listed Number IR 05000498/19990021999-03-16016 March 1999 Insp Repts 50-498/99-02 & 50-499/99-02 on 990110-0220. No Violations Noted.Major Areas Inspected:Licensee Operations, Maint,Engineering & Plant Support IR 05000498/19990031999-03-0404 March 1999 Insp Repts 50-498/99-03 & 50-499/99-03 on 990222-25.No Violations Noted.Major Areas Inspected:Plant Support ML20203D5711999-02-10010 February 1999 Insp Repts 50-498/98-15 & 50-499/98-15 on 990614-1123. Violations Noted.Major Areas Inspected:Review of Circumstances Surrounding 980614 Fire in Potential Transformer & Subsequent Deenergization of Switchgear E1B ML20203D5611999-02-10010 February 1999 Notice of Violation from Insp on 980614-1123.Violation Noted:From 980614-0615,period Greater than 8 Hours,Unit 1 Channel III 125-volt Battery Bank E1B11 Inoperable with Reactor in Mode 1 & Reactor Not Placed in Hot Standby IR 05000498/19980111999-02-0404 February 1999 Insp Repts 50-498/98-11 & 50-499/98-11 on 981129-990109.No Violations Noted.Major Areas Inspected:Operations, Maintenance,Engineering & Plant Support IR 05000498/19990011999-01-27027 January 1999 Insp Repts 50-498/99-01 & 50-499/99-01 on 990104-07.No Violations Noted.Major Areas Inspected:Insp Reviewed Implementation of Solid Radwaste Mgt & Radioactive Matl Transportation Programs & Plant Support IR 05000498/19980161998-12-24024 December 1998 Insp Repts 50-498/98-16 & 50-499/98-16 on 981207-10.No Violations Noted.Major Areas Inspected:Plant Support, Including Alarm Stations,Security Equipment,Vital Area Barriers & Detection Aids & Security Event Logs IR 05000498/19980101998-12-22022 December 1998 Insp Repts 50-498/98-10 & 50-499/98-10 on 981018-1125.No Violations Noted.Major Areas Inspected:License Operations, Maint,Engineering & Plant Support ML20196G9171998-12-0202 December 1998 Notice of Violation from Insp on 981102-05.Violation Noted:Licensee Did Not Make Surveys to Ensure Compliance with 10CFR20.1902,requiring Posting of Each Radiation Area with Conspicuous Sign or Signs Bearing Radiation Symbol IR 05000498/19980201998-12-0202 December 1998 Insp Repts 50-498/98-20 & 50-499/98-20 on 981102-05. Violation Noted.Major Areas Inspected:Radiological Controlled Area Access Controls,Radiation Work Permits, Radiological Surveys & pre-job Health Physics Briefings IR 05000498/19980091998-11-12012 November 1998 Insp Repts 50-498/98-09 & 50-499/98-09 on 980906-1017. Violations Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant Support ML20195F2921998-11-12012 November 1998 Notice of Violation from Insp on 980906-1017.Violation Noted:On 980922,Work Order BS-354091 Contained Maint Instructions That Were Inappropriate to Circumstances IR 05000498/19980181998-10-21021 October 1998 Insp Repts 50-498/98-18 & 50-499/98-18 Has Been Canceled.No Insp Rept Will Be Issued IR 05000498/19980081998-09-28028 September 1998 Insp Repts 50-498/98-08 & 50-499/98-08 on 980726-0905.No Violations Noted.Major Areas Inspected:Operations, Maintenance,Engineering & Plant Support IR 05000498/19980141998-08-31031 August 1998 Insp Repts 50-498/98-14 & 50-499/98-14 on 980706-23.No Violations Noted.Major Areas Inspected:Engineering IR 05000498/19980131998-08-14014 August 1998 Insp Repts 50-498/98-13 & 50-499/98-13 on 980804-07.No Violations Noted.Major Areas Inspected:Licensee Performance & Capabilities During full-scale,biennial Exercise of Emergency Plan & Implementing Procedures IR 05000498/19980071998-08-11011 August 1998 Insp Repts 50-498/98-07 & 50-499/98-07 on 980614-0725.No Violations Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant Support IR 05000498/19983011998-07-14014 July 1998 Insp Repts 50-498/98-301 & 50-499/98-301 on 980601-04.No Violations Noted.Major Areas Inspected:Examiners Evaluated Competency of 6 Senior Operator Applicants for Issuance of Operating Licenses at Plant,Units 1 & 2 & Operations ML20236M3011998-07-0808 July 1998 Notice of Violation from Insp on 980503-0613.Violation Noted:Fire Brigade Training Drill Did Not Assess Each Member'S Knowledge of Role in Fire Fighting Strategy for Area Assumed to Contain Fire IR 05000498/19980061998-07-0808 July 1998 Insp Repts 50-498/98-06 & 50-499/98-06 on 980503-0613. Violations Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant Support ML20237E7231998-06-0202 June 1998 EN-98-042:informs Commission That NRC Will Issue Confirmatory Order Modifying Licensee (Effective Immediately) & Exercise Discretion IAW Section VII.B.6 of Enforcement Policy Not to Issue NOV IR 05000498/19980051998-05-18018 May 1998 Insp Repts 50-498/98-05 & 50-499/98-05 on 980322-0502. Violation Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant Support ML20247M4751998-05-18018 May 1998 Notice of Violation from Insp on 980322-0502.Violation Noted:Combustible Matl,Specifically,Wood Scaffold Installed & Remained in safety-related 2A Isolation Valve Cubicle from Feb 1997 Until April 1998,unattended & W/O Evaluation IR 05000498/19980041998-04-20020 April 1998 Insp Repts 50-498/98-04 & 50-499/98-04 on 980214-0321. Violations Noted.Major Areas Inspected:Operations,Maint, Engineering,Plant Support ML20217A8451998-04-20020 April 1998 Notice of Violation from Insp on 980214-0321.Violation Noted:Licensee Updated UFSAR to Reflect New LOCA Radiological Analysis,Which Increased Thyroid Dose to CR Operator,W/O Obtaining Prior NRC Review & Approval ML20217B5581998-03-24024 March 1998 Notice of Violation from Insp on 980104-0214.Violation Noted:Fire Hose Stations Listed in Addendum 3 of Procedure OPGP03-ZF-0018 Not Operable When Equipment in Area to Be Protected Required to Be Operable by TS IR 05000498/19980121998-03-24024 March 1998 Insp Repts 50-498/98-12 & 50-499/98-12 on 980223-27.No Violations Noted.Major Areas Inspected:Licensee Physical Security Program,Including Review of Access Authorization Program,Testing & Maint & Security Program Plans IR 05000498/19980031998-03-24024 March 1998 Insp Repts 50-498/98-03 & 50-499/98-03 on 980104-0214. Violation Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant Support Re Emergency Facilities ML20202D7781998-02-12012 February 1998 Insp Repts 50-498/98-02 & 50-499/98-02 on 980112-15. Violations Noted.Major Areas Inspected:Operations & Plant Support Re Radiation Protection ML20202D7701998-02-12012 February 1998 Notice of Violation from Insp on 980112-15.Violation Noted: Radiation Workers Who Were Likely to Receive Occupational Dose in Excess of 100 Mrems Per Yr Were Not Informed of Presence of Airborne Radioactivity IR 05000498/19970081998-01-23023 January 1998 Insp Repts 50-498/97-08 & 50-499/97-08 on 971116-980103.No Violations Noted.Major Areas Inspected:Operations, Engineering,Maint & Plant Support ML20197F3461997-12-22022 December 1997 Notice of Violation from Insp on 971112.Violations Noted: Programmatic Calculation Deficiencies,First Identified in Observation 92-01-13 Not Promptly Corrected 1999-09-03
[Table view] |
Text
"
.
.
i U.S. NUCLEAR REGULATORY COMMISSION
REGION IV
Docket Nos: 50-498,50-499 License Nos: NPF-76, NPF-80 !
Report No: 50-498/96-07, 50-499/96-07 Licensee: Houston Lighting & Power Company Facility: South Texas Project Electric Generating Station, Units 1 and 2 l l
Location: 8 Miles West of Wadsworth on FM 521 Wadsworth, Texas 77483 ,
Dates: September 8 through October 19,1996 Inspectors: D. P. Loveless, Senior Resident inspector J. M. Keeton, Resident inspector
W. C. Sifre, Resident inspector Approved by: J.1. Tapia, Chief, Project Branch A Division of Reactor Projects l
r l
j
l
,
l
!
'
,
l
)
'
9611130165 961104 PDR ADOCK 05000498 G PDR )
)
._ _ ._ . . ~ . _ _ __ _ _ . _ . _ _ _ . . . _ _ . . - _ - _ _ _
_
,
-
.
!
EXECUTIVE SUMMARY *
South Texas Project, Units 1 and 2 NRC Inspection Report 50-498/96-07;50-499/95-07 This resident inspection included aspects of licensee operations, engineering, maintenance, and plant support. The report covers a 6-week period of resident inspectio Ooerations
- Operators continued to perform professionally with an appropriate focus on reactor safety (Section 01.1).
e Shift turnover activities were attended by managers on a routine basis. Turnover information continued to be detailed, clear, and concise (Section 01.1).
e Material condition of the equipment and cleanliness of plant spaces were considered to be excellent with two isolated examples where housekeeping could have been better (Section O2.1, R1.1, P2).
e A decision to abandon the use of dialindicators for MOV position indication in 1989 was not captured in the training program for nonlicensed reactor operators (Section !
02.1). Licensed operators and the system engineer failed to identify the significance of leakage from the emergency core cooling system into the fuel handling building (Section 02.2).
Maintenance
- Maintenance and surveillance activities were professionally performed by knowledgeable mechanics and technicians (Sections M1.1 and M1.2).
Engineerino
- The design change and associated calculations performed in support of a piping support anomaly in the emergency core cooling system were determined to be acceptable following a detailed review (Section E1.1).
Plant Sucoort
- Radiological controls in the Unit 1 reac' tor containment building were good and housekeeping was considered excellent (Section R1.1).
.. _
,
'
. l Report Details l
l Summary of Plant Status Units 1 and 2 operated at essentially 100 percent reactor power throughout this inspection perio !
l I. Operations l 01 Conduct of Operations 01.1 Control Room Observations (Units 1 and 2)
i Insoection Scope (71707) !
l Using Inspection Procedure 71707, the inspectors routinely observed conduct of ;
operations in the Units 1 and 2 control rooms. Daily control board walkdowns, I attendance at shift turnover meetings, observations of operator performance, and reviews of control room logs and documentation, were performe Observations and Findinas During routine observations and interviews, the inspectors determined that the control room operators were continually aware of existing plant condition ;
Operators responded to annunciator alarms in accordance with approved ]
procedures. Annunciator alarms were promptly announced to the control room staff who, in turn, acknowledged with repeat backs. The unit supervisors remained cognizant of ongoing activitie The inspectors routinely attended shift turnovers. The on-shift operators provided clear and concise information to the oncoming operators. Oncoming operators routinely reviewed the control room logs. Plant mangers and operations managers were often observed attending shift turnover meeting On September 21, during the night shift, the inspector observed an operations staff meeting in the Unit 1 control room conducted by the shift supervisor. The meeting provided a good forum for exchange of information about ongoing activities with good feedback from the reactor plant operators. The site was under a tornado watch and, as a result, the awareness of the condition of equipment within the protected area was emphasize On iieptember 23, the inspector observed the Unit 1 unit supervisor conducting a prejob briefing for a containment entry in accordance with Plant Surveillance Procedure OPSP03-XC-0002, Revision 10, " Containment inspection." The briefing
.
s-2-l
was thorough, with emphasis on the control of debcis and the identification and reporting of abnormal conditions inside containmen Conclusions
.
The inspectors concluded that the operators were performing professionally with an I appropriate focus on safety. Shift turnover meetings were thorough and routinely attended by managemen Operational Status of Facilities and Equipment
O2.1 Plant Tours (Units 1 and 2)
i Insoection Scope (71707)
The inspectors toured portions of the accessible plant areas in Units 1 and 2 on a daily basis. Areas of special attention during this inspection period included:
- Turbine generator building in Unit * Essential cooling water building for Unit * Fuel handling building emergency core cooling pump rooms in Units 1 and * Fuel handling building spent fuel pool cooling and cleanup . system pump and valve rooms in Unit * Protected area yar Observations and Findinas On September 17,1996, the inspector performed a detailed walkdown of the emergency core cooling water system suction piping and the associated supports and structural members. The system alignment matched the valve positions
, indicated on Piping and Instrumentation Diagram SN129F05013, Sheet 1, " Safety injection System." Hangers and supports were properly aligned, and piping components were in good condition. In general, system components were in excellent material condition. One piping support anomaly was identified and reviewed as documented in Section E1.1.b'of this inspection repor The inspector also noted during the walkoown that the local position indicator for several safety-related motor-operated valves (MOVs), including Safety injection Minimum Flow Recirculation Line Isolation Valves 1-MOV S10013A, 1-MOV-S10013B,1-MOV-Sl0013C,1-MOV-S10014A,1-MOV-S100148, and 1 MOV-S10014C, did not accurately reflect the position of the valves. The position indicator consisted of e small dial on the side of the MOV housing. The system
- _ _ _ __ - _______ _ - ____ - .
.
..
)
-3-engineer stated that they had previously evaluated the inaccurate position indicators in 1989 and determined that they would not be used. He also stated that operators had been trained to know that these MOV position indicators were inaccurate and should not be relied upo Two reactor plant operators were interviewed to determine what indication would be used to determine the position of a valve. In both cases, the reactor plant operators stated that, if the valve had a dial indicator, they would refer to that indication. The inspectors also interviewed current control room operators and verified that they were aware that the dial indicators were not to be used. The inspectors verified that operators were informed in 1989 of the decision to abandon the use of the dial indicators. However, this information was not captured in the training program for the nonficensed reactor plant operators. The inspectors could find no evidence that the training program had advised against using these indicators for valve position determination. Discussions with the lead trainer for reactor plant operators disclosed that neither the training plans nor the qualification cards contained information which would alert the reactor plant operators of the inoperable localindicator dials. The inspector informed the shift supervisor that a discrepancy existed between the decision to not use the dialindicators and the knowledge that the reactor plant operators expressed regarding the use of the dial indicators. He acknowledged the concern and ensured that other shift supervisors communicated this to each operating crew. The training department was also informe The inspectors also verified that the lack of knowledge concerning the use of the dialindicators did not represent a potential for misdiagnosing the correct position of a valve. This was accomplished by reviewing applicable operating procedures to verify that nonlicensed operators would not be required to verify valve positions by the sole use of dialindicators. There were no requirements identified which would cause this to happen. As such, the concern was indicative of a failure to capture previously disseminated engineering knowledge into the training program for nonlicensed operator On September 20, the inspector performed a walkdown of the accessible portions of the spent fuel pool cooling and cleanup system in Unit 2. System operability was verified by assuring that valve, electrical, and control board alignments were in the correct positions. Equipment condition was good and no leakage was noted. Area housekeeping was excellent. Only minor discrepancies were identified and reported to the control room shift superviso On September 21, during night shift, the inspector observed a reactor plant operator ,
securing equipment during his routine rounds in the protected area while the site j was under a tornado watc i
!
~
,
.
I
. q
!
'l i
-
-4-
. Conclusions
- The material condition of plant equipment continues to be excellent. The potential
- use of dial indicators on MOVs for verification of valve position by reactor plant operators was inconsistent with management expectations and was not adequately
- addressed in trainin !
-
l j. 02.2 Enaineered Sefety Features Leakaae Contribution to Accident._Q)se Rates I
i Insoection Scone (71707) l
, During a routine inspection of the emergency core cooling system, the inspectors
- questioned the potential for leakage from system valves to cause increased offsite doses following a postulated large-break loss of con! ant accident. On ,
September 11,1996, resident inspectors determined that a valve in the emergency 1 core cooling system had been leaking into the fuel handling building since February 22,1996. This condition, the circumstances surrounding its identification,
{ and the safety significance were reviewed.
, Observations and Findinas Condition Report 96 2271 was written on February 22,1996, to document that ;
water was leaking into the fuel handling building sump from the emergency core
>
cooling system. The condition report designated the leak as a material condition
, which needed to be repaired. This designation, CAO-D, did not require a review for operability or reportability. Based on the historical pumping rate from the sump and
.
decreases in refueling water storage tank water level, licensed operators had quantified the leakage at approximately 300 gallons per day (gpd). Operators had documented that the leakage was assumed to be seat leakage through Pump Suction Relief Valve 2-PSV-394 The system engineer informed the inspector that the relief valve had been scheduled for repairs in 1997. The inspector determined that the estimated leakage from the valve was greater than the design leak rate of 4,140 cubic centimeters per hour documented in Table 15.6-12 of the Updated Final Safety Analysis Report (UFSAR).
The inspector noted that the estimated leak rate of 300 gpd was clearly in excess
, of the approximately 26 gpd maximum leak rate designated in the UFSAR for all
<
components in the three engineered safety features trains. UFSAR
< Section 15.6.5.3.2 describes leakage from engineered safety features components
-
located in the fuel handling building as a potential source of fission product leakage
- following a loss of coolant accident. When informed of this by the inspector, the licensed operators declared Train C of the emergency core cooling system
. inoperable and deenergized the associated containment sump suction valve in the
'
closed position. The leaking valve was later determined to be the Train C high head safety injection pump discharge flush line valve,1-SI-0120C. The valve was cut
- out and replaced.
. .'
>
.
5- !
On October 4,1996, licensee engineers made a preliminary determination that the identified leakage from Valva 1 SI-0120C would have resulted in exceeding the thyroid dose limits of 10 CFR Part 50, Appendix A, General Design Criterion 19,in the Technical Support Center and in the control room. A 1-hour, nonemergency I notification was made in accordance with 10 CFR 50.72 (b)(1)(ii)(B), because the l condition was determined to be outside the design basis of the plant. Additional analyses performed by the licensee engineers since that time indicated that control room operator doses would have remained within General Design Criterion 19 limit However, these new analyses change the initial evaluation by utilizing the actual j
, nasured primary containment leakage rate and not the ma ! mum allowable j i containment leakage rate utilized in the accident analyses and referenced in the Technical Specifications. The adequacy of using the measured leakage rate instead i of the maximum allowable rate has not been reviewe l 4 i
'
i Conclusions
,
Licensed operators and the system engineer failed to identify that leakage from the emergency core cooling system into the fuel handling building was significant and failed to correct the problem in a timely manner. At the end of this inspection
- period, the inspectors were continuing to review the adequacy of the licensee's j
analyses, which were used to retract the nonemergency notification and to find that
- General Design Criterion 19 limits were not exceeded. Therefore, this issue will remain open and will be tracked as Unresolved item (URI) 498
- 499/96007-0 ,
'
\
II. Maintenance l s ,
1 ;
i M1 Conduct of Maintenance i M1.1 General Comments on Field Maintenance Activities Ir)soection Scoce (62707)
j
, The inspectors observed all or portions of the following work activities, identified by their work authonzation numbers:
Unit 1:
- 95013551: Lubrication and Inspection of Reactor Containment Fan Cooler Supply Fan 11C
- 95014563: Lubrication and inspection of Reactor Containment Fan Cooler Supply Fan 12C
- 96093883: Troubleshoot and Repair Normal Power Supply Inverter 8E241 EIVOO2
. .. .. . _ _ _ ._ _ . . . _ . .__
, _ _ _ .
.
f
a E
! -6-
,
.
Ur>!t 2: l
.
l e 94037226: Calibration of ITE-51 Relays on Train C 4160 kV Breaker for
) Essential Cooling Water Pump 2C i
l * 96086596: Lubrication and inspection of Limitorque Actuator for Motor i Operated Valve SI-MOV-0016C i
i j Observations and Findinas l
'
The inspectors found the work performed under these activities professional and ,
thorough. The mechanics and technicians demonstiated a detailed knowledge of :
procedures and equipment associated with the tasks. Supervisors and system ,
engineers were observed monitoring job progress and providing oversigh Conclusions .
,
The inspectors concluded that routine maintenance activities observed were professionally performed by very knowledgeable mechanics and technician Maintenance supervisors were providing an appropriate level of field supervision and oversigh M1.2 General Comments on Surveillance Testina :
' Insoection Scoce (61726)
The inspectors observed all or portions of the following surveillances:
Unit 1:
- Plant Surveillance Procedure OPSP03-SP-0008C, Revision 2: Solid State *
Protection System Train C Slave Relay Test Unit 2:
- Plant Surveillance Procedure OPSP02-HC-0001, Revision 0: Containment Pressure ACOT Observations and Findinas The inspectors found that the testing activities were professional and thorough. All observed tests were performed in accordance with the approved surveillance procedures. Technicians were experienced in and knowledgeable of their assigned tasks. Technicians in training status were appropriately supervised by qualified technicians. Surveillance tests were satisfactorily completed within their Technical Specification required frequencies, and procedures properly implemented the i
k, ,
5 .
!
-7-
!
l surveillance requirements. Test instruments were within their current calibration ,
cycles. Dual verification was observed when required by procedures, and the I technicians informed the control room operators of expected alarm I c. Conclusions The inspectors concluded that the observed surveillance tests were well performed l and fully implemented the associated Technical Specification surveillance '
requirement . Enaineerina l E1 Conduct of Engineering E Review of Emeraency Core Coolina System Structural Sunoort Anomalv Insoection Scone (37551)
The inspectors identified a structural support anomaly in the Train A emergency core cooling system. A review of design change documents and engineering !
calculations supporting the ecceptability of the anomaly was conducte ' Observations and Findinas On September 17,1996, the inspector noted that a piping support bracket on the Train A emergency core cooling system containment sump suction piping was of a different design than the equivalent support for the Trains B and C piping. Since the Train A support did not appear to be as robust as the other supports, the inspector reviewed the associated design calculations. A review of Field Change Request DJ-08125 indicated that the piping support was initially intended to be identical to those on the other trains. However, since the piping was installed slightly offset from the centerline of the wall embed plate, a redesign of the support was required. Engineering Calculation JC-SI-9101-550008 was generated to evaluate the new design. The inspector reviewed the calculation and determined that the design of the support bracket and the weld were acceptable, Conclusion The inspector determined that the licensee's calculation associated with a redesigned support bracket for the conteinment sump recirculation piping was acceptabl . _ _ _ . __- _ . _ . _ _ .__ ..__ _ . _ _. _ _ ._ _
,
-
.
.
.
v 8-IV. Plant Support R1 Radiological Protection and Chemistry Controls R1.1 Tours of Radioloaical Controlled Areas (RCAs) Insoection Scoce (71750) ,
The inspectors routinely toured the RCAs in Units 1 and 2. These tours included observation of work, verification of proper radiological work permits, sampling of locked doors, and observations of entrance and egress from the RCA Observations and Findinas
'
On September 17,1996, the inspectors observed an extension ladder laying across bags labeled as radiological materials in the fuel handling building radiological waste truck bay. The inspectors reported the ladder to a health physics technician who was in the area. The technician stated that the ladder was not properly stored and ;
immediately moved the ladder to its proper storage locatio On September 24, the inspectors toured the accessible portions of the Unit 1 reactor containment building with a health physics technician. Housekeeping was ;
excellent and no loose debris was observed. The technician was knowledgeable ,
about radiological conditions and work in progress inside the containment buildin ; Conclusions Implementation of radiological controls in the Unit 1 reactor containment building were very good and housekeeping was excellent with one isolated exceptio ,
P2 Status of EP Facilities, Equipment, and Resources (71750)
On September 23, the inspector toured the Unit 1 Technical Support Center (TSC).
The facility was in a good emergency readiness state with ne substantive !
discrepancies observed. Minor discrepancies were reported to the shift supervisor and immediately corrected. The inspector also toured the TSC load center and air handling equipment room. The drain valve for the TSC Chilled Water Pump 118 discharge pressure indicator was leaking and appeared to have been leaking for a some time, based on the amount of water on the floor. An unsecured hoist was
- also found adjacent to the TSC air handling unit. The inspector notified the shift
!' supervisor of these conditions. On September 25, the inspector revisited the TSC air handling equipment room and verified the correction of the reported !
! discrepancies. The inspector-identified standing wate from the TSC Chilled Water -
- Pump 11B discharge pressure indicator leak was considered an isolated example of
'
I inattention to detail in plant tour ,
,
.
. _ . . . . . . _ . - _ - . . . . _ . _ _ _ _ . _ . . _ . _ . _ . . .
,
,.- .
i
!
) i i
!
. !
i i
I S1 Conduct of Security and. Safeguards Activities (71750) i i
f On September 21, the inspector toured the protected area boundary during the ;
night shift. Isolation zones were free of obstructions, lighting was appropriate, and j sec'urity officers were observed on routine patrol !
i
!
l I
,
I l
!
i I
l
,
!
,
l
. - - . . , , . _ - . . .I ..
, - - . - - . _ - - . - - - . . . . _ .- , -. - . - - . _ . .
J
. -
j
- ATTACHMENT j PARTIAL LIST OF PERSONS CONTACTED i
Licensee i A. Aldridge, Supervisor, Engineering Specialist i T. Cloninger, Vice President, Nuclear Engineering
K. Coates, Manager, Maintenance 2 i j D. Daniels, Manager, Operating Experience l B. Dowdy, Assistant to Group Vice President i A. Granger, Administrator i J. Groth, Vice President, Nuclear Generation
! E. Halpin, Manager, Design Engineering Department
! W. Harrison, Supervising Licensing Engineer j S. Head, Licensing Supervisor l T. Jordan, Manager, Systems Engineering
, M. Kanavos, Manager, Mechanical Fluid Systems
{ D. Leazar, Director, Nuclear Fuels and Analysis i J. Lovell, Plant Operations Manager, Unit 1
, F. Mangan, General Manager, Plant Services
'
B. Masse, Plant Manager, Unit 2 G. Parkey, Plant Manager, Unit 1 1 D. Rencurrel, Manager, Electrical / instrumentation and Controls
- D. Schulker, Compliance Engineer S. Thomas, Manager, Design Engineering Department W. Waddell, Manager, Maintenance 1 j F. Wagar, General Manager, Human Resources i G. Weldon, Manager, Nuclear Training Department !
INSPECTION PROCEDURES USED IP 37551: Onsite Engineering IP 61726: Surveillance Observations IP 62707: Maintenance Observations IP 71707: Plant Operations IP 71750: Plant Support Activities IP 92901: Followup - Plant Operations IP 92903: Followup - Engineering !
IP 93702: Prompt Onsite Response to Events at Operating Power Reactors
..
.. -
'
2-ITEMS OPENED, CLOSED. AND DISCUSSED Opened I
499/96007-01 URI review the circumstances surrounding the failure of l plant personnel to identify that leakage from the I emergency core cooling system into the fuel handling building was significant i
LIST OF ACRONYMS USED l
gpd gallons per day NRC' Nuclear Regulatory Commission ,
PDR Public Document Room l RCA radiological controlled area l TSC Technical Support Center l UFSAR Updated Final Safety Analysis Report ,
URI unresolved item :