MONTHYEARML20196E8931999-06-16016 June 1999 Rev 0 to 2B11-0001, Core Shroud B214R1 Structural Evaluation ML20155C6921998-10-27027 October 1998 Audit Rept for Audit Conducted on 981006-09 on Implementation of GL 98-01, Year 2000 Readiness of Computer Sys at Npps ML20202D9051998-01-21021 January 1998 Rev 0 to 0VA-0114, Control Bldg Transient Temp Analysis During Spring Conditions ML20216J1151997-09-0303 September 1997 Rev 5 to CP&L-CED-M-01, Mlsb Analysis CR Dose Analysis to Support Power Uprate ML20137Y6491997-03-26026 March 1997 Rev 3 to MSLB Analysis CR Dose Analysis to Support Power Uprate ML20136E8021997-01-24024 January 1997 Rev 0 to Control Room & Offsite Doses Due to Control Rod Drop Accident ML20134L3121996-11-20020 November 1996 Press Release II-96-96, NRC Staff Proposes $150,000 Fine Against CP&L at Brunswick ML20134H2481996-11-13013 November 1996 Press Release II-96-94, NRC Schedules Special Insp Exit Meeting at Brunswick Plant ML20128Q1391996-10-18018 October 1996 Press Release II-96-85, NRC Staff Holds Predecisional Enforcement Conference to Discuss Brunswick Equipment Concerns W/Cp&L ML20133F3741996-09-18018 September 1996 Rev 1 to Brunswick Units 1 & 2 Hydro Test P-T Curve Development ML20202D8941996-09-12012 September 1996 Rev 0 to 0VA-0104, Control Bldg Transient Temp Analysis ML20217N0901995-04-0505 April 1995 Rev 0 to CPL-36Q-303, Comparison of ASME Code App a Versus App G Methodology ML20078Q2201994-12-15015 December 1994 Rev 1 to Caculation CPL-34Q-301, Weld Overlay Repair Design for BSEP Unit 1 Feedwater Safe-End Welds ML20058N8231993-12-22022 December 1993 Undated Package Consisting of Attachment 1 to Employee Concerns Program ML20046A3291992-12-31031 December 1992 Analysis for Bsep,Units 1 & 2 SWS for Analysis for TS 3.7.1.2 Proposed Change. ML20046A3351992-08-11011 August 1992 Bsep,Unit 2 SWS Operating Limits, Reflecting Upgraded NSW Pump Motor Thrust Bearings ML20046A3401992-08-11011 August 1992 Bsep,Unit 1 SWS Hydraulic Analysis, Reflecting Installation of Upgraded NSW Pump Motor Thrust Bearings ML20046A3261992-03-27027 March 1992 Bsep,Units 1 & 2 SW Single Failure Analysis, Reflecting Installation of Plant Mods ML20079M9501991-11-11011 November 1991 Responses to NUMARC Aquatic Resources Survey & Questionnaire to Support Part 51 Rule Change Socioeconomic & Waste Mgt Questions ML20079M9901991-11-11011 November 1991 Responses to NUMARC Aquatic Resources Survey & Questionnaire to Support Part 51 Rule Change Socioeconomic & Waste Mgt Questions ML20067A9871991-01-21021 January 1991 Rev 0 to Flow Evaluation - RHR Valve to Recirculation Tee ML20067A9771991-01-17017 January 1991 Rev 0 to Summary of Stress for Plan Evaluation ML20067A9701991-01-16016 January 1991 Rev 0 to Stress Analysis of RHR Valve to Recirculation Tee ML20066C5371990-12-15015 December 1990 Rev 0 to Through Wall Leak Evaluation for Line 2-SW-234-6-157 ML20065N9511990-11-30030 November 1990 TIP Incident Dose Calculations ML20046A4491989-12-19019 December 1989 BSEP SE Sys Instrumentation & Control Setpoint Review. ML20129F4831985-05-0909 May 1985 Package of Compilations of Results of Operator Licensing & Requalification Exams ML20009G1221981-05-11011 May 1981 Telcon W/D McGuire Re Temporary Loss of Power to Security Sys on 810511.Power Loss Caused Inability to Monitor Security Alarms in CAS & Secondary Alarm Station.Sys Back on Line & Fully Operational.Written Rept Submitted by 810815 1999-06-16
[Table view] Category:PRESS RELEASE OR NEWS ARTICLE
MONTHYEARML20134L3121996-11-20020 November 1996 Press Release II-96-96, NRC Staff Proposes $150,000 Fine Against CP&L at Brunswick ML20134H2481996-11-13013 November 1996 Press Release II-96-94, NRC Schedules Special Insp Exit Meeting at Brunswick Plant ML20128Q1391996-10-18018 October 1996 Press Release II-96-85, NRC Staff Holds Predecisional Enforcement Conference to Discuss Brunswick Equipment Concerns W/Cp&L 1996-11-20
[Table view] |
Text
I
- A United States Nuclear Regulatory Commission office of Public Affairs Region II 101 Marietta Street, Suite 2900 Atlanta, GA 30323 No.
- II-96-94 FOR IMMEDIATE RELEASE Contacts: Ken Clark 404-331-5503 (Wednesday, November 13, 1996)
Roger Hannah 404-331-7878 NRC SCHEDULES SPECIAL INSPECTION EXIT MEETING AT BRUNSWICK PLANT The Nuclear Regulatory Commission staff has scheduled a public exit meeting at Carolina Power & Light's (CP&L) Brunswick nuclear power plant in Southport to discuss the results of an NRC i inspection into potential tampering events at the plant last l week. The meeting is scheduled for 10:30 a.m. Friday, November '
15, in the plant's Training Center. l The potential tampering events involved locks on the plant site that some person or persons attempted to disable. An NRC inspector from the Region II office in Atlanta has been conducting a special inspection this week and will present !
preliminary results of that inspection at the public exit meeting.
CP&L took additional security measures after the potential tampering was discovered and continues to investigate the incidents. The NRC inspection is looking at CP&L's security program in place before the events and the company's responses to the potential tampering.
l 4
9611140013 961113 PDR PRESS R RQ-II-96-094 PDR PRM 140001 o/I !