Summary of 840622 Meeting W/Util Re Integrated Living Schedules,Per Generic Ltr 83-20.List of Attendees Encl
ML20137F003
Person / Time
Site: Turkey Point  NextEra Energy icon.png
Issue date: 07/02/1984
From: Mcdonald D
Office of Nuclear Reactor Regulation
To:
Office of Nuclear Reactor Regulation
Shared Package
ML20136F031 List:
References
FOIA-85-663 GL-83-20, NUDOCS 8601170397
Download: ML20137F003 (3)


Text

' ~

~ . . . .

p, ewtb

/fn cacg'o, UNITED STATES

~

7, NUCLEAR REGULATORY COMMISSION

, i WASWNGTON. D. C. 205S5

% ..../

Docket Nos. 50-250 JUL 2 - !gg and 50-251 LICENSEE: Florida Power and Light Company (FPL)

FACILITIES: Turkey Pont Plant Units 3 and 4

SUBJECT:

SUMMARY

OF MEETING HELD ON JUNE 22, 1984 TO DISCUSS INTEGRATED LIVING SCHEDULES

~

BACKGROUND Generic Letter 83-20, dated May 7,1984, was issued to all licensees -

endorsing the concept of establishin'g implementation schedules for new an'd existing requirements which reflect the importance of the safety requirement ~

to the public health and safety and licensee's ability to complete the necessary engineering, evaluation and design. An enclosure .to the 14,tter was an amendment to the Duane Arnold Energy Center (DAEC) operating .l.icense. 2 The amendment incorporated a licensee condition which appr.oved the  : . . ...

licensee's " Plan for Integrated Scheduling of Plant Modifications,foPpAEC,."

This first step towards development of an industry-wide program eskabl'ish realistic schedules for implementation of safety improvements, both .

utility-initiated and NRC-required, at operating reactors is-in accordan'ce with the Comission's statement of policy and planning guidance for.1983. ~

MEETING

SUMMARY

1.. .

The meeting was opened and all of the participants were introduced'. A~ copy of the list of attendees is included as enclosure 1. The meeting was requested by FPL and Mr. J. Burford (FPL) briefly discussed the purpose of '

the meeting. The FPL staff is in the early stages of developing a. resource based Living Schedule and requested that the NRC staff provide feddba,ck and insight into methodologies and processess being used and found accepta,ble for establishing priorities and schedules. ,'

.c The NRC staff indicated that the Commission's 1984 Policy and' Plant (ink. . ,

Guidance cortinues to put a high emphasis on Integrated Implementaflon.~. -

Scheduling. The integrated concept is a cooperative effort necessary'.io develop an orderly process for managing plant changes on a realistic basis and thus becomes an effective management tool for optimizing allocation cf.

resources. A fonnal license condition or amendment is necessary..to show. r good faith and confirm an agreement between the NRC and licensees trOmeeting schedules for implementing necessary plant modifications. The NRC siiaff' strongly emphasised that the methodology and process for priorit.izincj,ahd establishing the " Integrated Living Schedule" is the subject of.the Jicense-condition, not the schedule itself. , 7 .: , "

~

B601170397 B51218 ~ 5 : r. 9 , .

PDR FOIA '

RYANB5-663 PDR _.

.. A" C.[3

.a l

  • L
r. * ~. .

2-JUL 2 1984 The advantages derived once the methodology and process has been formally approved are appropriate order of priority; integration of all NRC and FPL projects; provisions for changing s'chedules established and; confirmatory Orders relating to schedules and implementation, such as Supplement I to NUREG-0737, would not be necessary.

CONCLUSION The NRC staff indicated that considerable benefits, both for industry and regulators, would result from a joint, good faith effort. Some of the '

methodologies that could be considered for establishing prio'tities and integrating efforts are engineering judgement, analytic hearchy, risk based cost-cenefit analysis or combinations of these. The staff further indicated that they would work with FPL in the selection, refinement and implementation of the methodology best suited for the Turkey Point Plant for

, establishing priorities and integrating existing and new efforts.

,) ) *-

a .- A , &: A Daniel G. Mcdonald, Project Manager Operating Reactors Branch el Division of Licensing i

Enclosure:

As stated cc w/ enclosure:

See next page i

l

w_ .. ,

4

_3.

ENCLOSURE-ATTENDANCE LIST

, INTEGRATED LIVING SCHEDULES MEETING NRC - FPL ,

JUNE 22, 1984 Daniel G. Mcdonald - NRC/DL PM Turkey Point-John N. Hannon NRC/DL TA/DL .

Stephen A. Elrod - NRC RII Section Chief Jack De Mastry FP&L Manager-Nuc. Lic.

Donald E. Sells- 'NRC/DL PM St. Lucie

. David R. Cooper. FPL Licensing Engineer

' Jerry N. Burford

~

FPL Supervisor . Licensing

S. Varga NRC DL O. B. Vassallo NRC DL
.

4 G. Lainas NRC DL 1-i A