MONTHYEARML20206B3411998-12-31031 December 1998 Annual Radiological Environmental Operating Rept for North Anna Power Station & ISFSI for Jan-Dec 1998. with ML20207B2871998-12-31031 December 1998 App B Environ Protection Plan 1998 Annual Rept. with ML20217E8681997-12-31031 December 1997 Radioactive Effluent Release Rept for North Anna Power Station,Units 1 & 2 for Reporting Period of Jan-Dec 1997 ML20217F1141997-12-31031 December 1997 Environ Protection Plan 1997 Annual Rept ML20217H4861997-12-31031 December 1997 Radiological Environ Monitoring Program for 970101-1231 ML20202E0881996-12-31031 December 1996 Corrected Table 1A to Annual Radioactive Effluent Release Rept, for Period Jan-Dec 1996 ML20138A4931996-12-31031 December 1996 App B Environ Protection Plan 1996 Annual Rept ML20138B5081996-12-31031 December 1996 Annual Radioactive Effluent Release Rept for North Anna Power Station for Period Jan-Dec 1996 ML20138D7121996-12-31031 December 1996 1996 Annual Radiological Environ Operating Rept ML20107M4711995-12-31031 December 1995 Annual Radioactive Effluent Release Rept North Anna Power Station (Jan-Dec 1995) ML20108C5281995-12-31031 December 1995 1995 Annual Radiological Environ Operating Rept ML20107K1941995-12-31031 December 1995 Environ Protection Plan 1995 Annual Rept ML20082M6411994-12-31031 December 1994 1994 Annual Radiological Environ Operating Rept ML20082N4091994-12-31031 December 1994 Annual Radioactive Effluent Release Rept North Anna Power Station Jan-Dec 1994 ML20082U7731994-12-31031 December 1994 Annual Environ Operating Rept for North Anna Power Station Units 1 & 2 for 1994 ML20065P6761993-12-31031 December 1993 1993 Annual Radiolgical Environ Operating Rept ML20063L6531993-12-31031 December 1993 Radioactive Effluent Release Rept North Anna Power Station Jul-Dec 1993 ML20029D4021993-12-31031 December 1993 App B Environ Protection Plan 1993 Annual Rept. W/940427 Ltr ML20056G9101993-06-30030 June 1993 Radioactive Effluent Release Rept North Anna Power Station Jan-June 1993 ML20045B0411993-06-0808 June 1993 Results of Settlement Monitoring Survey & Graphs. W/930608 Ltr ML20114B7641992-06-30030 June 1992 Radioactive Effluent Release Rept,North Anna Power Station, Jan-June 1992 ML20101S6201992-06-30030 June 1992 NPDES Discharge Monitoring Rept for June 1992 for North Anna Power Station ML20092M3341991-12-31031 December 1991 Recorded Annual Whole Body Exposure Rept for Jan-Dec 1991 ML18153C9161991-12-31031 December 1991 Semiannual Performance Data Rept for Jul-Dec 1991. W/ 920228 Ltr ML20101B0851991-12-31031 December 1991 Annual Environ Operating Rept for North Anna Units 1 & 2, 1991 ML20101B0121991-12-31031 December 1991 1991 Annual Radiological Environ Operating Rept ML20092M8961991-12-31031 December 1991 Radioactive Effluent Release Rept for North Anna Power Station, for Jul-Dec 1991 ML20082K8151991-06-30030 June 1991 Radioactive Effluent Release Rept for North Anna Power Station,Units 1 & 2 for Period Jan-June 1991 ML20029A5691990-12-31031 December 1990 Radioactive Effluent Release Rept,North Anna Power Station, Jul-Dec 1990. W/910218 Ltr ML20073G4001990-12-31031 December 1990 1990 Annual Radiological Environ Operating Rept ML20066J6091990-12-31031 December 1990 Recorded Annual Whole Body Exposure Rept for North Anna Power Station for 1990 ML20073G9911990-12-31031 December 1990 Annual Environ Operating Rept for 1990 ML20058Q3891990-08-16016 August 1990 Addendum to Semiannual Radioactive Effluent Release Rept for Jan-June 1989 ML20064A2541990-06-30030 June 1990 Radioactive Effluent Release Rept,North Anna Power Station,Jan-June 1990 ML20006F2031989-12-31031 December 1989 Recorded Annual Whole Body Exposure Rept 1989. W/900220 Ltr ML20042E9721989-12-31031 December 1989 1989 Radiological Environ Monitoring Program Rept. W/900430 Ltr ML20042E8721989-12-31031 December 1989 App B Environ Protection Plan,1989 Annual Rept. W/900430 Ltr ML20246N3371989-06-30030 June 1989 Radioactive Effluent Release Rept for Jan-June 1989. W/ ML20235Z3761988-12-31031 December 1988 Recorded Annual Whole Body Exposure Rept 1988 ML20085M6401988-12-31031 December 1988 Environ Study of Lake Anna & Lower North Anna River,Annual Rept for 1988,Including Summary of 1986-1988 ML20245F5341988-12-31031 December 1988 App B Environ Protection Plan,1988 Annual Rept ML20245J6341988-12-31031 December 1988 Radiological Environ Monitoring Program for 1988 ML20235U3721988-12-31031 December 1988 Radioactive Effluent Release Semiannual Rept,Jul-Dec 1988 & Portions of Revised Offsite Dose Calculation Manual ML20153G1001988-06-30030 June 1988 Semiannual Radioactive Effluent Release Rept North Anna Power Station Jan-June 1988 ML20151T7381987-12-31031 December 1987 App B Environ Protection Plan 1987 Annual Rept ML20149N0311987-12-31031 December 1987 Semiannual Radioactive Effluent Release Rept for Jul-Dec 1987 ML20151Y3091987-12-31031 December 1987 Radiological Environ Monitoring Program for 1987 ML20149N1021987-12-31031 December 1987 Recorded Annual Whole Body Exposure Rept for North Anna Power Station for 1987 ML20237K4051987-06-30030 June 1987 Semiannual Radioactive Effluent Release Rept,North Anna Power Station,Jan-June 1987 ML20238D8241986-12-31031 December 1986 Revised Radiological Environ Monitoring Program for 1986 1998-12-31
[Table view] Category:TEXT-ENVIRONMENTAL REPORTS
MONTHYEARML20207B2871998-12-31031 December 1998 App B Environ Protection Plan 1998 Annual Rept. with ML20206B3411998-12-31031 December 1998 Annual Radiological Environmental Operating Rept for North Anna Power Station & ISFSI for Jan-Dec 1998. with ML20154H0991998-10-0909 October 1998 NPDES Noncompliance Notification:On 981005,unauthorized Point of Discharge Occurred Due to CT Overflowing for Approx Two Minutes.Caused by Failure of Valve to Close Properly. Station Personnel Collected Samples of Discharge ML20217F1141997-12-31031 December 1997 Environ Protection Plan 1997 Annual Rept ML20217H4861997-12-31031 December 1997 Radiological Environ Monitoring Program for 970101-1231 ML20217E8681997-12-31031 December 1997 Radioactive Effluent Release Rept for North Anna Power Station,Units 1 & 2 for Reporting Period of Jan-Dec 1997 ML20202E0881996-12-31031 December 1996 Corrected Table 1A to Annual Radioactive Effluent Release Rept, for Period Jan-Dec 1996 ML20138D7121996-12-31031 December 1996 1996 Annual Radiological Environ Operating Rept ML20138B5081996-12-31031 December 1996 Annual Radioactive Effluent Release Rept for North Anna Power Station for Period Jan-Dec 1996 ML20138A4931996-12-31031 December 1996 App B Environ Protection Plan 1996 Annual Rept ML20107M4711995-12-31031 December 1995 Annual Radioactive Effluent Release Rept North Anna Power Station (Jan-Dec 1995) ML20108C5281995-12-31031 December 1995 1995 Annual Radiological Environ Operating Rept ML20107K1941995-12-31031 December 1995 Environ Protection Plan 1995 Annual Rept ML20078H9151995-01-26026 January 1995 NPDES Noncompliance Notification:On 950120,structural Failure of Fiberglass Tank Allowed Water Containing H-901-G to Spill Into Chemical Addition Bldg Sumps.Reason(S) for Equipment Failure & Necessary C/A Under Investigation ML20082U7731994-12-31031 December 1994 Annual Environ Operating Rept for North Anna Power Station Units 1 & 2 for 1994 ML20082N4091994-12-31031 December 1994 Annual Radioactive Effluent Release Rept North Anna Power Station Jan-Dec 1994 ML20082M6411994-12-31031 December 1994 1994 Annual Radiological Environ Operating Rept ML20076F9441994-10-13013 October 1994 Vpdes Noncompliance Notification:On 940920,sewage Treatment Plant Upsets Occurred,Impacting Facilities Discharging Via Outfall 007 & Outfall 011.Operations Will Be Monitored & Adjustments Made to Bring Units Back Into Acceptable Level ML20070G4451994-07-14014 July 1994 NPDES Noncompliance Notification:On 940709,oil Spill to North Anna River Occurred.Caused by High Winds Associated W/ Violent Thunderstorm Dislodging Oil Drums Into River.After Removal of Drums & Bucket,Light Oil Sheen Dissipated ML20069N4211994-06-17017 June 1994 NPDES Noncompliance:On 940501,oil Discharged from Hydraulic Oil Reservoir Below Lake Anna Main Dam.Caused by Worn o-ring in Inlet Valve Key Lock Switch.Switch Replaced & All Hose Replaced.Listed Options Being Evaluated ML20070P8161994-05-0505 May 1994 NPDES Noncompliance Notification:On 940501,hydraulic Oil Leak Discovered on Hydro Unit 5A Located Below Lake Anna Dam.Unit Immediately Shut Down & Oil Cleaned Up from Around Leak Area.Leak Repaired & Hydro Unit Returned to Svc 940502 ML20064F0641994-03-0404 March 1994 NPDES Noncompliance Notification:On 940228,discovered Clog in Sewer Leading to Package Treatment Plants,Discharge Through 005 & 007 Caused by Backup in Sewer.Sewage Solids Cleaned in Overflow Areas & Repaired Pipe Cleanout ML20063H5201994-01-31031 January 1994 NPDES Noncompliance Notification:On 940125,facility Experienced Unusual Discharge of Chromate to Clarifier from Leak in Component Cooling Sys.Caused by Defective HX Tubes. Leaking Tubes Replaced to Stop Loss of Chromate from Sys ML20065P6761993-12-31031 December 1993 1993 Annual Radiolgical Environ Operating Rept ML20063L6531993-12-31031 December 1993 Radioactive Effluent Release Rept North Anna Power Station Jul-Dec 1993 ML20029D4021993-12-31031 December 1993 App B Environ Protection Plan 1993 Annual Rept. W/940427 Ltr ML20058G0291993-11-30030 November 1993 NPDES Noncompliance Notification:On 931122,discovered Leak in Closed CCS Which Determined to Contain 0.36 Parts Per Million Cr-04.Caused by Addl HX Tubes in Same Component as Similiar Leak Reported on 931102.Leaking Tubes Plugged ML20059G9251993-11-0505 November 1993 NPDES Noncompliance Notification:On 931101,determined That Approx .7 Lb of Cr-04 Released Per Day Through Clarifier Discharge Point (Outfall 003).Caused by Leak in Closed Ccs. Leaking Equipment Isolated & Repairs Made ML20056G9101993-06-30030 June 1993 Radioactive Effluent Release Rept North Anna Power Station Jan-June 1993 ML20045B0411993-06-0808 June 1993 Results of Settlement Monitoring Survey & Graphs. W/930608 Ltr ML20128D3041993-01-22022 January 1993 NPDES Noncompliance Notification:On 930108,discharge of Condensate from Condenser Hotwell Via Previously Unreported Pipe to Circulating Water Tunnel Occurred.No Pollutants Involved & No Environ Damage Noted ML20104B4661992-09-10010 September 1992 NPDES Noncompliance Notification:On 920904,discharge of Potassium Chromate Through Outfall 003 Occurred.Caused by CCW Sys Leaking Into Secondary Sys Blowdown Through Hx. Blowdown Sys Isolated & Sys Returned to Normal Operation ML20099H0971992-08-12012 August 1992 NPDES Noncompliance Notification:On 920613 Spill Originated from Overfilled Chemical Addition Tank Inside Turbine Bldg. Approx 161 Lbs of Hydrazine Solution Spilled.No Unpermitted Release to Environ Occurred.Surveillances Increased ML20114B7641992-06-30030 June 1992 Radioactive Effluent Release Rept,North Anna Power Station, Jan-June 1992 ML20101S6201992-06-30030 June 1992 NPDES Discharge Monitoring Rept for June 1992 for North Anna Power Station ML20094H5601992-03-0404 March 1992 NPDES Noncompliance Notification:On 920226,diesel Fuel Oil Leak Discovered at Fuel Pumphouse Coming from Fuel Oil Transfer Sys.Caused by Broken Fuel Pump Strainer Drain. Fuel Trapped in Pipe Pumped Into Vacuum Tank Truck ML20092M3341991-12-31031 December 1991 Recorded Annual Whole Body Exposure Rept for Jan-Dec 1991 ML20092M8961991-12-31031 December 1991 Radioactive Effluent Release Rept for North Anna Power Station, for Jul-Dec 1991 ML20101B0121991-12-31031 December 1991 1991 Annual Radiological Environ Operating Rept ML18153C9161991-12-31031 December 1991 Semiannual Performance Data Rept for Jul-Dec 1991. W/ 920228 Ltr ML20101B0851991-12-31031 December 1991 Annual Environ Operating Rept for North Anna Units 1 & 2, 1991 ML20085M5781991-11-11011 November 1991 Section 316(a) Demonstration for North Anna Power Station: Environ Studies of Lake Anna & Lower North Anna River. Undated Document ML20082K2481991-08-23023 August 1991 Informs of 910704 Oil Spill at Facility.Oil Soak Pads Placed in Fuel Oil Truck Unloading Area Spill Basin,Storm Drain Area,Oil Separator Weir at Discharge Canal,Oil Boom at Discharge Canal & Oil Boom at End of Discharge Canal ML20082K8151991-06-30030 June 1991 Radioactive Effluent Release Rept for North Anna Power Station,Units 1 & 2 for Period Jan-June 1991 ML20066J2721991-02-21021 February 1991 NPDES Noncompliance Notification:On 910217.product Level in Chemical Storage Tank Significantly Reduced Due to Failure of Level Indication Sys Which Allowed Siphoning of Stored Water Treatment Chemical to Discharge ML20070A7521991-01-21021 January 1991 NPDES Noncompliance Notification:On 910115,approx 110,000 Gallons of Makeup Water Discharged to Storm Drain That Empties Into Discharge Canal Via Outfall 004.Caused by Need to Clean & Paint Tank.Personnel Instructed ML20066F8401991-01-18018 January 1991 Confirms 910116 Telcon Rept of 910116 Oil Spill.Caused by Rain Washing Oil Off Outside of Drums of Waste Diesel Fuel Loaded on Truck.Absorbant Pads Placed Around Truck & Path to Runoff to Stormdrain ML20073G9911990-12-31031 December 1990 Annual Environ Operating Rept for 1990 ML20073G4001990-12-31031 December 1990 1990 Annual Radiological Environ Operating Rept ML20066J6091990-12-31031 December 1990 Recorded Annual Whole Body Exposure Rept for North Anna Power Station for 1990 1998-12-31
[Table view] |
Text
. ..
VRGINI A El.ECI MIC ANI) POWER CONH%NY Rsciistost), Vano:NIA 2326 April 21, 1997 United States Nuclear Regulatory Commission Serial No.97-244 Attention: Document Control Desk NAPS /JHL Washington, D. C. 20555 Docket Nos. 50-338 50-339 License Nos. NPF-4 NPF-7 Gentlemen:
VIRGINIA El.ECTRIC AND POWER COMPANY NORTH ANNA POWER STATION UNITS 1 AND 2 ANNUAL ENVIRONMENTAL OPERATING REPORT Pursuant to Section 5.4.1 of the Appendix B Technical Specifications, Environmental Protection Plan, enclosed is the Annual Environmental Operating Report for Nort.1 Anna Power Station Unit Nos.1 and 2 for 1996. j No new commitments are intended as a result of this letter. If you have any questions or require additional information, please contact us. l l
Very truly yours,
- Y
'/N S. P. Sarver, Acting Manager i Nuclear Licensing and Operations Support l Enclosure cc: U. S. Nuclear Regulatory Commission 1 Region 11 C 00l /
101 Marietta Street, N. W.
Suite 2900 Atlanta, Georgia 30323 NRC Senior Resident inspector North Anna Power Station
- M** E 8s n aa b ei
, ,; ll.. ll I.lO .III.ll.Ill. I.I
.-. -. . _ . _ . . . -- - . . . ~ . - - - . - . -
l VIRGINIA ELECTRIC AND POWER COMPANY NORTH ANNA POWER' STATION j UNITS 1 AND 2 APPENDIX B ENVIRONMENTAL PROTECTION PLAN 1996 ANNUAL REPORT DOCKET NOS. 50-338 AND 50-339 l
1 I
l l
i
e .
., . l i
i INTRODUCTION l This 1996 Environmental Operating Report for the North Anna Power Station is submitted by Virginia Electric and Power Company I as required under Section 5.4.1 of Appendix B, Environmental ,
Protection Plan (EPP). The objectives of the EPP are to verify j that the power station is operated in an environmentally acceptable !
i manner, to coordinate NRC requirements, maintain consistency with l t
other federal, state and local requirements, and to keep the NRC ,
informed of the environmental effects of facility construction and !
operation. During 1996, no significant adverse environmental i f
impact occurred as a result of the operation of North Anna Power Station, Units 1 and 2. Aquatic issues are addressed in the J licensee's VPDES permit number VA 0052451 issued by the Virginia )
J State Water Control Board. The VPDES permitting program is administered by the Department of Environmental Quality-Water Division and the NRC relies on this agency for regulation of matters involving water quality and aquatic biota.
Listed below are the summaries and reports as required under Section 5.4.1 of the EPP.
PLANT DESIGN AND OPERATION (SECTION 3.1) j i
There were no changes in station design and operation proposed !
in 1996 that involved a potentially significant unreviewed i environmental issue.
]
(1)
F EROSION CONTROL INSPECTION - SITE (SECTION 4.2.2.1) j An on-site erosion control inspection was performed at North Anna Power Station by the Civil / Design Engineering Department' j beginning November 4, 1996 and ending on December 16, 1996, according to Periodic Test Procedures 1-PT-9.3, Erosion Control Inspection - Station Site. Erosion was minor or non-existent in most areas, however, three areas were determined to require remedial attention. Some erosion was noted beside the road below the former in-processing center, this ditch was filled in and covered with asphalt. The concrete downcommer along the East side of the old Unit Three intake was noted to have fallen in. The concrete was removed, new fill compacted and the area covered with a geomembrane. A concrete curb was constructed above this area and tied into existing curbs on either end to prevent future erosion.
Some new erosion was noted in the borrow pit area, erosion ditches were filled in and the existing straw bale / fabric siltation fence was restored.
EROSION AND SEDIMENT CONTROL PROGRAM - CORRIDOR RIGHTS-OF-WAY (SECTION 4.2.2.2)
Erosion inspections were made on the following corridor g rights-of-way during 1996: North Anna - Midlothian; North Anna -
Morrisville; North Anna - Gordonsville; and North Anna - Ladysmith.
4 There were no locations recorded on these lines where significant erosion had occurred. No herbicides were used in these areas l l
during 1996.
(2) r
. -. . . ~ . - . . .
A NONCONPLIANCE (SECTION 5.4.1)
There'were~no Environmental Protection Plan occurrences of noncompliance during 1996.
NONROUTINE REPORTS (SECTION 5.4.2) '
i There was one nonroutine event during 1996 which resulted in i
three VFDES exceptions. This event was the result of a Unit 1 reactor trip previously reported in LER Report No.50-338/96-005-00.
The cover letter for the Discharge Monitoring Reports (DMR's) for that month and the applicable DMR are attached (pages 4-6).
1 (3)
I
. Ihr OJ)owlhv4tt) l Mhund \ orginia 2311i j l
4 September 5, 1996 CERTIFIED MAIL RETURN RECEIPT REOUESTED y,RGWiA POWER Department of Environmental Quality Water Regional Office 116 North Main Street l i
P. O. Box 268 Bridgewater, Virginia 22812 l Gentlemen:
Re: NORTH ANNA POWER STATION -
DISCHARGE MONITORING REPORT FOR AUGUST 1996.
i Attached is the original of the Aucust 1996 Discharge Monitoring :
Report for North Anna Power Station.
This report is required by and prepared specifically for the Virginia Department of Environmental Quality. It represents truly, accurately, and completely the observed results of measurements and analyses required by the State to be performed and submitted, but only such results. It is not intended as an assertion of the accuracy of any instrument, reading or analytical result, nor is it an endorsement of the suitability of any analytical or measurement procedure.
The following information is presented as required by part II, Section F.2. of VPDES permit No. VA0052451 concerning outfall 013.
The turbine building sump high-volume sump pumps were utilized for a total of eleven minutes between 1130 hours0.0131 days <br />0.314 hours <br />0.00187 weeks <br />4.29965e-4 months <br /> and 1300 hours0.015 days <br />0.361 hours <br />0.00215 weeks <br />4.9465e-4 months <br /> on August 27, 1996 in response to turbine building sump high levels. i Approximately 9,900 gallons of water was discharged through outfall I 013, the permitted outfall for these pumps. Samples were taken as required (at 1206 hours0.014 days <br />0.335 hours <br />0.00199 weeks <br />4.58883e-4 months <br />) with the following results outside of permit limits: pH -- 9.13 SU, and oil and grease -- 24.6 mg/L (see j
, DMR for outfall 013). The turbine building sumps normally '
discharge through outfall 104 after being processed through an oil separator with pH taken at the end of the discharge canal.
The turbine building sump high levels were a result of a Unit i reactor trip and subsequent malfunction of several relief valves to reseat properly, increasing the amount of leak-by water into the sumps. This is the first time these pumps have been used in more than five years and their future use is neither planned nor anticipated. All mechanical problems with the relief valves have been corrected and future problems of this magnitude are not anticipated.
I 1
l l
information
~
If you have any questions or desire additional'
' concerning this submittal, please contact Mr. Carter Cooke at (540) 894-2856.
. Sincerely,
&JAWY W. R. Matthews
_o Station Manager 4
bc: w/ attachment J. K. Puckett - IN-1E !
A. C. Cooke D. L. Huffman
PEmf7EE NAMMMSSpMCLUDE COMMONWEALTH OF VIRGINIA '
FACIUTY pIAMBLOCAT10N D DIFFERfCT) DEPARTMENT OF ENVIRONMENTAL OUALITY '
i matteAL MLLUTJerT Distanaat RLEISATim STEftutspets) INDUSTRIAL MAJOR Ots, i DIscaARGE MONITOR 230G REPORT (m ggpy_ gp g , ,
(REGIONAL OFFICE) !
NAME VEPCO-NORTH ANNA ,
^ "'** VA0052451 013 5000 DOMINION BOULEVARD VALLEY REGIONAL OFFICE PERMiTNoMeER *L" P. O. BOX 268 GLEN ALLEN, VA 23060 MONITORING PERICO BRIDGENATER, VA. 22812 FAC lu ry YM MO OAY YEAR MO DAY 540-828-2595 LOCATION FILE NO. 22-4740. FRoM 96 08 01 TO 96 08 31 NOTE ; READ PERMf7 AND GENERAL INSTRUCTIONS "
BEFORE COMPLETING THIS FORM. ,
OllANTITY OR I OATMNG OUALITY OR CONCENTRATION PARAMETER FREQJENCY AVERAGE M AXIM UM U NITS MINIM UM AVERAGE M AXtM UM UNf78
$ et ANALYSIS E 001 0.0099 0.0099 ************** ************** **************
REPORTED MGD O 1/M EST FLOW -- -
NL NL *"""*"*** ***"******** * * " " " " " "
1/M EST
' 002 REPORTED ************** * * * * " * * * * "
- 9.13 ************* 9.13 1 1/M GRAB PH -- *****a******* *************
SU 6.0000 a"a********* 9.0000 1/M GRAB 004 TOTAL ***""****" *"***"**"" *****"a**"* ,
25.5 25.5 0 SUS. SOLIDS REPORTED MGIL 1/M GRAB
__ ............. ............. u......u.*** 30.0000 100.0000 1/M GRAB 500 0lL & ************* * * * * * * * * * * " " *""""**aa REPORTED 24.s 24.6 2 1/M GRAB ggg MG/L
_==,r ............. ............. ..........***
15.0000 20.0000 1/M GRAB REPORTED
~__
i i
REPORTED l --
l l
5 REPORTED
~
t l !
i
)
REPORTED r
l ._._ t l Aor'tTaonAL tranIT atoularnENTs on connzurs:
TMAL TOTAL FLOW TOTAL BOD 5 BYPASSES occuantNets eu o ) tro)
OPERAJOp IN RESPOPMBLE CHARGE DATE OVE LOWS N/A N/A N/A ENN NEM M # M
. E E""nu'"CT"o"."on"s t o h "'E* E'"w*"""s?EM'oEsus.coTo"EET mA TYPED OR PRINTED NAREE SIGNATURE CERTTPICATE 100. YEAR 94 0 day
"".,'a*Jv"E7nnTon"i eas'E="" I* E"m"EIvE""o'n"m"os"E"""E *E* S PResectPAL EXECUT2WE OFFICER OR AUTHORIZED AGENT TELEPHOpeE DATE
_E rOn GATHERS.G THE FORMATION.THE W.FORMAYlON SumarrTEDIS TOTHE SEST or My NNOWLEDGE AND BEUEF TIquE. AC COM MAugW l w me icmT.ne=a n Tu ron a son uNo r=
n.tarf.C.u.nATE T
AN.D. rom PLE.TF. I.A.etuoD.A.HEACOCK Twe oss uTvo tE THA,T THE.RE ARE ,, e niso a wxAfo.M I.
s sEE nus c..iam Anonuse.im en.AtTes 96 09 05 540 894 2108 u gnoEs gEgy rus ue To omam Ano on wumam amosonmen ac yy,,,,,,,,,,,,,, , g y,g, , y,,, ,, ,,y c uuc n u p n n mo. . < -- - - -
. . _ _ _ _ _ _ _ _ . _ . _ , . _ . _ _