App B Environ Protection Plan 1996 Annual Rept
ML20138A493
Person / Time
Site: North Anna  Dominion icon.png
Issue date: 12/31/1996
From: Sarver S
VIRGINIA POWER (VIRGINIA ELECTRIC & POWER CO.)
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
97-244, NUDOCS 9704280089
Download: ML20138A493 (8)


Text

. ..

VRGINI A El.ECI MIC ANI) POWER CONH%NY Rsciistost), Vano:NIA 2326 April 21, 1997 United States Nuclear Regulatory Commission Serial No.97-244 Attention: Document Control Desk NAPS /JHL Washington, D. C. 20555 Docket Nos. 50-338 50-339 License Nos. NPF-4 NPF-7 Gentlemen:

VIRGINIA El.ECTRIC AND POWER COMPANY NORTH ANNA POWER STATION UNITS 1 AND 2 ANNUAL ENVIRONMENTAL OPERATING REPORT Pursuant to Section 5.4.1 of the Appendix B Technical Specifications, Environmental Protection Plan, enclosed is the Annual Environmental Operating Report for Nort.1 Anna Power Station Unit Nos.1 and 2 for 1996. j No new commitments are intended as a result of this letter. If you have any questions or require additional information, please contact us. l l

Very truly yours,

- Y

'/N S. P. Sarver, Acting Manager i Nuclear Licensing and Operations Support l Enclosure cc: U. S. Nuclear Regulatory Commission 1 Region 11 C 00l /

101 Marietta Street, N. W.

Suite 2900 Atlanta, Georgia 30323 NRC Senior Resident inspector North Anna Power Station

M** E 8s n aa b ei

, ,; ll.. ll I.lO .III.ll.Ill. I.I

.-. -. . _ . _ . . . -- - . . . ~ . - - - . - . -

l VIRGINIA ELECTRIC AND POWER COMPANY NORTH ANNA POWER' STATION j UNITS 1 AND 2 APPENDIX B ENVIRONMENTAL PROTECTION PLAN 1996 ANNUAL REPORT DOCKET NOS. 50-338 AND 50-339 l

1 I

l l

i

e .

., . l i

i INTRODUCTION l This 1996 Environmental Operating Report for the North Anna Power Station is submitted by Virginia Electric and Power Company I as required under Section 5.4.1 of Appendix B, Environmental ,

Protection Plan (EPP). The objectives of the EPP are to verify j that the power station is operated in an environmentally acceptable  !

i manner, to coordinate NRC requirements, maintain consistency with l t

other federal, state and local requirements, and to keep the NRC ,

informed of the environmental effects of facility construction and  !

operation. During 1996, no significant adverse environmental i f

impact occurred as a result of the operation of North Anna Power Station, Units 1 and 2. Aquatic issues are addressed in the J licensee's VPDES permit number VA 0052451 issued by the Virginia )

J State Water Control Board. The VPDES permitting program is administered by the Department of Environmental Quality-Water Division and the NRC relies on this agency for regulation of matters involving water quality and aquatic biota.

Listed below are the summaries and reports as required under Section 5.4.1 of the EPP.

PLANT DESIGN AND OPERATION (SECTION 3.1) j i

There were no changes in station design and operation proposed  !

in 1996 that involved a potentially significant unreviewed i environmental issue.

]

(1)

F EROSION CONTROL INSPECTION - SITE (SECTION 4.2.2.1) j An on-site erosion control inspection was performed at North Anna Power Station by the Civil / Design Engineering Department' j beginning November 4, 1996 and ending on December 16, 1996, according to Periodic Test Procedures 1-PT-9.3, Erosion Control Inspection - Station Site. Erosion was minor or non-existent in most areas, however, three areas were determined to require remedial attention. Some erosion was noted beside the road below the former in-processing center, this ditch was filled in and covered with asphalt. The concrete downcommer along the East side of the old Unit Three intake was noted to have fallen in. The concrete was removed, new fill compacted and the area covered with a geomembrane. A concrete curb was constructed above this area and tied into existing curbs on either end to prevent future erosion.

Some new erosion was noted in the borrow pit area, erosion ditches were filled in and the existing straw bale / fabric siltation fence was restored.

EROSION AND SEDIMENT CONTROL PROGRAM - CORRIDOR RIGHTS-OF-WAY (SECTION 4.2.2.2)

Erosion inspections were made on the following corridor g rights-of-way during 1996: North Anna - Midlothian; North Anna -

Morrisville; North Anna - Gordonsville; and North Anna - Ladysmith.

4 There were no locations recorded on these lines where significant erosion had occurred. No herbicides were used in these areas l l

during 1996.

(2) r

. -. . . ~ . - . . .

A NONCONPLIANCE (SECTION 5.4.1)

There'were~no Environmental Protection Plan occurrences of noncompliance during 1996.

NONROUTINE REPORTS (SECTION 5.4.2) '

i There was one nonroutine event during 1996 which resulted in i

three VFDES exceptions. This event was the result of a Unit 1 reactor trip previously reported in LER Report No.50-338/96-005-00.

The cover letter for the Discharge Monitoring Reports (DMR's) for that month and the applicable DMR are attached (pages 4-6).

1 (3)

I

. Ihr OJ)owlhv4tt) l Mhund \ orginia 2311i j l

4 September 5, 1996 CERTIFIED MAIL RETURN RECEIPT REOUESTED y,RGWiA POWER Department of Environmental Quality Water Regional Office 116 North Main Street l i

P. O. Box 268 Bridgewater, Virginia 22812 l Gentlemen:

Re: NORTH ANNA POWER STATION -

DISCHARGE MONITORING REPORT FOR AUGUST 1996.

i Attached is the original of the Aucust 1996 Discharge Monitoring  :

Report for North Anna Power Station.

This report is required by and prepared specifically for the Virginia Department of Environmental Quality. It represents truly, accurately, and completely the observed results of measurements and analyses required by the State to be performed and submitted, but only such results. It is not intended as an assertion of the accuracy of any instrument, reading or analytical result, nor is it an endorsement of the suitability of any analytical or measurement procedure.

The following information is presented as required by part II, Section F.2. of VPDES permit No. VA0052451 concerning outfall 013.

The turbine building sump high-volume sump pumps were utilized for a total of eleven minutes between 1130 hours0.0131 days <br />0.314 hours <br />0.00187 weeks <br />4.29965e-4 months <br /> and 1300 hours0.015 days <br />0.361 hours <br />0.00215 weeks <br />4.9465e-4 months <br /> on August 27, 1996 in response to turbine building sump high levels. i Approximately 9,900 gallons of water was discharged through outfall I 013, the permitted outfall for these pumps. Samples were taken as required (at 1206 hours0.014 days <br />0.335 hours <br />0.00199 weeks <br />4.58883e-4 months <br />) with the following results outside of permit limits: pH -- 9.13 SU, and oil and grease -- 24.6 mg/L (see j

, DMR for outfall 013). The turbine building sumps normally '

discharge through outfall 104 after being processed through an oil separator with pH taken at the end of the discharge canal.

The turbine building sump high levels were a result of a Unit i reactor trip and subsequent malfunction of several relief valves to reseat properly, increasing the amount of leak-by water into the sumps. This is the first time these pumps have been used in more than five years and their future use is neither planned nor anticipated. All mechanical problems with the relief valves have been corrected and future problems of this magnitude are not anticipated.

I 1

l l

information

~

If you have any questions or desire additional'

' concerning this submittal, please contact Mr. Carter Cooke at (540) 894-2856.

. Sincerely,

&JAWY W. R. Matthews

_o Station Manager 4

bc: w/ attachment J. K. Puckett - IN-1E  !

A. C. Cooke D. L. Huffman

PEmf7EE NAMMMSSpMCLUDE COMMONWEALTH OF VIRGINIA '

FACIUTY pIAMBLOCAT10N D DIFFERfCT) DEPARTMENT OF ENVIRONMENTAL OUALITY '

i matteAL MLLUTJerT Distanaat RLEISATim STEftutspets) INDUSTRIAL MAJOR Ots, i DIscaARGE MONITOR 230G REPORT (m ggpy_ gp g , ,

(REGIONAL OFFICE)  !

NAME VEPCO-NORTH ANNA ,

^ "'** VA0052451 013 5000 DOMINION BOULEVARD VALLEY REGIONAL OFFICE PERMiTNoMeER *L" P. O. BOX 268 GLEN ALLEN, VA 23060 MONITORING PERICO BRIDGENATER, VA. 22812 FAC lu ry YM MO OAY YEAR MO DAY 540-828-2595 LOCATION FILE NO. 22-4740. FRoM 96 08 01 TO 96 08 31 NOTE ; READ PERMf7 AND GENERAL INSTRUCTIONS "

BEFORE COMPLETING THIS FORM. ,

OllANTITY OR I OATMNG OUALITY OR CONCENTRATION PARAMETER FREQJENCY AVERAGE M AXIM UM U NITS MINIM UM AVERAGE M AXtM UM UNf78

$ et ANALYSIS E 001 0.0099 0.0099 ************** ************** **************

REPORTED MGD O 1/M EST FLOW -- -

NL NL *"""*"*** ***"******** * * " " " " " "

1/M EST

' 002 REPORTED ************** * * * * " * * * * "

  • 9.13 ************* 9.13 1 1/M GRAB PH -- *****a******* *************

SU 6.0000 a"a********* 9.0000 1/M GRAB 004 TOTAL ***""****" *"***"**"" *****"a**"* ,

25.5 25.5 0 SUS. SOLIDS REPORTED MGIL 1/M GRAB

__ ............. ............. u......u.*** 30.0000 100.0000 1/M GRAB 500 0lL & ************* * * * * * * * * * * " " *""""**aa REPORTED 24.s 24.6 2 1/M GRAB ggg MG/L

_==,r ............. ............. ..........***

15.0000 20.0000 1/M GRAB REPORTED

~__

i i

REPORTED l --

l l

5 REPORTED

~

t l  !

i

)

REPORTED r

l ._._ t l Aor'tTaonAL tranIT atoularnENTs on connzurs:

TMAL TOTAL FLOW TOTAL BOD 5 BYPASSES occuantNets eu o ) tro)

OPERAJOp IN RESPOPMBLE CHARGE DATE OVE LOWS N/A N/A N/A ENN NEM M # M

. E E""nu'"CT"o"."on"s t o h "'E* E'"w*"""s?EM'oEsus.coTo"EET mA TYPED OR PRINTED NAREE SIGNATURE CERTTPICATE 100. YEAR 94 0 day

"".,'a*Jv"E7nnTon"i eas'E="" I* E"m"EIvE""o'n"m"os"E"""E *E* S PResectPAL EXECUT2WE OFFICER OR AUTHORIZED AGENT TELEPHOpeE DATE

_E rOn GATHERS.G THE FORMATION.THE W.FORMAYlON SumarrTEDIS TOTHE SEST or My NNOWLEDGE AND BEUEF TIquE. AC COM MAugW l w me icmT.ne=a n Tu ron a son uNo r=

n.tarf.C.u.nATE T

AN.D. rom PLE.TF. I.A.etuoD.A.HEACOCK Twe oss uTvo tE THA,T THE.RE ARE ,, e niso a wxAfo.M I.

s sEE nus c..iam Anonuse.im en.AtTes 96 09 05 540 894 2108 u gnoEs gEgy rus ue To omam Ano on wumam amosonmen ac yy,,,,,,,,,,,,,, , g y,g, , y,,, ,, ,,y c uuc n u p n n mo. . < -- - - -