Forwards Proposed Rev 1F to BVPS Unit 1 IST Program for Pumps & Valves & Proposed Rev 2D to BVPS Unit 2 IST Program for Pumps & Valves for Review & Approval,In Response to Violation Noted in Insp Rept 50-412/94-09
ML20072Q905
Person / Time
Site: Beaver Valley
Issue date: 08/29/1994
From: Noonan T
DUQUESNE LIGHT CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
Shared Package
ML20072Q907 List:
References
NUDOCS 9409120285
Download: ML20072Q905 (2)


Text

. _ _

m

"%>gf2C Telephone (412) 393-6000 c

y"g,'*g*l[,'oup August 29, 1994 Snippingport. PA 15077-0004 U. S. Nuclear Regulatory Commission Attn: Doculaent Control Desk Washington, DC 20555

Subject:

Beaver Valley Power Station, Unit No. 1 and No. 2 BV-1 Docket No. 50~334, License No. DPR-66 BV-2 Docket No. 50-412, License No. NPF-73 IST (Inservice Test) Programs; Proposed Revision IF and 2D The purpose of this submittal is to request NRC review and approval of Proposed Revision IF (Enclosure 1) and 2D (Enclosure 2) to the Unit No. 1 and 2 IST Programs. The proposed revisions include requests for relief from code testing requirements and from including ASME code class, manufacturer supplied, skid-mounted pumps and valves 4 in the IST Programs. I l

This request is a denouement of tur response to Violation i 50-412/94-09-01 for not including ASME code class skid-mounted pumps and valves in the Unit No. 2 IST Program. The proposed revision to the Unit No. 1 IST Program is being submitted for consistency, although not required, since Unit No. 1 is not an ASME code class ,

plant for pumps and valves.  !

It is requested that the NRC complete the review of this proposed request by December 31, 1994, so that the implementing procedures can be revised concurrently with other commitments resulting from our response to Violation 50-412/94-09-01.

If you have any r:Jestions, please contact Mr. Nelson R. Tonet at (412) 393-5210.

T. P. 1oonan ij h j ' , Division Vice President Nuclear Operations Attachment cc: Mr. IS. W. Rossbach, Sr. Resident Inspector Mr. T. T. Martin, NRC Region I Administrator Mr. G. E. Edison, Sr. Project Manager w : The Nuclear Professionals 9409120295 940829 0kY PDR ADOCK 05000334 P ppg l