ML20092A442

From kanterella
Revision as of 00:37, 5 May 2020 by StriderTol (talk | contribs) (StriderTol Bot insert)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
Corrected Tech Spec Page Re Reactor High Pressure Trip Setting
ML20092A442
Person / Time
Site: Pilgrim
Issue date: 08/31/1995
From:
BOSTON EDISON CO.
To:
Shared Package
ML20092A163 List:
References
NUDOCS 9509110042
Download: ML20092A442 (2)


Text

,

s PNPS .

TABLE 3.2.A 704 cns '

3 INSTRUMENTATION THAT INITIATES PRIMARY CONTAINMENT ISOLATION D .*

OO 00 nm XN Operable Instrument oa Channels Per Trio System (1)

@@ Minimum Available Instrument Trip Level Settinn Action (2) t O tD f$Oh! 2(7) 2 Reactor Low Water Level 211.6" indicated level (3) A and D

-24 (A

1 1 Reactor High Pressure $76 psig D l 2 2 Reactor Low-Low Water Level at or above - 46.4 in. A indicated level (4) 2 2 Reactor High Water Level 555.4" indicated level (5) B 2(7) 2 High Drywell Pressure $2.22 psig A 2 2 Low Pressure Main Steam Line 2810 psig (8) B 2(6) 2 High Flow Main Steam Line $136% of rated steam flow B 2 2 Main Steam Line Tunnel Exhaust Duct High Temperature 5170 F B l 2 2 Turbine Basement Exhaust l

Duct High Temperature $150 F B 1 1 Reactor Cleanup System High Flow 5300% of rated flow C 2 2 Reactor Cleanup Systea High Temperature $150 F C Revision Amendment No. 34;-42;-86;-147;-150;-151;-154;-162;164 3/4.2-7

FNFS -

TABLE 3.2.A .

INSTRUNIDtTATION THAT INITIATES FRIM&RY cn"1AIIWlEFI ISOIATI0tt Operable Instrument .

gtasntels A r Trio System (1)

Minimica Ava11abis instrument Trio I.evel Sett!na Action (2) 2(7) 2 Reactor Low Water Level g11.6" indicated level (3) A and D 1 1 Reactor liigh Pressure sig D l

2 2 Remetur Low-Low Water Level at or above - 46.4 in. A indicated level (4; 2 2 Reactor liigh Water Imvel 555.4* indicated level (5) 8 2(7) 2 II1gh Drywell Pressure 52.22 psig A 2 2 Low Pressure Main Steam Line 2810 paig (8) 3 2(6) 2 Iligh Flow Main Steam Line 5136% of rated stess flow 3 2 2 Main Steam Line Tunnel ~

Exhaust Dust liigh Temperature <l70*P 3 2 2 Turbine Basement Exhaust Duct ilLgh Teteperatute 5153"F &

1 1 Reactor Claanup Systes fligh Flow $303% of rated flow C 2 2 Reactor Cleanup Systen liigh Temperature 5153 F c Revision N Ameiulment No. 34 1 -42,-26,- 14 71 - 150r -15t r -lE4.W 4 3/4.2-7

.e

_ - _ - _ - . _ _ _ ---__-.____-____-_n --- _ _ _ _ _ _ _ _ _ _ - - _ _ _ _ _ _ - - -- _ -- _ - - - - - - - -- - _- - - - - _ _ - - _ - _ - - - _ - _ . - .