ML20073C367
ML20073C367 | |
Person / Time | |
---|---|
Site: | Grand Gulf |
Issue date: | 08/31/1994 |
From: | Budnitz R, Davis P, Ravindra M, Tong W EQE, INC., FUTURE RESOURCES ASSOCIATES, INC., PRD CONSULTING |
To: | NRC OFFICE OF NUCLEAR REGULATORY RESEARCH (RES) |
References | |
CON-FIN-L-1923 NUREG-CR-6143, NUREG-CR-6143-V05, NUREG-CR-6143-V5, NUDOCS 9409230278 | |
Download: ML20073C367 (110) | |
Text
--_ . .
l NUREG/CR-6143 Vol. 5 1
Evaluation 0:? Potential Severe !
Accic.ents During Low Power anc.
Shutdown Coerations at Grand Gu1:?, E nit 1 Analysis of Core Damage Frequency from Seismic Events for Plant Operational State 5 During a Refueling Outage
. J I udr tz/I'RA P. R. Davis /PRD M. K. Ravindra, W. H. *Ibng/EQE Future Resources Associates, Inc.
PRD Consulting EQE International, Inc.
Prepared for U.S. Nuclear Regulatory Commission p$f2 $$h Oho! 416 p PDR
, . , . . ..= _- .- - . _
f f
'i AVAILABILtTY NOTICE I Availab*ty of Reference Matenals Cited in NRC Pubhcations Most documents cited in NRC publications will be avaltable from one of the following sources:
- 1. The NRC Pubhc Document Room, 2t20 L Street. NW., Lower Level. Washington. DC 20555-0001 2 The Supenntendent of Documents. U S. Government Printing Office Mail Stop SSOP, Washington. DC ,
20402-9328 ]
j
- 3. The National Technical Information Service. Springfield. VA 22161 i i
Although the hsting that follows represents the majority of documents cited in NRC pubhcations, it is not in-tended to be exhaustive. '
Referenced documents available for inspection and copying for a fee from the NRC Public Document Room ;
include NRC correspondence and internat NRC memoranda: NRC bulletins, circulars, information notices, in-spection and investigation notices; licensee event reports; vendor reports and correspondence; Commission papers: and applicant and bcensee documents and correspondence ,
l The following documents in the NUREG series are avadable f or purchase from the GPO Sales Program: formal NRC siaff and contractor reports. NRC-sponsored conference proceedings. international agreement reports. ;
grant pubhcations and NRC booklets and brochures. Also available are regulatory guides. NRC regulations in the Coce of Federal Regulations, and Nuc: ear Regularory Commission Issuances Documents avaliable from the National TechnicalInformation Service include NUREG-series reports and tech-nical reports prepared by other Federal agencies and reports prepared by the Atomic Energy Commission, forerunner agency to the Nuclear Regulatory Commission.
1 Documents available from public and special technical hbraries include all open bteratur e items, such as books, '
l journal articles, and transactions. Federal Register notices. Federal and State legislation. and congressional ,
reports can usually be obtained from these hbrancs Documents such as theses, dissertations. foreign reports and translations. and non-NRC conference pro-ceedings are available for purchase from tne organization sponsoring the publication cited. !
Single copies of NRC draft reports are avanable free, to the extent of supply, upon written request to the Office
- of Administration. Distribution and Mail Services Section. U.S Nuclear Regulatory Commission. Washington.
I' DC 20555-0001.
1 Copies of industry codes and standards used in a substantive manner in the NRC regulatory process are maln-ta!ned at the NRC Ubrary. 7920 Norfolk Avenue, Bethesda, Maryland, for use by the pubhc. Codes and stan-dards are usua!!y copyrighted and may be purchased from the originating organ 4zation or, if they are American Nationa! Standards. from the American National Standards institute,1430 Broadway, New York, NY 10018.
DISCLAIMER NOTICE )
This report was prepared as an account of work sponsored by an agency of the United States Government.
Neither the United States Government nor any agency thereof, or any of their employees, makes any warranty, expressed or imphed, or assumes any legal liabihty of responsibility for any third party's use, or the results of I such use, of any information, apparatus, product or process disclosed in this report, or represents that its use by such th rd party would not infringe privately owned rights.
1 I
I l
NUREG/CR-6143 Vol. 5 Evaluation of Potential Severe '
Accidents During Low Power and Shutdown Operations at Grand Gulf, Unit 1 Analysis of Core Damage Frequency from Seismic Events for Plant Operational State 5 During a Refueling Outage Manuscript Completed: July 1994 Date Published: August 1994 Prepared by R. J. Budnitz, Future Resources Associates, Inc.
P. R. Davis, PRD Consulting M. K. Ravindra, W. H. Tbng, EOE International, Inc.
Future Resources Associates, Inc.
2039 Shattuck Avenue, Suite 402 Berkeley, CA 94704 PRD Consulting '
P. O.3 y.2046 Sheridan, WY 82801 EQE international, Inc. i 18101 Von Karman Avenue, Suite 400 Irvine, CA 92715 Prepared for ;
Division of Safety Issue Resolution '
Office of Nuclear Regulatory Research U.S. Nuclear Regulatory Commission Washington, DC 20555-0001 NRC FIN L1923
ABSTRACT Traditionally, probabilistic risk assessments (PR As) of severe accidents at nuc! car power plants have explored accidents initiated during full-power operation. However, in 1989 the U.S.
Nuclear Regulatory Commission (NRC) initiated an extensive program to examine carefully the potential risks during low-power and shutdown operations. The program included two parallel projects, one at Sandia National Laboratories studying a boiling water reactor (Grand Gulf), and the other at Brookhaven National Laboratory studying a pressurized water reactor (Surry Unit 1). Both the Sandia and Brookhaven projects have examined only accidents initiated by internal plant faults --- so-called " internal initiators". This project, which has explored the likelihood of seismic-initiated core damage accidents during refueling outage conditions,is complementary to the internal-initiator analyses at Brookhaven and Sandia. This i report covers the seismic analysis at Grand Gulf, while a companion report documents the i Surry seismic analysis. l 1
All of the many systems modeling assumptions, component non-seismic failure rates, and I human error rates that were used in the internal-initiator study at Grand Gulf have been I adopted here, so that the results of the study can be as comparable as possible. Both the Sandia i study and this study examine only one shutdown plant operating state (POS) at Grand Gulf, namely POS 5 representing cold shutdown during a refueling outage. This analysis has been ,
limited to work analogous to a level-1 seismic PRA,in which estimates have been developed i for the core-damage frequency from seismic events during POS 5. The methodology is almost identical to that used for full-power seismic PRAs, as widely practiced in the nuclear industry.
The results of the analysis are that the core-damage frequency for carthquake-initiated accidents during refueling outages in POS 5 is found to be quite low in absolute terms,less than
-104/ year. The core-damage frequency is also low relative to the frequency during POS 5 for internal initiators, as analyzed in the companion study by Sandia.
Vol. 5 iii NUREG/CR-6143 N_ . .
._ _ _ _ - _ _ _ _ _ _ . _- l
.t t
TABLE OF CONTENTS ABSTRACT.............................................................. iii !
l 1
E X E C UTI V E S U MM A R Y. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . ix {
FOREWORD............................................................... xi :
i A CK N O WL E D G MEN TS . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .. . . . . . . . xiii =
l
- 1. I N T R O D U CTI O N . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 1-1 '
l.1 Objective of the Report . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 1-1 1.2 Importa nce of th e Issue . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 1-1 1.3 Scope ............................. .................... 1-2 ,
1.4 A ss u m p t i o n s . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 1-2 ,
1.5 Organization of the Report . . . . . . . . . . . . . . . . . . . .. . . . . . . . . . . . 1-4 l
- 2. SEISMIC RISK AN ALYSIS METHODOLOGY . . . . . . . . . . . . . . . . . . . . . . . . . . . 2-1 !
2.1 Seismic Haza rd Analysis . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 2-1 l 2.2 Seismic Fragility Evaluation . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 2-2 !
2.3 Analysis of Plant Systems and Accident Sequences . . . . . . . . . . . 2-2 ;
2.4 Evaluation of Core Damage Frequency. . . . . . . . . . . . . . . . . . . . . . 2-3
- 3. SEISMIC H AZARD AN ALYSIS . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 3-1 I
3.1 EPRI and LLNL Seismic' Hazard Studies . . . . . . . . . . . . . . . . . . . . 3-1:
i.
- 4. SYSTEMS AN ALYSIS FOR GR AND GULF. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 4-1 4.1 Identification of Accident Sequences . . . . . . . . . . . . . . . . . . . . . . . 4-1 3 4.1.1 A ss u m p t i o n s . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 4-2 j 4.1.2 Ev e n t T r e e s . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 4-2 l i
4.2 Seismic Capacities of Grand Gulf Safety Systems . . . . . . . . . . . . 4-2 4.2.1 The "Sufficiently Rugged" Items . . . . . . . . . . . . . . . . . . . . . 4-2 4.2.2 Systems and Components not Necessarily "Sufficiently Rugged" . .. . . . . . . . . . . . . . . . . . . . . . 4-3 4.2.3 Summary of System Fragilities. . . . . . . . . . . . . . . . . . . . . . . 4-5 4.3 Systems-Analysis Discussion . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 4-6 ') '
4.3.1 Core Damage Due to Seismic Failures Only . . . . . . . . . . . 4-6 4.3.2 Core Damage Due to a Combination of Seismic Failures, Non-Seismic Failures, and Human Errors . . . . . . . 4-7 4.4 Consideration of Duration of POS 5 During Refueling Outages 4-8 l
Vol. 5 . v NUREG/CR-6143 i i
]
i l
c:
- i i
k i
[ TABLE OF CONTENTS (continued) ;
- 5. SEISMIC FR AGILITY EVALUATION FOR GR AND GULF . . . . . . . . . . . . . . 5-1 5.1 Introduction............................................ 5-1 5.2 Seismic Walkdown of Grand Gulf . . . . . . . . . . . . . . . . . . . . . . . . 5-1 5.2.1 Genera 1.......................................... 5-1 5.2.2 Walkdown Proced u res . . . . . . . . . . . . . . . . . . . . . . . . . . . 5-2 !
5.2.3 Walkdown Documentation . . . . . . . . . . . . . . . . . . . . . . . . . . 5-5 ,
5.2.4 Wal kd o w n Fin d i n gs. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 56 5.3 Seismic Fragility Evaluation . . . . . . . . . . . . . . . . . . . . . . . . . . .. . . . 5-9 5.3.1 Seismic Fragility Methodology . . . . . . . . . . . . . . . . . . . . . . 5-9 i 5.3.2 Grand Gulf Seismic Fragilities . . . . . . . . . . . . . . . . . . . . . 5 17' 5.3.3 Example of Equipment Fragility Evaluation . .. . . . . . . . 5-19 ;
1
- 6. SEISMIC RISK QUANTIFICATION FOR GRAND GULF . . . . . . . . . . . . . . . . 6-1 1 6.1 BaseCase.............................................. 6-1 6.2 Sensitivity Studies . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 6-1 ;
6.3 Comparison with CDF from Internal Initiators During Cold '
Shutdown and with CDF at Full Power . . . . . . . . . . . . . . 6-2 ,
- 7. CONCLUSIONS AND RECOMMEND ATIONS . . . . . . . . . . . . . . . . . . . . . . . . . . 7-1
- 8. R E F E R E N C E S . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .. 8-1 i
l 1
i l
i i
i l
l i
i l
NUREG/CR-6143 vi Vol. 5 w_--_A -
LIST OF FIGURES 2-1 Seismic Hazard Curves For a Nuclear Power Plant Site . . . . . ... .. 2-4 2-2 Family of Fragility Curves For a Component . ..... .. . ..... . 2-5 2-3 Probability Distribution of Seismically-Induced Severe Core Damage Frequency . .. ....... ... .. . .. . 2-6 3-1 EPRI Seismic Hazard Curves For Grand Gulf Site . . . .. . . ..... 3-2 3-2 LLNL Seismic Hazard Curves For Grand Gulf Site . . .... . ..... ... 3-3 3-3 10,000-Year Return Period Ground Response Spectrum For Grand Gulf Site. . . . . . . . . . . . ... ....... . . .. ....... 3-4 5.2-1 SEWS of MCC 16B21 (3 pages) . . . . . . . . ... .. .. ....... . ... . .. 5-26 5.2-2 SEWS of HPCS Diesel Generator (2 pages). . .. .. . ...... . .. .. . 5-29 5.2-3 Masonry Block Wall near the 480V Load Center. . .... . . .. . . 5-31 5.2-4 Masonry Block Wall at the Control Room. . ....... . ..... . . . .. 5-31 5.2-5 Base Anchorage Detail of the Condensate Water Storage Tank . . .. . . 5-32 5.2-6 Pipe at Base of 300,000-Gallon Fire Water Tank (Unanchored). . . ..... 5-32 5.2-7 Trapeze Cable Tray Supported Off the Floor Above. . .. ... .. . 5-33 5.2-8 Cable Trays Supported on the Floor. . . .. ... .. ....... . .. . 5-33 5.2-9 Day Tank of the Emergency Diesel Generator. .. .. ..... .. ... . 5-34 5.2-10 Day Tank of the HPCS Diesel Generator . .. ..... . .... . . 5-34 5.2-11 SSW Pump Motor Mounting. . . . . . .. .. .... ....... . .. .. . 5-35 5.2-12 Base Anchorage of the SSW Pump . ....... ......... . ...... 5-35 5.2-13 RHR Pump. . . . ................. ..... ...... ...... ... ... 5-36 5.2-14 RHR Heat Exchanger Support Column. . . .. ..... ............... 5-36 5.2-15 RHR Heat Exchanger Support Column Anchorage. . . . . . .. .. . .. . 5-37 5.2-16 4 8 0 V Loa d Ce n t e r. . . . . . . . . . . . . . . . . . . . . . . . . . . . ........ ..... 5-37 5.2-17 Anchorage Detail of Control Room Panels. . . . . . . . . . . . . . . . . . . . . . 5-38 5.2 18 Details of Control Room Raised Floor . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 5-38 5.2-19 Sta tion Ba t tery Details. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 5-39 5.2-20 Station Ba ttery Rack Anchorage Details. . . . . . . . . . . . . . . . . . . . . . . . . . . . 5-39 5.2-21 Two Types of Circuit Breakers at Grand Gulf 500kV Switchyard. .... 5-40 5.2-22 Disconnect Switches at the 500kV Switchyard. . . . . . . . .............. 5-40 5.2-23 500kV Switchyard Bus Support Structure and Ceramic Insulators. . . . . . 5-41 5.2-24 Clip at the Base of Circuit Breaker Support Skid . . . . . . . . . . . . . . . . . . 5-41 5.3-1 Median,5% Non-Exceedance, and 95% Non-Exceedance Fragility Cu rves For a Com pone n t . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .. 5-42 5.3-2 Comparison of Grand Gulf SSE Design Spectrum with 104/ year UHS. . 5-43 LIST OF TABLES 5.3-1 Grand Gulf Low Power PRA Component Seismic Fragilities (2 pages) . . . 5-24 61 Core-Damage-Frequency Estimates. . . . . . . . .... ... . .. . ....... 6-3 6-2 Sensitivity of POS 5 CDF to Seismic Site Hazard. . . . . . . . . . . . . . . . . . . . . 6-3 6-3 Grand Gulf: Comparison of CDF for Shutdown vs. Full-Power Conditions and for Seismic Initiators ve.
Internal Initiators. . . . . . . . . . . . . . . . . . ... . . ..... 6-4 Vol. 5 vii NUREG/CR-6143
EXECUTIVE
SUMMARY
\
Traditionally, probabilistic risk assessments (PR As) of severe accidents at nuclear power plants have explored accidents initiated during full-power operation. However, in 1989 the U.S.
Nuclear Regulatory Commission (NRC) initiated an extensive program to examine carefully the potential risks during low-power and shutdown operations. The program included two
, parallel projects, one at Sandia National Laboratories studying a boiling water reactor (Grand Gulf), and the other at Brookhaven National Laboratory studying a pressurized water reactor (Surry Unit 1). Both the Sandia and Brookhaven projects have examined only accidents initiated by postulated internal plant faults --- so-called " internal initiators".
This project, which has explored the likelihood of seismic-initiated core damage accidents during refueling-outage conditions, is complementary to the internal-initiator analyses ai Sandia and Brookhaven. This report covers the seismic analysis at Grand Gulf, v hile a companion report documents the Surry seismic analysis. The project reported here is the second phase of a two-phase effort, the initial phase of which was scoping in character, having been performed primarily to establish if the issue was judged to be important enough to justify the '
more extensive and more quantitative evaluation reported here.
All of the many systems modeling assumptions, component non-seismic failure rates, and human error rates that were used in the internal-initiator study at Grand Gulf have been adopted here, so that the results of the two studies can be as comparable as possible. Both the Sandia study and this study examine only one shutdown plant operating state (POS) at Grand -
Gulf, namely POS 5 representing cold shutdown during a refueling outage.
This analysis has been limited to work analogous to a level-1 seismic PRA,in which estimates have been developed for the core-dsmage frequency from seismic events during POS 5. The methodology is almost identical to that used for full-power seismic PRAs, as widely practiced in the nuclear industry. However, seismic-induced relay chatter is beyond the scope of this analysis. Seismic hazard curver from both the Electric Power Research Institute (EPRI) and the Lawrence Livermore Nati'>nal Laboratory (LLNL) have been used. Assessments of the
- likelihood of various post-coro-damage plant-damage states (level-2 PRA) and of significant radioactive releases (level-3 PRA) are beyond the scope of this evaluation. j The results of the analysis are that the core-damage frequency for carthquake-initiated accidents during refueling outages in POS 5 is found to be quite low in absolute terms,less than 10-7/ year. This is true using both the EPRI and the LLNL seismic hazard curves. The reasons for this are (i) Grand Gulf's seismic capacity in responding to earthquakes during shutdown is excellent, well above its design basis; (ii) the Grand Gulf site enjoys one of the least seismically active locations in the United States; and (iii) the Grand Gulf plant is only in POS 5 during refueling outages for an average (mean) of 3.1% of the time. The core-damage frequency is also low relative to the frequency during POS 5 for internalinitiators, as analyzed in the companion study by Sandia.
Vol. 5 ix NUREG/CR-6143
FOREWORD (NUREG/CR-6143 and 6144)
Low Power and Shutdown Probabilistic Risk Assessment Program Traditionally, probabilistic risk assessments (PRA)of severe accidents in nuclear power plants have considered initiating events potentially occurring only during full power operation. Some previous screening analyses that were performed for other modes of operation suggested that risks during those modes were small relative to full power operation. However, more recent studies and operational experience have implied that accidents during low power and shutdown could be significant contributors to risk.
During 1989, the Nuclear Regulatory Commission (NRC) initiated an extensive program to carefully examine the potential risks during low power and shutdown operations. The program includes two parallel projects performed by Brookhaven National Laboratory (BNL) and Sandia National Laboratories (SNL), with the seismic analysis performed by Future Resources Associates. Two plants, Surry (pressurized water reactor) and Grand Gulf (boiling water reactor), were selected as the plants to be studied.
The objectives of the program are to assess the risks of severe accidents due to internal events, internal fires, internal floods, and seismic events initiated during plant operational states other than full power operation and to compare the estimated core damage frequencies,important accident sequences and other qualitative and quantitative results with those accidents initiated during full power operation as assessed in NUREG-ll50. The scope of the program includes that of a level-3 PRA.
The results of the program are documented in two reports, NUREG/CR-6143 and 6144. The reports are organized as follows:
For Grand Gulf:
NUREG/CR-6143 - Evaluation of Potential Severe Accidents During Low Power and Shutdown Operations at Grand Gulf, Unit 1 Volume 1: Summary of Results !
Volume 2: Analysis of Core Damage Frequency from Internal Events for Plant l Operational State 5 During a Refueling Octage ,
Part 1: Main Report l Part lA: Sections 1 - 9 :
Part IB: Section 10 l PartIC: Sections 11 - 14 Part 2: Internal Events Appendices A to H I Part 3: Internal Events Appendices I and J l Part 4: Internal Events Appendices K to M Volume 3: Analysis of Core Damage Frequency from Internal Fire Events for Plant ;
~
Operational State 5 During a Refueling Outage Volume 4: Analysis of Core Damage Frequency from Internal Flooding Events for Plant Operational State 5 During a Refueling Outage Volume 5: Analysis of Core Damage Frequency from Seismic Events for Plant i Operational State 5 During a Refueling Outage !
Volume 6: Evaluation of Severe Accident Risks for Plant Operational State 5 During a Refueling Outage Part 1: Main Report Part 2: Supporting MELCOR Calculations i
Vol. 5 xi NUREG/CR-6143
FOREWORD (continued)
For Surry:
, NUREG/CR-6144 - Evaluation of Potential Severe Accidents During Low Power and l Shutdown Operations at Surry Unit-1 Volume 1: Summary of Results l Volume 2: Analysis of Core Damage Frequency from Internal Events During Mid-loop Operations Part 1: Main Report Part I A: Chapters 1 - 6 l- Chapters 7 - 12 Part IB:
Part 2: Internal Events Appendices A to D 1 Part 3: Internal Events Appendix E i l
Part 3A: Sections E.1 - E.8 i
Part 3B: Sections E.9 - E.16 Part 4: Internal Events Appendices F to H Part 5: Internal Events Appendix I Volume 3: Analysis of Core Damage Frequency from Internal Fires During Mid-loop Operations Part 1: Main Report Part 2: Appendices Volume 4: Analysis of Core Damage Frequency from Internal Floods During Mid-loop Operations Volume 5: Analysis of Core Damage Frequency from Seismic Events During Mid-loop Operations Volume 6: Evaluation of Severe Accident Risks During Mid-loop Operations Part 1: Main Report Part 2: Appendices I
1 l'
l l
NUREG/CR-6143 xii Vol. 5
1 ACKNOWLEDGMENTS This project has been supported by the U.S. Nuclear Regulatory Commission under contract NRC-04-92-058, "PRA Analysis of LWR Low-Power and Shutdown Accidents Initiated by Earthquakes", as a Phase II project under the NRC's Small Business Innovation Research Program. Richard C. Robinson Jr.of NRC's Office of Nuclear Regulatory Research provided technical liaison with the project team.
The project could not have been effectively accomplished without the insights gained from the much larger shutdown-risk projects that have recently been completed under NRC support at Sandia National Laboratories (for Grand Gulf) and at Brookhaven National Laboratory (for Surry). We wish to thank all the many participants in those projects for their excellent work, and in particular Donnie W. Whitehead of Sandia and Tsong-Lun Chu of Brookhaven. In addition, the authors wish to thank Heather Schriner and John Forester of Sandia for their work in performing some specific systems analyses especially for this project, which were extremely important in tying down some of the key systems-analysis issues.
Finally, we wish to thank the staff members at Entergy's Grand Gulf power station for their cooperation, both during our walkdowns of the plant and afterward in furnishing technical information.
Vol. 5 xiii NUREG/CR-6143
I ,.
l t
l '
l j 1. INTRODUCTION 1.1 Objective of the Report This project has explored the likelihood of seismic-initiated core damage accidents during !
refueling outage conditions at the Surry (Unit 1) and Grand Gulf nuclear power plants. This report documents the Grand Gulf analysis, while a companion report (Ref.FRA/Surry,1994) documents the Surry analysis. The project reported here is the second phase of a two-phase effort, the initial phase of which (Ref. FRA,1991) was scoping in character, having been ;
performed primarily to establish if the issue was judged to be important enough to justify the more extensive and more quantitative evaluation reported here. Throughout this report, we l will refer to the earlier study as the " Phase-I study" and, where necessary for clarity, this study -
as the " Phase-II study". , ;
1 The Phase-I results were preliminary in character,and served principally both to establish that the issue is important enough to merit further study, and to assure the study team that it is fully feasible to adapt the scismic-PRA methodology for full-power seismic PRA to this i problem. The findings on both points were favorable enough to justify continuing with this Phase-II project. ;
1.2 Importance of the issue The issue of whether the risk of a large core-damage accident is significant when nuclear power plants are in shutdown conditions has received increasing attention in recent years. It <
is beyond our scope here to summarize the several recent studies of this issue: suffice it to state ',
that the problem has been judged important enough that the U.S. Nuclear Regulatory Commission (NRC) has supported a major shutdown-risk research program for the past three >
years. The program has examined shutdown risk by performing in-depth probabilistic risk ,
assessments (PRAs) at two U.S. nuclear power plants, Grand Gulf and Surry Unit 1, and has resulted in significant insights into various safety issues that may arise during shutdown i f conditions. The Grand Gulf study was carried out at Sandia National Laboratories, and the Surry study at Brookhaven National Laboratory, both under contract to NRC and both using subcontractors to supplement the in-house expertise at the two laboratories.
) The results of this effort have recently been published (Ref.Sandia,1994; BNL,1994), and the i findings are important: the overall core-damage frequency for potential accidents during the ;
shutdown conditions that were examined is comparable to the core-damage frequency during .i full power operation.
However, the NRC shutdown-risk projects at Sandia and Brookhaven did not examine risks !
during shutdown that might arise from earthquake-initiated accidents: they both concentrated I on so-called " internal initiators" such as transients, loss-of-coolant accidents, and loss of offsite -1 power. They also both examined scenarios that might arise from internal fires and internal flooding. In the project being reported here for Grand Guif,'and in the companion project for ;
Surry, the carthquake-initiator issue has been examined. Esth of these projects are fully coor-dinated with these two larger studies of internal initiatora.
t Vol. 5 1-1 NUREG/CR-6143 1
1.3 Scope The scope of this effort was limited to an examination of two nuclear power plants: Grand Gulf, a General Electric BWR/6 with a Mark-III containment, and Surry Unit 1. a Westinghouse 3-loop PWR with a subatmospheric containment. Grand Gulf, owned by Entergy Corporation, i is. located on the Mississippi River in east-central Mississippi, and is alone on its site. Surry-1, i owned by Virginia Electric Power Company,is located in the tidewater region of southeastern i Virginia, and has a nearly identical companion unit. There were two principal reasons for )
selecting these two plants:
o As mentioned above, both the Grand Gulf and the Surry-1 nuclear stations have been ;
the subject of probabilistic shutdown risk studies (excluding seismic-initiated events) ;
recently completed for the U.S. Nuclear Regulatory Commission. The Grand Gulf study 1 was accomplished by Sandia National Laboratories (Ref. Sandia,1994), and the Surry study was accomplished by Brookhaven National Laboratory (Ref. BNL,1994).
Appropriate models, data, and results from these studies were available for direct use in this seismic shutdown risk study. This information proved to be invaluable in completing this analysis.
i o Both Grand Gulf (Ref. Brown et al.,1990) and Surry (Ref. Breeding et al.,1990) have also been the subjects of an extensive risk assessment for full-power conditions sponsored by the Nuclear Regulatory Commission and performed by Sandia National i Laboratories, as part of the very large NUREG-1150 PRA study (Ref. NRC/l150,1990).
For Surry (but not for Grand Gulf), this NUREG-1150 analysis included an investiga-tion of seismic-initiated accidents during full power conditions (Ref. Bohn et al.,1990), :
in which a limited amount of plant-specific seismic fragility information was developed for Surry's components and structures.
The NUREG-1150 full-power PRA study covered five plants. Seismic-initiated accidents at I full power were analyzed for only two of them, the other (besides Surry) being Peach Bottom Unit 2, a BWR. Parts of the Peach Bottom external-events report (Ref. Lambright et al.,1990) also served as an important source of information for the Phase-I scoping project (Ref. FRA, 1991) that preceded this full-scope project. i This analysis has been limited to work analogous to a level-1 seismic PRA. j We have developed an estimate for the core-damage frequency from seismic events during certain conditions. Assessments of the likelihood of various post-core-damage plant-damage [
states (level-2 PRA) and of significant radioactive releases (level-3 PRA) are beyond the scope -
of this evaluation. I 1.4 Assumptions l
1 The following key assuniptions have made for this study of Grand Gulf:
- a. As mentioned, the recent shutdown risk study for Grand Gulf (Ref. Sandia,1994) is the principal basis for the systems-analysis parts of our work here: indeed, we could not have accomplished this work at all without using the other very extensive analysis as our point of i departure. The Sandia analysis contains numerous assumptions that are necessary to bound the j scope and to simplify the detailed work, and we have adopted all of these assumptions without exception. Most importantly, we have adopted directly the loss-of-offsite-power (LOOP) event
. trees, including the definitions of the top events and underlying thermalhydraulic and other r assumptions that support these event trees. r NUREG/CR-6143 1-2 Vol. 5 I
1 I
I
- b. Only refueling outages have been considered in this seismic analysis. Indeed, only one specific Plant Operating State (POS) occurring within the standard refueling outages at Grand Gulf has been considered. This is Plant Operating State 5 (" cold shutdown"), discussed in more detail in Chapter 4. Outages for other reasons frequently occur at nuclear power plants, and they are of two broad types: controlled shutdowns and uncontrolled (rapid) shutdowns.
Although these outages for other reasons can produce the same plant operating states but with configurations unique to the reason for the shutdown, resources in this analysis dic! not permit examining outage configurations other than POS 5 during a refueling outage,
- c. We assume that the only seismic events of concern are those that cause loss-of-offsite-power (LOOP) transients. Seismic events of lower acceleration than those causing LOOP are expected to have a negligible probability of causing severe plant accidents for two reasons: (i) Critical plant equipment, including the residual heat removal (RHR) system, can withstand signifi-cantly higher accelerations than that which is sufficient to cause LOOP (Ref.Bohn et al.,1990; Lambright et al.,1990). Thus, loss of core-cooling capability will have a very low probability for seismic events too small to cause a LOOP. (ii) With offsite power available, sources of water sufficient to cool the core from alternative pumping sources will generally be available even if the RHR system fails.
- d. We also assume that seismic-initiated LOOP is non-recoverable in the time frame of interest in this study (from about I to 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />). This is a reasonable and only slightly conservative assumption, because the LOOP initiator is most likely to arise from the seismic-caused failure of the ceramic insulators in the plant substation (Ref. Bohn et al.,1990; Lambright et al.,1990).
Replacement of these insulators would likely require several hours at a minimum,and probably much longer. Additionally, other damage caused by the earthquake, for example to offsite transmission systems and offsite switchyards, would likely hamper efforts to recover offsite power.
- e. The engineering methodology to develop probabilistic seismic fragility curves is described below (Chapter 2). The methodology uses a successive-screening approach,in which structures and equipment that are judged to be very strong under carthquake loading are screened out first, so that the number of items for which actual numerical fragilities must be developed is limited. Also, for a few items the study team was unable to obtain enough information, either ,
because access to some parts of the plants was limited or because engineering information in I the appropriate form was not available. For these items, generic fragilities have been used. )
i
- f. We have assumed that the seismic failures of identical equipment in similar locations are fully correlated. This means, for example, that when a postulated earthquake causes one l service-water pump to fail, we have assumed that the other service-water pumps will also fail. '
This simplifying assumption is probably conservative in many cases, but perhaps not overly so for truly identical equipment. Sensitivity studies performed in several past seismic PR As have shown that the bottom-line results are sensitive to this assumption at a level of about a factor of plus-or-minus two.
- g. Equipment failure from seismic-induced relay chatter is outside the scope of this analysis.
While relay chatter can be important (Ref. Budnitz, Lambert, and Hill,1987), it is a complicated issue, and the resources to study it were not available within this project. In any event, relay chatter is being studied at every U.S. nuclear plant as part of the current IPEEE program (Ref. Chen et al.,1991), and it is expected that almost all of the relays that are espe-cially sensitive to relay chatter will be identified and,if appropriate, modified in the course of the IPEEE studies.
- h. As discussed below (see Chapter 3), for the seismic hazard we have used both the 1993 LLNL analysis (Ref. Sobel,1993) and the EPRI analysis (Ref. EPRI,1989).
Vol. 5 1-3 NUREG/CR-6143 l
l l .
1.5 Organization of the Report The report is organized into three parts: first, we discuss the methodology used (Chapter 2 ---
risk-assessment methodology and Chapter 3 --- seismic hazard analysis inputs). Next, we discuss the analysis and results (Chapters 4,5, and 6); and then we summarize in Chapter 7 the principal findings of the analysis. j l
l i
i I
l I
1 NUREG/CR-6143 1-4 Vol. 5
i
- 2. SEISMIC RISK ANALYSIS METHODOLOGY The objectives of a full-scope seismic PRA of a nuclear power plant are to estimate the.
~ frequencies of occurrence of severe core damage, serious radiological releases, and consequenc-es in terms of early fatalities,long term adverse health effects and property damage, and to identify significant contributors to plant risks. In this study, only a level-1 seismic PRA has been performed, leading only to estimates of the frequency of occurrence of severe core damage.
- i The key elements of a level-1 seismic PRA are:
- 1. Seismic hazard analysis - estimation of the frequency of various levels of seismic ground motion (acceleration) occurring at the site.
- 2. Seismic fragility evaluation - estimation of the conditional probabilities of structural or equipment failure for given levels of ground acceleration.
- 3. Systems / accident sequence analysis- modeling of the various combinations of structural and equipment failures that could initiate and propagate a seismic core damage accident sequence.
- 4. Evaluation of core damage frequency - assembly of the results of the seismic hazard, fragility, and systems analyses to estimate the frequencies of core damage for various accident sequences and for the plant as a whole.
In the following subsections, the methods used in each of the above stages of a level-1 seismic PRA are outlined.
2.1 Seismic Hazard Analysis Seismic hazard is usually expressed in terms of the frequency distribution of the peak value of a ground-motion parameter (e.g., peak ground acceleration) during a specified time interval.
Somewhat different approaches to implementing the basic methodology are documented in (Bernreuter et al,1989) and (EPRI,1989). The different steps of this analysis are as follows:
- 1. Identification of the sources of earthquakes, such as faults and seismotectonic provinces.
- 2. Evaluation of the carthquake history of the region to assess the frequencies of occurrence of earth?,uakes of different magnitudes or epicentralintensities.
- 3. Development of attenuation relationships to estimate the intensity of earthquake-induced ,
I ground motion (e.g., peak ground acceleration) at the site.
- 4. Integration of the above information to estimate the frequency of exceedance for selected ;
ground motion parameters.
The hazard estimate depends on uncertain estimates of attenuation, upperbound magnitudes, and the geometry and seismic activity of the postulated sources. Such uncertainties are included in the hazard analysis by assigning probabilities or weights to alternative hypotheses Vol. 5 2-1 NUREG/CR-6143 i
about these parameters. A probability distribution for the frequency of occurrence is thereby developed. The annual frequencies for exceeding specified values of the ground motion parameter are displayed as a family of curves with different weights (Figure 2-1).
A Bayesian estimate of the frequency of exceedance at any peak ground acceleration is obtained as the weighted sum of the frequencies of exceedance at this acceleration given by the different hazard curves; the weighting factor is the probability assigned to each hazard curve.
2.2 Seismic Fragility Evaluation The methodology for evaluating seismic fragilities of structures and equipment is documented in (Ref. Ravindra and Kennedy,1983) and (Ref. Kennedy and Ravindra,1984). Seismic fragility of a structure or equipment item is defined as the conditional probability of its failure at a given value of the seismic input or response parameter (e.g., ground acceleration, stress, moment, or spectral acceleration). Seismic fragilities are needed in a PRA to estimate the conditional probabilities of occurrence of initiating events (e.g., loss of offsite power,large LOCA, small LOCA, RPV rupture) and the conditional failure probabilities of different mitigating systems (e.g., safety injection system, residual heat removal system, containment spray system).
The objective of fragility evaluation is to estimate the ground acceleration capacity of a given component. This capacity is defined as the peak ground motion acceleration value at which the seismic response of a given component located at a specified point in the structure exceeds the component's resistance capacity, resulting in its failure. The ground acceleration capacity of the component is estimated using information on plant design bases, responses calculated at the design analysis stage, as-built dimensions, and material properties. Because there are many variables in the estimation of this -ground acceleration capacity, component fragility is described by a family of fragility curves; a probability or weighting value is assigned to each j curve to reflect the uncertainty in the fragility estimation (Figure 2-2).
2.3 Analysis of Plant Systems and Accident Sequences 1
Frequencies of severe core damage and radioactive release to the environment are calculated I by combining plant logic with component fragilities and seismic hazard estimates. Event and fault trees are constructed to identify the accident sequences that may lead to severe core damage and radioactive release.
l The plant systems and sequence analyses used in seismic PRAs are based on the PRA j Procedures Guide (Ref. NRC,1983) and can generally be summarized for a level-1 PRA as j follows: i l
- 1. The analyst constructs event and fault trees reflecting (a) failures of key system components l or structures that could initiate an accident sequence and (b) failures of key system components or structures that would be called on to stop the accident sequence.
- 2. The fragility of each such component (initiators and mitigators)is estimated. !
- 3. Fault trees and event trees are used to develop Boolean expressions for severe core damage that lead to each distinct accident sequence.
As an example,the Boolean expression for severe core damage in the Zion Probabilistic Safety Study (Ref. Zion,1981) is:
NUREG/CR-6143 2-2 Vol. 5
Boolean = 4 + 8 + 10 + 14 + 17 + 21 + (12 + 22 + 26)
- 9 (Eq. 2-1)
The numbers represent components for which seismic fragilities have been developed, as described earlier. The symbols "+" and **" indicate "OR" and "AND" operations, respectively.
Plant level fragility curves are obtained by aggregating the fragilities of individual components according to Equation 2-1, using either Monte Carlo simulation or numerical integration. The plant level fragility means the conditional probability of severe core damage for a given peak ground acceleration at the site. The uncertainty in plant level fragility is displayed by developing a family of fragility curves; the weight (probability) assigned to each curve is derived from the fragility curves of components appearing in the specific accident sequence.
2.4 Evaluation of Core Damage Frequency Plant level fragilities are convolved with the seismic hazard curves to obtain a set of doublets for the accident frequency,
(<pij,fij >) (Eq. 2-2) where f ij si the seismically-induced accident frequency and piji s the discrete probability of '
this frequency, pij = qi p3 (Eq. 2-3) f;i = f(a) i j
[(dH /da) da (Eq. 2-4)
Here, Hj represents the j'h hazard curve,i f thethi accident fragility curve; qi si the proba-bility associated with the ith fragility curve and p jis the probability associated with the jth hazard curve.
The above equations state that the convolution between the seismic hazard and plant level fragility is carried out by selecting hazard curve j and fragility curve i; the probability assigned to the accident frequency resulting from the convolution is the product of the probabilities pi and q) assigned to these two curves. The convolution operation given by Equation 2-4 consists of multiplying the occurrence frequency of an carthquake peak ground acceleration between a and a + da (obtained as the derivative of Hj with respect to a) with the conditional probability of the accident fragility curve, and integrating such products over the entire range of peak ground accelerations zero to infinity. In this manner, a probabilistic distribution on the frequency of a given accident sequence can be obtained.
Severe core damage occurs if any one of the accident sequences occurs. By probabilistically combining the various sequences, the plant level fragility curves for severe core damage are ebtained. Integration of the family of fragility curves over the family of seismic hazard curves yields the probability distribution function of the occurrence frequency of severe core damage (Figure 2-3).
Vol. 5 2-3 NUREG/CR-6143 l
1
I J
10-2
- curve 1 ggq ,
- Cume2 hNCN / f A ,
Cuwe 3 EE ANAN 'N / / 7
.O 10'3 -
' 7-_'7_--- '__._ _ . . ' _ _
'_ - curve s l
O 'N s x
'z^.
x c, m x m,', , ',_ , , - curve 7 ,
f Curve 8 0- NN N ww!nw v /,
c m WNWwr u~as CD 10 4 - . -i - ;.
V O 'x7x x x
's L'sx
-mum m CD O D %\h i 10-5 hN( --- - - _ --
(U 's 's's'A'si i ,
3 C \ n'A i1 ', <
C x sig x w x 4 i X k\ \\ \
10-6 10 100 1000 l 2
Acceleration (Cm/Sec ) ,
J l
\
Figure 2-1: Seismic Hazard Curves For A Nuclear Power Plant Site ,
NUREG/CR-6143 2-4 Vol. 5
6 i
t 1.0 e :
2 >
l
'iB LL o.s -
o x
- -3 0.6 - q1 q2 q3 q4 q5
.o a
_O e
CL 0.4 -
m C
O '
-h 0.2 -
C O !
0 ,
0 i i i i O 0.4 0.8 1.2 1.6 2.0 -
Peak Ground Acceleration, g Figure 2-2: Family of Fragility Curves for a Component i 1
i 1
1 i
i Vol. 5 2-5 NUREG/CR-6143
4 I
i l
i l
Internal events Total core l damage e !
$ l
.N 3 Other external ,
y events o
ct Seismic events
, , ,,,,,,1 , , ,,,,,,1 , , i i i s e il i < 2i ' I $
1 x 10 7 1 x 10 4 1 x 10 4 ,1 x 10 d 1 x 10'3 Coro damage frequency (per year) !
Figure 2-3: Probability Distribution of Seismically-induced Severe Core Damage Frequency ;
NUREG/CR-6143 2-6 Vol. 5
- 3. SEISMIC HAZARD ANALYSIS 3.1 EPRI and LLNL Seismic Hazard Studies Seismic hazard curves are needed to estimate the core-damage frequeneb of different plant operating states. Typically, a site-specific seismic hazard analysis is performed to obtain the hazard curves. For the Grand Gulf site, two such studies have already been conducted and the results are available in a usable form.
Figure 31 is the set of seismic hazard curves for the Grand Gulf site developed by the Electric Power Research Institute (Ref. EPRI,1989). Shown are the mean, median,15th-percentile and 85th-percentile curves. Each curve is the annual probability of exceedance plotted against the peak ground acceleration. Similar curves developed by the Lawrence Livermore National Laboratory (Ref. LLNL,1993) are shown in Figure 3-2. These two sets of hazard curves are used in the seismic risk quantification reported in Chapter 6. Note that the LLNL hazard curves beine used are from the recent 1993 LLNL study (Ref. SobeL 1993). not the earlier 1989 LLNL study (Ref. Bernreuter et al.,1989) that has now been superseded.
For fragility evaluation, a site-specific ground motion response spectrum is needed. In NUREG-1407 (Ref. Chen et al.,1991),it is recommended that either of the spectral shapes developed in the above EPRI and LLNL studies could be used. The median spectral shape corresponding to a 10,000-year return period along with variability estimates given in the LLNL study (Ref. Sobel,1993) is suggested for this purpose (Figure 3-3).
Two important considerations arise in the use of these seismic hazard curves. These curves provide estimates of probability of exceedance per year. However, the plant outages only extend for a fraction of the year. This must be taken into account in the estimation of frequencies of different plant operating states during shutdown (See Section 4.4 below).
Secondly, the objective of this study is to assess the contribution of the seismic-induced risks in shutdown conditions and to compare it to the risks from other events during refueling outages. It would be interesting to know how the seismic-induced shutdown risk varies from nuclear plant site to site. Towards this end, we have performed sensitivity studies by " moving" the Grand Gulf power station to different sites elsewhere in the eastern United States (with different seismic hazard curves) and estimating the impact. This is discussed in Chapter 6.
Vol. 5 3-1 NUREG/CR-6143
l 1
w 0 GRAND GULF-EPRI Z o oo, !
< v. , l C 5'.\ \ MMN !
w . a' i
W 0.0001 5 '.,'. ..
.ss 15TH FRACTILE 1 0 : , s ...... J
', ' MEDIAN W 1 E-05 ; .
s LL E '
. 's 85TH FRACTILE l 0 1 E-06
=
's s ---
i
',, 's s
's s
- 1 E-07 ',
- ~
s i CD : ',
O 1 E-08 :
O :
[ -
1 ..
1 E-09 : ..
._1 5 . .
D 1 E-10 2 0 200 400 600 800 1,000 Z
< ACCELERATION (CM/SEC*2)
Figure 3-1: EPRI Seismic Hazard Curves for Grand Gulf Site NUREG/CR-6143 3-2 Vol. 5
f w
0 GRAND GULF-LLNL Z 0,001 _
<C 1 h
g 0.0001
!\ s MEAN
's s g l 15TH FRACTILE W 1 E-05 [ \, MEDIAN 1 - -
STH FRACTILE O
1 E-06 = -
j ',, ~~
g 1 E-07 _
CD ! ',
<( -
1 E-08 ,
E :
~
n_ -
g 1 E-09 .,, ,
- <C E .,
3 -
z 1E-10 0 200 400 600 800 1,000 l
Z l
< ACCELERATION (CM/SEC*2) ;
Figure 3-2: LLNL Seismic Hazard Curves for Grand Gulf Site Vol. 5 3-3 NUREG/CR-6143
GRAND GULF-10,000 YEAR SPECTRA '
1,000 ;
O :
- 15TH PERCENTILE W
y) 300 N -
50TH PERCENTILE y ...... l C 100 j 85TH PERCENTILE 30
_ ~
O O 10 .
._J i LLI : ',,- j
> 3 '
._J -
<:( ,-,'
[ 1 : '
l-- : ,-
O ,-
W 0.3 O. -
U) ' ' ' ' ' ' '
0.1 O.01 0.02 0.05 0.1 0.2 0.5 1 2 5 10 PERIOD (SECOND)
I i
Figure 3-3: 10,000 year Return Period Groured Response Spectrum for the Grand Gulf Site NUREG/CR-6143 3-4 Vol. 5
- 4. SYSTEMS ANALYSIS FOR GRAND GULF 4.1 Identification of Accident Sequences This section presents the systems-analysis part of this study, leading up to a very simple expression for the cut-set that, when quantified, will provide an estimate of core damage frequency.
4.1.1 Assumptions Several assumptions were made at the outset of the study to simplify the analysis and provide meaningful results. These assumptions are as follows:
4.1.1.1 Plant Ooeratinn State (POS) 5 Oniv: As mentioned briefly in the introductory material in Section 1.4 above, the Sandia study of internally-initiated accidents during shutdown (Ref.
Sandia,1994) examined only refueling-outage accidents occurring during Plant Operating State (POS) 5, which is only one of the many possible POS states during shutdown.
As discussed in detail in the Sandia report (Ref. Sandia,1994), POS 5 is the " cold shutdown" state, consisting of Operating Condition 4 (temperature s 200 degrees F) and Operating Condition 5 until the vessel head is off. In POS 5 the vessel head is on, but this is a transition state, either " going down"in power prior to refueling or " coming up" to power after refueling.
The meaning of the phrase " going down" is that the plant is in transition from POS 4 (" hot shutdown") to POS 6 (" vessel head off, water level raised to steam lines"), while the phrase
" coming up" means that the plant is coming back to power and is in transition from POS 6 to POS 4. In the Sandia report, the two conditions are called POS 5D ("5 down") and POS SU ("5 up"), respectively.
4.1.1.2 Loss of offsite oower: It wes determined that the only seismic events which are of concern in this study are those that cause loss of offsite power (LOOP). Seismic events of lower ground-motion than those causing LOOP are found to have a negligible probability of causing severe plant accidents for two reasons. First, as discussed in Chapter 5 (see Table 5.3-1), all other critical plant equipment can withstand significantly higher seismic accelerations than that which is sufficient to cause LOOP. Thus, loss of core-cooling capability or other transients will have a negligible probability for seismic events smaller than those causing a LOOP.
Second, based on the internal-events analysis by Sandia (Ref. Sandia,1994), when offsite powe -
is available numerous alternate sources of water sufficient to cool the core would be available with very high probability. Thus, only LOOP-initiated accidents are considered in this study.
4.1.1.3 LOOP recovery: It is assumed that seismic initiated LOOP is non-recoverable in the timc frame of interest in this study. While this is a slightly conservative assumption,it is con-sidered reasonable because the LOOP initiator is most likely to be failure of the ceramic insulators in the plant substation (see Chapter 5). Replacement of these insulators would very likely require mote than a few hours. Furthermore, other damage caused by the earthquake would likely hamper efforts to repair the switchyard. Offsite damage to other parts of the electriPal power grid that supplies power to the plant would also be expected, which would likely delay ~ efforts to restore offsite power. Thus, recovery of offsite power is assumed not to occur after an earthquake large enough to cause LOOP.
Vol. 5 4-1 NUREG/CR-6143 l
4.1.2 Event Trees In order to identify accident sequences for the study, seismic shutdown event trees must be developed. These event trees identify the functions and systems that are important in evaluating the progression of accidents during POS 5 following the occurrence of a seismic l event. l
-l As a practical matter, the event trees used in this seismic analysis are the internal-events LOOP l event trees taken directly from the Sandia study. These event trees are very complicated, multi-layered trees that can be found in the Sandia report (Ref. Sandia,1994). They will not be reproduced here.
4.2 Seismic Capacities of Grand Gulf Safety Systems l
In Chapter 5 (Table 5.3-1), the seismic fragility values for various items of equipment are presented. Based on this table, the following hierarchy of equipment can be developed, listed in order of increasing strength. Here the weakest equipment is listed first, based on median seismic fragility (in units of PGA, peak ground acceleration):
Component Median Seismic Franility (PGAT Loss of Offsite Power 0.30 g Condensate Storage Tank (CST) 0.59 g Standby Service Water (SSW) Pumps 0.82 g all other equipment (above 1.50 g)
The key safety systems can be grouped into those that depend on the three items listed above I (LOOP, CST, SSW pumps), and those that do not. If an item does not depend on one of these three,it is considered sufficiently rugged that for the purposes of this analysis we can assume that it will not fail-- here "sufficiently rugged" means that the item's median seismic fragility )
is sufficiently strong that it will not fail for earthquakes with PGA up to about 1.5g, an l earthquake almost surely large enough to cause core damage during shutdowns at Grand Gulf, i but an earthquake that,if it can happen at all, has an extremely low annual frequency, well j below 10-s/ year (see Chapter 3).
4.2.1 The "sufficiently rugged" Items !
The sufficiently rugged systems and components include the following:
l o the reactor protection (scram) system; 'l o all electrical components except of fsif e power, including inverters, batteries, and '
diesel generators; this explicitly includes the crucial Emergency DC Power System; o all motors and associated equipment; o the turbine and generator; o all piping; NUREG/CR-6143 4-2 Vol. 5
l 0 the reactor pressure vessel; o all valves, and in particular all relief valves and associated hardware; o all large pumps except the SSW pumps; o all instruments; o air-handling and room-cooling equipment; and o all tanks except the CST.
RCIC. One of the key safety systems during power operation is the Reactor Core Isolation Cooling (RCIC) System, which provides high-pressure coolant injection to the reactor vessel during accidents. RCIC's particular feature is its steam-driven pump that is AC-independent.
Unfortunately, although RCIC is seismically rugged,in POS 5 the pressure and temperature are reduced sufficiently that there is not enough steam to operate the RCIC system, so it will not be considered further.
Structures: All of Grand Gulf's buildings and other structures are seismically rugged, based on generic seismic-capacity considerations. Besides the various buildings, this specifically includes the suppression pool. the drywell structure, and all containment structures.
4.2.2 Systems and components that are not necessarily "sufficiently rugged" The principal systems appearing on the LOOP event trees are systems to deliver water to the reactor vessel, systems involved with the RHR heat-removal function, and systems to provide pressure relief. We will next discuss all of these systems and what limits their seismic capacities.
In order to clarify what will follow, we will make one key point here as a preview of the ultimate conclusion:
The seismic caoacity of the Standby Service Water (SSW) system (median 0.82e PGA) controls the seismic caoacity of almost everythine else.
This is because:
o The seismic capacity of the Emergency AC Power system is controlled by the seismic capacity of the SSW system (median 0.82g PGA).
o All of the other key systems below depend either o*1 SSW directly or on Emergency AC Power (which itself depends on SSW). Therefore, the seismic capacities of all of these key systems are controlled by the seismic capacity of the SSW system (median 0.82g PGA).
We will begin with the SSW system and the Emergency AC Power System, and then discuss the other systems:
Standby Service Wr;ter (SSW) System: The SSW system provides heat removal from plant equipment during emergency shutdown of the plant. It has three trains, each with a motor-Vol. 5 4-3 NUREG/CR-6143
l I
1 l
1 driven pump, motor-operated valves, and heat exchangers. Train C is dedicated to HPCS. All three SSW pumps are vertical centrifugal pumps, taking water from the cooling tower basins.
The SSW depends on AC for pumps and valves,and DC for initiating the actuation logic. The l controlling seismic fragility is that of the vertical centrifugal service-water pumps at 0.82g. l 4
Emergency AC Power System: The Emergency AC Power System consists of the AC power divisions, driven by the emergency diesel generators, that are used to shut down the plant safely af ter a transient or LOCA. A key dependency is that the SSW system is needed to supply cooling water to the diesel jacket water coolers. Another key dependency in a LOOP transient is on the emergency DC system, because the AC divisions require DC power for circuit breaker control power, diesel generator field flashing, and the diesel fuel oil booster pump. The controlling fragility is that of the SSW system, whose vertical cer.trifugal pumps have a median fragility at 0.82g. The diesel generators themselves have a median fragility > 1.5g.
High Pressure Core Sorav (HPCS) System: The HPCS system can provide coolant to the reactor vessel, and has its own dedicated electrical support system. It can draw from either the CST (the primary source) or the suppression pool by automatic switchover on low CST level or high SP level. It requires AC power to operate the pumping and DC power for control. Its controlling seismic fragility in LOOP transients is that of the emergency AC system at a median PGA level of 0.82g. j Low Pressure Core Sorav (LPCS) System: The single-train LPCS system provides low-pressure coolant to the vessel. Its suction is from the suppression pool. Its motor-driven pump and valving depend on AC power, and it needs DC power for the actuation relay logic and pump breaker. LPCS's controlling seismic fragility in a LOOP transient is that of the emergency AC system at 0.82g.
Low Pressure Coolant Iniection (LPCI) System: The three-train LPCI system provides low-pressure coolant to the vessel, taking its suction from the suppression pool. Two trains have RHR pumps that are in common with other RHR modes, the SPC, SDC, and CS modes. These two trains have heat exchangers downstream of the pump, while the third train is injection-dedicated and has no heat exchangers or other RHR function. LPCI's motor-driven pumps, RHR pump cooling, RHR pump room cooling, and RHR valving depend on AC power. LPCI also needs DC power for the actuation relay logic and pump breakers, and depends on the SSW system for pump cooling. The LPCI system's controlling seismic fragility is that of the SSW's vertical centrifugal pumps at 0.82g, and also of the emergency AC system at 0.82g (because emergency AC depends on SSW).
Sucoression Pool Cooline (SPC) System: The two-train SPC system removes decay heat from the suppression pool during accidents, taking suction from the pool. It is one of the several modes of the RHR system, and shares several components with other RHR modes: the pumps are common with the LPCI, CS, and SDC modes, and each train's suppression pool suction valve is common to the LPCI and CS modes. Each train has two heat exchangers in series downstream of the pump. The SPC mode must be manually initiated and aligned. The SPC system depends on AC power for pumps and valves, DC power for initiating the actuation logic, and SSW to cool the pumps. The controlling seismic fragility is that of the SSW's vertical centrifugal pumps at 0.82g, and also of the emergency AC system at 0.82g (because emergency AC depends on SSW).
Shutdown Cooline (SDC) System: The two-train SDC system removes decay heat from the vessel during accidents, taking suction from one recirculation pump's suction line in the primary system. Each train has two heat exchangers in series downstream of the pump. It is NUREG/CR-6143 4-4 Vol. 5
one of the several modes of the RHR system, and shares several components with other RHR modes: the pumps are common with the SPC, LPCI, and CS modes, and each train's heat exchangers are common to those of the LPCI, SPC, and CS modes. The SDC mode must be manually initiated and aligned. The SDC system depends on AC power for pumps and valves, DC power for initiating the actuation logic, and SSW to cool the pumps. The controlling seismic fragility is that of the SSW's vertical centrifugal pumps at 0.82g, and also of the emergency AC system at 0.82g (because emergency AC depends on SSW).
Containment Sorav (CS) System: The two-loop CS system suppresses pressure in the containment during accidents, taking suction from the suppression pool. Each loop has two heat exchangers in series. It is one of the several modes of the RHR system, and shares several components with other RHR modes: the pumps are common with the SPC, LPCI, and SDC modes, the suppression pool suction valve is common to the SPC and LPCI modes, and each loop's heat exchangers are common to those of the SDC and SPC modes. The CS mode is automatically initiated and controlled, but operators can intervene if autoactuation fails. The CS system depends on AC power for pumps and valves, DC power for initiating the actuation logic, and SSW to cool the pumps. The controlling seismic fragility is that of the SSW's vertical centrifugal pumps at 0.82g, and also of the emergency AC system at 0.82g (because emergency AC depends on SSF).
Standbv Service Water (SSW) Cross-Tie System: The SSW cross-tic system can be used as a backup when other sources of emergency vessel injection have failed. It must be manually aligned and actuated. It consists of one train of the SSW system and one train of the LPCI system. Because LPCI's controlling seismic fragility is that of the SSW system at 0.82g, SSW's seismic fragility controls both trains at 0.82g.
Sucoression Pool Makeuo (SPMU) System: The SPMU system provides water from the upper containment pool to the suppression pool following a LOCA, through two lines that penetrate the side walls in the separator storage area of the upper containment pool. The water flows by gravity but has two normally-closed, motor-operated butterfly valves in series. It requires AC power to operate the valves and DC power for the initiation logic. The SPMU system's controlling seismic fragility is that of the emergency AC system at 0.82g. ;
i l
Control Rod Drive (CRD) System: The CRD system,a backup source of high-ptessure injection, i draws from the CST and its controlling seismic fragility is that of the large CST tank 0.59g. I All other dependencies have higher seismic capacity. !
Firewater (FW) System: The FW system is a backup low-pressure injection system, with three trains, one using a motor-driven pump and two using diesel-driven pumps. The suction is from two dedicated 300,000-gallon storage tanks. To use the FW system for vessel injection, operators must manually align and actuate the system. The diesel-driven pumps have no outside interfaces or dependencies, with self-contained batteries. The FW system's major ,
importance, besides for fighting fires, is when blackout conditions occur. Its controlling l seismic fragility is that of its large storage tanks, which are unanchored and which were found I during the walkdown to be too weak to be relied on during any sizeable carthquake. Therefore, the FW system is not included in our analysis.
4.2.3 Summary of System Fragilities i
l As the above discussion indicates, most of Grand Gulf's safety-system fragilities are controlled l either directly by the SSW system's median fragility of 0.82g or indirectly by SSW through the fact that the emergency AC power system's median fragility is controlled by SSW. The CRD Vol. 5 4-5 NUREG/CR-6143 l
l
1 and FW systems have weaker seismic capacities, the CRD system capacity being controlled by the CST capacity (median 0.598) and the FW system being seismically very weak because its large FW tanks are both unanchored.
The following short table indicates the controlling capacity for each system discussed:
Safety Item that Controls PGA at which Median System Seismic Canacity Fracility Occure a
controlline systems:
FW system FW tanks very weak offsite power ceramic insulators 0.30g CRD system condensate storage tank 0.59g SSW system vertical centrifugal pumps 0.82g systems controlled by other systems:
AC EPS system SSW 0.82g LPCI system SSW, AC 0.82g SPC system SSW, AC 0.82g SDC system SSW, AC 0.82g CS system SSW, AC 0.82g SSW cross-tie SSW 0.82g HPCS system AC 0.82g LPCS system AC 0.82g SPMU system AC 0.82g DC EPS system none very strong 4.3 Systems-Analysis Discussion 4.3.1 Core Damage Due to Seismic Failures Only Based on the above observations about the seismic ruggedness of the various Grand Gulf safety <
systems, a few broad conclusions can be simply stated: f o At earthquake levels near 0.30g (PGA), Grand Gulf will experience a LOOP (loss of offsite power) event, but no other seismic failures are expected to occur.
o At larger carthquake levels, near 0.59g (PGA), the Condensate Storage Tank will fail, o At even larger earthquake levels, Standby Service Water fails (median capacity 0.82g PGA), and this failure causes essentially gjlother safety systems to fail.
The systems implications of each of these three conditions will be discussed in turn next:
hinnic failure of LOOP alone: The seismic failure of LOOP is predicted to occur at a mean frequency of less than 10'8/ year (LLNL seismic hazard curves) or even smaller frequencies (EPRI seismic hazard curves). Even for the higher LLNL seismic-hazard rate, the only way to generate a core-damage accident with seismic-initiated LOOP alone is to experience a series of non-seismic failures, as captured in the Sandia internal-initiators analysis (Ref. Sandia,1994).
NUREG/CR-6143 4-6 Vol. 5
However, based on that analysis, all such seismic-LOOP-only cut sets have frequencies below 4
10 / year, taking into account the very small frequency of seismic-caused LOOP. They are therefore unimportant.
Seismic failure of LOOP and CST: This combination of failures will occur at earthquake levels l near 0.59g PGA, the median capacity of the CST. This is predicted to occur at a mean frequency of near 104/ year (LLNL seismic hazard curves) or near 104/ year (EPRI seismic hazard curves). However, with no other failures besides LOOP, the CST is not needed for any particular safety function. Therefore, as with LOOP alone, this combination can be screened l out based on the Sandia internal-initiators analysis (Ref. Sandia,1994). I Seismic failure of LOOP and SSW: At earthquake levels near 0.82g PGA, the SSW system will fail due to the failure of the vertical-shaft service-water pumps. When this happens, qgr_c. re !
damane is inevitable. As seen above, this is because in the absence of offsite power essentially i all of the key safety systems depend on SSW either directly or indirectly through the I dependence of emergency AC power on SSW.
This is confirmed by a special analysis conducted by the Sandia group, from which two key l findings emerge: -
)
o LOOP and CST failures together do not lead to core-damage accidents without !
other failures that are very unlikely (see the discussion immediately below in l subsection 4.3.2).
o LOOP and SSW failures together inevitably lead to core-damage.
I Therefore, the single dominant core-damage accident sequence has the following cut set, where AND is the Boolean "and":
cut set for core damage = (seismic LOOP) AND (seismic SSW failure).
Because " seismic LOOP" occurs at such a low carthquake level compared to "s-ismic SSW
. failure"(median of 0.30g vs. 0.82g), the core damage frequency is actually simply the frequency of an earthquake that leads to SSW failure, during the fraction of the year in which Grand Gulf is refueling in POS 5:
core-damage frequency / year =
(fraction of time in POS 5) x (frequency / year of seismic SSW failure).
This is a simple calculation, the results of which are presented in Chapter 6, using the convolution methodology discussed in Chapter 2.
4.3.2 Core Damage Due to a Combination of Selsmic Failures, Non-Seismic Fallures, and Human Errors
( In addition to the core-damage sequences discussed above, in which core damage arises
! exclusively from seismic-caused failures, there is the possibility of additional core-damage l sequences in which non-seismic failures and human errors also contribute. To study whether any such sequences are important at Grand Gulf, the non-seismic systems analysis that was developed by the Sandia team (Ref. Sandia,1994) was used. Special systems analyses were Vol. 5 4-7 NUREG/CR-6143 I
performed by the Sandia team, who searched for any sequences with the following properties (here the asterisk [*] means Boolean "AND" and the plus sign [+] means Boolean "OR")-
(Seismic Loss of Offsite Power)
- (Seismic Loss of CST) ;
l
- [(All other Non-Seismic Failures) + (Human Errors)] l Given that the firewater (FW) system is very weak under seismic loads (see above) and therefore cannot be relied on after an earthquake, the Sandia analysis identified no such sequences with mean continnent failure probabilities (for the non-seismic failures + human errors) greater than about 10-4, taking into account the duration of time (3.1%)in POS 5, and also the likelihood of being in the appropriate " time window" that Sandia used in their analysis j to differentiate various situations within POS 5. i l
The mean frequency of the combinations of seismic f ailures contributing to the above sequence l type is less than 10-8/ year. Therefore, this sequence type contributes negligibly (in the range of 10 4/ year or less) to the overall mean core-damage frequency at Grand Gulf. It can thus safely be screened out and ignored, and in this analysis it has been. l i
4.4. Consideration of Duration in.POS 5 During Refueling Outages i This section provides a discussion of the estimated duration,in hours, for the Plant Operating State (POS 5) of interest in this study. This time interval is important in estimating the annual core damage frequency from seismic events because the estimate must account for the fraction i of the time during a given year that the plant is in the POS of interest.
Only refueling outages were considered in this seismic analysis. Outages for other reasons i frequently occur at nuclear power plants, and they are of two broad types: controlled ;
shutdowns and uncontrolled (rapid) shutdowns. These outages, for reasons other than !
refueling, can produce the same plant operating states but with unique configurations based ;
l on the reason for the shutdown. However, this analysis did not examine outage configurations i other than those for refueling. The reason for this limitation is because the companion study ;
from which this analysis derived considerable input information (Ref. Sandia,1994) also con- ;
sidered only shutdown :tetes during refueling outages. j As part of the Sandis shutdown risk study (Ref. Sandia,1994), an evaluation was completed to estimate the time that the Grand Gulf plant was in Plant Operating State (POS) 5. 3 Information for all of Grand Gulf's refueling outages except the very first one was collected I and analyzed,in order to arrive at the fraction of the time in which the plant was in both POS SD and SU. These fractions were found to be as follows-fraction of time in POS 5D 0.008 fraction of time in POS 5U 0.023 l TOTAL FRACTION OF TIME IN POS 5 0.031 This means that, over its operating history, Grand Gulf was in POS 5 during refueling outages i
for an average of 3.1% of the time, or an average of about 270 hours0.00313 days <br />0.075 hours <br />4.464286e-4 weeks <br />1.02735e-4 months <br /> / year. Because there is a wide distribution of times spent in POS 5 among the several refueling outages in Grand Gulf's operating history, the value is uncertain: the Sandia report estimates the error factor on this value to be plus-or-minus a factor of about 2.
NUREG/CR-6143 4-8 Vol. 5 l
l 1
- 5. SEISMIC FRAGILITY EVALUATION FOR GRAND GULF 5.1 Introduction In this Chapter, the details concerning the seismic fragility evaluation for Grand Gulf be ;
discussed. Section 5.2 will discuss the seismic walkdown, and Section 5.3 will discuss the seismic fragility evaluation.
5.2. Seismic Walkdown of Grand Gulf t
5.2.1 General The seismic walkdown of Grand Gulf was performeo in December,1991 and included the :
following personnel:
James Owens Entergy Amir Shahkarami Entergy :
Robert J. Budnitz Future Resources Associates i Peter R. Davis PRD Consulting htK. Ravindra EQE Wen H. Tong EQE. ,
The purposes of the seismic walkdown were to:
- 1. Pre-screen all equipment items that have sufficiently high seismic capacities.
- 2. Clearly define the failure modes of components which are not pre-screened. Review and gather detailed information and measurements on equipment and structures for performing scismic fragility evaluations. I
- 3. Identify spatial system interaction (SI) concerns that are judged to be potentially serious problems (such as heavy, questionably secured space heaters or ceiling fixtures over critical batteries, etc.)
One of the primary objectives of the seismic walkdown was to screen all equipment items that are judged to have High Confidence of Low Probability of Failure (HCLPF) capacities higher than 0.3g peak ground acceleration (pga).
Prior to the walkdown, an initial list of components was made available based on the components modeled in the internal event fault trees that were judged to be critical from a seismic standpoint. Using the plant layout drawings the equipment locations were identified.
The following provides a list and brief discussion of the structures and equipment identified I
as target areas for seismic walkdown review.
I Vol. 5 5-1 NUREG/CR-6143 l
l l
Yard Eauioment and Structuren Yard equipment and structures reviewed during the walkdown included:
o Auxiliary Building o Containment Building o Control Building o Diesel Generator Building o Standby Service Water Cooling Tower and Storage Basins o Condensate Water Storage Tank.
Seismic reviews of these structures were performed using primarily the as-built structural drawings. During the walkdown, seismic separation gaps between the auxiliary building and the diesel generator building and between the containment building and the auxiliary building were verified.
Eauioment: The Grand Gulf plant layout drawings were reviewed prior to the walkdown to locate mechanical and electrical equipment identified on the equipment list. Seismic Evaluation Walkdown Sheets (SEWS) were prepared for each component to record detailed information for fragility evaluation.
All of the major equiprnent components identified by the system analysts were reviewed during the walkdown in accor lance with the procedures discussed in the section below. Generically reviewed component. included piping, valves, ducting, cable trays, and instrument racks.
5.2.2 Walkdown Procedures 5.2.2.1 Structures: Information necessary for seismic evaluation of civil structures is normally obtained from design drawings rather than walkdowns. Drawings are reviewed to obtain a general understanding of construction and configuration of the structures and to identify any specific data to be obtained during the walkdown. The walkdown of structures is to determine the following: ;
o Verify that the structures are in general conformance with the design drawings o Identify any gross deficiencies that might result in reduced capacities o Confirm that structural separations indicated on the drawings are provided o Obtain structural details not available from the drawings.
5.2.2.2 Eauioment: Components which were reasonably accessible and located in non-radio-active or moderately radioactive environments were reviewed. To assess components in high-radioactive environments, or within contaminated containment, smaller inspection teams and more hurried inspection were employed. For components which were not accessible, the equipment inspection relied on alternate means such as photographic inspection and seismic reanalysis.
In the event that the walkdown team had a reasonable basis for assuming that a group of components is similar and is similarly anchored, then only a single component of this group was inspected. The " similarity-basis" was developed during the walkdown. The one component of each type which was selected was thoroughly inspected. The other components were then reviewed during the walkdown to ensure similarity with the selected unit. Outliers, lack of similarity, anchorage which was different from that snown on drawings or prescribed in the criteria for that component, potential SI problems, situations that are at odds with the team NUREG/CR-6143 5-2 Vol. 5
I members' past experience, and any other areas of concern were looked for during the walkdown. When such concerns surfaced, the limited sample size of one component of each type for thorough inspection was increased. The increase in sample size which should be inspected depended upon the number of outliers and different anchorages, etc., which were observed. The following provides specific procedures used for the review of different classes of equipment inspected during the walkdown.
Tanks. Design drawings fcr the tanks and their foundations and or supports were reviewed to obtain a general understanding of the tank configurations and anchorage details. Walkdown procedures for the tanks included the following:
o Verification that the overall tank configuration and anchorage details conform with the design drawings.
o Review of piping flexibility and other attachments to identify any potential sources of damage due to seismic anchor movement.
o Inspection of any unique features, which are not common to tanks, but are identified '
during a review of the drawings.
o Identification and inspection of potential sources for seismic interaction.
Pumos. Historical performance during past earthquakes of horizontal and vertical pumps has -
shown high seismic capacities. The walkdown procedures concentrated on:
i o Verifying pump and motor anchorage including type of anchorage, foundation configuration and integrity.
l 0 Reviewing potential nozzle loads and piping flexibility. . .
o Identifying interaction potential from attached or adjacent components.
Heat Exchancers. Walkdown procedures for heat exchangers concentrated on:
1 o Reviewing the supports including support saddles and anchorage details between the saddles and the concrete piers.
o Reviewing nozzle loads and piping flexibility.
o Identifying interaction potential from attached or adjacent components.
SEWS sheets were used to record configuration and dimensional data from the walkdown for heat exchanger support, anchorage, and attached or adjacent component interaction potential details that were not available from the plant data reviewed prior to the walkdown.
Diesel Generators. Past performance of diesel generators demonstrates their lower bound capacity levels higher than 0.5g rga. The walkdown procedures concentrated on:
o Reviewing anchorage and support integrity, noting if any vibration isolators were present.
o Reviewing the peripherals such as engine control panel. diesel day tank, fuel oil lines, air intake and exhaust ducting, and starting air receiver for positive anchorage.
Vol. 5 5-3 NUREG/CR-6143
. - -= -_. - _. . -
i
'l SEWS sheets were used during the walkdown to record any problem areas enecuntered.
Electrical Distribution Eauioment. Walkdown procedures for electrical distribution equipment I included >
Reviewing and collecting anchorage details of the cabinet or enclosures for subsequent j o
analytical review.- j o Verifying that the internal instruments and components are positively attached to the cabinet framing or enclosure walls and that the device mountings are not excessively t flexible. l t
o Identifying any system spatialinteraction problems or flood or spray concerns. {
Past performance of electrical distribution equipment during earthquakes suggestslower bound seismic capacities to exceed 0.5g pga, providing the equipment and internals, instruments, _j breakers, contactors, etc., are properly anchored.
HVAC Eauioment. Two procedures for reviewing the HVAC equipment were used: !
'l o For HVAC equipment found mounted on vibration isolators, a detailed walkdown ;
review was performed.
o For HVAC equipment found positively anchored to a supporting structure, an !
engineering judgmental evaluation was performed and documented ' during the t t
walkdown.
HVAC equipment positively anchored, as well as vibration isolator supported equipment with r positive lateral restraints, have performed well during past earthquakes. l l
The review for HVAC equipment mounted on vibration isolators included recording the dimensional data and support configuration sufficient to perform an analytical evaluation .
after the walkdown.
The review of components in the second case included air intake and exhaust dampers, and exhaust fans. The walkdown review assessed anchorage and any seismic deficiencies present in order to judge that the component has a high seismic capacity. The predominant form of j documentation for these components was the use of photographs to record the walkdown j findings. l 1
HVAC Ductine. The walkdown procedures consisted of two approaches: )
1 o Inspecting the ducting in close proximity to the HVAC equipment components reviewed.
This includes:
o Vertical and lateralload resisting members of the ducting o Any possible anchor point displacements that could impart significant loads to connected ducting o Inspecting samples of the ducting system selected during the walkdown.
Documentation consisted of noting any anomalies and taking several photographs.
NUREG/CR-6143 5-4 Vol. 5
_ _ . .=_ __ .__ ___ _ _ _ _ _ _ _ _ _ _ _
t i
I Valves. Walkdown procedures consisted of a review of valves identified in the equipment list.
Areas of concern reviewed during the walkdown included observing interaction potential i between the valve operator and adjacent structure or component, evaluation of oversized or ;
eccentric operators, and reviewing possible anchor point displacements between piping and valve. SEWS were used to document the walkdowns, and similar valves were reviewed by a less J detailed walkby to verify similarity and to verify the absence of a seismic-interaction concern. ;
Pioine. Past seismic PRA studies and earthquake experience data have shown that welded steel piping systems have a very high resistance to seismic loads.
Two piping failure modes that were addressed during the walkdown include:
o Impacting failures of valve operators I o Damage to piping caused by the failure of anchorage of attached equipment.
]
The valve clearance issue and the equipment anchorage issue were addressed in the evaluation -l of the specific equipment component and not as a part of the piping review. l The procedure for walking down the piping system included following the piping layout drawings to verify support locations, assessing system interaction potential to the piping, and noting detailed configuration information for piping details that were judged to be of potential concern. Particular attention was placed on evaluation of nonseismic piping, such as fire protection piping, and potential impacts on critical components.
Cable Travs. Inspection of the cable trays was performed with a general survey of cable tray systems in the plant. This general survey was performed to obtain an overview of cable tray construction throughout the plant. This included a review of the variety of cable tray system ,
layouts, support configurations, and construction details. The inspection also considered items l identified as being of potential concern, including failure of taut cables due to large relative l displacement, severing of cables caused by sharp edges at the ends of cable trays, and weld i failure. ;
Instrument Racks. Walkdown procedures of instrument racks consisted of:
o Reviewing and collecting anchorage details of instrument racks supporting instruments, o Reviewing and verifying positive attachment of the instruments and components to the racks.
o Identifying seismic spatial interaction concerns to instrument tubing or air lines due to seismic failure of adjacent equipment. !
5.2.3 Walkdown Documentation Walkdown documentation for equipment and structures consisted of recording the findings using SEWS forms (Figures 5.2-1 and 5.2-2) and photographs (Figures 5.2-3 through 5.2-24). The ;
SEWS forms were developed for each particular class of component indicating specific i information required to confirm the high seismic capacity of the component in place as well I as to record details sufficient to perform a seismic fragility evaluation if necessary. The SEWS forms reflect the varying levels of information required between different classes of equip- 1 ment depending on their seismic ruggedness (e.g. pumps require little review other than to '
verify anchorage and interaction potential whereas HVAC components supported by vibration isolators require a detailed review,and thus a greater amount of information must be recorded
. Vol. 5 5-5 NUREG/CR-6143
1
=
for a fragility evaluation).
Photographs were also used to record details of the equipment walkdown review. Photographs provide a permanent record of what was reviewed and support any notes or details taken during the walkdown. System interaction concerns were typically documented with
- photographs. Additionally, photographs were used in the fragility evaluation to confirm details taken in the walkdown or to provide additional clarification.
5.2.4 Walkdown Findings 5.2.4.1 Structu r_gi Safety Related Structures: The following safety related structures were surveyed during the walkdown:
o Auxiliary Building -
o Containment Building o Control Building o Diesel Generator Building o Standby Service Water Cooling Tower and Storage Basins All the Category I civil structures were constructed of reinforced concrete. Information required to develop structural fragilities is obtained primarily from the structural drawings.
Thus, seismic walkdown review of building structures was limited to verification of building separations and identification of block walls which may pose a seismic interaction concern to safety related equipment components.
Block Walls: Masonry block walls that are located adjacent to safety related equipment that were reviewed were noted in two places: 1) at the 480V load control center (Figure 5.2-3) and
- 2) at the control room (Figure 5.2-4). These walls were designed to the plant design SSE level.
For seismic events beyond the design SSE level, a fragility analysis is necessary to determine the median seismic capacity of these block walls.
Yard Tanks: Ground mounted storage yard tanks included in the walkdown are the condensate water storage tank (CST), the fire water storage tanks and the underground diesel generator fuel oil tanks. The CST is a large diameter vertical flat bottom storage tank anchored to a common reinforced concrete foundation mat with the refueling water storage tank. Both tanks are surrounded by dike walls. The CST is anchored to the concrete foundation with (14) anchor bolts of 1.5-inch diameter (Figure 5.2-5). Detailed information for the fragility evaluation was obtained from vendor drawings and foundation drawings.
The 300,000-gallon fire water tanks are unanchored vertical flat bottom storage tanks supported at grade. A pipe near the base of the tank was observed restrained by a U bolt (Figure 5.2-6). As such, the pipe may become damaged in a seismic event as it may behave as a restraint to the unanchored tank. The three diesel generator fuel oil storage tanks are buried 11 feet below grade outside of the diesel generator building. The fuel oil transfer pumps are located inside the tanks. The tanks were not reviewed during the walkdown due to inaccessibility.
5-6 Vol. 5 NUREG/CR-6143
- m
l l
l 5.2.4.2 Eauioment The Grand Gulf seismic walkdown consisted of a review of majority of the equipment components included in the study. The following provides brief summaries for various classes of equipment reviewed during the walkdown.
Cable Travs: Cable tray systems in the plant were sampled. Both trapeze and floor mounted supports were observed as shown in Figures 5.2-7 and 5.2-8. Diagonal bracing members were observed in both longitudinal directions of the cable trays. No seismic deficiency was noted.
Mechanical Eauioment: Mechanical equipment including piping, valves, pumps, vessels and heat exchangers, were observed to be well anchored and appeared rugged in construction.
Based on our experience with similar equipment in past earthquakes and in conducting other PRAs, we do not expect mechanical equipment in general to be dominant contributors to seismic risk.
Diesel Generators: One HPCS diesel generator and two Division I diesel generators were reviewed. All three engine generators are mounted on the diesel generator building floor slabs at the grade level. The HPCS engines and the generator are mounted on separate skids.
However, individual skids were observed well anchored to the concrete floor slab such that no differential movement between the engine and the generator is expected.
The diesel oil day tanks were observed to be well constructed and are supported on braced frames constructed of heavy steel angle sections as shown in Figures 5.2-9 and 10. Each support leg is bolted down with a 1-1/2" diameter bolt. Vertical air receiver tanks .were also observed to be well anchored in the same room where diesel generators and day tanks are located.
SSW Pumo B: The Standby Service Water pump is a vertical long shaft pump. The motor is mounted on the top of the pump discharge head (Figure 5.2-1I) which in turn is anchored to the SSW building concrete floor slab with four bolts as shown in Figure 5.2-12. Lateral supports of the pump casing and pump shaft were not reviewed during the walkdown due to inaccessibility.
RHR Pumo: The RHR pumps as shown in Figure 5.2-13 for pump 'C" are located in the auxiliary building at the elevation 93' slab (i.e. basemat). The driver (i.e. motor) was observed rigidly connected to the pump. The areas where the pumps are located were observed to be free of seismic interaction concerns.
RHR Heat Exchancer B: The RHR heat exchanger "B" is a vertical shell and tube type exchanger located in the north east corner of the auxiliary building. The exchanger is vertically supported on four structural steel columns as shown in Figure 5.2-14. Anchorage at the base of the support columns is shown in Figure 5.2-15. Laterally, the exchanger is restrained at two elevations. Due to high radiation in the room, detailed review of the heat ;
exchanger and its supports was not performed. j Motor Control Centers (MCC) and Load Centers (LCh The MCCs for the standby service water j pumps are located in the standby service water building at grade. These MCCs appeared to be i well constructed and are welded to inverted channels which in turn are welded to steel embeds.
MCC 16B21 was attached to steel channels with machine bolts. Anchorage of MCC 16B11 and ;
LC 16Bil could not be verified during the walkdown. ;
i None of the MCCs that were reviewed were opened for inspection during the walkdown i because they were energized. Thus, mounting of the internal components and bolting of the adjacent cabinets were not inspected.
Vol. 5 5-7 NUREG/CR-6143 1
Electrical and Control' Eauioment: The following electrical and control equipment were reviewed during the walkdown o Motor Control Centers and Load Centers o 4kV Switchgear o 480V Laad Control Center o Diesel Generator Control Panels o ControlInstrumentation Panels i 4kV Switchecar: The 4kV switchgear (9-foot tall by 5-foot deep) is located in the control building at elevation 119'. The switchgear enclosure was not opened because the unit was energized. As a result, anchorage of the switchgear was not verified during the walkdown. ,
I 480V Load Control Center: The ITE load control center (LC 16 BB2) consisting of a 480V switchgear and a transformer is located in the auxiliary building at elevation 139'(Figure 5.2-16). The load center was not opened for inspection during the walkdown since it was energized. As such, mounting of the internal components of the switchgear and the transformer, and bolting of the adjacent cabinets were not inspected. Masonry block walls were I observed in the room where the load center is located (Figure 5.2-3).
Diesel Generator Control Panels: The control panel of the diesel generators is located in the diesel generator building at the elevation of the plant grade. The control panel is well anchored to the concrete floor slab with eight expansion bolts of 3/8" diameter at the front and back. l Control Instrumentation Panels: Various control panels and bench boards are located in ths control room. A raised floor was observed in the control room. However, panels and bench boards were found anchored at the base to structural steel members as shown Figure 5.2-17.
These steel members are in turn welded to steel embeds in the concrete floor slab (Figure 5.2-18). A masonry block wall was observed in the control room next to IH13 panels (Figure 5.2-4). No other concern was noted during the walkdown for the control instrumentation panels. i Batteries: The 125V station battery in the control building (elevation 119') was reviewed for construction of the battery cells, flexibility of the cables, spacers between the cells and between l l
the cells and rack,and construction and anchorage of the battery racks. A typical battery bank reviewed is shown in Figure 5.2-19. All the batteries and battery racks reviewed in the seismic walkdown were found to be well constructed and well anchored (Figure 5.2-20). The battery enclosures were constructed of Maronite type walls with a steel roof deck.
Offsite Power: A walkdown review was performed of the switchyard components. Equipment observed in the switchyard is similar to what has been observed by the team members in other east coast power stations. Two types of dead tank design circuit breakers (Figure 5.2-21) were observed in the switchyard. Because of the high voltage (500kV), longer than usual cantilevered ceramic insulators were observed on the circuit breakers (Figure 5.2-21),
disconnect switches (Figure 5.2-22), and bus support structures (Figure 5.2-23). Damage to switchyard components in past carthquakes has been attributed primarily to failure of the ceramic insulators. Furthermore, anchorage of the steel support frames of circuit breakers to the concrete foundation mat was observed to be provided by friction clips as shown in Figure 5.2-24. Heavy equipment anchored by similar friction clips is known to have displaced in past earthquakes due to failure of the anchorage.
5-8 Vol. 5 NUREG/CR-6143
Seismic Sostial Interactions: A few potential seismic spatial interaction (SI) concerns were noted during the scismic walkdown. The SI concerns can be categorized into the following groups:
o Potential impact of control room control panels or electrical cabinets by a masonry block wall.
o Potentialimpact of 480V load control center by the adjacent masonry block wall.
5.3 Seismic Fragility Evaluation 5.3.1 Seismic Fragility Methodology The seismic fragility of a structure or equipment is defined as the conditional probability of its failure at a given value of peak ground acceleration. The methodology for evaluating the seismic fragilities of structures and equipment is documented in (Ref. Ravindra and Kennedy '
(1983); PRA Procedures Guide (1983), and Kennedy and Ravindra (1984)). It has been developed and applied in over twenty-five seismic PRAs.
The objective of fragility evaluation is to estimate the ground acceleration capacity of a given component. This capacity is de fined as the peak ground acceleration value at which the seismic response of a given component located at a specified point in the structure exceeds the component's resistance, resulting in its failure. The ground acceleration capacity of the component is estimated using information on plant design bases, responses calculated at the design-analysis stage, as-built dimensions, and material properties. The ground acceleration capacity is a random variable which can be described completely by its probability distribution.
However, there is uncertainty in the estimation of the parameters of this distribution,the exact shape of this distribution, and in the appropriate failure model for the component. For any postulated failure model and set of parameter values and shape of the probability distribution, a fragility curve depicting the conditional probability of failure as a function of ground acceleration can be obtained. Hence, for different models and parameter assumptions, one could obtain different fragility curves. A satisfactory way to consider these uncertainties is to represent the component fragility by means of a family of fragility curves obtained as above; a subjective probability value is assigned to each curve to reflect the analyst's degree of belief in the model that yielded the particular fragility curve.
At any acceleration value, the component fragility (i.e., conditional probability of failure) varies from 0 to 1; this variation is represented by a subjective probability distribution. On this distribution we can find a fragility value (say,0.01) that corresponds to the cumulative subjective probability of 5%. We have 5% cumulative subjective probability (confidence) that the fragility is less than 0.01. Similarly, we can find a fragility value for which we have a confidence of 95%. Note that these statements can be made without reference to any probabili-ty model. Using this procedure, the median (50%), high (95%), and low (5%) confidence fragility curves can be drawn. On the high confidence curve, we can locate the fragility value of 5%; the acceleration corresponding to this fragility on the high confidence curve is the so called HCLPF (High Confidence Low Probability of Failure) capacity of the component. By characterizing the component fragility through a family of fragility curves, the analyst has ex-pressed all his knowledge about the seismic capacity of the component along with the uncertainties. Given the same information, two analysts with similar experience and expertise would produce approximately the same fragility curves. Development of the family of fragility curves using different failure models and parameters for a large number of components in a seismic PRA is impractical if it is done as described above. Hence, a simple Vol. 5 5-9 NUREG/CR-6143
-_ -_-- l
model for the fragility was proposed as described in the above cited references. In the following this fragility model is described.
5.3.1.1 Frastilitv Model The entire fragility family for an element corresponding to a particular failure mode can be expressed in terms of the best estimate of the median ground acceleration capacity, Am, and two random variables. Thus, the ground acceleration capacity, A,is given by (Eq. 5.3-1)
A=Am 'n 'U in which e nand e areu random variables with unit medians, representing, respectively, the inherent randomness about the median and the uncertainty in the median value. In this model, we assume that both eg and euare lognormally distributed with logarithmic standard deviations, Baand B u, respectively. The formulation for fragility given by Eq.(5.3-1) and the assumption of lognormal distribution allow easy development of the family of fragility curves which appropriately represents fragility uncertainty. For the quantification of fault trees in the plant system and accident sequence analyses, the uncertainty in fragility needs to be expressed in a range of conditional failure probabilities for~a given ground acceleration. This is achieved as explained below:
With perfect knowledge (i.e., only accounting for the random variability, BR), the conditional probability of failure, f , ofor a given peak ground acceleration level, a,is given by f, = 4 [In(a/A m) / Ba] (Eq. 5.3-2) where f(~)is the standard Gaussian cumulative distribution function. The relationship between f, and a is the median fragility curve plotted in Figure 5.3-1 for a component with a median ground acceleration capacity A,= 0.87g and Ba = 0.25. For the median conditional probability of failure range of 5% to 95%, the ground acceleration capacity would range from 0.58g to 1.31 g.
When the modeling uncertainty Bu is included, the fragility becomes a random variable (uncertain). At each acceleration value, the fragility f can be represented by a subjective probability density function. The subjective probability, Q (also known as " confidence") of not exceeding a fragility f' is related to f' by f' = 4 [(In(a/A, + BU #~* (Q))/Bn] (Eq. 5.3 3) where Q = P[f < f'l a] i.e., the subjective probability (confidence) that the condition-al probability of failure, f,is less than f' for a peak ground acceleration a
4-'(.) = the inverse of the standard Gaussian cumulative distribution function.
For example, the conditional probability of failure f' at acceleration 0.6g that has a 95%
nonexceedance subjective probability (confidence)is obtained from Eq. (5.3-3) as 0.79. The 5%
to 95% probability (confidence) interval on the failure at 0.6g is 0 to 0.79 with a median value of 0.068 and mean of 0.20. Subsequent computations are made easier by discretizing the random variable probability of failure f into different intervals and deriving a probability qi NUREG/CR-6143 5 - 10 Vol. 5
l
[
for each interval (Figure 2 2). Note that the sum of the qi probabilities associated with all the intervals is unity. The process develops a family of fragility curves, each with an associated probability q3 l The median ground acceleration capacitymA and its variability estimates Ba and By are l evaluated by taking into account the safety margins inherent in capacity predictions, response analysis, and equipment qualification, as explained below.
5.3.1.2 Failure Modes The first step in generating fragility curves such as those in Figure 5.3-1 is to develop a clear definition of what constitutes failure for each of the critical elements in the plant. This definition of failure must be agreeable to both the structural analyst generating the fragility curves and the systems analyst who must judge the consequences of component failure. Several modes of failure (each with a different consequence) may have to be considered and fragility !
curves may have to be generated for each of these modes. The following definitions of failure l are assumed for structures and equipment.
Structures: For elements of structures which support safety related equipment, failure is !
assumed to occur when inelastic deformations due to seismic motions are large enough to ,
potentially affect the operability of equipment or when a concrete wallis cracked sufficiently so that equipment attachments fail. This is a conservative definition of failure of a structure, and is at a lower acceleration level than the acceleration level for total collapse of a building.
Considerable margin exists for structural collapse compared to the capacities calculated for failure related to equipment (functional and structural failure modes). Also, a structural failure has been generally assumed to result in a common cause failure of multiple safety systems, housed in the same structure. Structures which are susceptible to sliding are considered to have failed when suffici .nt sliding deformation has occurred to fail buried or interconnecting piping or electrical duct Sanks.
Eauioment: Safety related equipment is ansumed to fail when it can no longer perform its function. Failure can be caused by either d rect failure (i.e. structural failure) or functional failure due to inertialloads or relative dispir cement-induced loading, orindirect failure caused by failure of an adjacent structure or component which can fall onto and fail the safety related equipment. Structural failure includes bending, buckling of supports, anchor bolt pullout, etc.
Functional failures include binding of valves, excessive deflection, and relay trip or chatter.
It may be possible to identify the failure mode most likely to be caused by the seismic event by reviewinr ;he equipment design and considering only that mode. Otherwise, fragility curves are developo based on the premise that the component could failin any one of many potential failure modes. Identification of the credible modes of failure is largely based on the analyst's experience and judgment. Review of plant design criteria, calculated stress levels in relation to the allowable limits, qualification test results, seismic fragility evaluation studies done on other plants, and reported .ailures (in past earthquakes, in licensee event reports and fragility tests) are usefulin this task.
Consideration should also be given to the potential for soil failure modes (e.g., liquefaction, toe bearing piessure failure, base slab uplift, and slope failures). For buried equipment (i.e., piping and tanks), failure due to lateral soil pressures may be an important mode. Seismically induced failures of structures or equipment under impact of another structure or equipment (e.g., a crane) may also be a consideration.
Vol. 5 5 - 1I NUREG/CR-6143
._ _ m .__ _
5.3.1.3 Estimation of Fragility Parameters i
In estimating fragility pa rameters,it is convenient to work in terms of an intermediate random -
variable called the factor of safety. The factor of safety, F, on ground acceleration capacity above the safe shutdown earthquake level specified for design, AssE,is defined as follows i
A = FA SSE Actual seismic caoacity of element !
F =
Actual response due to SSE j
= Actual seismic caoacity of element ;
Calculated capacity x Calculated caoacity.
Design response due to SSE i
x Desien resoonse due to SSE j Actual response due to SSE ,
F is further simplified as: ,
F = Actual seismic canacity of element Design response due to SSE x Desien resoonse due to SSE ,
Actual response due to SSE F FFs (Eq. 5.3-4)
=
ca 5
The median factor of safety, F , can be directly related to the median ground acceleration capacity, A , as: ,
A, / ASSE (Eq. 5.3-5)
F, =
The logarithmic standard deviations of F, representing inherent randomness and uncertainty, l are identical to those for the ground acceleration capacity A.
5.3.1.4 Structural Franility For structures, the factor of safety can be modeled as the product of three random variables:
F (Eq. 5.3-6) i
=
FsF, FRS The strength factor, Fs, represents the ratio of ultimate strength (or strength at loss-of-func-tion) to the stress calculated for Assg. In calculating the value of F s, the nonseismic portion of the totalload acting on the structure is subtracted from the strength as follows:
F3 = (S - Pg) / (P.p - P3 (Eq. 5.3-7) where S is the strength of the structural element for the specific failure mode, P3 is the normal operating load (i.e., dead load, operating temperature load, etc.) and P.c is the total load on the structure (i.e., sum of the seismic load for A ssE and the normal operating load). For higher -
5 - 12 Vol. 5 NUREG/CR-6143 i
earthquake levels, other transients (e.g., SRV discharge, and turbine trip) may have a high probability of occurring simultaneously with the earthquake; the definition of P3 insuch cases should be extended to include the loads from these transients.
The inelastic energy absorption factor (ductility), F,, accounts for the fact that an earthquake represents a limited energy source and many structures or equipment items are capable of absorbing substantial amounts of energy beyond yield without loss-of-function. A suggested method to determine the deamplification effect resulting from inelastic energy dissipation in-volves the use of ductility modified response spectra (Ref. Newmark,1977). The deamplifica- .
tion factor is primarily a function of the ductility ratio p defined as the ratio of maximum displacement to displacement at yield. More recent analyses (Ref.Riddell and Newmark,1979) have shown the deamplification factor to be a function of system damping. One might estimate a median value of p for low-rise concrete shear walls (typical of auxiliary building walls) of 4.0. The corresponding median F value would be 2.4. The variabilities in the inelastic energy absorption factor, F,, are estim,ated as Sn = 0.21 and BU = 0.21, taking into account the I uncertainty in the predicted relationship between F,, p, and system damping.
The structure response factor, Fas, recognizes that in the design analyses structural response was computed using specific (often conservative) deterministic response parameters for the structure. Because many of these parameters are random (often with wide variability) the '
actual response may differ substantially from the design-calculated response for a given peak ground acceleration.
The structure response factor, Fas,is modeled as a product of factors influencing the response variability:
F ns -
Fsi F,F aFu F uc F F Ec so Fss, (Eq. 5.3 8) where F SA = spectral shape factor representing variability in ground motion and associated ground response spectra l
F, = direction factor representing the variability in the two earthquake direction response spectral values about the mean value Fa = damping factor representing variability in response due to difference between actual damping and design damping Fu = modeling factor accounting for uncertainty in response due to modeling assumptions F ue = mode combination factor accounting for variability in response due to the method used in combining dynamic modes of response F Ec = earthquake component combination factor accounting for variability in response due to the method used in combining earthquake components F sD = factor to reflect the reduction with depth of seismic input F ss = factor to account for the effect of soil-structure interaction Vol. 5 5 - 13 NUREG/CR-6143 1
l
The median and logarithmic standard deviations of F are expressed as:
Fm = F sm F, F samFam Fg, F ucm FEcm F SDm F s s, (Eq. 5.3-9) and (Eq. 5.3-10)
B 72 = (Bs* + B U +O SA + ***
- OSS ) /
The logarithmic standard deviation Br is further divided into random variability B R, and uncertainty, BU. To obtain the median ground acceleration capacity Am the median factor of safety. Fm,is multiplied by the safe shutdown earthquake peak ground acceleration.
5.3.1.5 Eauioment Franility For equipment and other components, the factor of safety is composed of a capacity f actcr, Fc. I a structure response factor, Fas, and an equipment response (relative to the structure) factor, .l F RE. Thus, F = Fc Fag F as - (Eq. 5.3-11) l The capacity factor Fc for the equipment is the ratio of the acceleration level at which the !
equipment ceases to perform its intended function to the seismic design level. This acceleration l level could correspond to a breaker tripping in a switchgear, excessive deflection of the control l rod drive tubes, or failure of a steam generator support. The capacity factor for the equipment may be calculated as the product of Fs and F . The strength factor, Fs,is calculated using Eq.
(5.3-7). The strength, S, of equipment is a fu,nction of the failure mode. Equipment failures can be classified into three categories:
i
- 1. Elastic functional failures
- 2. Brittle failures
- 3. Ductile failures.
Elastic functional failures involve the loss of intended function while the component is stressed below its yield point. Examples of this type of failure include the following:
o Elastic buckling in tank walls and component supports o Excessive blade deflection in fans o Shaft seizure in pumps.
The strength of the component is considered to be the load level at which functional failure occurs.
Brittle failure modes are those which have little or no system inelastic energy absorption capability. Examples include the following:
o Anchor bolt failures o Component support weld failures o Shear pin failures.
Each of these failure modes has the ability to absorb some inelastic energy on the component level, but the plastic zone is very localized and the system ductility for an anchor bolt or a 5 - 14 Vol. 5 NUREG/CR-6143
support weld is very small. The strength of the component failing in a brittle mode is therefore calculated using the ultimate strength of the material.
Ductile failure modes are those in which the structural system can absorb a significant amount of energy through inelastic deformation. Examples include the following:
o Pressure boundary failure of piping o Structural failure of cable trays and ducting ,
o Polar crane failure.
The strength of the component failing in a ductile mode is calculated using the yield strength of the material for tensile loading. For flexural loading, the strength is defined as the limit load or load to develop a plastic hinge.
The inelastic energy absorption factor, F,, for a piece of equipment is a function of the ductility ratio, p. The median value F,is considered close to 1.0 for brittle and functional failure modes. For ductile failure modes of equipment that respond in the amplified acceleration region of the design spectrum (i.e.,2 to 8 Hz):
F, = e (2p - 1)1/2 (Eq. 5.3-12) where e is a random variable reflecting the error in Eq. (5.3-12) and has a median value of 1.0 and a logarithmic standard deviation, Bu, ranging from 0.02 to 0.10 (increasing with the ductili-ty ratio). For rigid equipment, F,is given by F, = ep 048 (Eq. 5.3-13)
Again, e is a random variable of median equal to 1.0 and logarithmic, standard deviation ranging from 0.02 to 0.10.
The median and logarithmic standard deviation of ductility ratios for different equipment are calculated considering recommendations of (Newmark,1977). This reference gives a range of ductility ratios to be used for design. The upper end of this range might be considered to represent approximately the median value, while the lower end of the range might be estimated at about two logarithmic standard deviations below the median.
The equipment response factor Fag,is the ratio of equipment response calculated in the design to the realistic equipment response; both responses are calculated for design floor spectra. F RE is the factor of safety inherent in the computation of equipment response. It depends upon the response characteristics of the equipment and is influenced by some of the variables listed under Eq.(5.3-8). These variables differ according to the seismic qualification procedure. For equipment qualified by dynamic analysis, the important variables that influence response and variability are as follows:
o Qualification method (QM) o Spectral shape (EA)- including the effects of peak broadening and smoothing, and artificial time history generation o Modeling (affects mode shape and frequency results)(M) o Damping (6)
Vol. 5 5 - 15 NUREG/CR-6143
o Combination of modal responses (for response spectrum method)(MC) o Combination of earthquake components (EC).
For rigid equipment qualified by static analysis, all variables, except the qualification method, are not significant. The equipment response factor is the ratio of the specified static coefficient divided by the zero period acceleration of the floor level where the equipment is mounted. If the equipment is flexible and was designed via the static coefficient method, the ,
dynamic characteristics of the equipment must be considered. This requires estimating the i fundamental frequency and damping,if the equipment responds predominantly in one mode.
The equipment response factor is the ratio of the static coefficient to the spectral acceleration at the equipment fundamental frequency.
Where testing is conducted for seismic qualification, the response factor must take into account the following:
o Qualification method (QM) o Spectral shape (S A) o Boundary conditions in the test versus installation (BC) o Damping (6) o Spectral test method (sine beat, sine sweep, complex waveform, etc.)(STM) o Multi-directional effects (MDE).
The overall equipment response factor is the product of these factors of safety corresponding to each of the variables identified above. The median and logarithmic standard deviations for randomness and uncertainty are estimated following Eqs. (5.3 9) and (5.3-10).
The structural response factor, Fas,is based on the response characteristics of the structure at the location of component (equipment) support. The variables pertinent to the structural response analyses used to generate floor spectra for equipment design are the only variables of interest to equipment fragility. Time-history analyses using the same structural models used to conduct structural response analysis for structural design are typically used to generate floor spectra. The applicable variables are as follows: .
o Spectral shape o Damping o Modeling o Soil-structure interaction.
For equipment with a seismic capacity level that has been reached while the structure is still within the clastic range, the structural response factors should be calculated using damping values corresponding to less than yield conditions (e.g., about 5% median damping for reinforced concrete). The combina; ion of earthquake components is not included in the structural response since the variable is to be addressed for specific equipment orientation in the treatment of equipment response.
Median F,and variability S and g B estimates u are made for each of the parameters affecting NUREG/CR-6143 5 - 16 Vol. 5 s
l l
capacity and response factors of safety. These median and variability estimates are then combined using the properties of lognormal distributions in accordance with Eqs. (5.3-6),
(5.3-8), and (5.3-11) to obtain the overall median factor of safety F, and variability Ba and Bu estimates required to define the fragility curves for the structure or equipment. For each variable affecting the factor of safety, the random (BR )and uncertainty (B u) variabilities must be separately estimated. The differentiation is somewhat judgmental, but it can be based on l general guidelines. Essentially, Bn represents variability due to the randomness of the carthquake characteristics for the same acceleration and to the structural response parameters l which relate to these characteristics. The dispersion represented by Bu is due to factors such !
as the following:
l o Our lack of understanding of structural material properties such as strength, inelastic energy absorption, and damping.
o Errors in calculated response due to use of approximate modeling of the structure and l inaccuracies in mass and stiffness representations. j o Usage of engineering judgment in lieu of complete plant-specific data on fragility levels of equipment capacities, and responses.
5.3.2 Grand Gulf Seismic Fragilities l The seismic fragilities of equipment included in the Grand Gulf shutdown PRA are presented in Table 5.3-1. Selection of these equipment items was discussed in Section 5.2. Detailed discussions of the fragility evaluation are provided in this section. For structures such as concrete shear walls, prestressed concrete containment, steel frames, masonry walls, 1l l field-crected tanks, and buried structures, the fragility parameters are generally estimated i using plant-specific information. Fragilities of Grand Gulf Category I civil structures were l not calculated in this study. All the Category I civil structures are constructed of reinforced l concrete. Based on the cursory walkdown review and a review of design documents,it was judged that Grand Gulf Category I structures generally would not be significant seismic risk contributors.
For major passive equipment (e.g., reactor pressure vessel, steam generator, reactor coolant l
, pump, recirculation pump, major vessels, heat exchangers, and major piping), it is preferable '
l to develop plant-specific fragilities using original design analyses. Because of the large quantities of other types of passive equipment (e.g., piping and supports, cable trays and supports, HVAC ducting and supports, conduit, and miscellaneous vessels and heat exchangers), l it is generally necessary to use generic fragilities. For active equipment, use of a combination of generic and plant-specific information is needed to develop fragilities.
5.3.2.1 Screeninn of Eauinment Grand Gulf equipment that is inherently seismically rugged was screened from detailed fragility evaluation. Such equipment included all the horizontal motor driven pumps, small shell and tube type heat exchangers, and emergency diesel generators (including peripherals).
Screening of equipment was performed following the procedures in EPRI NP-6041-M (EPRI, 1988).
5.3.2.2 Generic Eauioment Seismic Franilities
]
l Some equipment items in this study were assigned generic seismic fragilities for the following i reasons:
Vol. 5 5 - 17 NUREG/CR-6143
o Some equipment was not reviewed during the walkdown due to inaccessibility o Some anchorages could not be verified during the walkdown since the equipment was energized and could not be opened. This included some motor control centers, load centers, and the 480V transformer, o Some items lacked design information such as as-built drawings for performing a fragility evaluation.
For these equipment items, conservatively estimated seismic fragility values which were developed either from limited design information or from a review of UCID-20571 were assigned as indicated in Table 5.3-1.
512.4 Grand Gulf Soecific Eauioment Fracilities For the remaining Grand Gulf shutdown components, seismic fragilities were calculated following the methodology discussed in Section 5.2 using information such as walkdown data, design documents, and seismic qualification packages.
5 1 2.4.1 Basis for Factors of Safety 4 There was a general lack of detailed information available for this study on the seismic fragility of specific Grand Gulf equipment. This condition occurs because existing codes and standards do not require determination of ultimate seismic capacities, either for structures or ,
equipment qualified by analysis, or for equipment or components qualified by testing. ,)
Therefore, most median safety factors, estimates of variability, and conditional probabilities H of failure estimated in this study are based on existing analyses, qualified engineering judgment and assumptions. Limited additional analyses were conducted to evaluate the expected failure capacities of the important equipment. The additional analyses were based for the most part on the original design or qualification analyses which were available.
For most of the safety equipment,information on analysis methods vias available in the design g.
analyses and in summary form in the updated FSAR. Scismic response information for the selected sample of safety-related equipment evaluated in this study was obtained from available vendor seismic qualification reports or design cater'ations for specific components. ;
In some cases such as for piping, only the seismic analysis requirements and stress acceptance criteria were known. Safety factors for response and structural or functional capacity were estimated from existing information when available.
In-structure response spectra for all Category I structures were generated during the design process. From these typical floor response spectra and knowledge of estimates of equipment fundamental frequencies, an estimate was made of the median peak equipment response. The median peak equipment response estimate was then compared to the dynamic response or equivalent static coefficient used in design to determine a median safety factor on response.
Capacity f actors are derived from several sources of information: plant-specific design reports, test reports, generic earthquake experience data and generic analytical derivations of capacity based on governing codes and standards. Two failure modes were considered in developing capacity factors for piping and equipment: structural and functional. Equipment and piping l
design reports delineate stress levels for the specified seismic loading plus normal operating conditions. Where the equipment fails in a structural mode (i.e., pressure boundary rupture or loss of support), the median capacity factor and its variability were derived considering strength and energy absorption capability (ductility). In cases where equipment must function, the capacity factor was derived by comparing the equipment functional failure (or fragility) ;
j 5 - 18 Vol. 5 NUREG/CR-6143 I
I level to the design level of seismic loading. Some fragility test data are available on generic classes of equipment that have been utilized in hardened military installations. Such equipment was off-the-shelf without special shock-resistant design but is similar, in many cases, to nuclear power plant equipment. Other equipment fragility data used in this study are from Holman (1986), Bandyopadhyay et al.,(1986 and 1987) and EPRI(May 1987). These data provide estimates of the fragility levels, and thus, safety factors can be developed for the specified design earthquake. Fragility levels are not normally determinable from equipment qualification reports, but the achieved test levels can be utilized to update generic fragilities derived from the military or experience data.
5.3.2.4.2 Grand Gulf Seismic Desien Criteria The Grand Gulf Nuclear Station was designed in the mid 1970s in accordance with criteria and codes in effect at that time. The Grand Gulf systems and components that are essential to the prevention or mitigation of consequences of accidents which could affect the public health and safety were designed to enable the facility to withstand the effects of natural forces including earthquakes. The design criteria included the effects of simultaneous earthquake and loss-of-coolant-accident (LOCA) conditions, The plant was designed to withstand both a Safe Shutdown Earthquake (SSE) and an Operating Basis Earthquake (OBE). The structural design criteria for the SSE were based on 0.15g and the OBE on 0.075g peak horizontal ground accelerations for all Seismic Category I structures. The maximum vertical SSE ground acceleration for Grand Gulf was specified to be two-thirds of the horizontal acceleration. A comparison of the Grand Gulf design ground response spectrum with the EPRI median 10-4 uniform hazard spectrum (UHS) anchored to 0.15g SSE level is presented in Figure 5.3-2.
5.3.2.4.3 Differences Between Criteria Used for Desien of Grand Gulf and Parameters Used in the Evaluation of the Seismic Caoacity The seismic design of the Grand Gulf structures and equipment was based for the most part on currently accepted methodology and criteria in conformance with USNRC licensing requirements. These criteria and methods together with the design codes in use at the time of the design form a conservative design basis and ensure that substantial factors of safety are introduced at various stages in the design procedure. The exact magnitude of many of these safety factors is a matter of considerable discussion. Nevertheless, in order to establish a realistic value of the actual seismic capacity of a structure or equipment, the amount of conservatism along with its variability must be established as accurately as possible.
The general apmach used in the evaluation of the Grand Gulf seismic capacities is to develop the overall factor of safety associated with each important potential failure mode. Based on the governing design parameters, a median seismic capacity is then obtained in terms of the free field ground acceleration. The overall factor of safety is typically composed of several important contributions such as strength, inelastic energy absorption (ductility), and differences in median response compared to design values resulting from such parameters as earthquake characteristics, damping, and directional load components. The following section provides the fragility evaluation of an equipment item that was qualified by testing.
5.3.3 Example of Equipment Fragility Evaluation In this section, we describe the seismic fragility derivation of the station battery located at the Elevation 111 feet of the control building. The station battery was seismically qualified by shake table test. The test was performed in accordance with IEEE 344-1975 requirements with multi-frequency, biaxial input. The following presents the derivation of the station battery seismic fragility based on shake table test results.
Vol. 5 5 - 19 NUREG/CR-6143
i Eauioment Cacacity Factor j Streneth Faq1gri r For an equipment item qualified by shake table testing, the equipment is subjected to shake table motions such that the response spectrum of the input motion envelopes the required floor response spectrum. The tests are generally not carried to a failure level.
Thus, when no structural distress is observed in the test, the actual acceleration capacity is somewhat above the qualification acceleration level. j There was no structural distress noted in the qualification of the station battery. Thus, appropriate increase factors are required to estimate the margin between the median acceleration capacity for structural failure and the qualification acceleration level. For lack of measurements of stresses in the test, the yield level of the critical element is estimated to be a factor of 1.2 above the qualification level. A second factor which accounts for the difference between the median failure level and the yield level is estimated to be 1.5. Thus, the median equipment strength factor is Fs, = (l.2) (l.5) (S,. ras /Sanas) in which S,rRS is the test spectral acceleration and S. Ras is the required floor response spectral acceleration at the fundamental freauency of the equipment. The seismic qualification report documented that the test response spectrum is about three times that of the required response spectrum over the entire frequency range. Thus, the (S,.rRS/baRRS) ratio of 3.0 is assumed.
Therefore, the median equipment strength factor was estimated to be 5.4.
The variabilities in the strength factor are derived from the two increase factors,i.e.1.2 and 1.5. Based on that, the randomness and uncertainty variabilities in the strength factor were estimated to be:
Ba = 0.05 Bu = 0.11 Since the variability in the yield level is influenced somewhat by the characteristics of the seismic input, a Sgof 0.05 was estimated.
Inelastic Enerev Absorotion Factor: Because the generic equipment strength factor could correspond to a non-ductile anchorage failure, no additional credit was taken for ductility to increase the acceleration capacity. Thus, F ,, = 1.0 Ba = 0 BU = 0 Thus, the overall equipment capacity factor is Fem = 5.4 Ba = 0.05 Bu = 0.11 NUREG/CR-6143 5 - 20 Vol. 5
f Eauioment Resoonse Factors Oualification Method Factor: Because the station battery was qualified by random, multi-frequency shake table testing, the qualification method is taken to be median centered.
Thus, 1
- F quo = 1.0 l
Ba = 0 Bu = 0 ,
Damoine Factor: The qualification was based on test levels in which the test damping values are median centered by definition. Moreover,in evaluating the equipment strength factor, the.
test spectral acceleration was compared to the required floor response spectrum at the same o damping. Thus, the median damping factor is unity and the randomness and uncertainty variabilities are both zero.
F am = 1.0 Ba = 0 By = 0 Boundary Condition Factor: The variabilities associated with the boundary condition factor reflect the variation in the equipment response that is attributed to differences in the mounting or anchorage conditions between the test fixture and the as-built plant installation. Changes in the boundary conditions can include changes in mounting stiffness and mounting strength.
Variability can be estimated by estimating the equipment overtest factors (i.e. ratio of test spectral acceleration to the required spectral acceleration) at the median and plus or minus 1.65'Bf frequencies. Because the test response spectrum is three times the required response spectrum over the entire frequency range, the variability in the overtest factor due to frequency shift will not be significant. Thus, the median boundary condition factor and its associated variability (entirely uncertainty) were estimated to be-Fu = 1.0 Ba = 0 l Bu = 0.10 I Soectral Test Method Factor: This factor characterizes the ability of the test method to excite allimportant modes of the equipment sufficiently. The random, multi-frequency, biaxial tests l were utilized for qualifying the station battery. Therefore, the test method was judged to be capabic of exciting the important modes of the station battery. Thus, the median spectral test method factor is unity and the associated variabilities are zero. ,
I Entfigvak,Comoonent Combination Factor: The carthquake component combination factor i attempts to quantify the disparity between the test conditions and the actual earthquake response. Biaxial tests tend to be unconservative because they do not represent three directional input of an actual earthquake. However, given the configurations of the station battery (i.e rigid in the side to side direction), the front to back direction response governs the failure mode. The biaxial test was then judged to be median centered and the median factor i of safety is unity. The associated variability is entirely randomness and was estimated to be 1 0.10.
Vol. 5 5 - 21 NUREG/CR-6143 l
l
Thus, the overall equipment response factor is:
Fga = 1.0 Sg = 0.10 Su = 0 Structural Resoonse Factor: Variabilities of the following structural response factors were ;
estimated by using the median and 84th-percentile floor response spectra: l l
o Spectral shape factor o Structural damping factor o Structural modeling factor o Soil-structure interaction l
Soectral Shane Factor: At the fundamental frequency of the control building (i.e.about 4 Hz),
the 5% damped design spectral acceleration and the median spectral acceleration, from the design spectrum and the Uniform Hazard Spectrum for recurrence of 0.0001/ year, are 0.40g and 0.15g, respectively. Thus, I i
Fs s
=. 0.40/0.15 = 2.7 Bn = 0.20 TheSa variability is estimated to account for randomness of the earthquake ground motion, or variability in the shape of the Uniform Hazard Spectrum. There is no uncertainty variability associated with this factor.
Structurni Damoine Factor: Given the high soil radiation damping used in the Grand Gulf design soil-structure interaction analysis, the effect of structural material damping on the response is not significant such that the median damping factor is unity, and the associated uncertainty variability was estimated to be 0.05.
Modeline Factor: Assuming that the median fundamental frequency of the control building is 4 Hz and a B,of 0.3, the lower bound and upper bound frequencies (sl*Br from the median) are 3 Hz and 5.4 Hz, respectively. The corresponding spectral accelerations from the UHS are 0.15g and 0.15g. Thus, the modeling uncertainty associated with estimates of structural frequencies was estimated to be zero. The total modeling uncertainty including that associated with the mode shape is 0.15. Since the station battery is located at Elevation 111 feet which is close to the basemat, a smaller modeling uncertainty of 0.10 was estimated.
Soil-Structure Interaction: Two types of soil-structure interactior. effects are usually considered in the analysis of nuclear power stations at deep soil sites. The first effect is the variation of peak acceleration and frequency content with the depth. The second effect involves the variation in frequency and response of the structure due to flexibility of the soil media and dissipation of energy into this soil by radiation. The design basis soil-structure interaction analysis for Grand Gulf structures considered only the second effect. Due to lack of detailed soil-structure interaction (SSI) analysis for this shutdown-PRA study, the conservatism in the design SSI analysis from not considering the first effect was neglected.
Thus, the factor of safety of SSI was assumed to be unity. The associated variabilities were estimated to be 0.05 and 0.15, respectively, for randomness and uncertainty. A relatively low uncertainty variability was assumed since the design analysis conservatively set an upper NUREG/CR-6143 5 - 22 Vol. 5
bound limit of 10% damping for the composite modal damping.
Thus, the overall structural response factor and associated variabilities are:
Fa 3
= 1.0 Ba = 0.21 Su = 0.19 Thus, the median peak ground acceleration capacity of the station battery was determined to be:
A, = (5.4) (2.7) (l.0) (0.15g)
= 2.2g The variabilities associated with this median PGA capacity were determined to be 0.23 and 0.24, respectively for Bn and Bg, by combining variabilities of equipment capacity factor, equipment response factor and structural response factors (using Equation 5.3-10). The HCLPF capacity of the station battery is 1.0g.
l l
l I
I I
i l
l l
Vol. 5 5 - 23 NUREG/CR-6143 l
i I
Z- TABLE 5.3-1 C
$O COMPONENT SEISMIC FRAGILITIES N
b D
HCLPF COMMENTS COMPONENT DESCRIPTION Am ER BU f
l (g) (g) l 0.30 0.33 Grand Gulf specific fragitity.
SSW Pump O.82 0.25 0.30 0.65 Grand Gulf specific fragility.
-- - 0.30 Screened per EPRI NP-6041.
m RHR Pump 0.30 0.67 Grand Gulf specific fragility.
RHR Heat Exchanger 1.65 0.25 0.30 Screened per EPRI NP-6041.
Standby Diesel Generators 0.30 Screened per EPRI NP-6041.
HPCS Diesel Generator
-- -- 0.30 Screened per EPRI NP-6041.
Fuel Oil Day Tanks
- - 0.30 Screened per EPRI NP-6041.
Diesel Fuel Oil Tanks 0.24 0.75 Grand Gulf specific fragility.
1.60 0.23 D/G Control Pancis 0.24 1.00 Grand Gulf specific fragility.
2.20 0.23 Station Batteries
-- -- High median capacity based on D/G Air Receiver Tanks > 2g --
equipment capacity f actor.
S
-m 1
E TABLE 5.3-1 (CONTINUED) u l GRAND GULF LOW POWER PRA l
COMPONENT SEISMIC FRAGILITIES COMPONENT DESCRIPTION Am ER BU HCLPF COMMENTS (g) (g) 480V Load Control Center 1.87 0.25 0.30 0.75 Grand Gulf specific fragility; adjacent masonry wall has vertical rebars as well as horizontal Dur-O-Watt reinforcing steel such that it does not
- pose a collapse hazard to the load y center.
u 4kV Switchgear 2.43 0.25 0.30 1.00 Grand Gulf specific fragility.
Condensate Storage Tanks 0.59 0.21 0.18 0.31 Grand Gulf specific fragility.
Offsite power 0.30 0.25 0.35 0.11 Generic values.
Z C:
N trl O
hM b
8
l I
Revision 2, Corrected, 6/28/91 Status Y N U SCREENING EVALUATION WORK SHEET (SEWS) Sheet 1 of 3 Equip. ID No. M cc.i6 P;zl Equip. Class 1 - Motor Control Centers l Equipment Description ( if F :u )
Location: Bldg. A"X Floor El. IN Room, Row / Col I A 383 l Manuf acturer, Model, Etc. (optional)
SEISMIC CAPACITY VS DEMAND IJ 9, 1 Elevation where equipment receives seismic input
- 2. Elevation of seismic input below about 40' from grade Y@U
- 3. Equipment has fundamental frequency above about 8 Hz Y@U N/A Capacity based on: Existing Documentation DOC 4.
Bounding Spectrum BS GERS GERS Ground Response Spectrum GRS
- 5. Demand based on:
1.5 x Bounding Spectrum ABS Conserv. Des. In-Str. Resp. Spec. CRS Realistic M-Ctr. In-St. . Resp. Spec. RRS Does capacity exceed demand? -Pt-trV/A :
CAVEATS - BOUNDING SPECTRUM (Identify with an asterisk (*) those caveats which :
I are met by intent without meeting the specific wording of the caveat rule and explain the reason for this conclusion in the COMMENTS section below) .
- 1. Equipment .is included in earthquake xperience l equipment c, ass @N U N/A
- 2. 600 V ratit.g or less @N U N/A
- 3. Adjacent cabinets which are close enough to impact, or sections of multi-bay cabinets, are bolted together if they contain essential relays @N U N/A
- 4. Attached weight (except conduit) less l than about 100 lbs per cabinet assembly Y N@NA
- 5. Externally attached items rigidly anchored 1N U .N/A i
- 7. Cutouts in lower half less than 6 in. wide and 12 in. high Y h U N/A
- 8. All doors secured by latch or fastener Y N U NA ,
- 9. . Natural frequency relative to 8 Hz limit considered Y N U U l l 10. Anchorage adequate (See checklist below for details) YN N/A l
- 11. Relays mounted on equipment evaluated Y N N/A
- 12. Have you looked for and found no other adverse concerns? ]N N/A m Is the intent of all the caveats met for Bounding Spectrum? YNU(Np i
Figure 5.2-1: SEWS forrn of MCC 16B21 <
NUREG/CR-6143 5 - 26 Vol. 5 i
(
i Revision 2, Corrected, 6/28/91 SCREENING EVALUATION WORK SHEET (SEWS) $heet 2 of 3 Equip. ID No. Mcc :s 6 2l Equip. Class 1 - Motor Control Centers Equipment Description CAVEATS - GERS (Identify with an asterisk (*) those caveats which are met by intent without meeting the specific wording of the caveat rule and explain the reason for this conclusion in the COMMENTS section below)
- 1. Equipment is included in generic seismic testing l equipment class @N U NA
- 2. Meets all Bounding Spectrum caveats Y N U
- 3. Floor mounted cabinet @N U N/A
- 4. Average weight per section less than 800 pounds Y N @ N/A
- 5. -e anchorage utilizing MCC base channels @N U N/A
- 6. ate strength and stiffness in load transfer from anchorage to base frame (only for " function after" GERS) @N U N/A
- 7. Essential relays have GERS > 4.59 (only for i
" function during" GERS) Y N @ N/A l 8. Able to reset starters (only for
" function after" GERS) Y N (U'1 N/A l Is the intent of all the caveats met for GERS? Y N Uh ANCHORA_Gl ( v'M w c~umb.mqN k cJe r) 1 'opropriate equi ment characteristics detarmined
, mass, CG, raturol freq., damping, center of rotation) N U N/A
- 2. lype of anchorage covered by GIP N U N/ ~-
- 3. Sizes and locations of anchors determined N U N/:t
- 4. Adequacy of anchorage installation evaluated (weld quality and length, nuts and washers, expansion anchor tightness, etc.) Y@U N/A
- 5. Factors affecting anchorage capacity or margin of safety considered: embedment length, anchor spacing, free-edge distance, concrete strength / condition, and >
concrete cracking 'Y N U N/A
- 6. For bolted anchorages, gap under base less than 1/4-inch @N U N/A
- 7. Factors affecting essential relays considered: gap under base, capacity reduction for expansion anchors Y@U N/A
- 8. Base has adequate stiffness and effect of prying 9.
action on anchors considered Strength of equipment base and load path }N U N/A to CG adequate N U N/A ,
- 10. Embedded steel, grout pad or large concrete pad adequacy evaluated Y N 3 N/A Y ;
Are anchorage requirements met? Nh Vol. 5 5 - 27 NUREG/CR-6143
Revision 2, Corrected, C/28/91 SCREENING EVALUATION WORK SHEET (SEWS) Sheet 3 of 3 Equip. ID No. fiC c 1632l Equip. Class 1 - Motor Control Centers Equipment Description INTEPACTION EFFECTS
- 1. Sof t targets free from impact uy nearby equipment or structures 3N U N/A l
- 2. If equipment contains sensitive relays, equipment free from all impact by nearby equipment or structures Y N U N/A
- 3. Attached lines have adequate flexibility N U N/A
- 4. Overhead equipment or distribution systems are not likely to collapse N U N/A
- 5. Have you looked for and found no other adverse concerns? Y N U N/A is equipment free of interaction effects? YNU !
YNU 15 EOUIPMENT SEISMICALLY ADE0VATE?
COMMENTS
.( h o44 , i e n,, m r d,4 Esc k0 , ue( s colt,d 6 Tru <t,J ekm d Svt Jeldx d so SQ eu % d s vf c~ k uous voidJ, e
'l l
7 cM c. 1.
bati a b Lg etc b c k
/ I
- - 1 O O (
' i
$ M
<
- 6, ./
~ L
) i c> cI 1 f:h V:w i
Evaluated by: u4 TM_ [k 71<w 7@ Date: ' '-/4 I C u i
5 - 28 Vol. 5 NUREG/CR-6143
Revision 2, Corrected, 6/28/91 Status Y N U SCREENING EVALUATION WORK SHEET (SEWS) Sheet 1 of 2 Equip. ID No. H FC S D/d Equip. Class 13 - Motor-Generators Equipment Description Eml6mL Location: Bldg. D/6 Floor El. (wL Room, Row / Col Manufacturer, Model, Etc. (optional) 6M f w Jw )
SEISMIC CAPACITY VS DEMAND
- 1. Elevation where equipment receives seismic input - Gd N
- 2. Elevation of seismic input below about 40' from grade (,y) N U
- 3. Equipment has fundamental frequency above about 8 Hz CY) N U N/A
- 4. Capacity based on: Existing Documentation DOC Bounding Spectrum BS
- 5. Demand based on: Ground Response Spectrum GRS '
l.5 x Bounding Spectrum ABS Conserv. Des. In-Str. Resp. Spec. CRS Realistic M-Ctr. In-Str. Resp. Spec. RRS Does capacity exceed demand?
YNU @N CAVEGS - BOUNDING SPECTRUM (Identify with an asterisk (*) those caveats which are r.at by intent without meeting the specific wording of the caveat rule and explain the reason for this conclusion in the COMMENTS section below)
- 1. Equipment is included in earthquake experience equipment class Ch N U N/A ,
- 2. Main driver and driven equipment connected by -
a rigid support or skid 4 EJ,d , rs v.fi ad.m 4o a o-4 @7U
- 3. Base vibration isolators adequate for seismic loadsMN Y N U /
- 4. Attached lines have adequate flexibility M(9 N 1 N/A
- 5. Anchorage adequate (See checklist below for details) Y N g) N/A
- 6. Relays mounted on equipment evaluated 3N U N/A i
- 7. Have you looked for and found no other adverse concerns?
Is the intent of all the caveats met for Bounding Spectrum? }N U N/A Y N U N/A !
ANCHORAGE
- 1. Appropriate equipment characteristics determined (mass, CG, natural freq., damping, center of rotation) @N U N/A ,
- 2. Type of anchorage covered by GIP CD N U N/A l
- 3. Sizes and locations of anchors determined @N U N/A l
- 4. Adequacy of anchorage installation evaluated i (weld quality and length, nuts and washers, expansion anchor tightness, etc.) @N U N/A
- 5. Factors affecting anchorage capacity or margin of safety considered: embedment length, anchor spacing, free-edge distance, concrete strength / condition, and concrete cracking @N U N/A l 1
Figure 5.2-2: SEWS forrn of HPCS Diesel Generator l
Vol. 5 5 - 29 NUREG/CR-6143 i
i
Revision 2, Corrected, 6/28/91 SCREENING EVALUATION WORK SHEET (SEWS) Sheet 2 of 2 Equip. ID No. Hf6 5 #6 Equip. Class 13 - Motor-Generators Equipment Description ANCHORAGE (Cont'dl
- 6. For bolted anchorages, gap under base less than n 1/4-inch &N U N/A
- 7. Factors affecting essential relays considered: gap under base, capacity reduction for expansion anchors Base has adequate stiffness and effect of prying Y N Uh 8.
action on anchors considered -@N U N/A
- 9. Strength of equipment base and load path 10.
to CG adequate Embedded steel, grout pad or large concrete hN U N/A pad adequacy evaluated Y N U h.Y N U Are anchorage requirements met?
INTERACTION EFFECTS
- 1. Soft targets free from impact by nearby equipment or structures hN U N/A
- 2. If equipment contains sensitive relays, equipment free from all impact by nearby equipment or structures Y N U N/A
- 3. Attached lines have adequate flexibility Y N U N/A
- 4. Overhead equipment or distribution systems are ,
not likely to collapse Y N U N/A
- 5. Have you looked for and found no other adverse concerns? N U N/A Is equipaent free of interaction effects? - - - - - - - .
.Y S U
- I ii5- - . . . . . . .
15 E0VIPMENT SEISMICALLi ADEOUATE?
Y 'N U _- --
COMMENTS l
Evaluated by: aH 'I~ai. Date: i2A/
0 NUREG/CR-6143 5 - 30 Vol. 5
I I
i 1
I a3' WlT7% INm
~ c:?kg ;R.p:/$$4 A .% 2 ;4W,.y;Qgp
- n. c - , m9
![ ..,
.g. ppv_.
s
,igge. ,i b.m:h;;y~~A't h __. Ig
- w sc+ - . , ,
t am #
p-.m, y % *CamwT.:." - ~>h.
.ss .;,
k7;;;;;m;22 w p s %es ,,"w %, eqec.a ..eg s: "D.~g.?.
gg t r.Lh,Qvu sig
. :.; -m i,g.h,;
,93
.c 4- ,
gy~ w .. , 3.g ,
s .gg; 3
fNI[ :s w g', ,
- g][
w y ,
D' C '# W. gS'Mw - u q > g,s,g,f f ,
Figure 5.2-3: Masonry block wall near the 480V load center i
. e- 2:
.] ., .' l' 1
/- -
. f.
..;g lj
),-
g te 0, ,
- ,,,_,__.__- .f
'e' "
lf f
- p ^
- fM j q
~:'::} -
(irs
< l x,_
e % Ai ^
f 7
%~.,
.w +;.'$U f.
-%9 w &-
m.,"
. - s- M.
h: ' g
%;u e
(. + ; m ;:,
, . . - g-e--,
7 2:,m(, 3:
..Ak , ,. . [ b $ .. . ..
Figure 5.2-4: Masonry block wall at the control room i
1 l
l l
Vol. 5 5-31 NUREG/CR-6143 I
i -_ _
, 1 l
J ', ,. ,
i .; . . : l- $,
i
(-
..;+ c., g, .
^ ..,.:. y?g ..- , ,:
M' i '!., .,,..
.: . ~
.. ..c f..k'... '[.h:, N $}f k($ ,
j
,J.h[ a .
W g:.a.<: .s.t. .,:;
,9; ? ; .
m .1 r :. .
f
/ .
,I l
' 6 J
Figure 5.2-5: Base anchorage detail of the condensate water storage tank J
,i
&, .)7 g-;:
k.m,y:.e g3,;.g s
% xx 7 pj "
ctp 4 i$
l
' I
%_ [idl p l ..
gca 9.J , ,,
agg.$ON: T T' ;:-
f 1!! 1 .
I
, kEfhy?
nu... . . .:4 9 .L
_'wggy
..L 1.- . .u $Y W-Figure 5.2-6: Pipe at the base of the 300,000 gallon fire water tank (unanchored) l l
i NUREG/CR-6143 5 - 32 Vol. 5 i
s :- .y % , ,- u.,
- .. . r -
')
' ? ., .N ? &q %~
j; gj 8" - ' < W b-
, .; ,y .c ~
w . .. . , , .
'_l ,: /
[fkl;w i .-
- Na, ' , . <
}
ll
., C
}' .
4 5 ;
- 3
.. N ,
Figure 5.2-7: ,
Trapeze cable tray supported ? -
4 .. T .
off the floor above .
W
! e ..
.i N\ l
- s. sN% s~~~.
k . .- ..' ['.-.
i %* gg
- ~M F~?
k\
%x
% _.g,' ,g A-
~ ,
' '\ 'R4Wengt mm. . ,
_a J.j, .
W " T i p g =. ~.~.-.:- . p_ (
- f hf l: f . [
-===-d
- ~-(lTL_w Y : ' j; }
,4' I. . . .
. , -_g
. / .
ll , -
- i. .
p ?
m i .
_-c ...~
c- 3 ',M .
. . , - - w i,_ ; m , 1 f : .
.gi l ? .1 ,
. F .) 1
.d '[~,'..
g~ :i.Y N h- l ~
a -
^ ' TQl ,,
- - -y ,.;-y lk p L . e_ .........:. > . . . .> .. -
Figure 5.2-8: Cable trays supported on the floor Vol. 5 5 - 33 NUREG/CR-6143 l
i l . _ _ _ - _ _ _ - _ _ . . . - . . . - - _ - . _ . . - - - - -
_.a#. m..As. 23 a. m_.4 e a ea-m m a -z.an.gm--%_., .m n - - - , ---- - - - - - - - - _
/
's#
4
+
/
~
yy .
~
/
... '*se,
/'
l
/
l
- O '& ,, '
24 %,
/
l i
)
i l l
-- , :77, ;_ ---
'; pM$l l t :!M -
l p,.. .
a.: -
- .2 ,' ' ; ./; + l
'; ~ ~
'S t 4 = 3,4}i; 2-ghc m gj ,
9 % E?d~;;z: ,,,
kd 3]k i !, i c., !
t
- .w;-
i.;a i
' P5??
- *Q.Ag w ~..~
Figure 5.2-11: SSW pump motor mounting y W
- yL ;;n ,
J; *h ggp:, .. , ' " "
f 9 s.
L i: ,x i s.
~
W. ,
C, M
,"w' '<
.t
- .
- u~
Figure 5.2-12: -
1/.l Base anchorage of the SSW hc ..'
[
pump '
?/
\ q, ,
85 ;
$f s:l? l 1 y 4
'si.c:dj i
Vol. 5 5 - 35 NUREG/CR-6143
)
/
/
z 1
/
- ,, s ;. . % ,
e,
/
/
l
/
Ng 'G q, ' Jg 04 ,
/
? $ - - - - - - - - ~ ~ *
.?- .; % * . ;.
r- -
. :, ,7, y -
t ~ ~ '
6
- p. .,
3 '- I !
D .d I
s
). l ~ 1 y _
r t
% 98 9
',. . .g- q w (' .
.g -
w
., ;. ?~.
?
.;~ _
%j, s n!.
- n -
. p,. s - ;
j '"?
k k h ll fh$ $- l f l.
- . i. " .
.J8iGyyfQ3 .
I Figure 5.2-15: RHR heat exchanger support column anchorage W
,- l [
a l
M.V sp h
A- I C qs 1 h'Qf@Tsi i , l? ;
I v - : -y ,
av~ *'m-
{lE;. -
1:
?g.-n e
^ ,
Figure 5.2 Q ' "4 _ _ _
$"? .Q 480V load center X:: 3-t gr +
- o. ; : v...
j f,[E$[id[' ?O ' " :r' x
i 1-4 e .;
l " 4 5 ,..
1 g ..
l I tyty;ht
' "? f -
'm Vol. 5 5 - 37 NUREG/CR-6143
I l
i
- t
\
f,..
,.s#" . .:
a !*
~
c'[
I . g ,
. . , a.:114 , '
.p . . .
~,, l f5']-l,h% 1 . ,gf
a .g>y. ,sw j
e
.p-n ~; : .
l
'?, ~ rf. jo).3. : --
' .) s
'of. . . a . . :.t-Jll;<.
l .? * , '
1 f5 ;, ~ . ~ 4 '*. Q -
en g;g/p/j'1.-
k.! -
y' % . -
- -Y l
l
'f}@l9 v
. J, .,~ .. ., . %.%
< Hf.", ;
s,y > .
l y' '
.- r .. _
P,, ' .
.. t 1 .. .. .- .
i I
- .. ;' 43 :0:22 -
i l
/ .,
.'-- g s.
i
! Figure 5.2-17: Anchorage detail of control room panels l
i I
i ,. us-1 I <
J 1 l
1 2
i j
- \
- : .
l 4
s Figure 5.2-18: Details of control roorn raised floor NUREG/CR-6143 5 - 38 Vol. 5
i t ,e
.= . j;U
- v 3 .-- ,
s q ,
N~
- a:hl"s' 3
i.
p %,
- . .a_a Figure 5.2-19: Station battery details 5 .: 7 .'
'i l ^%. '
. "'q j
~
- t. 4. -
. .l'. j * .
' g?;[% W
~
~
f' ' ' "
Figure 5.2-20: Station battery rack anchorage details Vol. 5 5 39 NUREG/CR-6143 I
I
N
~
t -
y .
e i
=
- . y 9 .
M c s
' ' . '. _ , . /. .
.a
' " ' =- '
ev .
o 7 [. _
- x. ;-
....-_~f.-
, ,g
'"?*'_ ' l }
s- :
yp r,
--> -- '; p4 y$- 'Al g' ,
4
's'j*e e
- 3. -
~ r
- e. - - _- ;;- . <.,
. , 3~
-- , .. ? T ,_4gg?]
- . go -w~ .
'2*-%'+% Oy.N +y .-
.. . . f.: Y s.,.* g:e y, . ..
~. . . . e . .
- 3. ; 3 - 3j g i
Figure 5.2-21: Two types of circuit breakers at the Grand Gulf 500kV switchyard 1 1
,2.- ,
- + .
9<
- e. . ,.
5 J i, y? Y U '-. k . G ..
M. ,=.-u&. -. g W. %.- - . . . A'
_u,... .
m :s .
= __ . a:: p;.
.~:?
B.or flnTIEiu.1I:2f e sr. : p ss 3-~ .k(
g7 .:e . . - '
re - .
.t ,
- e il
- 7 .' - e.:. __ __ . . r j' ,
'( .
. . ~gi. ?: . :~
~ '~ -
l
- Figure 5.2-22
- Disconnect switches at the 500kV switchyard i
I i
l NUREG/CR-6143 5 - 40 Vol. 5 j 1
i
4 L
3 s i.
\ i 4 1 A i
1 i 1
\ -.
(
, g,.3 .
. k- . %.}s:' ,..;
';. . . = - .. N .,
'I f ,7 . .
-y> $ ',' 4
" ' ' .: %.. . s; l: .
_ 'h(
n~
'( j .M $,,, , .N.'
- t. ~ a , .. .
+
y 'k! .
- j bt.p- .tegei N ' r.'y;'.'
6d e s 7 -
i
! DS ' '
f:: . ,W n (;I
_~
- )J ; \.!;)
? m
~
Ih bk: P. . 1. g .'
Nc ! q a g , . ' ' [,.
Figure 5.2-23: 500kV switchyard bus support structure and ceramic insulators 1
- n. Q IOI& h- e . vef
.g ' is l rf,j' ( f 4
..e Agn?[m.s.,Q, : Q .6q%,,
. . i
@t w@ p% %-r,,
^
- r. ,. - i'
[. . . .. g* .-
~;' .. _ ; ,4 ' .*
9 F :
4 '_ ", -
. 5' 2 '
,e
~
- -, R. s ' ' o, ' ' ..
~
~
~ ~
.,7
~
- i
- ~ * . -
o
, = *,
<. 4,
~.
Y ;
l - . 'g ga .c - -
.R.' .
- Figure 5.2-24
- Clip at the base of circuit breaker support skid l
l Vol. 5 5-41 NUREG/CR-6143 j
i 1
?
L1J K 1 -- Am = 0.87 g
_3 9y = 0.25
~
<C 9 y = 0.35 ,**,***
LL LL 0.8 -
O 0.79 Median ,'
, Mean 95%
g ~
Confidence ,'
_J N 0.6 - o'
<C e
.ca O -
T ,o i ct
- 3 0.4 - ,
<C
< 5%
Z Confidence
~
O ,'
0.20
- V-
~
a 0,2 -
,o ,
Z
- O -
O , 0.068 0 ; ,
0.4 0.6 0.8 1.2 1.4 O 0.2 1 HCLPF O.32g PEAK GROUND ACCELERATION (g) 2 HOC 12teCHART.1 Figure 5.3-1: Median,5% Non-Exceedance, and 95% Non-Exceedance Fragility Curves For a Component NUREG/CR-6143 5 - 42 Vol. 5
i m._2fx w y- v, w ,yn ev . . ./xwv v u m fs iw
. . . u m x, vyfm >>,s -
.-. ./v., w ,.x v s s x m sevx >: v x Ai s< s i vv e wux v 'A v s-Ni//V / A.'Al A X \/N IN/ \ \A// / /N'/(NK. f\/\ N/ '\ sV/V)' jOM\X N/x \/ \ u
- >$' V V V h\nN Y \ x Wy',V Y Ys\K'x Y \ \ ///r/ ' h% N '_/ \ \3 X/Xt'V!Xs's'XN \ NY//X V' / iNNXN N N NJ T / / X t x'4 \ \ /4 W/ Ki/ XWNd 'X/X/ XS%\MX 'k{I Xif f.
%%VN/ WM,;XWVNG'%Wx%L .a.'f)@'l'[eX NkN\/d2TM'st kM \ 5MNi /,M '
W'9' M7g'g%W / !)
% ;'4x/':
/ \ o D
r- wxvvv vx.-
s ,x i e
// y' xs v w ex x 0 0JAYvvux x /(- o y
_A V \ A V \ V\ A "
DQ ',-AX\^
fMWxV t \_/ N- s S// IN/\ N/ 'N N/ / / [- /D\AAA 3 W I '.I'\ \/ x N 1 AX\.X \A \/ \ - o iL'/ /%MNX \\ /N///YhKN Y \ \2 'i / / WMN 'VN N rAX// 'M[NW \\h7/X/ / Xs\W\\W/ -/X/ / X4NWN Nfx 5 M/X / $ N sh M NX/IX / M Y MMX / X\N\Y/M 3 XPV'/ WM%'\V i [N E %Ef'# 'v' V'lM !
7['N\N23$fN'N>b a l 7' 7' gNg '/ '
MSSM /,// g
//g 4 Fc j y f i,
m I '
R x '
/ >hb \ '
.c s N. '
i & .e :
.w X ,N . / s J mxxvv ux<x D K,X e .'< / A . i s \_ / /- a ;
0 j
sx x ^< vx m <x vus nA; n-
, eux vj vrexw !N. A v
.. i
\ N4/wwxvv^ v ^
f<r v \ v v g w v.'y . ear \A vN s y/A>N'<sA v VV v//r I M NA tv' N -
a m Wy/ /Ny NN Y \ \2 W J' / ' '\YW/) D ht\ Y \ \- i (7 M l r/Xf / !'9 i\'X'M \ \y>O'/ X}j^p\4Ne lXsh ' /s C/' 5//NX/ E . X:'NW'\ \h $ $-
M4X /_'] p @T\V2K7/NA TM\MX 'A M jI KNNs\X* - 0
'h O D ')
E W')Q \
%$M(W~'Wi?DO l'$IN l l
/ \< 'E I Mk
- < s\.p, -
/%9 J2
/ Ncxvvvsn n N/ !
tD xx s. k , f
- h,rvwx x / o k
- No ., un...u1 n.
. v n v x - - E T ./'/J WsM V\ Al V N *i/V/k%N V\ KI V 'N l gb '
0'V\ V V g vve r MhAf;,M,;. 2 'x v x O vs/N N/ s - o x A'V . y 7'1 %*' 'xy'N xy wf f p s n., s v ?.gf- .yy' i X'NN'N 5 &j[A'/V';'Y,4fN M y /,Y f v ig .
/fMI '\ \// y M '. X 1 3 _ 2js X; ; j M) s%,Ai]S's'Rx,
^
A A .+MIX -
6 YgM[%/}/ \
$^,y ;
- W- g
- +g, m
C h g (pJg bk.N ,p N[/INp-( i')4'h'y.A,'[ !Mikx'
,g, h ,grN y , . \,,i N '\, o ) .
h_ N N, .I \ '
h'f/ \ f l /
k' thb: ./' / , / ! . , b . ,. / ]
o o o e o e y o cas Jed *u! '^s A1!aola/\ leJ1oads I
Vol. 5 5 - 43 NUREG/CR-6143
- 6. SEISMIC RISK QUANTIFICATION FOR GRAND GULF 6.1 Base Case The key elements of seismic risk quantification are seismic hazard analysis (Chapter 3), systems analysis (Chapter 4) and seismic fragility evaluation (Chapter 5). In this Chapter, these are assembled together to obtain estimates of the frequencies of different plant operating states.
In Chapter 4, Plant Operating State (POS) 5 during refueling outages was studied, because it was selected by the Sandia team (Ref.Sandia,1994) for analysis for internal initiators during shutdown. Based on the systems analysis described in Chapter 4, we have developed a simple Boolean equation for POS 5, given in Chapter 4.
Note that the basic event in this Boolean equation is a seismic-ir duced failure (service-water system failure). The seismic fragilities of components have been estimated as described in Chapter 5.
The seismic quantification, using the methodology described in Chapter 5, was dor e using the software package EQESRA (proprietary to EQE International Inc.) which takes as input the family Of seismic hazard curves and the family of seismic fragility curves for all components appearing in the Boolean equations. The component failures are treated as statistically independent in the computations.
Table 6-1 shows the base case core-damage-frequency results. The base case consists of the Grand Gulf plant with both EPRI and LLNL seismic hazard curves. Note that the LLNL hazard curves beine used are from the 1993 LLNL study (Ref. Sobel 1993L not from the earlier 1989 LLNL study (Ref. Bernreuter et al.1989) that has now been superseded. In Table 6-1, the mean, median,5 percentile and 95 percentile core-damage frequencies for POS 5 are shown.
It is seen from the table that the mean annual core-damage frequency for POS 5 is below 104 per year using either the LLNL or the EPRI seismic hazard curves. Therefore, we conclude that the seismic contribution to core damage frequency in POS 5 during refueling outages is very small at Grand Gulf.
6.2 Sensitivity Studies Because one objective of this study is to derive generic conclusions on the significance of seismic events to shutdown risks, it is of interest to know how the seismic core damage frequency would vary with the site location. For this purpose, we assumed that the Grand Gulf plant could be at a site with a seismic hazard typical of the ensemble of sites in the eastern ,
United States. The Zion nuclear power plant site in Illinois was chosen. To study the effect '
for the plant with one of the highest seismic hazards in the eastern U.S., we chose the Pilgrim site in Massachusetts. Table 6-2 compares the core-damage frequency of plant operating state POS 5 for the two sites with that at the Grand Gulf site.
It can be seen from Table 6-2 that the core-damage frequency would be a factor of about 30 higher if the Grand Gulf plant were located at Zion, and slightly less than a factor of 200 higher if it were located at the Pilgrim site.
Vol. 5 6-1 NUREG/CR-6143
6.3 Comparison with CDF from internal Initiators During Cold l Shutdown and with CDF at Full Power
\
It is instructive to compare the results for annual core-damage frequency (CDF) from this study with the CDF during shutdown arising from so-called " internal initiators", which has been analyzed by Sandia National Laboratories (Ref. Sandia,1994). Also instructive is a comparison with the NUREG-IISO findings for CDF at Grand Gulf for full-power operation.
The comparison of core-damage-frequency results is shown in Table 6.3. From examining the .l Table, several important observations emerge- ,
o During shutdown conditions (in POS 5) the total annual mean CDF arising from earthquakes is small compared to the CDF arising from internal initiators from (Ref. Sandia,1994): a factor of about 30 smaller for the LLNL seismic hazard .
curves and a factor of about 800 smaller using the EPRI hazard curves.
o The CDF per year at full power, from the NUREG-Il50 analysis (Ref.
NRC/ll50,1990) is a factor of 2 larger than the CDF arising from internal initiators during POS 5, so the results of this study are' even smaller when compared with those from NUREG-1150. .
o The Error Factor (EF)in this seismic study is significantly greater than the EF in Sandia's analysis of CDF from internal initiators during refueling outages in POS 5. This is primarily due to the large uncertainty in the seismic hazard curves but another contribution arises from the uncertainty in the seismic fragilities, j
\
j i
l l
l l
i l
l NUREG/CR-6143 6-2 Vol. 5
TABLE 6.1 CORE-DAMAGE-FREQUENCY ESTIMATES (all values are core-damage frequency per year) 5% 95 %
POS State Mean Median Confidence Confidence LLNL (1993) Hazard Curves POS5 7.1 E-8 2.4 E-9 2.1 E-11 2.2 E-7 EPRI Hazard Curves POS 5 2.5 E-9 2.0 E-10 2.5 E-12 1.1 E-8 i r
TABLE 6.2 SENSITIVITY OF POS 5 CDF TO SEISMIC SITE HAZARD (all values are core-damage frequency per year)
(using EPRI hazard curves) .
Sitt Mean Median 95% Confidence :
i Grand Gulf Site 2.5 E-9 2.0 E-10 1.1 E-8 ;
Pilgrim Site 4.7 E-7 3.7 E 8 2.1 E-6 i Zion Site 7.8 E-8 5.3 E-9 3.7 E-7 i NOTE: This sensitivity study repres:nts " moving" the Grand Gulf reactor to the other two sites shown, with all other features of Grand Gulf remaining the same. '
Vol. 5 6-3 NUREG/CR-6143 !
i i
TABLE 6.3 GR AND GULF: COMPARISONS OF CDF FOR SHUTDOWN is. FULL-POWER CONDITIONS AND FOR SEISMIC INITIATORS vs. INTERNAL-INITIATORS Analysis Condition Reference Mean CDF/vear Error Factor
- Shutdown (POS 5), Sandia 2.0 E-6 4.2 internal initiators h (Ref. Sandia,1994)
Shutdown (POS 5) This study 7.1 E-8 (LLNL)* 90 seismic initiator 2.5 E-9 (EPRI)* 55 -
Full power NUREG-IISO 4.0 E-6 10 internal initiatorsb (Ref. NRC/l150,1990)
Footnotes for Table 6.3:
a) The Error Factor is the ratio of the 95%-percentile value to the median value of CDF (core-damage frequency / year).
b) The notation " internal initiators" includes all initiators that start with internal plant faults or loss of offsite power, but excludes internal fires and internal flooding.
c) The notation (LLNL) and (EPRI) indicates use of the LLNL or the EPRI seismic hazard curves for the Grand Gulf site.
NUREG/CR-6143 6-4 Vol. 5
.e
- 7. CONCLUSIONS AND
SUMMARY
A number of irnportant insights emerge from this Grand Gulf analysis, including:
Core-d a ma ce freau enev: The core-damage frequency for earthquake-initiated accidents during refueling outages in Plant Operating State (POS) 5 (cold shutdown) is found to be low in absolute terms, below 104 / year. The reasons for this are (i) Grand Gulf's seismic capacity in responding to earthquakes during shutdown is excellent, well above its design basis;(ii) the Grand Gulf site enjoys one of the least seismically active locations in the United States; and (iii) the Grand Gulf plant is only in POS 5 for an average (mean) of 3.1% of the time.
The core-damage frequency is also low relative to the core-damage frequency during POS 5 for internalinitiators, as analyzed in the companion study by Sandia (Ref.Sandia,1994). This can be seen in Table 6.3.
The results are olant-soecific; We believe that the results for Grand Gulf are highly plant-specific, in the sense that the seismic capacities, the specific cut set that is found to be most important, and the seismicity of the site are all difficult to generalize to other reactors elsewhere.
Shutdown seismic seauences are similar to full-oower seismic secuences: Nevertheless, it is important to observe that all of the sequence types, components, and human errors that emerge in the key sequences in this analysis are similar or identical to sequences, components, and human errors that appear in typical full-power seismic PRAs. That is, nothing that has arisen as important in this study appears to be unique to earthquakes occurring during shutdown conditions. Whether this observation is generalizable to other reactors at other sites is unknown to us.
Sensitivities: Sensitivity studies reveal that if the Grand Gulf reactor were moved to the Zion site in Illinois (a typical midwestern site) or the Pilgrim site in Massachusetts (one of the most seismically active sites among all of the reactor sites in the eastern U.S.), the mean annual CDF from this study would increase by a factor of about 30 or 200, respectively.
Uncertainties: While there are significant uncertainties in the numerical values of core-damage frequencies found in this study (see Tables 6.1 through 6.3), the above conclusions are relatively robust --- they do not depend on the detailed numerical values found. i i
l Vol. 5 7-1 NUREG/CR-6143 l
l l
1 a
- 8. REFERENCES Bandvocadhvav et aL 1986: K.K. Bandyopadhyay and C.H. Hofmayer, " Seismic Fragility of Nuclear Power Plant Components (Phase I)", NUREG/CR-4659, Vol.1, Brookhaven National Laboratory,1986 ILandvocadhvav et al 1987: K.K. Bandyopadhyay et al.," Seismic Fragility of Nuclear Power Plant Components (Phase II), Motor Control Center, Switchboard, Panelboard and Power Supply", NUREG/CR-4659, Vol. 2, Brookhaven National Laboratory,1987 Bandvocadhvav et aL 1990: K.K. Bandyopadhyay et al.," Seismic Fragility of Nuclear Power Plant Components (Phase II), Switchgear, I&C Panels (NSSS) and Relays", NUREG/CR-4659, Vol. 3, Brookhaven National Laboratory,1990 Bandvocadhvav et aL 1991a: K.K. Bandyopadhyay, C.H. Hofmayer, and S. Shteyngart," Relay Test Program, Series I Vibration Tests", NUREG/CR-4867, Brookhaven National Laboratory, 1991a Bandvocadhvav et al 1991b: K.K. Bandyopadhyay et al.,
- Seismic Fragility of Nuclear Power Plant Components (Phase II): A Fragility Handbook of Eighteen Components", NUREG/CR-4659, Vol. 4RM, Brookhaven National Laboratory,1991b Bernreuter et al 1989: D.L. Beinreuter, J.B. Savy, R.W. Mensing and J.C. Chen, " Seismic Hazard Characterization of 69 Nucle.ar Plant Sites East of the Rocky Mountains," NUREG/-
CR-5250, Lawrence Livermore National Laboratory, January 1989 BNL.1994: T-L.Chu et al.," Evaluation of Potential Severe Accidents During Low-Power and Shutdown Operations at Surry Unit 1", NUREG/CR-6144, Volume 2," Analysis of Core Damage Frequency from In*ernal Events during Mid-Loop Operations", Brookhaven National Laboratory for the U.S. Nuclear Regulatory Commission, June 1994 Bohn et al 1990: M.P. Bohn, J.A. Lambright, S.L. Daniel, J.J. Johnson, M.K. Ravindra, P.O.
Hashimoto, M.J. Mraz, and W.H. Tong, " Analysis of Core Damage Frequency: Surry Power Station, Unit 1, External Events", NUREG/CR-4551, Vol. 3, Rev.1, Part 3, Sandia National Laboratories, December 1990 Breedine et al 1990: R.J. Breeding, J.C. Helton, W.B. Murfin, and L.N. Smith, " Evaluation of Severe Accident Risks: Surry Unit 1, Main Report", NUREG/CR-4551, Vol. 3, Rev.1, Part 1, Sandia National Laboratories, October 1990 Brown et al 1990: T.D. Brown, R.J. Breeding, H.-N. Jow, J.C. Helton, S.J. Higgins, C.N. Amos, and A.W. Shiver, " Evaluation of Severe Accident Risks: Grand Gulf, Unit 1, Main Report",
NUREG/CR-4551, Vol. 6, Rev.1, Part 2, Sandia National Laboratories, December 1990 Budnitz. Lambert. and Hill.1987: R.J. Budnitz, H.E. Lambert, and E.E. Hill, " Relay Chatter and Operator Response After a Large Earthquake", NUREG/CR-4910, Future Resources Associates, Inc., August 1987 Vol. 5 8-1 NUREG/CR-6143
i Camobell et al. 1988: R.D. Campbell, M.K. Ravindra, and R.C. Murray, " Compilation of Fragility Information from Available Probabilistic Risk Assessments", Report UCID-20571, Rev.1, Lawrence Livermore National Laboratory, Livermore, California,1988 Chen et al.1991: J.T. Chen et al., " Procedural and Submittal Guidance for the Individual Plant Examination of External Events (IPEEE) for Severe Accident Vulnerabilities,"
NUREG-1407, U.S. Nuclear Regulatory Commission, June 1991 EPRL 1988: Electric Power Research Institute, "A Methodology for Assessment of Nuclear Power Plant Seismic Margin,", EPRI Report NP-6041,1988 EPRL 1989: Electric Power Research Institute,"Probabilistic Seismic Hazard Evaluations at Nuclear Power Plant Sites in the Central and Eastern United States: Resolution of the Charleston Earthquake Issue," Prepared by Risk Engineering Inc., Yankee Atomic Power Company and Woodward Clyde Consultants, EPRI Report NP-6395-D, April 1989 l l
EPRL 1991: Electric Power Research Institute," Generic Seismic Ruggedness of Power Plant Equipment", (Revision 1). ANCO Engineers, Inc., Report EPRI NP-5223-SL,1991 J EOE.1992: "Transmittalof FinalSeismic Response Analysis Results for Surry and North Anna IPEEE and USI A-46 Resolution", EQE Correspondence No. 52182-0-015, EQE International, San Francisco, November 30,1992 FR A.1991: R.J. Budnitz and P.R. Davis, "A Scoping Evaluation of Severe Accidents at the Surry and Grand Gulf Nuclear Power Plants Resulting fr'om Earthquakes During Shutdown Conditions", Future Resources Associates, Inc. for the U.S. Nuclear Regulatory Commission, 1991 FR A /Su rrv.1994: R.J. Budnitz, P.R. Davis, M.K. Ravindra, and W.H. Tong, " Evaluation of Potential Severe Accidents During Low-Power and Shutdown Operations at Surry Unit 1",
NUREG/CR-6144, Volume 5," Analysis of Core Damage Frequency from Seismic Events During Mid-Loop Operations", Future Resources Associates, Inc. for the U.S. Nuclear Regulatory Commission, August 1994 Holman and Chou.1986a: G.S. Holman and C.K. Chou, " Component Fragility Research Program: Phase I Component Prioritization", NUREG/CR-4899, Lawrence Livermore National Laboratory,1986 Holman and Chou.1986b: G.S. Holman and C.K. Chou, ' Component Fragility Research Program: Phase I Demonstration Tests," NUREG/CR-4900, Lawrence Livermore National Laboratory,1986 Kennedy and Ravindra.1984: R.P. Kennedy and M.K. Ravindra, " Seismic Fragilities for Nuclear Power Plant Risk Studies," Nuclear Engineering and Design, Vol. 79, No.1, pp. 47-68, May 1984 Lambricht et al 1990: J.A. Lambright, M.P. Bohn, S.L. Daniel, J.J. Johnson, M.K. Ravindra, P.O.Hashimoto,htJ.Mraz,W.H. Tong,and D.A.Brosseau," Analysis of Core Damage Frequency:
Peach Bottom Unit 2, External Events", NUREG/CR-4550, Vol. 4, Rev.1, Part 3, Sandia National Laboratories, December 1990 NUREG/CR-6143 8-2 Vol. 5
Newma rk.1977: N.ht Newmark, " Inelastic Design of Nuclear Reactor Structures and Its implications on Design of Critical Equipment", Paper K 4/1, " Proceedings of the Fourth Conference on Structural Mechanics in Reactor Technology", San Francisco, California, August 1977 NRC.1983: PRA Procedures Guide, Chapter 10. " Analysis of External Events", and Chapter 11," Seismic Risk Analysis", NUREG/CR-2300, U.S. Nuclear Regulatory Commission, January 1983 NRC/NUR EG-1150.1990: U.S. Nuclear Regulatory Commission," Severe Accident Risks: An Assessment for Five U.S. Nuclear Power Plants, Final Summary Report", NUREG-1150, December 1990 Ravindra and Kennedy. 1983: M.K. Ravindra, and R.P; Kennedy, " Lessons Learned from Seismic PRA Studies," Paper M6/4,in " Proceedings of the Seventh Conference on Structural Mechanics in Reactor Technology," Chicago, Illinois, August 1983 Riddell and Newmark.1979: R. Riddell and N.M. Newmark, " Statistical Analysis of the Response of Nonlinear Systems Subjected to Earthquakes", Report UILU 79-2016, University of Illinois, Urbana, August 1979 -
Sandia.1994: D.W. Whitehead et al., " Evaluation of Potential Severe Accidents During Low-Power and Shutdown Operations at Grand Gulf", NUREG/CR-6143, Volume 2," Analysis of Core Damage Frequency from Internal Events for Plant Operational State 5 During a Refueling Outage" Sandia National Laboratories for the U.S. Nuclear Regulatory Commission, June 1994 Sobel.1993: P.Sobel," Revised Livermore Seismic Hazard Estimates for 69 Nuclear Power Plant Sites East of the Rocky Mountains", NUREG-1488 (draft), October 1993 i
Swain and Guttmann.1980: A.D. Swain and H.E.Guttmann," Handbook of Human Reliability Analysis With Emphasis on Nuclear Power Plant Applications", NUREG/CR-1278, Sandia National Laboratories, April 1980 Zion.1981: Commonwealth Edison Company," Zion Probabilistic Safety Study",1981 e
Vol. 5 8-3 NUREG/CR-6143
Kiyoharu Abe Ephraim Asculai l Dept. of Reactor Safety Research Division of Nuclear Safety Nuclear Safety Research Center Wagramestrasse, 5 Tokai Research Establishment P.O. Box 100 JAERI A-1400 Wien Tokai-mura, Naga-gun AUSTRIA Ibaraki-ken, JAPAN Vladimar Asmolov Head, Nuclear Safety Department Sarbes Acharya I. V. Kurchatov Institute Department of Energy of Atomic Enegry NS-1/FORS Moscow, 123181 Washington, DC 20585 RUSSIA Dr. Ulvi Adalioglu J. de Assuncao Cekmece Nukleer Arastraima ve Cabinete de Proteccao &
Egitim Merekezi Seguranca Nuclear P.K. 1 Ministerio da Indusstria Havaalani/ ISTANBUL Ave. de Republica 45-6 TURKEY 1000 Lisbon PORTUGAL Dr. Eng. Kiyoto Aizawa Senior Engineer H.P. Balfanz, Head i Reactor Eng. Dev. Department Institute of Probabilistic l PNC Safety Analysis l 9-13, Chome, Akasaka TUV Nord 1 Minato-K, Tokyo Grosse Bahn*trasse 31 JAPAN D-22525 Hamburg 54 GERMANY Harry Alter Manager Applied Tech Pat Baranowsky ,
Nuclear Systems Tech USNRC-AEOD/TPAB NE-46 MS: T-4A9 US DOE Washington, DC 20585 Robert A. Bari, Deputy Chairman Dept of Nuclear Energy R.M. Andrews Bldg 197C Nuclear Installations Insp. Brookhaven National Laboratory St. Peters House Upton, NY 11973 Balliol Raod, Bootle Merseyside L20 31Z UNITED KINGDOM Librarian )
Technical Information Section l Battelle Pacific Northwest Lab George'Apostolakis P. O. Box 999 UCLA Richland, WA 99352 Boelter Hall, Room 5532 Los Angeles, CA 90024-1597 Dr. John Baum Dept of Nuclear Energy Director of Reactor Engineering Radiological Sciences Div f Bldg 703 M Argonne National Laboratory 9700 S Caos Ave Brookhaven National Laboratory Bldg 208 Upton, NY 11973 Argonne, IL 60439 l
Dist-1
. - - - _ - _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ h
l Eric Beckjord Dennis Bley Buttonwood Consulting l USNRC-RES/DO MS: T-10F12 17291 Buttonwood St. l i
Fountain Valley, CA 92708 Robert Bernero USNRC-NMSS/DO Roger Blond MS: T-8A23 Booz-Allen & Hamilton 4330 East West Highway Bethesda, MD 20814 Andrea Besi I Institute for Systems Engineering and Informatics M. P. Bohn 1 CEC Joint Research Centre Division 6449 l CP N 1 Sandia National Laboratories 1-21020 Ispra (Varese) Albuquerque, NM 87185 l ITALY Dr. Mario Bonaca l John Bickel Manager, Reactor Engineering Idaho National Engineering Lab. Northeast Utilities EG&G MS: 3850 P.O. Box 270 P.O. Box 1625 Hartford, Conn. 06141 Idaho Falls, ID 83415 Robert B. Borsum Vicki Bier Nuclear Power Division Dept. of Industrial Engineering B & W Nuclear Tech University of Wisconsin-Madison 1700 Rockville Pike 1513 University Avenue, Room 389 Suite 525 Wisconsin, WI 53706 Rockville, MD 20852 Scott Bigelow Stephen Boult S CUBED Electrowatt Engineering Services 2501 Yale SE, Suite 300 (UK) Ltd.
Albuquerque, NM 87106 Grandford House 16 Carfax, Horsham West. Sussex RH12 IUP Prof. Dr. Dr . -Ing . E . H . Adolf ENGLAND Birkhofer Gesellschaft for Anlagen und Reaktorsicherheit (GRS) mbH Gary Boyd Forschungsgelande Safety & Reliability Optimization D-8046 Garching Services rederal Republic of Germany 9724 Kingston Pike, Suite 102 Knoxville, TN 37922 David Black Brookhaven National Laboratory (2)
American Electric Power Attn: Lev Neymotin 1 Riverside Plaza Arthur Tingle Columbus, OH 43215 Building 130 Upton, NY 11973 Harold Blackman Idaho National Engineering Lab.
EG&G MS: 3850 David M. Brown Paul C. Rizzo Associates, Inc.
P.O. Box 1625 Idaho Falls, ID 83415-3850 300 Oxford Drive Monroeville, PA 15146-2347 Dist-2
l Tom D. Brown A. L. Camp l Sandia National Laboratories Division 6412 Dept. 6413 MS: 0748 P.O. Box 5800 Sandia National Laboratories j
(, Albuquerque, NM 8*/185 Albuquerque, NM 87185-0748 1 Robert J. Budnitz John Forbes Campbel Future Resources Associates, Inc. HM Superintending Inspector 2039 Shattuck Avenue, Suite 402 Health & Safety Executive Berkeley, CA 94704 St. Peter's He'2se Balliol Road Bootle L20 31Z Gary Burdick UNITED KINGDOM USNRC-RES/SAIB MS: T-10F13 Leonel Canelas New University of Lisbon Arthur Buslik Quinta de Torre USNRC-RES/PRAB 2825 Monte de Caparica MS: T-9F31 PORTOGAL Edward Butcher Harold Careway USNRC-NRR/SPSB General Electric Co., M/C 754 MS: 0-10E4 175 Curtner Ave.
San Jose, CA 95129 ;
Technical Library B&W Nuclear Service Co D. D. Carlson
- P. O. Box 10935 Division 6411 Lynchburg, VA 24506 Sandia National Laboratories Albuquerque, NM 87185 Stefaan Caeymaex '
Safety & Systems Section Jose E. De Carles Nuclear Generation Dept. CSN International Coordinator TRACTEBEL Consejo de Seguridad Nuclear Avenue Ariane 7 Calle Justo Dorado 11 B-1200 Bruxelles 28040 Madrid BELGIUM SPAIN Leonard Callan, Administrator Annick Carnino U.S. Nuclear Regulatory Commission International Atomic Energy Agency Harris Tower and Pavilion Wagramerstrasse 5, P.O. Box 100 611 Ryan Plaza Drive, Suite 400 A-1400 Vienna Arlington, TX 76011-8064 AUSTRIA ,
J. Calvo S. Chakraborty Division of PSA & Human Factors Swiss Federal Nuclear Safety Consejo de Seguridad Nuclear Inspectorate Calle Justo Dorado, 11 Hauptabteilung far die Sicherheit 20040 Madrid der Kernanlagen SPAIN CH-5232 Villigen-HSK SWITZERLAND Erulappa Chelliah USNRC-RES/PRAB MS: T-9F31 Dist-3
i Mike Check S. Daggupaty NUS Environment Canada 910 Clopper Road 4905 Dufferin Street Gaithersburg,.MD 20878 Downsview l Ontario, M3H ST4 CANADA Nilesh Chokshi USNRC-RES/SSEB MS: T-10L1 Louise Dahlerup Inspectorate of Nuclear Inst.
Danish Civil Defense &
T. L. Chu Emergency Planning Agency 3rookhaven National Laboratory 16, Datavej Department of Nuclear Energy DK-3460 Birkerod Bldg. 130 DENMARK Upton, NY 11973 John Darby Peter Cooper SEA, Inc.
SRD/AEA Technology 6100 Uptown Blvd. NE Wigshaw Lane Albuquerque, NM 87110 Culcheth Cheshire WA3 4NE England Gerald Davidson Fauske and Associates, Inc.
16 W 070 West 83rd Street Susan E. Cooper Burr Ridge, IL 60521 Science Applications Int'l. Corp.
11251 Roger Bacon Drive Reston, VA 22090 Peter Davis PRD Consulting P.O. Box 2046 Michael Corradini Sheridan, WY 82801 l University of Wisconsin )
1500 Johnson Drive l Madison, WI 53706 P. De Gelder i Secretary, BEIGIAN NUCLEAR SOCIETY (BNS)
E.R. Corran A V Nuclear ANSTO Reasearch Establishment Avenue du Roi 157 Lucas Heights Reserch Labs. B-1060 Brussels Private Mail Bag 1 BELGIUM Manai, NSW 2234 AUSTRALIA Lennart Devell l Studsvik Nuclear Massimo Cozzone Studsvik Energiteknik AB A.N.P.A. S-611 82 Nykoping Via V. Brancati, 48 SWEDEN I-00144 Rome l ITALY ,
J. Devooght l Service de la Metrologie Nucl l University Libre de Bruxelles j George Crane 1570 E. Hobble Creek Dr. Faculte des Sciees Appliqu. !
Springville, Utah 84663 50 Avenue F-D Roosevelt Bruxelles 5 BEI4IUM Mark Cunningham USNRC-RES/PRAB MS: T-9F31 Dist-4 l
1
t 1
G. Diederick John Flack Commonwealth Edison Co. USNRC-RES/SAIB LaSalle County Station MS: T-10F13 RR1, Box 220 2601 North 21st Rd.
Marsielles, IL 61341 Karl Fleming Pickard, Lowe & Garrick 2260 University Drive Chuck Dobbe Newport Beach, CA 92660 Idaho National Engineering Lab.
EG&G MS: 3840 P.O. Box 1625 Terry Foppe Idaho Falls, ID 83415 Safety Analysis Engineering Rocky Flats Plant Energy Systems Group Mary Drouin Rockwell International Ccrp USNRC-RES\SAIB P.O. Box 464 MS: T-10F13 Golden, CO 80401 Duke Power Co. (2) R H. Gauger Attn: Duncan Brewer Manager-Reliability Engr Steve Deskevich A/E Div 422 South Church Street Holmes & Narver Inc.
Charlotte, NC 28242 R Roanne Circle Irvine, CA 92714 Bill Eakin ;
Northeast Utilities Robert Gobel Box 270 Clark University Hartford, CT 06141 Center for Technology, Environment and Development 950 Main St.
Stewart D. Ebneter Worcester, MA 01610-1477 USNRC 261, Marietta St., Suite 2900 Atlanta, GA 30323-0199 Paul Govaerts Studiecentrum voor Kernenergie (SCK/CEN)
Adel A. El-Bassioni Boeretang, 200 USNRC-NRR/PRAB B-2400 Mol MS: 0-10E4 BELGIUM ENEA/ DISP (2) Mr. Gubler Attn: Alvaro Valeri International Atomic Energy Agency Alfredo Bottino NENS/ SAD BOB 42 Via Vitaliano Brancati, 48 Wagramerstrasse 5, P.O. Box 100 00144 Roma EUR A-1140 Vienna ITALY AUSTRIA Walter P. Engel Paul M. Haas, President PRAG M3R Analysis & Reg Matter Concord Associates, Inc.
NE-60 725 Pollissippi Parkway CRYCITY Suite 101, Box 6 US DOE Knoxville, TN 37933 Washington, DC 20585 i
Dist-5
F. T. Harper Steven Hodge Division 6413 Oak Ridge National Laboratories l
MS: 0748 P. O. Box Y Sandia National Laboratories Oak Ridge, TN 37831 l Albuquerque, NM 87185-0748 Gary Holahan Dr. U. Hauptmanns USNRC-AEOD/OSP Gesellschaft FQr Anlagen und MS: T-4A9 Reaktorsicherheit (GRS) mgH Schwertnergasse 1 D-5000 K61n 1 N.J. Holloway GERMANY A72.1 Atomic Weapons Establishment Ademaston Sharif Heger Reading RG7 4PR UNM Chemical and Nuclear UNITED KINGDOM Engineering Department Farris Engineering, Room 209 Albuquerque, NM 87131 Griff Holmes Westinghouse Electric Co.
Energy Center East Jon C. Helton Bldg. 371 Dept. of Mathematics P.O. Box 355 Arizona State University Pittsburgh, PA 15230 Tempa, AZ 85287 William Hopkins Dr. P. M. Herttrich Bechtel Power Corporation Gesellschaft fGr Anlagen und 15740 Shady Grove Road Reaktorsicherheit (GRS) mbH Gaithersburg, MD 20877 Schwertnergasse 1 5000 K61n 1 GERMANY Dean Houston USNRC-ACRS MS: P-315 Dr. D.J. Higson Radiological Safety Bureau Australian Nuclear Science & Der-Yu Hsia Institute of Nuclear Energy Research
, Technology Organisation P.O. Box 153 Lung-Tan 325 Roseberry, NSW 2018 TAIWAN AUSTRALIA Alejandro Huerta-Bahena Dr. Mitsumasa Hirano National Commission on Nuclear Deputy General Manager Safety and Safeguards (CNSNS)
Institute of Nuclear Safety Insurgentes Sur N. 1776 NUPEC C. P. 04230 Mexico, D. F.
3-6-2, Toranomon, Minato-ku MEXICO Tokyo 108 JAPAN Peter Humphreys US Atomic Energy Authority Dr. S. Hirschberg Wigshaw Lane, Culcheth Paul Scherrer Institute Warrington, Cheshire Vurenlingen and Villigen UNITED KINGDOM, WA3 4NE CH-5232 Villigen PSI SWITZERLAND Dist-6
.- - - . - _ -. - . _ .- .- . - _ . . ~
l t,
.t W. Huntington Dr. H. Kalfsbeek Commonwealth Edison Co. DG/XII/D/1 LaSalle-County Station Commission of the European ,
RR1, Box 220 Copununities i 2601 North 21st Rd. Rue de la Loi, 200 ;
Marsielles, IL 61341 B-1049 Brussels BEIGIUM ;
J.S. Hyslop USNRC-RES/PRAB Yoshio Kano MS: T-9F31 General Mngr. & Sr. Engineer .
Systems Analysis Section' ;
O-arai Engineer. Centr, PNC i Idaho National Engineering Lab. (2) Higashi-Ibaraki-gun Attn: Doug Brownson Ibaraki-Ken, 133-13 Darrel Knudson JAPAN EG&G MS: 3840 P.O. Box 1625 Idaho Falls, ID 83415 William Kastenberg ;
t UCLA Boelter Hall, Room 5532 ;
Idaho National Engineering Lab. (2) Los Angeles, CA 90024 ;
Attn: Art Rood Mike Abbott EG&G MS: 2110 Barry Kaufer P.O. Box 1625 OECD/NEA Idaho Falls, ID 83415 "Le Seine St. Germain" 12 Boulevard des Iles 92130 Issy-les-Moulineaux Hanspeter Isaak FRANCE Abteilung Strahlenschutz Hauptabteilung fOr die Sicherheit der Kernanlagen (HSK) Paul Kayser CH-5303 Wurenlingen Division de la Radioprotection SWITZERLAND Avenue des Archiducs, 1 L-1135 Luxembourg-Belair LUXEMBOURG l Brian Ives UNC Nuclear Industries P. O. Box 490 Ken Keith Richland, WA 99352 TVA W 20 D 201 'l 400 West Surmnit Hill Kamlar Jamili Knoxville, TN 37092 DP-62/PTN Department of Energy .
Washington, D.C. 20585 G. Neale Kelly Commission of the European Communities Robert Jones Joint Research Centre USNRC-NRR/DSSA Rue de la Loi 200 MS: 0-8E1 B-1049 Brussels BELGIUM Edward Jordan USNRC-AEOD/DO John Kelly MS: T-4D18 Sandia National Laboratories P. O. Box 5800 MS 0742 )
Albuquerque, NM 87185 I Dist-7 ,
Knolls Atomic Power Laboratory (2) Dr. J.M. Lanore Attn: Ken McDonough CEA/IPSN/DAS j Dominic Sciaudone Centre d' Etudes Nuclsaires de ;
Box 1072 Fontenay-aux-Roses l Schenectady, NY 12301 B . P . n' 6 92265 Fontenay-aux-Roses CEDEX FRANCE Dr. K. Koberlein Gesellschaft fQr Reaktorsicherheit mbH Jose A. Lantaron Forschungsgelande Consejo de Seguridad Nuclear D-8046 Garching Sub. Analisis y Evaluaciones ,
GERMANY Calle Justo Dorado, 11 28040 Madrid SPAIN Alan Kolaczkowski Science Applications International Corporation Josette Larchier-Boulanger 2109 Air Park Rd. S. E. Electricte de France Albuquerque, NM B7106 Direction des Etudes Et Recherches 30, Rue de Conde 75006 Paris Jim Kolanowski FRANCE Commonwealth Edison Co.
35 let National West i Chicago, IL 60690 H. Larsen Head of Department Riso National Laboratory John G. Kollas P.O. Box 49 Institute of Nuclear Technology and DK-4000 Roskilde Radiation Protection DENMARK I N.R.C.P.S. 'Demokritos" P.O. Box 60228 GR-153 10 Aghia Paraskevi Lawrence Livermore Nat'l Lab. (4)
Attiki Attn: George Greenly GREECE Marvin Dickerson Rolf Lange Sandra Brereton S. Kondo Livermore, CA 94550 Department of Nuclear Engineering Facility of Engineering University of Tokyo Shengdar Lee 3-1, Hongo 7, Bunkyo-ku Yankee Atomic Electric Company Tokyo 580 Main St.
JAPAN Boston, MA 17407 l
D. Lamy B.T.F. Liwaang I
CEN/SCK Dept. of Plant Safety Assessment Dept. Scientific Irradiation Swedish Nuclear Power Inspec.
Experiment & Study BR2 P.O. Box 27106 Boeretang, 200 S-10252 Stockholm B-2400 Mol SWEDEN BELGIUM l Peter Lohnberg Expresswork International, Inc.
1740 Technology Drive San Jose, CA 95110 Dist-8 i
Steven M. Long Hideo Matsuzuru USNRC-NRR/SPSB Tokai Research Establishment MS: 0-10E4 Tokai-mur Maka-gun Ibaraki-ken, 319-11 D, Eugenio Gil Lopez JAPAN Consejo de Seguridad Nuclear Calle Justo Dorado, 11 28040 Madrid Jim Mayberry SPAIN Ebasco Services 60 Chubb Ave.
7.yndhurst, NJ 07071 Los Alamos National Laboratory (2)
Attn: Kent Sasser N-6, K-557 Andrew S. McClymont Los Alamos, NM 87545 IT-Delian Corporation 1340 Saratoga-Sunnyvale Rd.
Suite 206 Christiana H. Lui San Jose, CA 95129 USNRC-RES/PRAB MS: T-9F31 Michael McKay Los Alamos National Laboratory John Luke A-1, MS F600 Services Florida Power & Light P.O. Box 1663 P.O. Box 14000 Los Alamos, NM87545 Juno Beach, FL 33408 Zen Mendoza Daniel Manesse SAIC ISPN 5150 El Camino Real Boite Postale n* 6 Suite C3 1 92265 Fontenay-aux-Roses CEDEX Los Altos, CA 94022 FRANCE Dr. J. Mertens Fred Mann Division of Risk Analysis &
Westinghouse Hanford Co. Reactor Technology WIA-53 Institute of Safety Research P.O. Box 1970 Research Centre Julich (KFA)
Richland, WA 99352 D-52425 Julich GERMANY l Nadia Soldo Falcao Martins Comissao Nacional de Energia Nuclear Jim Meyer R General Severianao 90 S/408-1 Scienteen l Rio de Janeiro 11821 Parklawn Dr. <
BRAZIL Suite 100 l Rockville, MD 20852 Harry F. Martz Analysis and Assessment Division Joe Minarick Los Alamos National Laboratory Science Applications Int'l Corp.
Los Alamos, NM 87545 301 Laboratory Road ,
P.O. Box 2501 l Oak Ridge, TN 37830 Herbert Massin Commonwealth Edison Co.
35 let National West Chicago, IL 60690 Dist-9
Jose I. Calvo Molins, Head Ken O'Brien Division of P.S.A. and Human Factors University of Wisconsin Consejo de Seguridad Nuclear Nuclear Engineering Dept.
Calle Justo Dorado, 11 153 Engineering Research Blvd.
28040 Madrid Madison, WI 53706 SPAIN Theresa Oh INEL Tech Library Ken Muramatsu Risk Analysis Laboratory EG&G MS: 2300 Japan Atomic Energy Research P. O. Box 1625 Idaho Falls, ID 83415-2300 ILstitute Tokai-mura, Naka-gun Ibaraki-ken, 319-11, Tokyo N. R. Ortiz, Director JAPAN Nuclear Energy Technology Division 6400 Joseph A. Murphy Sandia National Laboratories Division of Safety Issue Resolution Albuquerque, NM 87185 U.S. Nuclear Regulatory Commission MS: T-10E50 Washington, DC 20555 Robert Ostmeyer U.S. Department of Energy Rocky Flats Area Office Kenneth G. Murphy, Jr. P. O. Box 928 US Department of Energy Golden, CO 80402 '
19901 Germantown Rd.
Germantown, MD 20545 Robert Palla USNRC-NRR/SPSB Shankaran Nair MS: 0-10E4 Central Electricity Generating Board Berkeley Nuclear Laboratories Gareth Parry Berkeley NUS Corporation Gloucestrshire CL13 9PB 910 Clopper Rd.
Gaithersburg, MD 20878 UNITED KINGDOM Ray Ng Vern Peterson NEI Building T886B 1776 Eye St. N EG&G Rocky Flats Suite 300 P.O. Box 464 Washington, DC 20006-2496 Golden, CO 80402 G. Petrangeli G. Niederauer ENEA Nuclear Energy ALT Disp Los Alamos National Laboratory Via V. Brancati, 48 P. O. Box 1663 MSK 575 00144 Rome Los Alamos, NM 87545 ITALY Oak Ridge National Laboratory (2) Ing. Jose Antonio Becerra Perez Comision Nacional De Seguridad Attn: Steve Fisher Nuclear Y Salvaguardias Sherrel Greene MS-8057 Insurgentes Sur 1806 01030 Mexico, D. F.
P.O. Box 2009 MEXICO Oak Ridge, TN 37831 Dist-10
William T. Pratt M. Roch Brookhaven National Laboratory Manager of Design, Nuclear Building 130 Department Upton, NY 11973 TRACTEBEL Avenue Ariane 7 B-1200 Bruxelles Urho Pulkkinen BEIGIUM Technical Research Centre of Finland A.E. Rogers Laboratory of Electrical & General Electric Co Automation Engineeering 175 Curtner Ave Otakaari 7B, 02150 Espoo 15 MC-489 FINIAND San Jose, CA 95125 Blake Putney Judy Rollstin Science Applications GRAM Inc International Corporation 8500 Menual Blvd. NE 5150 El Camino Real, Suite C31 Albuquerque, NM 87112 Los Altos, Ca 94022 Marc Rothschild Dr. V. M. Raina Halliburton NUS Project Manager-Risk Assessment 1303 S. Central Ave.
Ontario Hydro H11 G1 Suite 202 700 University Ave. Kent, WA 98032 Toronto, Ontario MSG 1X6 CANADA Christopher Ryder USNRC-RES/PRAB William Raisin MS: T-9F31 NEI 1726 M. St. NW Suite 904 Takashi Sato, Deputy Manager Washington, DC 20036 Nuclear Safety Engineering Section Reactor Desis Engineering Dept.
Nuclear Energy Group, Toshiba Corp.
Ann Ramey-Smith Isogo Engineering Center USNRC-RES/PRAB 8, Shinsugita-cho, Isogo-ku, MS: T-9F31 Yokohama 235, JAPAN Dale Rasmuson Martin Sattison Idaho National Engineering Lab.
USNRC-AEOD/TPAB MS: T-4A9 P. O. Box 1625 Idaho Falls, ID 83415 l
John Ridgely USNRC-RES/SAIB Dr. U. Schmocker MS: T-10F13 Hauptabteilung fQr die Sicherheit der Kernanlagen CH-5232 Villigen HSK Richard Robinson (2) SWITZERLAND USNRC-RES/PRAB MS: T-9F31 A.J. Seebregts ECN Nuclear Energy Westerduinweg, 3 Postbus 1 NL-1755 Petten ZG l THE NETHERLANDS Dist-11
Dr. S. Serra Stone & Webster Engineering Corp Ente Naxionale per I'Energia Technical Information Center Electtrica (ENEL) A. Hosford via G.B. Martini 3 245 Summer Street 245/01 l I-00198 Rome ITALY Boston, MA 02210 H. Shapiro Dennis Strenge Licensing & Risk Branch Pacific Northwest Laboratory Atomic Energy of Canada Ltd. RTO/ 125 Sheridan Park Research Comm. P.O. Box 999 Mississauga, Ontario L5K 1B2 Richland, WA 99352 CANADA Technadyne Engineer. Consultants (3)
Nathan O. Siu Attn: David Chanin Center for Reliability and Risk Jeffery Foster Assessment Walt Murfin Idaho National Engineering Lab. Suite A225 EG&G MS: 3850 8500 Menual Blvd. N P.O. Box 1625 Albugtterque, NM 8'7112 '
Idaho Falls, ID 83415-3855 Ashok Thadani 4 E. Soederman USNRC-NRR/ADT l ES-Konsult AB MS: 0-12G18 !
I Energy and Safety P.O. Box 3096 S-16103 Bromma T. G. Theofanous SWEDEN University of California, S. B.
Department of Chemical and Nuclear Engineering Desmond Stack Santa Barbara, CA 93106 Los Alamos National Laboratory l Group Q-6, Mail Stop K556 i Los Alamos, NM 87545 Catherine Thompson USNRC-RES/SAIB MS: T-10F13 >
Jao Van de Steen KEMA Laboratories Utrechtseweg, 310 Soren Thykier-Nielsen Postbus 9035 Riso National Laboratory NL 800 ET Arnhem Postbox 49 '
THE NETHERLANDS DK4000 Roskile DENMARK Eli Stern Israel AEC Licensing Div. R. Toossi P.O. Box 7061 Physical Research, Inc.
Tel-Aviv 61070 25500 Hawthorn Blvd.
ISRAEL Torrance, CA 90505 Dr. Egil Stokke Ennio Traine Advisory Group ENEL OECD Halden Reactor Project Via Vialiano, 48 P.O. Box 173 00144 Rome N-1751 Halden ITALY NORWAY Dist-12
i Ulf Tveten. .
}
Environmental Physics Section Seppo Vuori '
Institutt for Energiteknikk Technical Research Centre of Finland Postboks 40 Nuclear Engineering Laboratory N-2007 Kjeller Lonnrotinkatu 37 ,
NORWAY P.O. Box 169 .
Sf-00181 Helsinki 18 FINLAND .
US Department of Energy Energy Library Room G 034/GTN Dr. Ian B. Wall AD-622.1 81 Irving Avenue i Washington, DC 20585 Atherton, CA 94027 ,
i US Department of Energy Edward Warman NS-50-(GTN) Stone & Webster Engineering Corp. '
NS-10.1 P.O. Box 2325
.S-161 Boston, MA 02107 Washington, DC 20585 .
J E. Werner r U.S. Environmental Reactor Research & Techn Division Protection Agency (2) US DOE Idaho Operations i Attn: Allen Richardson MS: 1219 Joe Logsdon 850 Energy Drive
- Office of Radiation Programs Idaho Falls, ID 83401-1563 Environmental Analysis Division ,
Washington, DC 20460 l Dr. Wolfgang Werner Safety Assessment Consulting GmbH Harold VanderMolen Veilchenweg 8 ;
USNRC-RES/PRAB D 83254 Breitbrunn .
MS: T-9F31 GERMANY Dr. A. Valeri Westinghouse Electric Corp {
A.N.P.A. Technical Library ,
Via Vitaliano Brancati, 48 P. O. Box 355 I-00144 Rome East 209 ITALY Pittsburgh, PA 15230 j Magiel F. Versteeg Westinghouse Electric Corp .j Ministry of Social Affairs NTD l and Employment Central File Nuclear Safety t 25 5 V De ag 4b85- I THE NETHERLANDS Pittsburgh, PA 15230 .,
Martin Virgilio Westinghouse Electric Company (3)
USNRC-NRR/DSSA Attn: John Lacovin !'
MS: 0-8E2 Burt Morris Griff Holmes !
Energy Center East, Bldg. 371 'l R. Virolainen, (Chairman PWG5) P.O. Box 355 .;
Systems Integ. Off. (STUK) Pittsburgh, PA 15230 P.O. Box 268
- Kumpulanite 7 SF 60101 Helsinks t FINLAND ,
Dist-13 i
t i
l
-l Westinghouse Savannah River Co. (2)
Attn::Kevin O'Kula
' Jackie East-Safety Technology Section
' 1991 S. Centennial Ave., Bldg. 1 Aiken, SC 29803 i
Donnie Whitehead l Department 6412, MS: 0747 '
Sandia National Laboratories i.
P.O. Box 5800 )
Albuquerque, NM 87185-0747 i
t Keith Woodard -[
PI4, Inc. !
7315 Wisconsin Ave.
Suite 620 East .
Bethesda, MD 20814-3209 t i
John Wreathall ,
John Wreathall & Co.
4157 MacDuff Way )
Dubin, OH 43017 M. K. Yeung University of Hong Kong 3 Mechanical Engineering Dept.
Polfulam HONG KONG Bob Youngblood Brookhaven National Laboratory Department of Nuclear Energy Bldg.~130 Upton, NY-11973 i
Carlo Zaffiro A.N.P.A.
Directorate for Nuclear Via Vitaliano Brancate, 48 I-00144 Rome ITALY Dr. X. Zikidis Greek Atomic Energy Comm.
N.R.C.P.S. "Demokritos" GR-153 10 Agia Paraskevi Attiki-GREECE Dist-14 i i
1
-_--.--_____1____-_:
NCC Pomu
- 35 U.S GiUCLE AR REGULATORY COMMIS$10W 1. R EPORT NUMBE R hR 1102 Numters mm BIBLIOGRAPHIC DATA SHEET i tsee instractrons on the reverses yyyy4y 2.TiTte ANo SusTITLE Vol. 5 !
Evaluation of Potential Severe Accidents During Low power and Shutdown Operations at Grand Gulf, Unit 1: 3 OATE REPORT PUBLISHED Analysis of Core Damage Frequency from Seismic "" 'E^a l
Events During Mid-loop Operations-Main Report Au gust 1994
- 5. AUTHOR (Si 6. TYPE OF REPORT R.J. Budnitz, Future Resources, Inc. 7, PERIOO COVERED rinciustre paress p.R. Davis, pRD Consulting M.K. Ravindra, W.H. Tong, EQE International, Inc.
- 8. PE R F ORMING ORGANIZAT CON - N AME AND ADDR ESS for NRc. orovene oremon. orr.ce or nee on.sU.s. Nuclear neguterory commanon. eno measna ndaress;1r contrector. orovice nCme and martmg dodresL)
Future Resources Assoc., Inc. pRD Consulting EQE International, Inc.
2039 Shattuck Ave., STE 402 p.O. Box 2046 18101 Von Karman Ave. STE 400 Berkeley, CA 94704 Sheridan, WY 82801 Irvine, CA 92715
- 9. SPONSORING ORGANtZATSON - N AME AND ADDR ESS fir knc. rype ~same ss ebove~;ir ontractor. c orovice Nac Dreisson, Ortwo or Region, U.S Nuclear Regulerory Commesuon, cne metimg endress)
Division of Safety Issue Resolution Office of Nuclear Regulatory Research U.S. Nuclear Regulatory Commission Washington, DC 20555-0001
- 10. SUPPLEMENTARY NOTES
- 11. ABSTRACT (200 words or km/
During 1989, the Nuclear Regulatory Commission (NRC) initiated an extensive program to carefully examine the potential risks during low power and shutdown operations. The .
program includes two parallel projects being performed by Brookhaven National Laboratory (BNL) and Sandia National Laboratories (SNL). Two plants, Surry (pressurized water reactor) and Grand Gulf (boiling water reactor), were selected as the plants to be studied. The objectives of the program are to assess the risks of severe accidents initiated during plant operational states other than full power operation and to compare the estimated core damage frequencies, important accident sequences and other qualitative and quantitative results with those accidents initiated during full power operation as assessed in NUREG-1150. The objective of this report is to document the approach utilized in the Grand Gulf plant and discuss the results obtained. A parallel report for the Surry plant is prepared by SNL.
1 a raer wus essur reseereners m socerect ree rcoorr.)
- 12. KE Y WORDS/DESCR!PTORS (tar worom oro rsses 13. AVAILAl$8L11 Y ST ATEMENT Grand Gulf Reactor, reactor shutdown, risk assessment, failure mode Unlimited analysis, reactor accidents, reactor core disruption, reactor start-up, ie. acuan v cLAmocaim RHR systems, systems analysis, thermodynamics, seismic events <g,g g "O"n~EfEssified
- 15. NUMBER OF PAGES l
- 16. PRICE NRC FORM 336 (249)
I Printed on recycled paper Federal Recycling Program
--- - _ - - - - - - - - - - - - - (
EVALRTWlF POTENTIAL SEVERE ACCIDEM DURING IRQ DM NUREG/CR-6143, Vol. 5 AND SHUTDOWN OFERATIONS AT GRAND GULF, UNIT 1: AUGUST 1994 :
SEISMIC EVENTS umIED STATES setetAt rouniu etAss RATE NUCLEAR REGULATORY COMMISSION ecstace Ano rtes e4o WASHINGTON, D.C. 20555-0001 ussac PERMfT NO. G-67 OFFICIAL BUSINESS PENALTY FOR PRIVATE USE, $300 1 1EN 1;c555139531 A N ruBLICATIONs SVCS
'j p 3_c c o -N U D U' DC Oc555 2WFN-6E7 WASHINGTON
_ . . _ . . . _ . , _ - - - - . - - . _ . - - _ - . . . . . _ . ..~ _ _ - _ - _ _ . .. - . _ .
.. . . - _ , . _ . _ _ . _ , . . - . ,