ML20039D695
From kanterella
Jump to navigation
Jump to search
ML20039D695 | |
Person / Time | |
---|---|
Site: | Grand Gulf |
Issue date: | 11/30/1981 |
From: | Cybulskis P, Hatch S, Wooton R SANDIA NATIONAL LABORATORIES |
To: | NRC OFFICE OF NUCLEAR REGULATORY RESEARCH (RES) |
References | |
CON-FIN-A-1047, RTR-NUREG-1150-2-V1-6.03 NUREG-CR-1659, NUREG-CR-1659-V04, NUREG-CR-1659-V4, SAND80-1897-V04, SAND80-1897-V4, NUDOCS 8201060015 | |
Download: ML20039D695 (425) | |
Similar Documents at Grand Gulf | |
---|---|
Category:CONTRACTED REPORT - RTA
MONTHYEARML20211K7681999-07-30030 July 1999
[Table view]Evaluation of Fuel Pin Failure Timing in Boiling Water Reactors ML20216E8721998-03-13013 March 1998 Rept to NRC Environ Monitoring at Grand Gulf Nuclear Station CY97, Conducted by Contract NRC-29-83-621 ML20101C8941995-10-16016 October 1995 Plant IPE Insight Support Rept for NUREG-1150 Plants ML20087K3691995-07-31031 July 1995 Evaluation of Potential Severe Accidents During LOW Power and Shutdown Operations at Grand Gulf,Unit 1.Summary of Results ML20082D5261995-03-31031 March 1995 Evaluation of Potential Severe Accidents During LOW Power and Shutdown Operations at Grand Gulf,Unit 1.Evaluation of Severe Accident Risks for Plant Operational State 5 During a Refueling Outage.Supporting Melcor Calculations ML20082B7411995-03-31031 March 1995 Evaluation of Potential Severe Accidents During LOW Power and Shutdown Operations at Grand Gulf,Unit 1.Evaluation of Severe Accident Risks for Plant Operational State 5 During a Refueling Outage.Main Report and Appendices ML20073C3671994-08-31031 August 1994 Evaluation of Potential Severe Accidents During LOW Power and Shutdown Operations at Grand Gulf, Unit 1.Analysis of Core Damage Frequency from Seismic Events During Mid-Loop Operations.Main Report ML20072D0581994-07-31031 July 1994 Evaluation of Potential Severe Accidents During LOW Power and Shutdown Operations at Grand Gulf,Unit 1.Analysis of Core Damage Frequency from Internal Events for Plant Operational State 5 During a Refueling Outage ML20072N9991994-07-31031 July 1994 Evaluation of Potential Severe Accidents During LOW Power and Shutdown Operations at Grand Gulf,Unit 1.Analysis of Core Damage Frequency from Internally Induced Flooding Events for Plant Operational State 5 During a Refueling. ML20071L7191994-06-30030 June 1994 Evaluation of Potential Severe Accidents During LOW Power and Shutdown Operations at Grand Gulf,Unit 1.Analysis of Core Damage Frequency from Internal Events for Plant Operational State 5 During a Refueling Outage.Internal ML20071L7411994-06-30030 June 1994 Evaluation of Potential Severe Accidents During LOW Power and Shutdown Operations at Grand Gulf,Unit 1.Analysis of Core Damage Frequency from Internal Events for Plant Operational State 5 During a Refueling Outage.Internal ML20071L6111994-06-30030 June 1994 Evaluation of Potential Severe Accidents During LOW Power and Shutdown Operations at Grand Gulf,Unit 1.Analysis of Core Damage Frequency from Internal Events for Plant Operational State 5 During Refueling Outage.Internal ML20071L5971994-06-30030 June 1994 Evaluation of Potential Severe Accidents During LOW Power and Shutdown Operations at Grand Gulf,Unit 1.Analysis of Core Damage Frequency from Internal Events for Plant Operational State 5 During a Refueling Outage.Main Report ML20071L5831994-06-30030 June 1994 Evaluation of Potential Severe Accidents During LOW Power and Shutdown Operations at Grand Gulf,Unit 1.Analysis of Core Damage Frequency from Internal Events for Plant Operational State 5 During a Refueling Outage.Section 10 ML20071L5661994-06-30030 June 1994 Evaluation of Potential Severe Accidents During LOW Power and Shutdown Operations at Grand Gulf,Unit 1.Analysis of Core Damage Frequency from Internal Events for Plant Operational State 5 During a Refueling Outage.Sections 1-9 ML20063B5501994-01-24024 January 1994 Evaluation of Util Response to Suppl 1 to NRC Bulletin 90-001,Grand Gulf,Unit 1, Technical Evaluation Rept ML20064K0511993-10-31031 October 1993 Summary Rept Of:Grand Gulf Low Power & Shutdown Abridged Risk Analysis, Final Ltr Rept ML18151A8991992-05-31031 May 1992 Summary Rept of :Grand Gulf Low Power & Shutdown Abridged Risk Analysis, Draft Ltr Rept ML20066D2981990-12-31031 December 1990 Evaluation of Severe Accident Risks: Grand Gulf,Unit 1.Main Report ML20066D3421990-12-31031 December 1990 Evaluation of Severe Accident Risks: Grand Gulf,Unit 1. Appendices ML20059N5101990-08-31031 August 1990 Technical Evaluation Rept on Response from Sys Energy Resources,Inc to Generic Ltr 88-01 Re Grand Gulf Nuclear Plant ML19332G5641989-11-30030 November 1989 Analysis of Core Damage Frequency: Grand Gulf, Unit 1 Internal Events Appendices.Continuation of Appendix D ML20248F3411989-09-30030 September 1989 Analysis of Core Damage Frequency: Grand Gulf, Unit 1 Internal Events Appendices ML20248F3451989-09-30030 September 1989 Analysis of Core Damage Frequency: Grand Gulf, Unit 1 Internal Events ML19324A6231989-05-31031 May 1989 Conformance to Generic Ltr 83-28,Item 2.2.1 - Equipment Classification for All Other Safety-Related Components: Grand Gulf-1, Technical Evaluation Rept ML20070Q5571989-01-31031 January 1989 Nuclear Power Plant Sys Sourcebook,Grand Gulf 1 ML20043B3721988-12-31031 December 1988 Stability Measurements During Cycle 2. ML19325C1581988-02-22022 February 1988 Technical Evaluation of Dcrdr. ML20235J2291987-09-30030 September 1987 Draft PRA-Based Sys Insp Plans ML18040B1891987-08-31031 August 1987 Selected Operating Reactors Issues:Stability Calculations for Grand Gulf 1 & Susquehanna 2 Bwrs. ML20235A0161987-04-30030 April 1987 Analysis of Core Damage Frequency from Internal Events:Grand Gulf,Unit 1.Main Report ML20235A0481987-04-30030 April 1987 Abslysis of Core Damage Frequency from Internal Events:Grand Gulf,Unit 1.Appendices ML20234B6831987-04-30030 April 1987 Evaluation of Severe Accident Risks and the Potential for Risk Reduction:Grand Gulf,Unit 1.Draft for Comment ML20214V2491987-04-30030 April 1987 Containment Event Analysis for Postulated Severe Accidents: Grand Gulf Nuclear Station,Unit 1.Draft for Comment ML20214S3461987-03-31031 March 1987 Conformance to Generic Ltr 83-28,Item 2.2.2-Vendor Interface Programs for All Other Safety-Related Components: Grand Gulf 1 & 2, Informal Rept ML20207S5201986-11-30030 November 1986 Technical Evaluation Rept for River Bend Station on SER Outstanding Issue (8) - Mark III Containment Sys Issues - Humphrey Safety Concerns (Hsc) ML20207S5231986-11-30030 November 1986 Technical Evaluation Rept for Gessar II Responses for Resolution of Humphrey Safety Concerns (Hsc) Re Mark III Containment Sys ML20207S5071986-09-30030 September 1986 Technical Evaluation Rept for Grand Gulf Nuclear Station on SER Outstanding Issue (8) - Mark III Containment Sys Issues - Humphrey Safety Concerns (Hsc) ML20207S5151986-06-30030 June 1986 Technical Evaluation Rept for Clinton Power Station on SER Outstanding Issue (8) - Mark III Containment Sys Issues - Humphrey Safety Concerns (Hsc) ML20155E0641986-04-0808 April 1986 App D to Evaluation of Licensee-Reported Revs to Process Control Program, Requesting Addl Info ML20155D1261986-04-0202 April 1986 App D to Evaluation of Licensee-Reported Revs to Offsite Dose Calculation Manual ML20214G9591986-03-31031 March 1986 Conformance to Generic Ltr 83-28,Item 2.1 (Part 2) Equipment Qualification (Reactor Trip Sys Components), Selected GE BWR Plants ML20212G3591986-03-31031 March 1986 Conformance to Reg Guide 1.97,Grand Gulf Nuclear Station, Unit 1 ML20211F0301986-03-31031 March 1986 Conformance to Generic Ltr 83-28,Item 2.1 (Part 1) Equipment Classification (RTS Components) Selected GE BWR Plants (Grand Gulf 1 & 2,Hatch 1 & 2,LaSalle 1 & 2 & Millstone 1) ML20202J4551986-03-28028 March 1986 First Interval Inservice Insp Program,Grand Gulf Nuclear Station, Technical Evaluation Rept ML20136F6531985-12-31031 December 1985 Review of Tdi Diesel Generator Owners Group Engine Requalification Program,Final Rept, Technical Evaluation Rept ML20207S5101985-11-30030 November 1985 Technical Evaluation Rept for Perry Nuclear Power Plant on SER Outstanding Issue (8) - Mark III Containment Sys Issues - Humphrey Safety Concerns (Hsc) ML20138H1321985-10-31031 October 1985 Conformance to Reg Guide 1.97,Grand Gulf Nuclear Station, Unit 1 ML20138R8981985-10-31031 October 1985 Conformance to Generic Ltr 83-28,Items 3.1.3 & 3.2.3,Grand Gulf Units 1 & 2, Technical Evaluation Rept ML20128H7791985-06-30030 June 1985 Rev 1 to Review of Engine Base & Bearing Caps for Tdi DSRV-12,DSRV-16 & DSRV-20 Diesel Engines, Technical Evaluation Rept 1999-07-30 Category:QUICK LOOK MONTHYEARML20211K7681999-07-30030 July 1999
[Table view]Evaluation of Fuel Pin Failure Timing in Boiling Water Reactors ML20216E8721998-03-13013 March 1998 Rept to NRC Environ Monitoring at Grand Gulf Nuclear Station CY97, Conducted by Contract NRC-29-83-621 ML20101C8941995-10-16016 October 1995 Plant IPE Insight Support Rept for NUREG-1150 Plants ML20087K3691995-07-31031 July 1995 Evaluation of Potential Severe Accidents During LOW Power and Shutdown Operations at Grand Gulf,Unit 1.Summary of Results ML20082D5261995-03-31031 March 1995 Evaluation of Potential Severe Accidents During LOW Power and Shutdown Operations at Grand Gulf,Unit 1.Evaluation of Severe Accident Risks for Plant Operational State 5 During a Refueling Outage.Supporting Melcor Calculations ML20082B7411995-03-31031 March 1995 Evaluation of Potential Severe Accidents During LOW Power and Shutdown Operations at Grand Gulf,Unit 1.Evaluation of Severe Accident Risks for Plant Operational State 5 During a Refueling Outage.Main Report and Appendices ML20073C3671994-08-31031 August 1994 Evaluation of Potential Severe Accidents During LOW Power and Shutdown Operations at Grand Gulf, Unit 1.Analysis of Core Damage Frequency from Seismic Events During Mid-Loop Operations.Main Report ML20072D0581994-07-31031 July 1994 Evaluation of Potential Severe Accidents During LOW Power and Shutdown Operations at Grand Gulf,Unit 1.Analysis of Core Damage Frequency from Internal Events for Plant Operational State 5 During a Refueling Outage ML20072N9991994-07-31031 July 1994 Evaluation of Potential Severe Accidents During LOW Power and Shutdown Operations at Grand Gulf,Unit 1.Analysis of Core Damage Frequency from Internally Induced Flooding Events for Plant Operational State 5 During a Refueling. ML20071L7191994-06-30030 June 1994 Evaluation of Potential Severe Accidents During LOW Power and Shutdown Operations at Grand Gulf,Unit 1.Analysis of Core Damage Frequency from Internal Events for Plant Operational State 5 During a Refueling Outage.Internal ML20071L7411994-06-30030 June 1994 Evaluation of Potential Severe Accidents During LOW Power and Shutdown Operations at Grand Gulf,Unit 1.Analysis of Core Damage Frequency from Internal Events for Plant Operational State 5 During a Refueling Outage.Internal ML20071L6111994-06-30030 June 1994 Evaluation of Potential Severe Accidents During LOW Power and Shutdown Operations at Grand Gulf,Unit 1.Analysis of Core Damage Frequency from Internal Events for Plant Operational State 5 During Refueling Outage.Internal ML20071L5971994-06-30030 June 1994 Evaluation of Potential Severe Accidents During LOW Power and Shutdown Operations at Grand Gulf,Unit 1.Analysis of Core Damage Frequency from Internal Events for Plant Operational State 5 During a Refueling Outage.Main Report ML20071L5831994-06-30030 June 1994 Evaluation of Potential Severe Accidents During LOW Power and Shutdown Operations at Grand Gulf,Unit 1.Analysis of Core Damage Frequency from Internal Events for Plant Operational State 5 During a Refueling Outage.Section 10 ML20071L5661994-06-30030 June 1994 Evaluation of Potential Severe Accidents During LOW Power and Shutdown Operations at Grand Gulf,Unit 1.Analysis of Core Damage Frequency from Internal Events for Plant Operational State 5 During a Refueling Outage.Sections 1-9 ML20063B5501994-01-24024 January 1994 Evaluation of Util Response to Suppl 1 to NRC Bulletin 90-001,Grand Gulf,Unit 1, Technical Evaluation Rept ML20064K0511993-10-31031 October 1993 Summary Rept Of:Grand Gulf Low Power & Shutdown Abridged Risk Analysis, Final Ltr Rept ML18151A8991992-05-31031 May 1992 Summary Rept of :Grand Gulf Low Power & Shutdown Abridged Risk Analysis, Draft Ltr Rept ML20066D2981990-12-31031 December 1990 Evaluation of Severe Accident Risks: Grand Gulf,Unit 1.Main Report ML20066D3421990-12-31031 December 1990 Evaluation of Severe Accident Risks: Grand Gulf,Unit 1. Appendices ML20059N5101990-08-31031 August 1990 Technical Evaluation Rept on Response from Sys Energy Resources,Inc to Generic Ltr 88-01 Re Grand Gulf Nuclear Plant ML19332G5641989-11-30030 November 1989 Analysis of Core Damage Frequency: Grand Gulf, Unit 1 Internal Events Appendices.Continuation of Appendix D ML20248F3411989-09-30030 September 1989 Analysis of Core Damage Frequency: Grand Gulf, Unit 1 Internal Events Appendices ML20248F3451989-09-30030 September 1989 Analysis of Core Damage Frequency: Grand Gulf, Unit 1 Internal Events ML19324A6231989-05-31031 May 1989 Conformance to Generic Ltr 83-28,Item 2.2.1 - Equipment Classification for All Other Safety-Related Components: Grand Gulf-1, Technical Evaluation Rept ML20070Q5571989-01-31031 January 1989 Nuclear Power Plant Sys Sourcebook,Grand Gulf 1 ML20043B3721988-12-31031 December 1988 Stability Measurements During Cycle 2. ML19325C1581988-02-22022 February 1988 Technical Evaluation of Dcrdr. ML20235J2291987-09-30030 September 1987 Draft PRA-Based Sys Insp Plans ML18040B1891987-08-31031 August 1987 Selected Operating Reactors Issues:Stability Calculations for Grand Gulf 1 & Susquehanna 2 Bwrs. ML20235A0161987-04-30030 April 1987 Analysis of Core Damage Frequency from Internal Events:Grand Gulf,Unit 1.Main Report ML20235A0481987-04-30030 April 1987 Abslysis of Core Damage Frequency from Internal Events:Grand Gulf,Unit 1.Appendices ML20234B6831987-04-30030 April 1987 Evaluation of Severe Accident Risks and the Potential for Risk Reduction:Grand Gulf,Unit 1.Draft for Comment ML20214V2491987-04-30030 April 1987 Containment Event Analysis for Postulated Severe Accidents: Grand Gulf Nuclear Station,Unit 1.Draft for Comment ML20214S3461987-03-31031 March 1987 Conformance to Generic Ltr 83-28,Item 2.2.2-Vendor Interface Programs for All Other Safety-Related Components: Grand Gulf 1 & 2, Informal Rept ML20207S5201986-11-30030 November 1986 Technical Evaluation Rept for River Bend Station on SER Outstanding Issue (8) - Mark III Containment Sys Issues - Humphrey Safety Concerns (Hsc) ML20207S5231986-11-30030 November 1986 Technical Evaluation Rept for Gessar II Responses for Resolution of Humphrey Safety Concerns (Hsc) Re Mark III Containment Sys ML20207S5071986-09-30030 September 1986 Technical Evaluation Rept for Grand Gulf Nuclear Station on SER Outstanding Issue (8) - Mark III Containment Sys Issues - Humphrey Safety Concerns (Hsc) ML20207S5151986-06-30030 June 1986 Technical Evaluation Rept for Clinton Power Station on SER Outstanding Issue (8) - Mark III Containment Sys Issues - Humphrey Safety Concerns (Hsc) ML20155E0641986-04-0808 April 1986 App D to Evaluation of Licensee-Reported Revs to Process Control Program, Requesting Addl Info ML20155D1261986-04-0202 April 1986 App D to Evaluation of Licensee-Reported Revs to Offsite Dose Calculation Manual ML20214G9591986-03-31031 March 1986 Conformance to Generic Ltr 83-28,Item 2.1 (Part 2) Equipment Qualification (Reactor Trip Sys Components), Selected GE BWR Plants ML20212G3591986-03-31031 March 1986 Conformance to Reg Guide 1.97,Grand Gulf Nuclear Station, Unit 1 ML20211F0301986-03-31031 March 1986 Conformance to Generic Ltr 83-28,Item 2.1 (Part 1) Equipment Classification (RTS Components) Selected GE BWR Plants (Grand Gulf 1 & 2,Hatch 1 & 2,LaSalle 1 & 2 & Millstone 1) ML20202J4551986-03-28028 March 1986 First Interval Inservice Insp Program,Grand Gulf Nuclear Station, Technical Evaluation Rept ML20136F6531985-12-31031 December 1985 Review of Tdi Diesel Generator Owners Group Engine Requalification Program,Final Rept, Technical Evaluation Rept ML20207S5101985-11-30030 November 1985 Technical Evaluation Rept for Perry Nuclear Power Plant on SER Outstanding Issue (8) - Mark III Containment Sys Issues - Humphrey Safety Concerns (Hsc) ML20138H1321985-10-31031 October 1985 Conformance to Reg Guide 1.97,Grand Gulf Nuclear Station, Unit 1 ML20138R8981985-10-31031 October 1985 Conformance to Generic Ltr 83-28,Items 3.1.3 & 3.2.3,Grand Gulf Units 1 & 2, Technical Evaluation Rept ML20128H7791985-06-30030 June 1985 Rev 1 to Review of Engine Base & Bearing Caps for Tdi DSRV-12,DSRV-16 & DSRV-20 Diesel Engines, Technical Evaluation Rept 1999-07-30 Category:ETC. (PERIODIC MONTHYEARML20211K7681999-07-30030 July 1999
[Table view]Evaluation of Fuel Pin Failure Timing in Boiling Water Reactors ML20216E8721998-03-13013 March 1998 Rept to NRC Environ Monitoring at Grand Gulf Nuclear Station CY97, Conducted by Contract NRC-29-83-621 ML20101C8941995-10-16016 October 1995 Plant IPE Insight Support Rept for NUREG-1150 Plants ML20087K3691995-07-31031 July 1995 Evaluation of Potential Severe Accidents During LOW Power and Shutdown Operations at Grand Gulf,Unit 1.Summary of Results ML20082D5261995-03-31031 March 1995 Evaluation of Potential Severe Accidents During LOW Power and Shutdown Operations at Grand Gulf,Unit 1.Evaluation of Severe Accident Risks for Plant Operational State 5 During a Refueling Outage.Supporting Melcor Calculations ML20082B7411995-03-31031 March 1995 Evaluation of Potential Severe Accidents During LOW Power and Shutdown Operations at Grand Gulf,Unit 1.Evaluation of Severe Accident Risks for Plant Operational State 5 During a Refueling Outage.Main Report and Appendices ML20073C3671994-08-31031 August 1994 Evaluation of Potential Severe Accidents During LOW Power and Shutdown Operations at Grand Gulf, Unit 1.Analysis of Core Damage Frequency from Seismic Events During Mid-Loop Operations.Main Report ML20072D0581994-07-31031 July 1994 Evaluation of Potential Severe Accidents During LOW Power and Shutdown Operations at Grand Gulf,Unit 1.Analysis of Core Damage Frequency from Internal Events for Plant Operational State 5 During a Refueling Outage ML20072N9991994-07-31031 July 1994 Evaluation of Potential Severe Accidents During LOW Power and Shutdown Operations at Grand Gulf,Unit 1.Analysis of Core Damage Frequency from Internally Induced Flooding Events for Plant Operational State 5 During a Refueling. ML20071L7191994-06-30030 June 1994 Evaluation of Potential Severe Accidents During LOW Power and Shutdown Operations at Grand Gulf,Unit 1.Analysis of Core Damage Frequency from Internal Events for Plant Operational State 5 During a Refueling Outage.Internal ML20071L7411994-06-30030 June 1994 Evaluation of Potential Severe Accidents During LOW Power and Shutdown Operations at Grand Gulf,Unit 1.Analysis of Core Damage Frequency from Internal Events for Plant Operational State 5 During a Refueling Outage.Internal ML20071L6111994-06-30030 June 1994 Evaluation of Potential Severe Accidents During LOW Power and Shutdown Operations at Grand Gulf,Unit 1.Analysis of Core Damage Frequency from Internal Events for Plant Operational State 5 During Refueling Outage.Internal ML20071L5971994-06-30030 June 1994 Evaluation of Potential Severe Accidents During LOW Power and Shutdown Operations at Grand Gulf,Unit 1.Analysis of Core Damage Frequency from Internal Events for Plant Operational State 5 During a Refueling Outage.Main Report ML20071L5831994-06-30030 June 1994 Evaluation of Potential Severe Accidents During LOW Power and Shutdown Operations at Grand Gulf,Unit 1.Analysis of Core Damage Frequency from Internal Events for Plant Operational State 5 During a Refueling Outage.Section 10 ML20071L5661994-06-30030 June 1994 Evaluation of Potential Severe Accidents During LOW Power and Shutdown Operations at Grand Gulf,Unit 1.Analysis of Core Damage Frequency from Internal Events for Plant Operational State 5 During a Refueling Outage.Sections 1-9 ML20063B5501994-01-24024 January 1994 Evaluation of Util Response to Suppl 1 to NRC Bulletin 90-001,Grand Gulf,Unit 1, Technical Evaluation Rept ML20064K0511993-10-31031 October 1993 Summary Rept Of:Grand Gulf Low Power & Shutdown Abridged Risk Analysis, Final Ltr Rept ML18151A8991992-05-31031 May 1992 Summary Rept of :Grand Gulf Low Power & Shutdown Abridged Risk Analysis, Draft Ltr Rept ML20066D2981990-12-31031 December 1990 Evaluation of Severe Accident Risks: Grand Gulf,Unit 1.Main Report ML20066D3421990-12-31031 December 1990 Evaluation of Severe Accident Risks: Grand Gulf,Unit 1. Appendices ML20059N5101990-08-31031 August 1990 Technical Evaluation Rept on Response from Sys Energy Resources,Inc to Generic Ltr 88-01 Re Grand Gulf Nuclear Plant ML19332G5641989-11-30030 November 1989 Analysis of Core Damage Frequency: Grand Gulf, Unit 1 Internal Events Appendices.Continuation of Appendix D ML20248F3411989-09-30030 September 1989 Analysis of Core Damage Frequency: Grand Gulf, Unit 1 Internal Events Appendices ML20248F3451989-09-30030 September 1989 Analysis of Core Damage Frequency: Grand Gulf, Unit 1 Internal Events ML19324A6231989-05-31031 May 1989 Conformance to Generic Ltr 83-28,Item 2.2.1 - Equipment Classification for All Other Safety-Related Components: Grand Gulf-1, Technical Evaluation Rept ML20070Q5571989-01-31031 January 1989 Nuclear Power Plant Sys Sourcebook,Grand Gulf 1 ML20043B3721988-12-31031 December 1988 Stability Measurements During Cycle 2. ML19325C1581988-02-22022 February 1988 Technical Evaluation of Dcrdr. ML20235J2291987-09-30030 September 1987 Draft PRA-Based Sys Insp Plans ML18040B1891987-08-31031 August 1987 Selected Operating Reactors Issues:Stability Calculations for Grand Gulf 1 & Susquehanna 2 Bwrs. ML20235A0161987-04-30030 April 1987 Analysis of Core Damage Frequency from Internal Events:Grand Gulf,Unit 1.Main Report ML20235A0481987-04-30030 April 1987 Abslysis of Core Damage Frequency from Internal Events:Grand Gulf,Unit 1.Appendices ML20234B6831987-04-30030 April 1987 Evaluation of Severe Accident Risks and the Potential for Risk Reduction:Grand Gulf,Unit 1.Draft for Comment ML20214V2491987-04-30030 April 1987 Containment Event Analysis for Postulated Severe Accidents: Grand Gulf Nuclear Station,Unit 1.Draft for Comment ML20214S3461987-03-31031 March 1987 Conformance to Generic Ltr 83-28,Item 2.2.2-Vendor Interface Programs for All Other Safety-Related Components: Grand Gulf 1 & 2, Informal Rept ML20207S5201986-11-30030 November 1986 Technical Evaluation Rept for River Bend Station on SER Outstanding Issue (8) - Mark III Containment Sys Issues - Humphrey Safety Concerns (Hsc) ML20207S5231986-11-30030 November 1986 Technical Evaluation Rept for Gessar II Responses for Resolution of Humphrey Safety Concerns (Hsc) Re Mark III Containment Sys ML20207S5071986-09-30030 September 1986 Technical Evaluation Rept for Grand Gulf Nuclear Station on SER Outstanding Issue (8) - Mark III Containment Sys Issues - Humphrey Safety Concerns (Hsc) ML20207S5151986-06-30030 June 1986 Technical Evaluation Rept for Clinton Power Station on SER Outstanding Issue (8) - Mark III Containment Sys Issues - Humphrey Safety Concerns (Hsc) ML20155E0641986-04-0808 April 1986 App D to Evaluation of Licensee-Reported Revs to Process Control Program, Requesting Addl Info ML20155D1261986-04-0202 April 1986 App D to Evaluation of Licensee-Reported Revs to Offsite Dose Calculation Manual ML20214G9591986-03-31031 March 1986 Conformance to Generic Ltr 83-28,Item 2.1 (Part 2) Equipment Qualification (Reactor Trip Sys Components), Selected GE BWR Plants ML20212G3591986-03-31031 March 1986 Conformance to Reg Guide 1.97,Grand Gulf Nuclear Station, Unit 1 ML20211F0301986-03-31031 March 1986 Conformance to Generic Ltr 83-28,Item 2.1 (Part 1) Equipment Classification (RTS Components) Selected GE BWR Plants (Grand Gulf 1 & 2,Hatch 1 & 2,LaSalle 1 & 2 & Millstone 1) ML20202J4551986-03-28028 March 1986 First Interval Inservice Insp Program,Grand Gulf Nuclear Station, Technical Evaluation Rept ML20136F6531985-12-31031 December 1985 Review of Tdi Diesel Generator Owners Group Engine Requalification Program,Final Rept, Technical Evaluation Rept ML20207S5101985-11-30030 November 1985 Technical Evaluation Rept for Perry Nuclear Power Plant on SER Outstanding Issue (8) - Mark III Containment Sys Issues - Humphrey Safety Concerns (Hsc) ML20138H1321985-10-31031 October 1985 Conformance to Reg Guide 1.97,Grand Gulf Nuclear Station, Unit 1 ML20138R8981985-10-31031 October 1985 Conformance to Generic Ltr 83-28,Items 3.1.3 & 3.2.3,Grand Gulf Units 1 & 2, Technical Evaluation Rept ML20128H7791985-06-30030 June 1985 Rev 1 to Review of Engine Base & Bearing Caps for Tdi DSRV-12,DSRV-16 & DSRV-20 Diesel Engines, Technical Evaluation Rept 1999-07-30 Category:NUREG REPORTS MONTHYEARML20195C2791998-11-0505 November 1998
[Table view]BWR Feedwater Nozzle Inservice Insp Summary Rept for GGNS, NUREG-0619-00006 ML20087K3691995-07-31031 July 1995 Evaluation of Potential Severe Accidents During LOW Power and Shutdown Operations at Grand Gulf,Unit 1.Summary of Results ML20082D5261995-03-31031 March 1995 Evaluation of Potential Severe Accidents During LOW Power and Shutdown Operations at Grand Gulf,Unit 1.Evaluation of Severe Accident Risks for Plant Operational State 5 During a Refueling Outage.Supporting Melcor Calculations ML20082B7411995-03-31031 March 1995 Evaluation of Potential Severe Accidents During LOW Power and Shutdown Operations at Grand Gulf,Unit 1.Evaluation of Severe Accident Risks for Plant Operational State 5 During a Refueling Outage.Main Report and Appendices ML20073C3671994-08-31031 August 1994 Evaluation of Potential Severe Accidents During LOW Power and Shutdown Operations at Grand Gulf, Unit 1.Analysis of Core Damage Frequency from Seismic Events During Mid-Loop Operations.Main Report ML20072N9991994-07-31031 July 1994 Evaluation of Potential Severe Accidents During LOW Power and Shutdown Operations at Grand Gulf,Unit 1.Analysis of Core Damage Frequency from Internally Induced Flooding Events for Plant Operational State 5 During a Refueling. ML20072D0581994-07-31031 July 1994 Evaluation of Potential Severe Accidents During LOW Power and Shutdown Operations at Grand Gulf,Unit 1.Analysis of Core Damage Frequency from Internal Events for Plant Operational State 5 During a Refueling Outage ML20071L5661994-06-30030 June 1994 Evaluation of Potential Severe Accidents During LOW Power and Shutdown Operations at Grand Gulf,Unit 1.Analysis of Core Damage Frequency from Internal Events for Plant Operational State 5 During a Refueling Outage.Sections 1-9 ML20071L7411994-06-30030 June 1994 Evaluation of Potential Severe Accidents During LOW Power and Shutdown Operations at Grand Gulf,Unit 1.Analysis of Core Damage Frequency from Internal Events for Plant Operational State 5 During a Refueling Outage.Internal ML20071L7191994-06-30030 June 1994 Evaluation of Potential Severe Accidents During LOW Power and Shutdown Operations at Grand Gulf,Unit 1.Analysis of Core Damage Frequency from Internal Events for Plant Operational State 5 During a Refueling Outage.Internal ML20071L6111994-06-30030 June 1994 Evaluation of Potential Severe Accidents During LOW Power and Shutdown Operations at Grand Gulf,Unit 1.Analysis of Core Damage Frequency from Internal Events for Plant Operational State 5 During Refueling Outage.Internal ML20071L5971994-06-30030 June 1994 Evaluation of Potential Severe Accidents During LOW Power and Shutdown Operations at Grand Gulf,Unit 1.Analysis of Core Damage Frequency from Internal Events for Plant Operational State 5 During a Refueling Outage.Main Report ML20071L5831994-06-30030 June 1994 Evaluation of Potential Severe Accidents During LOW Power and Shutdown Operations at Grand Gulf,Unit 1.Analysis of Core Damage Frequency from Internal Events for Plant Operational State 5 During a Refueling Outage.Section 10 ML20066D3421990-12-31031 December 1990 Evaluation of Severe Accident Risks: Grand Gulf,Unit 1. Appendices ML20066D2981990-12-31031 December 1990 Evaluation of Severe Accident Risks: Grand Gulf,Unit 1.Main Report ML19332G5641989-11-30030 November 1989 Analysis of Core Damage Frequency: Grand Gulf, Unit 1 Internal Events Appendices.Continuation of Appendix D ML20248F3451989-09-30030 September 1989 Analysis of Core Damage Frequency: Grand Gulf, Unit 1 Internal Events ML20248F3411989-09-30030 September 1989 Analysis of Core Damage Frequency: Grand Gulf, Unit 1 Internal Events Appendices ML20214V2491987-04-30030 April 1987 Containment Event Analysis for Postulated Severe Accidents: Grand Gulf Nuclear Station,Unit 1.Draft for Comment ML20235A0481987-04-30030 April 1987 Abslysis of Core Damage Frequency from Internal Events:Grand Gulf,Unit 1.Appendices ML20235A0161987-04-30030 April 1987 Analysis of Core Damage Frequency from Internal Events:Grand Gulf,Unit 1.Main Report ML20234B6831987-04-30030 April 1987 Evaluation of Severe Accident Risks and the Potential for Risk Reduction:Grand Gulf,Unit 1.Draft for Comment ML20069J4991983-03-31031 March 1983 Review of the Grand Gulf Hydrogen Igniter System ML20054L0881982-06-30030 June 1982 Safety Evaluation Report Related to the Operation of Grand Gulf Nuclear Station,Units 1 & 2.Docket Nos. 50-416 & 50-417.(Mississippi Power and Light Company) ML20039D6951981-11-30030 November 1981 Reactor Safety Study Methodology Applications Program: Grand Gulf NO.1 BWR Power Plant ML20126M2401981-05-31031 May 1981 Draft Environmental Statement Related to the Operation of the Grand Gulf Nuclear Station,Units 1 and 2.Docket Nos. 50-416 and 50-417.(Mississippi Power & Light Company,Middle South Energy,Inc.) 1998-11-05 Category:TEXT-PROCUREMENT & CONTRACTS MONTHYEARML20211K7681999-07-30030 July 1999
[Table view]Evaluation of Fuel Pin Failure Timing in Boiling Water Reactors ML20216E8721998-03-13013 March 1998 Rept to NRC Environ Monitoring at Grand Gulf Nuclear Station CY97, Conducted by Contract NRC-29-83-621 ML20101C8941995-10-16016 October 1995 Plant IPE Insight Support Rept for NUREG-1150 Plants ML20087K3691995-07-31031 July 1995 Evaluation of Potential Severe Accidents During LOW Power and Shutdown Operations at Grand Gulf,Unit 1.Summary of Results ML20082D5261995-03-31031 March 1995 Evaluation of Potential Severe Accidents During LOW Power and Shutdown Operations at Grand Gulf,Unit 1.Evaluation of Severe Accident Risks for Plant Operational State 5 During a Refueling Outage.Supporting Melcor Calculations ML20082B7411995-03-31031 March 1995 Evaluation of Potential Severe Accidents During LOW Power and Shutdown Operations at Grand Gulf,Unit 1.Evaluation of Severe Accident Risks for Plant Operational State 5 During a Refueling Outage.Main Report and Appendices ML20073C3671994-08-31031 August 1994 Evaluation of Potential Severe Accidents During LOW Power and Shutdown Operations at Grand Gulf, Unit 1.Analysis of Core Damage Frequency from Seismic Events During Mid-Loop Operations.Main Report ML20072D0581994-07-31031 July 1994 Evaluation of Potential Severe Accidents During LOW Power and Shutdown Operations at Grand Gulf,Unit 1.Analysis of Core Damage Frequency from Internal Events for Plant Operational State 5 During a Refueling Outage ML20072N9991994-07-31031 July 1994 Evaluation of Potential Severe Accidents During LOW Power and Shutdown Operations at Grand Gulf,Unit 1.Analysis of Core Damage Frequency from Internally Induced Flooding Events for Plant Operational State 5 During a Refueling. ML20071L7191994-06-30030 June 1994 Evaluation of Potential Severe Accidents During LOW Power and Shutdown Operations at Grand Gulf,Unit 1.Analysis of Core Damage Frequency from Internal Events for Plant Operational State 5 During a Refueling Outage.Internal ML20071L7411994-06-30030 June 1994 Evaluation of Potential Severe Accidents During LOW Power and Shutdown Operations at Grand Gulf,Unit 1.Analysis of Core Damage Frequency from Internal Events for Plant Operational State 5 During a Refueling Outage.Internal ML20071L6111994-06-30030 June 1994 Evaluation of Potential Severe Accidents During LOW Power and Shutdown Operations at Grand Gulf,Unit 1.Analysis of Core Damage Frequency from Internal Events for Plant Operational State 5 During Refueling Outage.Internal ML20071L5971994-06-30030 June 1994 Evaluation of Potential Severe Accidents During LOW Power and Shutdown Operations at Grand Gulf,Unit 1.Analysis of Core Damage Frequency from Internal Events for Plant Operational State 5 During a Refueling Outage.Main Report ML20071L5831994-06-30030 June 1994 Evaluation of Potential Severe Accidents During LOW Power and Shutdown Operations at Grand Gulf,Unit 1.Analysis of Core Damage Frequency from Internal Events for Plant Operational State 5 During a Refueling Outage.Section 10 ML20071L5661994-06-30030 June 1994 Evaluation of Potential Severe Accidents During LOW Power and Shutdown Operations at Grand Gulf,Unit 1.Analysis of Core Damage Frequency from Internal Events for Plant Operational State 5 During a Refueling Outage.Sections 1-9 ML20063B5501994-01-24024 January 1994 Evaluation of Util Response to Suppl 1 to NRC Bulletin 90-001,Grand Gulf,Unit 1, Technical Evaluation Rept ML20064K0511993-10-31031 October 1993 Summary Rept Of:Grand Gulf Low Power & Shutdown Abridged Risk Analysis, Final Ltr Rept ML18151A8991992-05-31031 May 1992 Summary Rept of :Grand Gulf Low Power & Shutdown Abridged Risk Analysis, Draft Ltr Rept ML20066D2981990-12-31031 December 1990 Evaluation of Severe Accident Risks: Grand Gulf,Unit 1.Main Report ML20066D3421990-12-31031 December 1990 Evaluation of Severe Accident Risks: Grand Gulf,Unit 1. Appendices ML20059N5101990-08-31031 August 1990 Technical Evaluation Rept on Response from Sys Energy Resources,Inc to Generic Ltr 88-01 Re Grand Gulf Nuclear Plant ML19332G5641989-11-30030 November 1989 Analysis of Core Damage Frequency: Grand Gulf, Unit 1 Internal Events Appendices.Continuation of Appendix D ML20248F3411989-09-30030 September 1989 Analysis of Core Damage Frequency: Grand Gulf, Unit 1 Internal Events Appendices ML20248F3451989-09-30030 September 1989 Analysis of Core Damage Frequency: Grand Gulf, Unit 1 Internal Events ML19324A6231989-05-31031 May 1989 Conformance to Generic Ltr 83-28,Item 2.2.1 - Equipment Classification for All Other Safety-Related Components: Grand Gulf-1, Technical Evaluation Rept ML20070Q5571989-01-31031 January 1989 Nuclear Power Plant Sys Sourcebook,Grand Gulf 1 ML20043B3721988-12-31031 December 1988 Stability Measurements During Cycle 2. ML19325C1581988-02-22022 February 1988 Technical Evaluation of Dcrdr. ML20235J2291987-09-30030 September 1987 Draft PRA-Based Sys Insp Plans ML18040B1891987-08-31031 August 1987 Selected Operating Reactors Issues:Stability Calculations for Grand Gulf 1 & Susquehanna 2 Bwrs. ML20235A0161987-04-30030 April 1987 Analysis of Core Damage Frequency from Internal Events:Grand Gulf,Unit 1.Main Report ML20235A0481987-04-30030 April 1987 Abslysis of Core Damage Frequency from Internal Events:Grand Gulf,Unit 1.Appendices ML20234B6831987-04-30030 April 1987 Evaluation of Severe Accident Risks and the Potential for Risk Reduction:Grand Gulf,Unit 1.Draft for Comment ML20214V2491987-04-30030 April 1987 Containment Event Analysis for Postulated Severe Accidents: Grand Gulf Nuclear Station,Unit 1.Draft for Comment ML20214S3461987-03-31031 March 1987 Conformance to Generic Ltr 83-28,Item 2.2.2-Vendor Interface Programs for All Other Safety-Related Components: Grand Gulf 1 & 2, Informal Rept ML20207S5201986-11-30030 November 1986 Technical Evaluation Rept for River Bend Station on SER Outstanding Issue (8) - Mark III Containment Sys Issues - Humphrey Safety Concerns (Hsc) ML20207S5231986-11-30030 November 1986 Technical Evaluation Rept for Gessar II Responses for Resolution of Humphrey Safety Concerns (Hsc) Re Mark III Containment Sys ML20207S5071986-09-30030 September 1986 Technical Evaluation Rept for Grand Gulf Nuclear Station on SER Outstanding Issue (8) - Mark III Containment Sys Issues - Humphrey Safety Concerns (Hsc) ML20207S5151986-06-30030 June 1986 Technical Evaluation Rept for Clinton Power Station on SER Outstanding Issue (8) - Mark III Containment Sys Issues - Humphrey Safety Concerns (Hsc) ML20155E0641986-04-0808 April 1986 App D to Evaluation of Licensee-Reported Revs to Process Control Program, Requesting Addl Info ML20155D1261986-04-0202 April 1986 App D to Evaluation of Licensee-Reported Revs to Offsite Dose Calculation Manual ML20214G9591986-03-31031 March 1986 Conformance to Generic Ltr 83-28,Item 2.1 (Part 2) Equipment Qualification (Reactor Trip Sys Components), Selected GE BWR Plants ML20212G3591986-03-31031 March 1986 Conformance to Reg Guide 1.97,Grand Gulf Nuclear Station, Unit 1 ML20211F0301986-03-31031 March 1986 Conformance to Generic Ltr 83-28,Item 2.1 (Part 1) Equipment Classification (RTS Components) Selected GE BWR Plants (Grand Gulf 1 & 2,Hatch 1 & 2,LaSalle 1 & 2 & Millstone 1) ML20202J4551986-03-28028 March 1986 First Interval Inservice Insp Program,Grand Gulf Nuclear Station, Technical Evaluation Rept ML20136F6531985-12-31031 December 1985 Review of Tdi Diesel Generator Owners Group Engine Requalification Program,Final Rept, Technical Evaluation Rept ML20207S5101985-11-30030 November 1985 Technical Evaluation Rept for Perry Nuclear Power Plant on SER Outstanding Issue (8) - Mark III Containment Sys Issues - Humphrey Safety Concerns (Hsc) ML20138H1321985-10-31031 October 1985 Conformance to Reg Guide 1.97,Grand Gulf Nuclear Station, Unit 1 ML20138R8981985-10-31031 October 1985 Conformance to Generic Ltr 83-28,Items 3.1.3 & 3.2.3,Grand Gulf Units 1 & 2, Technical Evaluation Rept ML20128H7791985-06-30030 June 1985 Rev 1 to Review of Engine Base & Bearing Caps for Tdi DSRV-12,DSRV-16 & DSRV-20 Diesel Engines, Technical Evaluation Rept 1999-07-30 |
Text
Retrieved from "https://kanterella.com/w/index.php?title=ML20039D695&oldid=2592470"