DCL-02-003, December 2001 Monthly Operating Report for Diablo Canyon Units 1 & 2

From kanterella
Revision as of 04:29, 28 March 2020 by StriderTol (talk | contribs) (StriderTol Bot insert)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
December 2001 Monthly Operating Report for Diablo Canyon Units 1 & 2
ML020390319
Person / Time
Site: Diablo Canyon  Pacific Gas & Electric icon.png
Issue date: 01/15/2002
From: Becker J
Pacific Gas & Electric Co
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
DCL-02-003
Download: ML020390319 (6)


Text

Pacific Gas and Electric Company James R. Becker Diablo Canyon Power Plant Station Director Mail Code 104/5/504 PO. Box 56 Avila Beach, CA 93424 January 15,2002 B05.545 3462 Fax: 805.545.4234 PG&E Letter DCL-02-003 U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, DC 20555-0001 Docket No. 50-275, DPR-80 Docket No. 50-323, DPR-82 Diablo Canyon Units I and 2 Monthly Operating Report for December 2001

Dear Commissioners and Staff:

Attached is the Monthly Operating Report for Diablo Canyon Power Plant, Units I and 2, for December 2001. This report is submitted in accordance with Technical Specification 5.6.4 and NRC Generic Letter 97-02.

Sincerely, James R. Becker cc: Robert D. Glynn, Jr.

Kurt Larson Barbara Lewis Ellis W. Merschoff David L. Proulx Girija S. Shukla Gregory M. Rueger INPO Record Center Enclosures LMP/1713/R0227863

Enclosure 1 PG&E Letter DCL-02-003 DECEMBER 2001, OPERATION SUMMARIES DIABLO CANYON POWER PLANT UNITS 1 AND 2 Summary of Unit I Operation Unit 1 began December in Mode 1 (Power Operation), at approximately 100 percent power. On December 20, 2001, as a precaution for forecasted high ocean swells and ocean debris, operators reduced power to approximately 20 percent. On December 21, 2001, operators returned the unit to approximately 100 percent power.

Summary of Unit 2 Operation Unit 2 began December in Mode 1 at approximately 100 percent power. On December 20, 2001, as a precaution for forecasted high ocean swells and ocean debris, operators reduced power to approximately 20 percent. On December 21, 2001, operators returned the unit to approximately 100 percent power.

Actuations of Safety or Pressurizer Power Operated Relief Valves There were no challenges to the pressurizer power operated relief valves, pressurizer safety valves, or steam generator safety valves.

Enclosure 2 PG&E Letter DCL-02-003 OPERATING DATA REPORT DOCKET NO.: 50-275 UNIT NAME: Diablo Canyon Unit 1 DATE: 01/02/2002 COMPLETED BY: L. Parker TELEPHONE: (805) 545-3386 REPORT MONTH: December 2001 S1. Design Electrical Rating (MWe - Net): 1 1103

2. Maximum Dependable Capacity (MWe - Net): 1087 This Month YTD Cumulative
3. Number of Hours Reactor Critical: 744.0 8760.0 127420.0
4. Number of Hours Generator On-Line: 744.0 8708.5 126042.3
5. Unit Reserve Shutdown Hours: 0.0 0.0 0.0
6. Net Electrical Energy Generated (MWH): 812620 9504586 130158089 1

Enclosure 2 PG&E Letter DCL-02-003 UNIT SHUTDOWNS DOCKET NO.: 50-275 UNIT NAME: Diablo Canyon Unit 1 DATE: 01/02/2002 COMPLETED BY: L. Parker TELEPHONE: (805) 545-3386 REPORT MONTH: December 2001 NO. DATE TYPE DURATION REASON1 METHOD CAUSE & CORRECTIVE F(Forced) (HOURS) OF ACTIONS S (Scheduled) SHUTTING DOWN2 COMMENTS N/A There were no shutdowns this month.

1. Reason 2. Method A-Equipment Failure (Explain) 1-Manual B-Maintenance or Test 2-Manual Trip/Scram C-Refueling 3-Automatic Trip/Scram D-Regulatory Restriction 4-Continuation from Previous Month E-Operator Training/License Examination 5-Other F- Administrative G-Operational Error (Explain)

H-Other (Explain) 2

Enclosure 2 PG&E Letter DCL-02-003 OPERATING DATA REPORT DOCKET NO.: 50-323 UNIT NAME: Diablo Canyon Unit 2 DATE: 01/02/2002 COMPLETED BY: L. Parker TELEPHONE: (805) 545-3386 REPORT MONTH: December 2001

1. Design Electrical Rating (MWe - Net): 1 1119
2. Maximum Dependable Capacity (MWe - Net): 1087 This Month YTD Cumulative
3. Number of Hours Reactor Critical: 744.0 8122.0 122681.8
4. Number of Hours Generator On-Line: 744.0 8052.6 121224.0
5. Unit Reserve Shutdown Hours: 0.0 0.0 0.0
6. Net Electrical Energy Generated (MWH): 805038 8658372 127405932 3

Enclosure 2 PG&E Letter DCL-02-003 UNIT SHUTDOWNS DOCKET NO.: 50-323 UNIT NAME: Diablo Canyon Unit 2 DATE: 01/02/2002 COMPLETED BY: L. Parker TELEPHONE: (805) 545-3386 REPORT MONTH: December 2001 NO. DATE FTYPE (Forced) DURATION (HOURS) REASON1 METHOD SHUTTING OF CAUSEACTIONS

& CORRECTIVE 2

S (Scheduled) DOWN COMMENTS N/A There were no shutdowns this month.

1. Reason 2. Method A-Equipment Failure (Explain) 1-Manual B-Maintenance or Test 2-Manual Trip/Scram C-Refueling 3-Automatic Trip/Scram D-Regulatory Restriction 4-Continuation from Previous Month E-Operator Training/License Examination 5-Other F- Administrative G-Operational Error (Explain)