July 2002 Monthly Operating Report for St. Lucie Units 1 & 2
ML022280317
Person / Time
Site: Saint Lucie  NextEra Energy icon.png
Issue date: 08/13/2002
From: Jernigan D
Florida Power & Light Co
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
L-2002-164
Download: ML022280317 (7)


Text

a , 3 0 FPL Florida Power & Light Company, 6501 South Ocean Drive, Jensen Beach, FL 34957 August 13, 2002 L-2002-164 10 CFR 50.36 U. S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, DC 20555 Re: St. Lucie Units 1 and 2 Docket Nos. 50-335 and 50-389 Monthly Operating Report Pursuant to Technical Specification 6.9.1.6, and the guidance of Generic Letter 97-02, attached are the July 2002 Operating Data Report, Summary of Operating Experience Report, and Unit Shutdowns and Power Reductions for St. Lucie Units 1 and 2.

Please cQoact us should there be any questions regarding this information.

Vice PreTsent St. Lucie Plant DEJ/tlt Attachments an FPL Group company

DOCKET NO.: 50-335 UNIT NAME: St. Lucie Unit 1 DATE: August 2, 2002 COMPLETED BY: J. A. Rogers TELEPHONE: (772) 467-7296 REPORTING PERIOD: July 2002

1. Design Electrical Rating (Mwe-Net) 830
2. Maximum Dependable Capacity (Mwe-Net). 839 MONTH -YTD CUMULATIVE
3. Number of Hours Reactor Critical 744 5087 181687.5
4. Number of Hours Generator On Line 744 5087 179874
5. Unit Reserve Shutdown Hours 0.0 0.0 0.0
6. Net Electrical Energy (MWH). 634334 4351543 147028282

SUMMARY

OF OPERATING EXPERIENCE DOCKET NO.: 50-335 UNIT: St. Lucie Unit 1 DATE: August 2, 2002 COMPLETED BY: J. A. Rogers TELEPHONE: (772) 467-7296 REPORT MONTH July 2002 Unit 1 operated at essentially full power through the entire month of July.

In accordance with the requirements of Technical Specification 6.9.1.6, there were no challenges to the power operated relief valves or the safety valves during the report period.

UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO.: 50-335 UNIT: St. Lucie Unit 1 DATE: August 2, 2002 COMPLETED BY: J.A. Rogers TELEPHONE: (772) 467-7296 REPORT MONTH July 2002 Number Date Typel Duration Reason 2 Method of Cause & Corrective (Hours) Shutting Down Action to Reactor3 Prevent Recurrence Unit I operated at essentially full power for the entire month of July.

I 3 F Forced Reason Method S Scheduled A - Equipment Failure (Explain) 1 - Manual B - Maintenance or Test 2 - Manual Scram C - Refueling 3 - Automatic Scram D - Regulatory Restriction 4 - Continued E - Operator Training & License Examination 5 - Load Reduction F - Administrative 9 - Other (Explain)

G - Operational Error (Explain)

H - Other (Explain) 091587 FPL

DOCKET NO.: 50-389 UNIT NAME: St. Lucie Unit 2 DATE: August 2, 2002 COMPLETED BY: J. A. Rogers TELEPHONE: (772) 467-7296 REPORTING PERIOD: July 2002

1. Design Electrical Rating (Mwe-Net) 830
2. Maximum Dependable Capacity (Mwe-Net). 839 MONTH -YTD CUMULATIVE
3. Number of Hours Reactor Critical 744 5072.4 145085.6
4. Number of Hours Generator On Line 744 5069.6 143327.3
5. Unit Reserve Shutdown Hours 0.0 0.0 0.0
6. Net Electrical Energy (MWVHI) 632433 4317996 118048642

SUMMARY

OF OPERATING EXPERIENCE DOCKET NO.: 50-389 UNIT: St. Lucie Unit 2 DATE: August 2, 2002 COMPLETED BY: J. A. Rogers TELEPHONE: (772) 467-7296 REPORT MONTH July 2002 Unit 2 operated at essentially full power through the entire month of July.

In accordance with the requirements of Technical Specification 6.9.1.6, there were no challenges to the power operated relief valves or the safety valves during the report period.

,I UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO.: 50-389 UNIT: St. Lucie Unit 2 DATE: August 2, 2002 COMPLETED BY: J.A. Rogers TELEPHONE: (772) 467-7296 REPORT MONTH July 2002 Number Date Typel Duration Reason 2 Method of Cause & Corrective (Hours) Shutting Down Action to Reactor3 Prevent Recurrence Unit 2 operated at essentially full power for the entire month of July.

1 2 F Forced Reason Method S Scheduled A - Equipment Failure (Explain) 1 - Manual B - Maintenance or Test 2 - Manual Scram C - Refueling 3 - Automatic Scram D - Regulatory Restriction 4 - Continued E - Operator Training & License Examination 5 - Load Reduction F - Administrative 9 - Other (Explain)

G - Operational Error (Explain)

H - Other (Explain) 091587 VPL