July 2002 Monthly Operating Report for Monticello Nuclear Generating Plant
ML022330503
Person / Time
Site: Monticello Xcel Energy icon.png
Issue date: 08/08/2002
From: Forbes J
Nuclear Management Co
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
Download: ML022330503 (3)


Text

NM-Committed to Nuclear Excelle Monticello Nuclear Generating Plant Operated by Nuclear Management Company, LLC August 8, 2002 US Nuclear Regulatory Commission Attn: Document Control Desk Washington, DC 20555 MONTICELLO NUCLEAR GENERATING PLANT Docket No. 50-263 License No. DPR-22 Submittal of Monticello Monthly Operating Report for July 2002 In accordance with Monticello Technical Specification 6.7.A.3, the report of operating statistics for the Monticello Nuclear Generating Plant for the month of July is provided.

Please contact Paul Hartmann at (763) 271-5172 if you require further information.

Jeffrey S. Forbes Site Vice President Monticello Nuclear Generating Plant c: Regional Administrator - Ill, NRC NRR Project Manager, NRC Sr. Resident Inspector, NRC Minnesota Dept. of Commerce J W.ICENSEXNRC Misc CorrespondenceWsonthly Operating Report doc 2807 West County Road 75 e Monticello, Minnesota 55362-9637 Telephone: 763-295-5151 9 Fax: 763-295-1454

r I . 11 OPERATING DATA REPORT DOCKET NO. 50-263 DATE 8 2 COMPLETED BY H. H. Paustian TELEPHONE 763/295-1317 OPERATING STATUS

]Notes

1. Unit Name __Monticello
2. Reporting period: July
3. Licensed Thermal Power (MWt): 1775
4. Nameplate Rating (Gross MWe): 613 ]
5. Design Electrical Rating (Net MWe): 600
6. Maximum Dependable Capacity (Gross MWe): 605.1
7. Maximum Dependable Capacity (Net MWe): 578.1 ]_]
8. If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report, Give Reasons: N/A
9. Power Level To Which Restricted, If Any (Net MWe): N/A
10. Reasons For Restrictions, If Any: _N/A THIS MONTH YR.-TO-DATE CUMULATIVE
11. Hours In Reporting Period 744 5087 272496
12. Number Of Hours Reactor Was Critical 744.0 4999.0 225168.6
13. Reactor Reserve Shutdown Hours 0.0 0.0 940.7
14. Hours Generator On-Line 744.0 4947.1 221745.8
15. Unit Reserve Shutdown Hours 0.0 0.0 0.0
16. Gross Thermal Energy Generated (MWH) 1319316 8734403 350856755
17. Gross Electrical Energy Generated (MWH) 441862 2988929 119055413
18. Net Electrical Energy Generated (MWH) 421673 2877369 114027354
19. Unit Service Factor 100.0% 97.2% 81.4%
20. Unit Availability Factor 100.0% 97.2% 81.4%
21. Unit Capacity Factor (Using MDC Net) 98.0% 97.8% 77.3%
22. Unit Capacity Factor (Using DER Net) 94.5% 94.3% 75.7%
23. Unit Forced Outage Rate 0.0% 2.8% 4.6%
24. Shutdowns Scheduled Over Next 12 Months (Type, Date, and Duration of Each)

Not Reported

25. If Shut Down At End Of Report Period, Estimated Date Of Startup:
26. Units In Test Status(Prior to Commercial Operation): N/A Forecast Achieved INITIAL CRITICALITY INITIAL ELECTRICITY COMMERCIAL OPERATION

9, UNIT SHUTDOWNS DOCKET NO. 50-263 UNIT NAME Monticello DATE 08-01-02 COMPLETED BY H. H. Paustian REPORT MONTH July TELEPHONE 763-295-1317 Method of System Comp Cause & Corrective Type Duration Reason Shutdown Code Code Action to No. Date (1) (hours) (2) (3) LER No. (4) (5) Prevent Recurrence None 12 3 4 F Forced Reason: Method: Draft IEEE Standard S Scheduled A Equipment Failure (Explain) 1 Manual 805-1984 (P805-D5)

B Maintenance or Test 2 Manual Scram C Refueling 3 Automatic Scram 5 D Regulator Restriction 4 Other (Explain) IEEE Standard 803A-1983 E Operator Training & Licensing Examination F Administrative G Operational Error (Explain)

H Other (Explain)

SUMMARY

The plant operated at essentially 100% power for the entire month of July 2002.