Proposed Tech Specs Implementing Thirteen Line Item Improvements Recommended by GL 93-05, Line-Item TS Improvements to Reduce SRs for Testing During Power Operation.
ML20059C544
Person / Time
Site: Seabrook NextEra Energy icon.png
Issue date: 10/28/1993
From:
NORTH ATLANTIC ENERGY SERVICE CORP. (NAESCO)
To:
Shared Package
ML20059C518 List:
References
GL-93-05, GL-93-5, NUDOCS 9311010189
Download: ML20059C544 (60)


Text

?

A

11. Markup of Proposed Chances See attached markup of proposed changes to Technical Specifications. Each line item in Generic ~

Letter 93-05 is separated and individually identified.

7 9311010189 931028 PDR PS P ADOCK 05000443  !

PDR p;l ge .

s I '% l 1

t

1. Control Rod Movement Test (4.2) 4 l

l i

1 i

l 8

i

r

~

REACTIVITY CONTROL SYSTEMS s

MOVABLE CONTROL ASSEMBLIES GROUP HEIGHT LIMITING CONDITION FOR OPERATION 3.1.3.1 ACTION b.3 (Continued) c) A power distribution map is obtained from the movable incore detectors and Fq(Z) and F g are verified to be within their limits within 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br />; and d) The THERMAL POWER level is reduced to less than or equal to 75% of RATED THERMAL POWER within the next hour and within the following 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br /> the High Neutron Flux Trip Setpoint is reduced to less than or equal to 85%

of RATED THERMAL POWER.

c. With more than one rod trippable but inoperable due to causes other than addressed by ACTION a. above, POWER OPERATION may continue provided that:
1. Within 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br />, the remainder of the rods in the bank (s) with the inoperable rods are aligned to within i 12 steps of the inoperable rods while maintaining the rod sequence and insertion limits of Specification 3.1.3.6. The THERMAL POWER level shall .

be restricted pursuant to Specification 3.1.3.6 during subsequent I operation, and

2. The inoperable rods are restored to OPERABLE status within 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br />.
d. With more than one rod misaligned from its group step counter demand i height by more than 12 steps (indicated position), be in HOT STANDBY l within 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br />.

SURVEILLANCE REOUIREMENTS I

4.1.3.1.1 The position of each full-length rod shall be determined to be ,

within the group demand limit by verifying the individual rod positions I at least once per 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br />, except during time intervals when the rod position deviation monitor is inoperable; then verify the group positions at least once per 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br />.

4.1.3.1.2 Each full-length rod not fully inserted in the core shall be determined to be OPERABLE by movement of at least 10 steps in any one direction at least once per days.

SEABROOK - UNIT 1 3/4 1-16 Amendment No. 9

s i s-I 1

1 l

2. Ilydrogen Monitor Surveillance (5.4) 9

s CONTAINMENT' SYSTEMS ,

3/4.6.4 COMBUSTIBLE GAS CONTROL HYOR0 GEN MONITORS LIMITING CONDITION FOR OPERATION 3.6.4.1.Two independent coritainment hydrogen monitors shall be OPERABLE.

APPLICABILITY: MODES 1 and 2.

ACTION:

a. With one hydrogen monitor inoperable, restore the inoperable monitor to OPERABLE status within 30 days or be in at least HOT STAN0BY within the next 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br />, b~ With both hydrogen monitors inoperable, restore at least one monitor to OPERABLE status within 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> or be in at least HOT STANDBY within the next 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br />.

SURVEILLANCE REOUIREMENTS _

/ n 9E 4.6.4.1 Each hydrogen monitor shal e demonstrated OPERABLE by the performance of a CHANNEL CHECK at s once per 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br />, an ANALOG CHANNEL _ 1 ays, and at least once per 3rdays on A g[DPERATIONALTEST_at_leastonceper5TAGGERED TEST BASI 9 by p contI1ning:

a. One volume percent hydrogen, balance nitrogen; and
b. Four volume percent hydrogen, balance nitrogen.

l l

l l

I l

l SEABROOK - UNIT 1 . 3/4 6-39 j

s

  • 1 P
3. Radiation Monitors (5.14) 5 L

I 1

1 i

i l

l 1

l 10

[ I' h.

TABLE 4.3-2 (Continued) .;

v,

'" ENGINEERED SAFETY FEATURES ACTUA110rt SYSTEM INSlRUMENTATION ..

~

.h SORVEILLANCE REQUIREHERTS i a

^ TRIP

' . ANALOG ACTUATING MODES E ' CHANNEL DEVICE MASTER SLAVE FOR WHICil Q CHANNEL CHANNEL CHANNEL OPERATIONAL OPERATIONAL ACTUATION RELAY RELAY SURVEILLANCE g FUNCTIONAL UNIT CHECK CAllBRATION TEST TEST LOGIC TEST TEST lEST IS REQUIRED.

3. Containment Isolation ,
a. Phase "A" Isolation
1) Manual Initiation N.A. N.A. H.A. R N.A. N.A. N.A 1, 2, 3, 4
2) Automatic Actuation H.A. M.A. N.A. N.A. M(1) M(1) Q 1, 2, 3, 4 Logic and Actuation Relays

) 3) Safety Injection See Item 1. above for all Safety Injection Surveillance Requirements.

w ,

J, b. Phase "B" Isolation m

!' 1) Manual Initiattort N.A. .N.A. N.A. R N.A. N.A. N.A 1, 2, 3, 4

2) Automatic Actuation N.A. N.' A. N.A. N.A. N(1) M(1)' .Q 1, 2, 3, 4 ,

Logic Actuation t Relays ,

3) Containment 5 R. M N.A. N.A. N.A. N.A. 1, 2, 3 ,

Pressure-Hi-3  :

c. Containment Ventilation Isolation
1) Manual Initiation N.A. .N.A. N.A. R N.A. N.A. N.A. '1, 2, 3' 4 ,

-2) Automatic Actuation N.A. .N.A. N.A. N.A. M(1) M(1) Q' 1, 2, 3, 4. -

Logic and Actuation Relays 3); Safety Injection See item 1. above-for all Safety injection Surveillance Requirements.

4) Containment On Line 5 R )- N.A. N.A. N.A. N.A. 1,'2,-3,_4 Purge Radioactivity-High Q

i

TABLE 4.3-3 RADIATION MONITORING INSTRUMENTATION FOR PLANT h

O OPERATIONS SURVEILLANCE REQUIREMENTS .

S i

DIGITAL c- CilANNEL MODES FOR WilICil CllANNEL CHANNEL OPERATIONAL SURVEILLANCE-h FUNCTIONAL UNIT CllECK CALIBRATION TEST IS REQlllRED s 1. Containment

a. Containment - Post LOCA -

Area Monitor S R H) All

b. RCS Leakage Detection 1
1) Particulate Radio- S R H 1,2,3,4 activity .
2) Gaseous Radioactivity S R H 1,2,3,4
2. Containment Ventilation Isolation *
a. On Line Purge Monitor

/

{ b. Manipulator Crane Area S R .M i 1, 2, 3, 4 S R H 6#

3 Monitor [

  • [
3. Main Steam Line S R H l 1, 2, 3, 4
4. Fuel Storage Pool Ar,eas 1 4
a. Radioactivity-liigh-Gaseous Radioactivity S R
  • H .) l
5. Control Room isolation I
a. Air Intake Radiation Level
1) East Air Intake S R H All
2) West Air Intake S R H ( All l
6. ~ Primary Component Cooling Water

'a . Loop A S R H Y All

b. Loop B S R H All

- TABLE NOTATIONS

  • With irradiated fuel in the fuel storage pool areas.
  1. During CORE ALTERATIONS or movement of. irradiated fuel within the containment. .

1 j

t

?

1 i

1

4. Reactor Coolant System Isolation Valves (6.1) I l

i 11

c. -- _ _ _ _ _ - _ _ _ _ __ _ _ _ _ _ . _ _ _ . _ _ _ _ _

't REACTOR COOLANT SYSTEM REACTOR COOLANT SYSTEM LEAKAGE OPERATIONAL LEAKAGE SURVEILLANCE REQUIREMENTS 4.4.6.2.2 Each Reactor Coolant System Pressure Isolation Valve.specified in Table 3.4-1 shall be demonstrated OPERABLE by verifying leakage to be within its limit:

a. At least once per 18 months, 7
b. Prior to ente ng MOD 2 whenever the plant has been in COLD SHUTDOWN for 72 ours or more and if leakage testing has not been performed in the previous 9 months,
c. Prior to returning the valve to service following maintenance, repair, or replacement work on the valve, and
d. Within 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> following valve actuation due to autcmatic or manual action or flow through the valve.
e. As outlined in the ASME Code,Section XI, paragraph IWV-3427(b).

The provisions of Specification 4.0.4 are not applicable for entry into ,

MODE 3 or 4.

1 I

l l

SEABROOK - UNIT 1 3/4 4-23 l

1

5. liigh Point Vent Surveillance Testing (6.3) 4 1

i i

l 1

)

12 l l

1 1

i

REACTOR COOLANT SYSTEM 3/4.4.11 REACTOR C_00LANT SYSTEM VENTS, LIMITING CONDITION FOR OPERATION 3.4.11 At least one Reactor Coolant System vent path consisting of one vent valve and one block valve powered from emergency busses shall be OPERABLE and closed

  • at each of the following locations:
a. Raactor vessel head, and
b. Pre'ssurizer steam space.

APPLICABILITY: MODES 1, 2, 3, and 4. .

ACTION:

a. With one of the above Reactor Coolant System vent paths inoperable, STARTUP and/or POWER OPERATION may continue provided the inoperable vent path is maintained closed with power removed from the valve actuator of all the vent valves and block valves in the inoperable vent path; restore the inoperable vent path to OPERABLE status within 30 days, or, be in HOT STANDBY within 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> and in COLD SHUTDOWN within the following 30 hours3.472222e-4 days <br />0.00833 hours <br />4.960317e-5 weeks <br />1.1415e-5 months <br />.
b. With both Reactor Coolant System vent paths inoperable; maintain the inoperable vent path closed with power removed from the valve actuators of all the vent valves and block valves in the inoperable vent paths, and restore at least one of the vent paths to OPERABLE status within 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> or be in HOT STANDBY within 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> and in COLD SHUTDOWN within the following 30 hours3.472222e-4 days <br />0.00833 hours <br />4.960317e-5 weeks <br />1.1415e-5 months <br />.

SURVEILLANCE REQUIREMENTS 4.4.11.1 Each Reactor Coolant System vent path block valve not required to be closed by AC ON a, or b. , above, shall be demonstrated OPI RABLE at least

_onceper[92 day by operating the valve through one complett cycle of full travel from t e control room.

4.4.11.2 Each Reactor Coolant System vent path shall be demonstrated OPERABLE at least once per 18 months by:

a. Verifying all manual isolation valves in each vent path are locked .

in the open position,

'h e cow suurvowa, ptp saln & pawz9

  • For an OPERABLE vent path using a power-operated relief valve (PORV) as the i vent path, the PORV block valve is not required to be closed. l l

l SEABROOK - UNIT 1 3/4 4-38 l

l l

e-f 2

7 k

6. Pressurizer IIcater (6.6) 6 13 g - . . . , -- y- c9 - - - - py, y-w ir -

iyq --g _ _ _ __m-- - - -- - - - -

. _ _ . . ._ m 4'

REACTOR COOLANT SYSTEM I 3/4.4.3 PRESSURIZER LIMITING CONDITION FOR OPERAT10N 3.4.3 The pressurizer shall be OPERABLE with a water volume of less than or . ,

equal to 92% of pressurizer level (1656 cubic feet), and at least two groups of  ;

pressurizer heaters each having a capacity of at least 150 kW.  ;

APPLICABILITY: MODES 1, 2, and 3.

ACTION:

a. With only one group of pressurizer heaters OPERABLE, restore at least-two groups to OPERABLE status within 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> or be in at least HOT STANDBY within the next 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> and in HOT SHUTDOWN within the -

following 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br />.

t

b. With the pressurizer otherwise inoperable, be in at least HOT STANDBY with the Reactor Trip System breakers open within 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> and in HOT SHUTDOWN within the following 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br />.

SURVEILLANCE REQUIREMENTS 4.4.3.1 The pressurizer water volume shall be determined to be within its limit at least once per 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br />.

4.4.3.2 The capacity of each of the above required groups of pressurizer heaters shall be verified by energizing the heaters _from the emergency power

~

supply and measuring circuit current at least once t.

t&

l SEABROOK - UNIT 1 3/4 4-10 l

l

f i

i;

7. Surveillance of Boron Concentration in the Accumulators (7.1) .,

i I

I i

4 I

l l

14

EMERGENCY CORE COOLING SYSTEM 5 ACCUMULATORS HOT STANOBY. STARTUP. AND POWER OPERATION SURVEILLANCE REQUIREMENTS 4.5.1.1.1 (Continued)

2) Verifying that each accumulator isolation valve is open,
b. At ' east once r 31 days nd within 6 " urs after e h solutic lume incr se of gre r than or e, al to 1*. of ank volume f n rifyin ve he baron ncentration f the accum ator solut  ; and c.

At least once per 31 days when the RCS pressure is above 1000 psig cy verifying that power to the isolation valve operator is disconnectec.

d. At least once per 18 months by verifying that each accumulator isola-tion valve opens automatically under each of the following conditions:
1) When an actual or.a simulated RCS pressure signal exceeds the P-11 (Pressurizer Pressure Block of Safety Injection) Setpoint, and
2) Upon receipt of a Safety Injection test signal.

4.5.1.1.2 Each accumulator water level and pressure channel shall be demon-strated OPERABLE:

a. At least once per 31 days by the performance of an ANALOG CHANNEL OPERATIONAL TEST, and
b. At least once per 18 months by the performance of a CHANNEL CALIBRATION.

s v M b.

By verifying following the boron concentration of the accumulator solution under the conditions:

1) At least once per 31 days,
2) Within 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> after each solution volume increase of greater than or '

equal to 1% of tank volume. This surveillance is not required when the volume increase makeup source is the RWST and the RWST has not been diluted since verifying that the RWST boron concentration is cual to or greater than the accumulator boron concentration limit.

p -

SEABROOK - UNIT 1 3/4 5-2

8 h

8. Accumulator Water Level and Pressure Channel Surveillance (7.4) 15

~ - . . .

'3/4.5 EMERGENCY CORE COOLING SYSTEMS 3/4.5.1 ACCUMULATORS -

HOT STANDBY, STARTUP, AND POWER OPERATION LIMITING CONDITION FOR OPERATION 3.5.1.1 Each Reactor Coolant System (RCS) accumulator shall be OPERABLE with:

a. The isolation valve open and power removed,
b. A contained borated water volume of between 6121 and 6596 gallons,
c. A boron concentration of between 1900 and 2100 ppm, and
d. A nitrogen cover pressure of between 585 and 664 psig.

APPLICABILITY: MODES 1, 2, and 3*.

ACTION:

a. With one accumulator inoperable, except as a result of a closed isola-tion valve, restore the inoperable accumulator to OPERABLE status within 8 hours9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br /> or be in at least HOT STANDBY within the next 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> and reduce pressurizer pressure to less than 1000 psig within the following 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br />.
b. With one accumulator inoperable due to the isolation valve being closed, either immediately open the isolation valve or be in at;least HOT STANDBY within 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> and reduce pressurizer pressure to less than 1000 psig within the following 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br />,
c. With one pressure or water level channel inoperable per accumulator, return the inoperable channel to OPERABLE status within 30 days or-be in at least HOT STANDBY within the next 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> and in HOT SHUTDOWN within the following 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br />.
d. With two pressure channels or two water level channels inoperable per accumulator, immediately declare the affected accumulator (s) inoperable.

SURVEILLANCE REQUIREMENTS

4. 5.1. ch accumulator shall be demonstrated OPERABLE:

~

a. At least once per 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> by-
1) Verifying the contained borated water volume and nitrogen cover pressure in the tanks, and
  • Pressurizer pressure above 1000 psig.

SEABROOK - UNIT 1 3/4 5-1 l

EMERGENCY CORE COOLING SYSTEMS ACCUMULATORS HOT STANDBY, STARTUP, AND POWER OPERATION SURVEILLANCE REOUIREMENTS 4.5.1.h([ Continued)

2) Verifying that each accumulator isolation valve is open,
b. At least once per 31 days and within 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> after each solution volume increase of greater than or equal to 1% of tank volume ey verifying the baron concentration of the accumulator solution; and c.

At least once per 31 days when the RCS pressure is above 1000 psig ey.

verifying that power to the isolation valve operator is disconnected.

d. At least once per 18 months by verifying that each accumulator isola-tion valve opens automatically under each of the following conditions:
1) When an actual or a simulated RCS pressure signal exceeds the P-11 (Pressurizer Pressure Block of Safety Injection) Setpoint, and
2) Upon receipt of a Safety Injection test signal.

4.5.1.1.2 Each accumulator water level an pressure channel s all be demon-strated OPERABLE:

a. At ast once per 31 days the performanca of an ANALOG CHANNEL RATIONAL TEST, and At least once per months by the perfor ance of a CHANNEL CALIBRATION.

SEABROOK - UNIT 1 3/4 5-2

1,...

1 4 $ I 4-

.I4

)

9. Visual Inspection of the Containment Stimp (7.5) i 4

I 16

EMERGENCY CORE C00LANG SYSTEMS ECCS SUBSYSTEMS - T,y GREATER THAN OR EQUAL TO 350*F SURVEILLANCE REQUIREMENTS 4.5.2 Each ECCS subsystem shall be demonstrated OPERABLE:

a.

At least once per 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> by verifying that the following valves are in the indicated positions with power to the valve operators removed:

Valve Number Valve Function Valve Position SI-V-3 Accumulator Isolation Open*

SI-V-17 Accumulator Isolation Open" SI-V-32 Accumulator Isolation Open*

SI-V-47 Accumulator Isolation Open" SI-V-114 SI Pump to Cold-Leg Isolation Open RH-V-14 RHR Pump to Cold-Leg Isolation Open RH-V-26 RHR Pump to Cold-Leg Isolation Open RH-V-32 RHR to Hot-Leg Isolation Closed RH-V-70 RHR to Hot-Leg Isolation Closed SI-V-77 SI to Hot-Leg Isolation Closed SI-V-102 SI to Hot-Leg Isolation Closed

b. At least once per 31 days by:
1) Verifying that the ECCS piping is full of water by venting the ECCS pump casings and accessible discharge piping high points, and
2) Verifying that each valva (manual, power-operated, or automatic) in the flow path that is not locked, sealed, or otherwise secured in position, is in its correct position.
c. By a visual inspection which verifics that no loose debris (rags, trash, clothing, etc.) is present in the containment which could be transported to the containment sump ead cause restriction of the pump suctions during LOCA conditions. This visual inspection shall be performed:
1) For all sible areas of the containment prior to establish-ing RI ONTAlleiENT INTEGRITY, and
2) "Of the a as aff cted thin con)aines at the ompletionpf each c tai m en when PR MARY AI INTEf#ITY/1 e s_ ished.f g g

" Pressurizer pressure above 1000 psig. ac ci f SEABROOK - UNIT 1 3/4 5-5 wd/s me. BSAJ7;4/A/niu7 l A17 G9, sty a &

= . ._ . . . .

b P

10. Containment Spray System (8.1) 9 4

r 17

.- CONTAINM #

P. SYSTEMS i 3/4.6.2 DEPRESSURIZATION AND COOLING SYSTEMS CONTAINf4ENT SPRAY SYSTEM LIMITING CONDITION FOR OPERATION 3.6.2.1 Two independent Containment Spray Systems shall be OPERABLE with each Spray System capable of taking suction from the RWST* and automatically trans-ferring suction to the containment sump.  ;

APPLICABILITY: MODES 1, 2, 3, and 4.

ACTION:  ;

I With one Containment Spray System inoperable, restore the inoperable Spray System to OPERABLE status within 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> or be in at least HOT STANDBY within .

the next 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br />; restore the inoperable Spray System to OPERABLE status l within the next 48 hours5.555556e-4 days <br />0.0133 hours <br />7.936508e-5 weeks <br />1.8264e-5 months <br /> or be in COLD SHUTDOWN within the following 30 hours3.472222e-4 days <br />0.00833 hours <br />4.960317e-5 weeks <br />1.1415e-5 months <br />.

SURVEILLANCE REOUIREMENTS 4.6.2.1 Each Containment Spray System shall be demonstrated OPERABLE: ,

a. At least once per 31 days by verifying that each valve (manual, power-operated, or automatic) in the flow path that is not locked, sealed, or otherwise secured in position is in its correct position;
b. By verifying, that on recirculation flow, each pump develops a ,

differential pressure of greater than or equal to 262 psi when tested  :

pursuant to Specification 4.0.5;

c. At least once per 18 months'during shutdown, by: ,
1) Verifying that each autcmatic valve in the flow path actuates to its correct position on a Containment Pressure-Hi-3_ test  :

signal, and

2) Verifying that each spray pump starts automatically on a Containment Pressur - i-3 test signal.

ID

d. At least once per 5 years y performing an air or smoke flow test through each spra header and verifying each spray nozzle is -

unobstructed. -'

flow path is one that is capable of taking suction from the refueling water .

storage tank upon being manually realigned.

SEABROOK - UNIT 1 3/4 6-14

11. Ilydrogen Recombiner (8.5) t k

18

l CONTAINMENT SYSTEMS COMBUSTIBLE GAS CONTROL

  • ELECTRIC HYDROGEN RECOMBINERS LIMITING CONDITION FOR OPERATION 3.6.4.2 Two independent Hydrogen Recombiner Systems shall be OPERABLE.

APPLICABILITY: MODES 1 and 2.

ACTION:

With one Hydrogen Recombiner System inoperable, restore the inoperable system to OPERABLE status within 30 days or be in at least HOT STANDBY within the next 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br />.

, SURVEILLANCE REQUIREMENTS 4.6.4.2 Each Hydrogen Recombiner System shall be demonstrated OPERABLF 4

a. (At- lent _.ciese@oresh[rifying during a Hydrogen Recombiner System functional test that the minimum heater sheath temperature increases to greater than or equal to 850 F within 90 minutes.

Upon reaching 850 F, increase the power setting to maximum power for 2 minutes and verify that the power meter reads greater than or

b. At at e g, Performing a CHANNEL CALIBRATION of all recombiner instrumentation and control circuits, '

g, 2) Verifying through a visual examination that there is no u evidence of abnormal conditions within the recombiner enclosure i (i.e. , loose wiring or structural connections, deposits of foreign materials, etc.), and

[, { 3) Verifying the integrity of all heater electrical circuits by I performing a resistance to ground test following the above required functional test. The resistance to ground for any heater phase shall be greater than or equal to 10,000 ohms.

l l

l SEABROOK - UNIT 1 3/4 6-19 l

..~

+ ,

z a

12. Auxiliary Feedwater Purup and Systern Testing (9.1) k 9

3 l

l 1

19

+ - - ,

l PLANT SYSTEMS TURBINE CYCLE AUXILIARY FEEDWATER SYSTEM LIMITING CONDITION FOR OPERATION ,

3.7.1.2 At least three independent steam generator auxiliary feedwater pumps and associated flow paths shall be OPERABLE with:

a. One motor-driven emergency feedwater pump, and one startup feedwater pump capable of being powered from an emergency bus and capable of being aligned to the dedicated water volume in.the conden ate storage tank, and
b. One steam turbine-driven emergency feedwater pump capable of being powered from an OPERABLE steam supply system.

APPLICABILITY: MODES 1, 2, and 3.*

ACTION:

a. With one auxiliary feedwater pump inoperable, restore the required auxiliary feedwater pumps to OPEPABLE status within 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> or be in at least HOT STANDBY within the next 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> and in HOT SHUTDOWN within the following 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br />.
b. With two emergency feedwater pumps inoperable, restore at least oneL emergency feedwater pump to OPERABLE status within 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> and restore both emergency feedwater pumps to OPERABLE status within 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br />, or be in at least HOT STANDBY within the next 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br />.and in COLD SHUTDOWN within the following 30 hours3.472222e-4 days <br />0.00833 hours <br />4.960317e-5 weeks <br />1.1415e-5 months <br />.
c. With one emergency feedwater pump and the startup feedwater pump l inoperable, restore both emergency feedwater pumps to OPERABLE status within 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> and all three pumps to OPERABLE status within 72' hours or be in at least HOT STANDBY within the next 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> and in HOT SHUTDOWN within the following 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br />.
d. With three auxiliary feedwater pumps inoperable, immediately initiate corrective action to restore at least one auxiliary feedwater pump to OPERABLE status as soon as possible.

l SURVEILLANCE REQUIREMENTS 4.7.1.2.1 Each auxiliary feedwater pump shall be demonstrated 0,PERABLEi

a. At least once per 31 days (An-a-STAffrERED TEST BASI 5fyT
1) Verifying that the motor-driven emergency feedwater pump ) -

g develops a discharge pressure of greater than or equal to I gg 1460 psig at a flow of greater than or equal to 270 gpm;

  • Not required in Mode 3 until initial criticality is achieved.

SEABROOK - UNIT 1 3/4 7-3

[ . ; - l- -- l-- -

..i_,_ _ _ _ _ _ _ _ _ - - _ _ _

PLANT SYSTEMS

[ TURBINE CYCLE AUXILIARY FEEDWATER SYSTEM SURVEILLANCE REOUIREMENTS 4.7.1.2.la. (Continued) -

'2) Verifying that the steam turbine-driven pump develops a discharge pressure of greater than or equal to 1460 psig at a flow of greater than or equal to 270 gpm when the secondary steam supply' pressure is greater than 500 psig. The previsions of Specification 4.0.4 are not applicable for entry into MODE 3;

3) Verifying that the startup feedwater pump develops a -discharge pressure of greater than or equal to 1375 psig at a flow of greater than or equal to 425 gpm; 4:-47 Verifying that each non-automatic valve in the flow path that is not locked, sealed, Jr otherv:se secured in position is in its correct position; d e57 Verifying that each automatic valve in the flow path is in the

~7 fully open position whenever the Auxiliary Feedwater System is- }'

placed in automatic control or when above 10% RATED THERMAL POWER; and

. (

3 & -67 Verifying that valves FW-156 and FW-163 are OPERABLE for alignment of the startup feedwater pump to the emergency feedwater header.

g.Ar- At least once per 18 months during shu.tdown by:

1) Verifying that each automatic valve in the flow path actuates '

to its correct position upon receipt of an Emergency Feedwater System Actuation test signal; i

2) Verifying that each emergency feedwater pump starts as designed automatically upon receipt of an Emergency Feedwater Actuation System test signal; l
3) Verifying that with all manual actions, including power source and valve alignment, the startup feedwater pump starts within the required elapsed time; and
4) Verifying that each emergency feedwater control valve closes i l

cn receipt of a high flow test signal. '

b. k.$fMl 0>tte p 92 Cil & D1 a STMGEefb MST BASIS by:

o j

+

SEABROOK - UNIT 1 3/4 7-4 i

13. Emergency Diesel Generatm Surveillance Requirements (10.1)

I r

u i

e t

20 1

3/4.8 ELECTRICAL POWER SYSTEMS 3/4.8.1 A.C. SOURCES OPERATING LIMITING CONDITION FOR OPERATION 3.8.1.1 As a minimum, the following A.C. electrical power sources shall be OPERABLE:

a. Two physically independent circuits between the offsite transmission network and the onsite Class 1E Distribution System, and
b. Two separate and independent diesel generators, each with:
1) A separate day fuel tank containing a minimum fuel volume fraction of 3/8 (600 gallons),
2) A separate Fuel Storage System containing a minimum volume of 60,000 gallons of fuel,
3) A separate fuel bansfer pump, l
4) Lubricating oil storage containing a minimum total volume of 275 gallons of lubricating oil, and l
5) Capability to transfer lubricating oil from storage to the diesel generator unit.

APPLICABILITY: MODES 1, 2, 3, and 4.

ACTION:

a. With an offsite circuit 6r-<HN enePat<@of the above required A.C. electrical power sourc OPERABILITY of the remaining A.C. so$by urces inoperable, performingdemonstrate Specification the 4.8.1.1.la. within 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> and at least once per 8 hours9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br /> thereafte(-)

and <nacification A._8.1.1.2a.5) tithir, 24 haur-&Orestore at leastTwo offsite circuits to OPERABLE status within 24 t h g nd_two-diese M __

M6R7 generator 4-to-OPERABLE-status-within-7240ues4.' Win at least HOT O' NDBY within the next 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> and in COLD SHUTDOWN within the lowing 30 hours3.472222e-4 days <br />0.00833 hours <br />4.960317e-5 weeks <br />1.1415e-5 months <br />.

tr." With one offsite circuit and one diesel generator of the above OC. required A.C. electrical power sources inoperable, demonstrate the OPERABILITYoftheremainingA.C. source 9EyperformingSpecifica-tion 4._8_ .1.1.la. within 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> and _at least once oer 8 hours9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br /> there-ter,(and4pec4f4eation 1.8.1.1.2a.5) within 2Fhour+;]fpstore at leas one of the inoperable sources to OPERABLE status within 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> or be in at least HOT STANDBY within the next 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> and Id6U in COLD SHUTDOWN within the following 30 hours3.472222e-4 days <br />0.00833 hours <br />4.960317e-5 weeks <br />1.1415e-5 months <br />. Restore at least C- two offsite circuits to OPERABLE status within 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> and two SEABROOK - UNIT 1 3/4 8-1

.- . ELECTRICAL' POWER SYSTEMS

.' A.C. SOURCES OPERATING LIMITING CONDITION FOR OPERATION 3.8.1.1 (Continued)

ACTION:

diesel generators to OPERABLE status within 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> from the time of initial loss or be in at least HOT STANDBY within the next 6 ours and in COLD SHUTOOWN within the following 30 hours3.472222e-4 days <br />0.00833 hours <br />4.960317e-5 weeks <br />1.1415e-5 months <br />. g, j[ With one diesel generator inoperable in addition to ACTION above, verify that:

or D- 1. All required systems, subsystems, trains, components, and devices that depend on the remaining OPERABLE diesel generator as a source of emergency power are also OPERABLE, and

2. When in MODE 1, 2, or 3, the steam-driven emergency feedwater pump is OPERABLE.

If these conditions are not satisfied within 2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br /> be in at least HOT STANDBY within the next 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> and in COLD SHUTDOWN within the following 30 hours3.472222e-4 days <br />0.00833 hours <br />4.960317e-5 weeks <br />1.1415e-5 months <br />.

&- With two of the above reouired offsit A c circuits inocerabl (de5Ionstrate the PERABI Y of tw diesel .nerator by per raing the (uireme s of 5 cificati 4.8.1. 2a.5) w' hin 1 ur an t l '

le once r 8 hou s thereaf er, unl s the di sel oer_rators re/

l ,al eady oc rating;frestore at least one of ne inoperable offsite -

l I

sources to OPERABLE status within 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> or be in at least HOT -

STANDBY within the next 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br />. With only one offsite source restored, restore at least two offsite circuits to OPERABLE status within 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> from time of initial loss or be in at least HOT M NDBY within the next 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> and in COLD SHUTDOWN within the

lowing 30 hours3.472222e-4 days <br />0.00833 hours <br />4.960317e-5 weeks <br />1.1415e-5 months <br />.

/ ,h With two of the above required diesel generators inoperable, demon- '

N strate the OPERABILITY of two offsite A.C. circuits by performing the d requirements of Specification 4.8.1.1.la. within 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> and at-least once per 8 hours9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br /> thereafter; restore at least one of the inoperable  ;

diesel gensrators to OPERABLE status within 2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br /> or be in at least HOT STANDBY within the next 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> and in COLD SHUTDOWN within the following 30 hours3.472222e-4 days <br />0.00833 hours <br />4.960317e-5 weeks <br />1.1415e-5 months <br />. Restore at least two diesel generators to OPERABLE status within 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> from time of initial loss or be in least HOT STANDBY within the next 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> and in COLD SHUTDOWN within the following 30 hours3.472222e-4 days <br />0.00833 hours <br />4.960317e-5 weeks <br />1.1415e-5 months <br />. -

i SEABROOK - UNIT 1 3/4 8-2

Insert b

b. With a diesel generator inoperable, demonstrate the OPERABILITY of'the remaining A.C. sources by performing Specification 4.8.1.1.la within 1 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> and at least once per 8 hours9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br /> thereafter. Demonstrate the OPERABILITY of the remaining 0PERABLE diesel generator by performing Specification 4.8.1.1.2a.5) within 8 hours9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br />.* Restore at least two diesel ,

generators to OPERABLE status within 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> or be in at least-HOT -

STANDBY within the next 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> and in COLD SHUTDOWN within the following- ,

30 hours3.472222e-4 days <br />0.00833 hours <br />4.960317e-5 weeks <br />1.1415e-5 months <br />.

1 Insert c Demonstrate the OPERABILITY of the remaining OPERABLE diesel generator by performing Specification 4.8.1.1.2a.5) within 8 hours9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br />.*

d

)

i 1

l l

  • The OPERABILITY of the remaining diesel generator need'not be verifie'd if the diesel generator became inoperable due to:
1. Preplanned preventive maintenance or testing,
2. An :noperable support system with no potential common mode failure for the remaining diesel generator, or
3. An independently testable component with no potential common mode failure for the remaining diesel generator.

.)

y t

.III. Retype of Proposed Chances '

See attached retype of proposed changes to Technical Specifications. The attached retype reflects the currently issued version of Technical Specifications. Pending Technical Specifications changes or Technical Specification changes issued subsequent to this submittal are not reflected in the enclosed retype. The enclosed retype should be checked for continuity with the current Technical - ,

Specifications prior to issuance.

Revision bars are provided in the right-hand margin to designate a change in the text. No revision  !

bars are utilized when the page is changed solely to accommodate the shifting of text due to -

additions or deletions.

The attached retype is presented in page order. Some of the recommended changes effect the l same specification. Therefore, some pages are being revised for two line item improvements.  !

6 i

v f

9

)

9

, 21

.  : )

.,' ~ REACTIVITY CONTROL SYSTEMS MOVABLE CONTROL ASSEMBLIES GROUP HEIGHT j 7

LIMITING CONDITION FOR OPERATION 3.1.3.1 ACTION b.3 (Continued) c) Apowerdistributionmapisobtginedfromthemovable incore detectors and Fo (Z) and F a are verified to be within their limits within 72. hours; and. .

d) The THERMAL POWER level is reduced to less than or equal to 75% of RATED THERMAL POWER within the.next hour and within the following 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br /> the High Neutron Flux Trip Setpoint is reduced to less than or equal.to 85% of RATED THERMAL POWER.

c. With more than one rod trippable but inoperable due to causes other than addressed by ACTION a. above, POWER- 1 OPERATION may continue provided that:
1. Within 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br />, the remainder of the rods in the bank (s) with the inoperable rods are aligned to within
  • 12 steps of the inoperable rods while maintaining the rod sequence and insertion limits of Specification 3.1.3.6. The THERMAL POWER level shall be restricted pursuant to Specification 3.1.3.6 during subsequent  !

operation, and '

2. The inoperable rods are restored to OPERABLE. status l within 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br />. ,
d. With more than one rod misaligned from its group step.
  • counter demand height by more than
  • 12 e* ' indicated position), be in HOT STANDBY within'6-houi .

SURVElltANCE RE0VIREMENTS .

i 4.1.3.1.1 The position of each full-length rod shall be determined to be within the group demand limit by verifying the individual rod positions at least once per 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br />, except during time intervals when the rod position deviation monitor is inoperable; then verify the group positions at least once i per 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br />.

4.1.3.1.2 Each full-length rod not fully inserted in the core shall be '

determined to be OPERABLE by movement of at least 10 steps in any.one .!

direction at least once per 92 days. l

^l

-SEABROOK - UNIT 1 3/4 1-16 Amendment No. 9 l

y yT y v*- g -T-- p9-p-T+' '-- my y - -e y wy= r--g-- p.-

, TABLE 4.3-2 (Continued) m E ENGINEERED SAFETY FEATURES ACTUATION SYSTEM INSTRUMENTATION

-$ SURVEILLANCE REQUIREMENTS R

4'

' TRIP ANALOG ACTUATING MODES E CHANNEL DEVICE MASTER SLAVE FOR WHICH Q CHANNEL CHANNEL CHANNEL OPERATIONAL OPERATIONAL ACTUATION RELAY RELAY SURVEILLANCE FUNCTIONAL UNIT CHECK CALIBRATION TEST TEST LOGIC TEST TEST TEST IS RE0VIRED

3. Containment Isolation
a. Phase "A" Isolation i 1) Manual Initiation N.A. N.A. N.A. R N.A. N.A. N.A. 1,2,3,4
2) Automatic Actuation N.A. N.A. N.A. N.A. M(1) M(1) Q 1,2,3,4 Logic and Actuation j_ Relays
3) Safety Injection See Item 1. above for all Safety Injection Surveillance Requirements, w b. Phase "B Isolation a,

w 1) Manual Initiation N.A. N.A. N.A. R N.A. N.A. N.A. 1, 2, 3, 4 w

N

2) Automatic Actuation N.A. N.A. N.A. N.A. M(1) M(1) Q 1,2,3,4
  • Logic Actuation Relays .
3) Containment S R M N.A. N.A. N.A. N.A. 1,2,3 Pressure-Hi-3
c. Containment Ventilation Isolation
1) Manual Initiation N.A. N.A. N.A. R N.A. N.A. N.A. 1,2,3,4

-2) Automatic Actuation N.A. N.A. N.A. N.A. M(1) M(1) Q 1,2,3,4 Logic and Actuation 3 Relays *

, 3) Safety. Injection' - Seel Item 1. above for all Safety Injection Surveillance Requirements. -

a r+

4) Containment On Line' S. R Q(2) N.A. N.A. N.A. N.A. 1,2,3,4 Purge Radioactivity- High I 5

______.___'_________2________m_.__mm___-_c __l_m _um - -,w ---. m =,..-.ww -- _& . ~ < < - . i_. m _ ___ a

TABLE 4.3-3 RADIATION MONITORING INSTRUMENTATION FOR PLANT k; OPERATIONS SURVEILLANCE REQUIREMENTS E;

Eg DIGITAL SR CHANNEL MODES FOR WHICH '

, CHANNEL CHANNEL OPERATIONAL SURVEILLANCE c= FUNCTIONAL UNIT CHECK CALIBRATION TEST IS REQUIRED 5 - 1. Containment

-a

~'

a. Containment - Post LOCA -

Area Monitor S R Q All E

b. RCS Leakage Detection

.1) Particulate Radio- S R Q 1, 2, 3, 4 activity

2) Gaseous Radioactivity S R Q 1,2,3,4
2. Containment Ventilation Isolation
a. On Line Purge Monitor S R Q 1,2,3,4

. b. Manipulator Crane Area S R Q 6#

w Monitor 2

ya 3. Main Steam Line S R. Q 1, 2, 3, 4 w

4. Fuel Storage Pool Areas
a. Radioactivity-High-Gaseous Radioactivity S -R Q
5. Control Room Isolation
a. Air Intake Radiation Level
1) East Air Intake S R Q- All
2) West Air Intake S R Q .All
6. Primary Component Cooling Water jf a. Loop A S R Q. .All

.g b. Loop B- S R Q- All R

8 r+

.. . FABLE NOTATIONS

  • With irradiated fuel in the fuel storage _ pool nreas.

if ~# During CORE ALTERNATIONS or movement of irradiatedLfuel within.the containment.

4

,1 REACTOR C0OLANT SYSTEM i

3/4.4.3 PRESSURIZER 1

LIMITING CONDITION FOR OPERATION 1

3.4.3 The pressurizer shall be OPERABLE with a water volume of less than or equalto92%ofpressurizerlevel(1656cubicfeet),andatleasttwogroups.

of pressurizer heaters each having a capacity of at least 150 kW.

APPLICABI'ITY:

g MODES 1, 2, and 3.

ACTION:

a. With only one group of pressurizer heaters OPERABLE, restore at least two groups to OPERABLE status within 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> or be in at least HOT STANDBY within the next 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> and in HOT SHUTDOWN within the following 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br />.
b. With the pressurizer otherwise inoperable, be in'at least HOT STANDBY with the Reactor Trip System breakers open within 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> and in HOT SHUTDOWN within the following 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br />.

SURVEILLANCE RE0VIREMENTS 4.4.3.1 The pressurizer water volume shall be determined to be within its limit at least once per 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br />.

4.4.3.2 The capacity of each of the above required groups of pressurizer heaters shall be verified by energizing the heaters from the emergency power supply and measuring circuit current at least once each refueling interval. l 1

l I

l l

l SEABROOK - UNIT 1 3/4 4-10 Amendment No.

l l

l

, .' REACTOR-COOLANT SYSTEM L

REACTOR COOLANT SYSTEM LEAKAGE OPERATIONAL LEAKAGE i

SURVEILLANCE RE0VIREMENTS  !

4.4.6.2.2 Each Reactor Coolant System Pressure Isolation Valve specified in Table 3.4-1 shall be demonstrated OPERABLE by verifying leakage to <

be within its limit: '

a. At least once per 18 months,
b. Prior to entering MODE 2 whenever the plant has been in COLD SHUTDOWN for 7 days or more and if leakage testing has not been performed in the I previous 9 months,
c. Prior to returning the valve to service following maintenance, repair, or replacement work on the valve, and
d. Within 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> following valve actuation due to automatic or manual action or flow through the valve.
e. As outlined in the ASME Code,Section XI, paragraph IWV-3427(b).

The provisions of Specification 4.0.4 are not applicable for entry into MODE 3 or 4. ,

r I

1 l

i 1

SEABROOK - UNIT 1 3/4 4-23 Amendment No.

I

..' ~

REACTOR COOLANT SYSTEM l ,

3/4.4.11 REACTOR COOLANT SYSTEM VENTS I'

l LIMITING CONDITION FOR OPERATION 3.4.11. At least one Reactor Coolant System vent )ath consisting of one vent valve and one block valve powered from emergency ausses shall be_0PERABLE

, and closed

  • at each of the following locations:

1

a. Reactor vessel head, and
b. Pressurizer steam space.

APPLICABILITY: MODES 1, 2, 3, and 4.

ACTION:

a. With one of the above Reactor Coolant System vent paths inoperable, STARTUP and/or POWER OPERATION may continue prov.ided the inoperable vent path is maintained closed with )ower removed from the valve actuator of all the vent valves and 31ock valves in the inoperable vent path; restore the inoperable vent path to OPERABLE status within 30 days, or, be in HOT STANDBY within-6 hours and in COLD SHUTDOWN within the following 30 hours3.472222e-4 days <br />0.00833 hours <br />4.960317e-5 weeks <br />1.1415e-5 months <br />.
b. With both Reactor Coolant System vent paths inoperable; maintain the inoperable vent path closed with )ower removed from the valve L actuators of all the vent valves and alock valves in the l- inoperable vent paths, and restore at least one of the vent paths  ;

l- to OPERABLE status within 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> or be in HOT. STANDBY within 6 i hours and in COLD SHUTDOWN within the following 30 hours3.472222e-4 days <br />0.00833 hours <br />4.960317e-5 weeks <br />1.1415e-5 months <br />.- l l

SURVEILLANCE RE0VIREMENTS 4.4.11.1 Each Reactor Ccolant System vent' path block valve not required to be closed by ACTION a, or b., above, shall be demonstrated OPERABLE at least once per COLD SHUTDOWN, if not performed within the previous 92 days, by operating I the valve through one complete cycle of full travel from the control room.

4.4.11.2 Each Reactor Coolant _ System vent path shall be demonstrated OPERABLE at least once per 18 months by:

a. Verifying all manual isolation valves in each vent path are locked E in the open position, l

l

  • For an OPERABLE vent path using a power-operated relief valve (PORV) as the vent path, the PORV block valve is not required to be closed.

SEABROOK - UNIT 1 3/4 4-38 Amendment No.

, 3/4.5 EMERGENCY CORT. COOLING SYSTEMS 3/4.5.1' ACCUMULATORS HOT STANDBY. STARTUP, AND POWER OPERATION -

LIMITING CONDITION FOR OPERATION

+

3.5.1.1 EachReactorCoolantSystem(RCS)accumulatorshallbeOPERABLEwith:

a. The isolation valve open and power removed,
b. A contained borated water volume of between 6121 and 6596 gallons,
c. A boron concentration of between 1900 and 2100 ppm, and .
d. A nitrogen cover-pressure of between 585 and 664 psig.

APPIICABILITY: MODES 1, 2, and 3*.  !

ACTION:

a. With one accumulator inoperable, except as a result of a closed isolation valve, restore the inoperable accumulator to OPERABLE status within 8 hours9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br /> or be in at least HOT STANDBY within the next 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> and reduce pressurizer pressure to less than 1000 psig within the following 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br />.
b. With one accumulator inoperable due to the isolation valve being closed, either immediately open the isolation valve or be in at least H0T STANDBY within 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> and reduce pressurizer pressure to less.than 1000 psig within the following 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br />.
c. With one pressure or water level channel inoperable per accumulator, return the inoperable channel to OPERABLE status i within 30 days or be in at least HOT STANDBY within the next 6 I hours and in HOT SHUTDOWN within the following 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br />.
d. With two pressure channels or two water level channels inoperable per accumulator, immediately declare the affected accumulator (s) inoperable.

SURVEILLANCE RE0VIREMENTS l

4.5.1.1 Each accumulator shall be demonstrated OPERABLE: I

a. At least once per 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> by:  ;
1) Verifying the contained borated water volume and nitrogen cover-pressure in the tanks, and
  • Pressurizer pressure above 1000 psig.

SEABROOK - UNIT 1 3/4 5-1 Amendment No.

EMERGENCY CORE C00LfNG SYSTEMS ACCUMULATORS HOT STANDBY. STARTUP AND POWER OPERATION ,

1 SURVEILLANCE RE0VIREMENTS l 4.5.1.1 (Continued) i

2) Verifying that each accumulator isolation valve is open. l
b. By verifying the boron concentration of the accumulator solution I under the following conditions: 1 i
1) At least once per 31 days, i 1 l
2) Within 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> after each solution volume increase of I  !

greater than or equal to 1% of tank volume. This I  ;

surveillance is not required when the volume increase makeup  ; ~!

source is the RWST and the RWST has not been diluted since- -l verifying that the RWST boron concentration is equal to or i greater than the accumulator boron concentration limit. I

c. At least once per 31 days when the RCS pressure is above 1000 psig .

by verifying that power to the isolation valve operator is disconnected,

d. At least once per 18 months by verifying that each accumulator- l isolation valve opens automatically under each of the following l conditions-l
1) When an actual or a simulated RCS pressure signal exceeds the P-11 (Pressurizer Pressure Block of Safety Injection) i Setpoint, and
2) Upon receipt of a Safety Injection test signal.

i I

SEABROOK - UNIT 1 3/4 S-2 Amendment No.

.'- j

.' EMERGENCY CORE COOLING SYSTEMS ECCS SUBSYSTEMS - T y GREATER THAN OR E00AL TO 350"F SURVEILLANCE RE0VIREMENTS 4.5.2 Each ECCS subsystem shall be demonstrated OPERABLE:

a. At least once per 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> by verifying that the following valves  ;

are in the indicated positions with-power to the valve operators removed:

Valve Number Valve Function Valve Position SI-V-3 Accumulator Isolation Open* a SI-V-17 Accumulator Isolation Open*

SI-V-32 Accumulator Isolation Open*

SI-V-47 Accumulator Isolation Open*

SI-V-114 SI Pump'to Cold-Leg Isolation Open RH-V-14 RHR Pump to Cold-Leg Isolation Open RH-V-26 RHR Pump to Cold-Leg Isolation Open RH-V-32 RHR to Hot-Leg Isolation Closed RH-V-70 RHR to Hot-Leg Isolation Closed ,

SI-V-77 SI to Hot-Leg Isolation Closed 'l SI-V-102 SI to Hot-Leg Isolation Closed

b. At least once per 31 days by:
1) Verifying that the ECCS piping is full of water by venting the ECCS pump casings and accessible discharge piping high ,

points, and 2)

Verifying)thateachvalve(manual, automatic in the flow path that is not power-operated,or locked, sealed, or otherwise secured in position, is in its correct position.

c. By a visual inspection which verifies that no loose debris (rags,.

trash, clothing, etc.) is present in the containment which could be ,

transported to the containment sump and cause restriction of the .

Jump suctions during LOCA conditions. This visual inspection;shall

)e performed:

1) For all accessible areas of.the containment prior to establishing primary CONTAINMENT INTEGRITY, and 1
2) At least once daily of the areas affected within containment I by containment entry and during the final entry when primary 1.

CONTAINMENT INTEGRITY is established. l

  • Pressurizer pressure above 1000 psig.

SEABROOK - UNIT 1 3/4 5-5 Amendment No.

,1  ; CONTAINMENT SYSTEMS i

3/4.6.2 DEPRESSURIZATION AND COOLING SYSTEMS CONTAINMENT SPRAY SYSTEM  ;

i LIMITING CONDITION FOR OPERATION 3.6.2.1 Two inde3endent Containment Spray Systems shall be OPERABLE with each-Spray System capa)le of taking suction from the RWST* and automatically trans-- ,

ferring suction to the containment sump.

APPLICABILITY: MODES 1, 2, 3, and 4.

ACTION:

With one Containment Spray System inoperable, restore the inoperable Spray System to OPERABLE status within 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> or be-in at least HOT STANDBY within the next 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br />; restore the inoperable' Spray System to OPERABLE status within the next 48 hours5.555556e-4 days <br />0.0133 hours <br />7.936508e-5 weeks <br />1.8264e-5 months <br /> or be in COLD SHUTD0WN within the following 30 hours3.472222e-4 days <br />0.00833 hours <br />4.960317e-5 weeks <br />1.1415e-5 months <br /> SURVEILLANCE REQUIREMENTS 4.6.2.1 Each Containment Spray System shall be demonstrated OPERABLE:

a. At least once per 31 days by verifying that each valve (manual, power-operated, or automatic) in the flow path that is not. locked, sealed, or otherwise secured in position is in its correct position;
b. By verifying, that on recirculation flow, each pump-develops a differential pressure of greater than or equal to 262 psi when tested pursuant to Specification 4.0.5;
c. At least once per 18 months during shutdown, by:
1) Verifying that each automatic valve in the flow path actuates-to its correct position on a Containment Pressure-Hi-3 test signal, and
2) Verifying'that each spray pump starts automatically on~a y Containment Pressure-Hi-3 test signal.  !
d. At least once per 10 years by performing an air or smoke flow test  !-  !

through each spray header.and verifying each spray nozzle is l unobstructed.

  • In MODE 4, when the Residual Heat Removal System is in operation, an OPERABLE flow path is one that is capable of taking suction from the refueling water storage tank upon being manually realigned.

SEABROOK - UNIT 1 3/4 6-14 Amendment No.

-- - - - - _ . = . ,

.' CONTAINMENT SYSTEMS .

3/4.6.4 COMBUSTIBLE GAS CONTROL HYDROGEN MONITORS LIMITING CONDITION FOR OPERATION 3.6.4.1 -Two independent containment hydrogen monitors shall be OPERABLE.

APPLICABILITY: MODES 1.and 2.

ACTION:

a. With one hydrogen monitor inoperable, restore the inoperable monitor to OPERABLE status within 30 days or be in at least HOT STANDBY within the next 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br />.
b. With both hydrogen monitors inoperable, restore at least one ,

monitor to OPERABLE status within 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> or be in at least HOT STANDBY within the next 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br />.

SURVEILLANCE RE0VIREMENTS 4.6.4.1 Each hydrogen monitor shall be demonstrated OPERABLE by the performance of a CHANNEL CHECK at least once per 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br />, an ANALOG CHANNEL OPERATIONAL TEST at least once per 92 days, and at least.once each refueling l interval by performing a CHANNEL CALIBRATION using sample gas containing: I

a. One volume percent hydrogen, balance nitrogen; and
b. Four volume percent hydrogen, balance nitrogen.

l l

SEABROOK - UNIT 1 3/4 6-18 Amendment No.  ;

4 CONTAINMENT SYSTEMS COMBUSTIBLE GAS CONTROL ELECTRIC HYDR 0 GEN RECOMBINERS LIMITING CONDITION'FOR OPERATION 3.6.4.2 Two independent Hydrogen Recombiner Systems shall be OPERABLE.

APPLICABILITY: MODES 1 and 2.

ACTION:

With one Hydrogen Recombiner System inoperable, restore the inoperable system to OPERABLE status within 30 days or be in at least HOT STANDBY within the next 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br />.

SURVEILLANCE RE0VIREMENTS 4.6.4.2 Each Hydrogen Recombiner System shall be demonstrated OPERABLE at I least once each refueling interval by: l

a. Verifying during a Hydrogen Recombiner System functional test that I the minimum heater sheath temperature increases to greater than or equal to 850'F within 90 minutes. Upon reaching 850 F, increase the power setting to maximum power for 2 minutes and verify that the power meter reads greater than or equal to 65 kW; and
b. Performing a CHANNEL CALIBRATION of all recombiner instrumentation I ,

and control circuits,

c. Verifying through a visual examination that there is no evidence of I abnormal conditions within the recombiner enclosure (i.e., loose wiring or-structural connections, deposits of foreign materials, etc.),and i l
d. Verifying the integrity of all heater electrical circuits by l  !

performing a resistance to ground test following the above required functional test. The resistance to ground for any heater phase shall be greater than or equal to 10,000 ohms.

1 SEABROOK - UNIT 1 3/4 6-19 Amendment No.

PLANT SYSTEMS TURBINE CYCLE AUXILIARY FEEDWATER SYSTEM LIMITING CONDITION FOR OPERATION 3.7.1.2 At least three independent steam generator auxiliary feedwater pumps and associated flow paths shall be OPERABLE with:

a. One motor-driven emergency feedwater pump, and one startup feedwater pump capable of being powered from an emergency. bus and capable of being aligned to the dedicated water volume in the condensate storage tank, and
b. One steam turbine-driven emergency feedwater pump capable of being powered from an OPERABLE steam supply system.

APPLICABILITY: MODES 1, 2, and 3.*

ACTION:

a. With one auxiliary feedwater pump inoperable, restore the required auxiliary feedwater pumps to OPERABLE status within 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> or be in at least HOT STANDBY within the next 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> and in HOT SHUTDOWN within the following 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br />, b.

With two emergency restore at least one emergency feedwater feedwater pumps inoperable, pump to OPERABLE status wi thin 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> and restore both emergency feedwater pumps to OPERABLE status within 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br />, or be in at least HOT STANDBY within the next 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> and in COLD SHUTDOWN within the following 30 hours3.472222e-4 days <br />0.00833 hours <br />4.960317e-5 weeks <br />1.1415e-5 months <br />.

c. With one emergency feedw'ater pump and the startup feedwater pump inoperable restore both emergency feedwater pumps to OPERABLE status within 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> and all three pumps to OPERABLE status within 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> or be in at least HOT STANDBY within the next 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> and in HOT SHUTDOWN within the following 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br />.
d. With three auxiliary feedwater pumps inoperable, immediately  :

initiate corrective action to restore at least one auxiliary ,

feedwater pump to OPERABLE status as soon as possible. ,

SURVEILLANCE RE0VIREMENTS 4.7.1.2.1 Each auxiliary feedwater pump shall be demonstrated OPERABLE:

a. At least once per 31 days by: 1
1) Verifying that each non-automatic valve in the flow path that I is not locked, sealed, or otherwise secured in position is in its correct position;
2) Verifying that each automatic valve in the flow path is in I the fully open position whenever the Auxiliary Feedwater System is placed in automatic control or when above 10% RATED '

THERMAL POWER; and

  • Not required in Mode 3 until initial criticality is achieved.

SEABROOK - UNIT 1 3/4 7-3 Amendment No.

PLANT SYSTEMS l

3) Verifying that valves FW-156 and FW-163 are OPERABLE for I alignment of the startup feedwater pump to the emergency feedwater header. ,
b. At least once per 92 days on a STAGGERED TEST BASIS by: l
1) Verifying that the motor-driven emergency feedwater pump develops a discharge pressure of greater than or equal to 1460 psig at a flow of greater than or equal to 270 gpm;
2) Verifying that the steam turbine-driven pump develops a discharge pressure of greater than or equal to 1460 psig at a flow of greater than or equal to 270 gpm when the secondary steam supply pressure is greater than 500 psig. The provisions of Specification 4.0.4 are not applicable for ,

entry into MODE 3;

3) Verifying that the startup feedwater pump develops a discharge pressure of greater than or. equal to 1375 psig at a flow of greater than or equal to 425 gpm;
c. At least once per 18 months during shutdown by: l
1) Verifying that each automatic valve in the flow path actuates-to its correct position upon receipt of an Emergency Feedwater System Actuation test signal;
2) Verifying that each emergency feedwater pump starts as designed automatically upon receipt of an Emergency Feedwater Actuation System test signal;
3) Verifying that with all manual actions, including power source and valve alignment, t'ie startup feedwater pump starts within the required elapsed time; and
4) Verifying that each emergency feedwater control valve closes on receipt of a high flow test signal.

SEABROOK - UNIT 1 3/4 7-4 Amendment No.

i

3/4.8 ELECTRICAL POWER SYSTEMS 3/4.8.1 A.C. SOURCES OPERATING LIMITING CONDITION FOR OPERATION 3.8.1.1 As a minimum, the following A.C. electrical power sources shall be OPERABLE:

a. Two physically independent circuits between the offsite transmission network and the onsite Class 1E Distribution System, and
b. Two separate and independent diesel generators, each with:

l 1) A separate day fuel tank containing a minimum fuel volume fraction of 3/8 (600 gallons),

2) A separate Fuel Storage System containing a minimum volume'of 60,000 gallons of fuel,  ;
3) A separate fuel transfer pump,
4) Lubricating oil storage containing a minimum total volume of l 275 gallons of lubricating oil, and
5) Capability to transfer lubricating oil from storage to the diesel generator unit. ,

APPLICABILITY: MODES 1, 2, 3, and 4.

ACTION:

1

a. With an offsite circuit of the above required A.C. electrical power l sources inoperable, demonstrate the OPERABILITY of the remaining A.C. source by performing Specification 4.8.1.1.la. within 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> and at least once per 8 hours9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br /> thereafter; restore at least two 'I offsite circuits to OPERABLE status within 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> or be in at I least HOT STANDBY within the next 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> and in COLD SHUTDOWN within the following 30 hours3.472222e-4 days <br />0.00833 hours <br />4.960317e-5 weeks <br />1.1415e-5 months <br />.

1 SEABROOK - UNIT 1 3/4 8-1 Amendment No.

. ELECTRICAL POWER SYSTEMS A.C. SOURCES OPERATING LIMITING CONDITION FOR OPERATION 3.8.1.1 (Continued) ,

ACTION:

b. With a diesel generator ino)erable, demonstrate the OPERABILITY of 1 the remaining A.C. sources ay performing Specification 4.8.1.1.la l within 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> and at least once 3er 8 hours9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br /> thereafter. I Demonstrate the OPERABILITY of tie remaining diesel generator by .l performing Specification 4.8.1.1.2a.5) within 8 hours9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br />.* Restore at I least two diesel generators to OPERABLE status within 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> or I be in at least H01 STANDBY within the next 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> and in COLD l SHUTDOWN within the following 30 hours3.472222e-4 days <br />0.00833 hours <br />4.960317e-5 weeks <br />1.1415e-5 months <br />. I
c. With one offsite circuit and one diesel generator of the above i required A.C. electrical power sources inoperable, demonstrate the i OPERABILITY of the remaining A.C. source by performing Specifica-tion 4.8.1.1.la, within 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> and at least once per 8 hours9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br /> there-after. Demonstrate the OPERABILITY of the remainin  ! )

generatorbyperformingSpecification4.8.1.1.2a.5)gdieselwithin 8 l hours.* Restore at least one of the inoperable sources to OPERABLE I status within 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> or be in at least H0T STANDBY within the next 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> and in COLD SHUTDOWN within the following 30 hours3.472222e-4 days <br />0.00833 hours <br />4.960317e-5 weeks <br />1.1415e-5 months <br />.

Restore at least two effsite circuits to OPERABLE status within 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> and two diesel generators to OPERABLE status within 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> from the time of initial loss or be in at least HOT STANDBY within the next 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> and in COLD SHUTDOWN within the following 30 hours3.472222e-4 days <br />0.00833 hours <br />4.960317e-5 weeks <br />1.1415e-5 months <br />.

l

  • The OPERABILITY of the remaining diesel generator need not be verified if the. I diesel generator became inoperable due to: 1 i
1. Preplanned preventive maintenance or testing, I I
2. An inoperable support system with no potential common mode failure for -l the remaining diesel generator, or l I
3. An independently testable component with no potential common mode failure i for the remaining diesel generator. 1 SEABROOK - UNIT 1 3/4 8-2 Amendment No.

ELECTRICAL POWER SYSTEMS.

~

A.C. SOURCES OPERATING LIMITING CONDITION FOR OPERATION 3.8.1.1 (Continued) E4 ACTION: l

d. With one diesel generator. inoperable in addition to ACTION b. or c. I above, verify that:
1. All required systems, subsystems, trains, components, and devices that depend on the remaining OPERABLE diesel-generator as a source of emergency power are also OPERABLE, .;

and 1

2. When in MODE 1, 2, or 3, the steam-driven emergency feedwater pump is OPERABLE.

If these conditions are not satisfied within 2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br /> be in at least HOT STANDBY within the next 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> and in COLD SHUTDOWN within the following 30 hours3.472222e-4 days <br />0.00833 hours <br />4.960317e-5 weeks <br />1.1415e-5 months <br />.

e. With two of the above required offsite A.C. circuits inoperable; l restore at least one of the inoperable offsite sources to OPERABLE status within 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> or be in at least HOT. STANDBY within the next 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br />. With only one offsite source restored, restore at -

least two offsite circuits to OPERABLE status within 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> from time of initial loss or be in at least HOT STANDBY within the next 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> and in COLD SHUTDOWN within the following 30 hours3.472222e-4 days <br />0.00833 hours <br />4.960317e-5 weeks <br />1.1415e-5 months <br />.

f. With two of the above required diesel generators ino>erable, demon- I' strate the OPERABILITY of two offsite A.C. circuits'ay performing the requirements of Specification 4.8.1.1.la. within I hour and.at-least once per 8 hours9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br /> thereafter; restore at.least one of the inoperable diesel generators to OPERABLE status within 2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br /> or be in at least HOT STANDBY within the next 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> and in. COLD SHUTDOWN within the following 30 hours3.472222e-4 days <br />0.00833 hours <br />4.960317e-5 weeks <br />1.1415e-5 months <br />. Restore at least two diesel generators to OPERABLE status within 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> from time of initial loss or be in least HOT STANDBY within the next 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> and in COLD SHUTDOWN within the following 30 hours3.472222e-4 days <br />0.00833 hours <br />4.960317e-5 weeks <br />1.1415e-5 months <br />.

SEABROOK - UNIT 1 3/4 8-2a Amendment No.

9 IV, Safety Evaluation of License Amendment Rennest 93-14 Proposed Chan_ges

  • The staff of the U.S. Nuclear Regulatory Commission (NRC) has completed a comprehensive examination of Technical Specification (TS) surveillance requirements that require testing during power operation. This effort is a part of the NRC Technical Specification Improvement Program -

(TSIP). The results of this work are reported in NUREG-1366, " Improvements to Technical Specifications Surveillance Requirements," December 1992.

The stafT found that while the majority of the testing at power is important,' safety can be I improved, equipment degradation decreased, and an unnecessary burden on personnel resources ,

eliminated by reducing the amount of testing that the Technical Specifications require at power J operating conditions.

The NRC stafT used four criteria to screen the surveillance requirements. The criteria are as follows:

i

1. The surveillance could lead to a plant transient. l
2. The surveillance results in unnecessary wear to equipment. l
3. The surveillance results in radiation exposure to plant personnel which is not justified by the safety significance of the surveillance.
4. The surveillance places an unnecessary burden on plant personnel because the time required is not justified by the safety significance of the surveillance.

On September 27, 1993 the NRC issued Generic Letter 93-05, "Line item Improvements to Reduce Surveillance Requirements for Testing during Power Operation" The Generic Letter encourages licensees to propose Technical Specification changes that are consistent .with the guidance provided.

l The changes proposed by License Amendment Request (LAR) 93-14 are consistent with the guidance provided in Generic Letter 93 05. Of the thirteen changes proposed only one change i

is not completely in accordance with the recommendations of NUREG-1366. This change to the ACTION statements of Technical Specification 3.8.1.1 is discussed below.

~

The change to the ACTION statements of Technical Specification 3.8.1.1 revises the action requirements for starting a non-affected emergency diesel generator when the limiting conditions ~

for operation of the electrical distribution system are degraded. Current action statements require l l alternate testing of a non-affected emergency diesel generator. This testing is performed to - .

enhance emergency diesel generator reliability. Industry experience has shown that alternate H testing has, in fact, reduced reliability because reliability decreases as the number of quick starts I increases. When emergency diesel generator reliability testing is required because of a potential common mode failure, this change will require starting the emergency diesel generator.

NUREG-1366 recommends both starting and loading the emergency diesel generator under this condition. Under the Limiting Condition of Operation (LCO), with one emergency diesel generator inoperable and the operable emergency diesel generator requiring testing, the operable emergency diesel generator should not be loaded. Loading the operable emergency diesel generator could subject it to grid faults which could adversely affect emergency diesel generator l

l 22 l

operation and could, in a worst case situation, result in a complete loss of all AC power (both offsite and onsite). This adverse condition was recognized by the NRC in a recent Notice of Violation to another licensee that cited the licensee for failing "...to avoid the potential for rendering all emergency diesel generators (EDG) unavailable by paralleling one or more EDGs to the grid while the remaining EDG(s) were inoperable.. " In this case the licensee's procedures required parallelling the operable EDG to the offsite power grid whenever the remaining EDG is inoperable. Therefore, the NUREG-1366 recommendation to load the diesel in response to an action condition is not incorporated.

1 l

increasing the surveillance test intervals as proposed in LAR 93-14 results in less frequent  !

surveillance testing and minimizes the potential number ofinadvertent Engineering Safety Features Actuation System (tiSFAS) actuations and reactor trips during surveillance testing. The increase J in the surveillance test interval enhances the operational effectiveness of plant personnel. The amount of time plant personnel spend performing surveillance testing will be reduced. This allows staff time to be used for other tasks such as additional preventive. maintenance. In addition, increasing the surveillance test interval will reduce unnecessary wear to equipment.

In conclusion, the changes proposed by LAR 93-14 do not adversely affect public health and -

safety. In addition, the proposed revision will reduce the potential for inadvertent ESFAS actuations and reactor trips due to testing activities and will allow North Atlantic to better manage resources to maintain the plant. Therefore, there is no increase in the safety consequences associated with the requested amendment.

1 1

i i

a i

23

_ - - - - ~ .

s

' V. Determination of Sienificant liarards for License Amendment Renuest 93-14  !

A. The changes do not involve a significant increase in the probability or consequences of  ;

an accident previously evaluated.

Each of the proposed changes has been extensively reviewed by the NRC during the -

preparation of NUREG-1366 and Generic Letter 93-05 and by North Atlantic during the development and approval of this License Amendment Request. For the purposes of addressing the no significant hazards consideration determination, each change is discussed below.

1. Control rod movement testing is performed to determine if the control rods are immovable. The control rods may be immovable either because of an electrical' problem in the control rod drive circuitry or because the control rod is mechanically stuck. Electrical problems with the control rod drive system, in general, do not prevent insertion of a control rod into the' core when the reactor trip breakers are opened.

Control rod movement testing has been ineffective in determining immovable control rods. NUREG-1366, Table 4.1, identified seventeen cases of mechanically stuck Pressurized Water Reactor (PWR) control rods since 1969. Of the seventeen, only 2 were discovered during Technical Specification rod motion surveillances. Both of these failures happened more than nine years ago. Most cases (15 out of 17) of mechanically immovable control rods were discovered during control rod drop timing _

tests performed during startup physics testing or when the rods were withdrawn from the core during plant startup. Extending the surveillance interval will not affect this failure discovery method.

The accident analyses assume that the single highest worth control rod is stuck and i will not insert. One immovable control rod will still bound this accident analysis.

For these reasons, the extension of the surveillance frequency from once every 31 days to once every 92 days will not result in a significant increase in the probability -

or consequences of a previously evaluated accident, nor will it result in a significant reduction in a margin of safety. -

2. liydrogen monitors are used to monitor hydrogen concentration in the containment following a Loss of Coolant Accident (LOCA). These monitors are used only after a LOCA to tell the operator when to initiate the hydrogen recombiners. The hydrogen recombiners are used to limit the amount of hydrogen in the post-LOCA ,

containment atmosphere. The hydrogen recombiners are not required for a period of hours to days after a large-break LOCA. -

Concurrent with the post-LOCA operation of these monitors, gas samples are obtained -

and independently used to determine hydrogen concentration. ' Therefore, even without the installed hydrogen monitors, post-LOCA hydrogen concentration can be determined. This determination can be completed within the same general time period as using the installed monitors. i 24 l

_ _ . ~

O For these reasons, the extension of the surveillance frequency for performing an ANALOG CilANNEL OPERATIONAL TEST from once every 31 days to once every 92 days, and a C11ANNEL CAllBRATION from once every 92 days on a STAGGERED TEST BASIS to once every refueling interval, will not result in a significant increase in the probability or consequences of a previously evaluated accident, nor will it result in a signiGcant reduction in a margin of safety. i

3. Industry experience has demonstrated that the testing of radiation monitors produces, a signincant number of isolations of the control room, fuel handling building. l auxiliary buildings, and various process lines. Additionally, this testing requires signiDeant staff-hours to implement. Frequent testing of the equipment may also degrade its performance. The radiation monitors at Seabrook Station have had a minimal failure history. In addition, CilANNEL CllECKS will continue to be performed every 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> on these monitors. These channel checks,in conjunction with failure alarms, would detect failures that require corrective action. It is appropriate, therefore, to extend the surveillance test interval.

Therefore, the extension of the surveillance frequencies from monthly to quanerly for the ANALOG CHANNEL OPERATIONAL TEST and the DIGITAL CilANNEL OPERATIONAL TEST will not result in a signi0 cant increase in the probability or consequences of a previously evaluated accident, nor will it result in a significant reduction in a margin of safety.

4. Allowable leakage from any pressure isolation valve (PIV) is sufGciently low to  ;

ensure early detection of possible in-series check valve failure. These vahes are important in preventing overpressurization and rupture 'of the Emergency Core Cooling System (ECCS) low pressure piping which could result in a LOCA that bypasses containment. This change will not change the eighteen-month surveillance -

test interval, nor will it change the required testing to be performed within 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> of valve actuation. This level of surveillance testing is appropriate for these valves.

Changing the frequency of the surveillance may allow an inoperable PIV to remain  !

in service longer than if the change were not implemented. 110 wever, the motor- .

operated valves have not experienced any excessive leakage. The check valves will ,

be tested within 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> of any actuation and since the reseating of the check vahes '

after actuation is the most likely method of failure, this change can be implemented without increasing the probability of a malfunction of equipment important to safety,  ;

For these reasons, the extension of the amount of time from three days to seven days l before pressure isolation valve testing is required will not result in~ a signiDeant increase in the probability or consequences of a previously evaluated accident, nor .

will it result in a signincant reduction in a margin of safety. ,

5. Reactor Coolant System (RCS) vents are provided to exhaust noncondensible gases  ;

and/or steam from the primary system that could inhibit natural circulation core cooling. He operability of at least one RCS vent path from the reactor vessel head and the pressurizer steam space ensures that the capability exists to perform this ,

function.  ;

25  ;

e

The valve redundancy of the reactor coolant vent paths serves to minimize the probability ofinadvertent or irreversible actuation while ensuring that a single failure of a vent valve, power supply, or control system does not prevent isolation of the vent path.

For these reasons, the extension of the surveillance frequency from once every 92 days to once per COLD SIIUTDOWN will not result in a significant increase in the probability or consequences of a previously evaluated accident, nor will it result in a significant reduction in a margin of safety.

6. The pressurizer heaters are used to control Reactor Coolant System pressure during .

normal operations. Additionally, the minimum number of pressurizer heaters specified in the Technical Specifications enhances the capability of the plant to control Reactor Coolant System pressure and establish natural circulation.

The pressurizer heaters are nonnally in constant use, both the proportional and to some extent the backup heaters. Any problems associated with these heaters would be identified during such operation. These heaters are also very reliable.

For these reasons, the extension of the surveillance frequency from.once every 92 days to each refueling interval will not result in a significant increase in the probability or consequences of a previously evaluated accident, nor will it result in a significant reduction in a margin of safety.

7. This Technical Specification change will remove the requirement to verify boron concentration of accumulator inventory after a volume increase of 1% or more if the -

makeup is from the RWST und the minimum concentration of boron in the RWST is greater than or equal to the minimum boron concentration in the accumulator, and the RWST has not been diluted since it was last sampled and determined to be within specifications.

I This change will not affect the proper accumuh . boron concentration of the l

accumulators. Therefore this change will not result in a significant increase in the probability or consequencet of a previously evaluated accident, nor will it result in a significant reduction in a margin of safety.

8. This Technical Specification change removes the accumulator water level and pressure channel surveillance from the Technical Specifications and places them into a licensee-controlled orogram. These changes are consistent with industry recognition that accumutm .umentation operability is not directly related to the capability of the accue -

4 Y perfonn their safety function.

Rehwating the m u entation surveillance requirements is an administrative change which will not , s equipment availability, testing, or operation; therefore, it will-have no effect on tue consequences of an accident.

( 26 t

/ 4 * .

r I

For these reasons, this change will not result in a significant increase in the probability or consequences o' a previously evaluated accident, nor will it result in a signi0 cant reduction in a margin of safety.

9. This Technical Specification change clarifies when the containment sump visual inspection must be performed. Current inspections must be performed at the -

completion of each containment entry; therefore, multiple jobs in one day would require multiple inspections. The NRC staff recommends that this inspection be done at least once daily if the containment has been entered that day and when the final containment entry is made. This change would reduce the number of unnecessary inspections and also reduce personnel exposure.

This change only clarifies the current surveillance requirements; it does not make substantial changes to these requirements nor does it change the method of performing the surveillance.

For these reasons, this change will not result in a significant increase in the probability or consequences of a previously evaluated accident, nor will it result in a significant reduction in a margin of safety.

10. This Technical Specification change will revise the containment spray system nozzle testing surveillance from once every f . years to once every ten years.

The two independent containment spray systems provide post-accident cooling of the containment atmosphere. The containment spray systems also provide a mechanism for removing iodine from the containment atmosphere. The surveillance test verifies by an air or smoke flow test that the spray nozzles are unobstructed. The extension of the surveillance frequency does not affect administrative controls that preclude entry of foreign material into the nozzles.

At Seabrook Station, the piping headers and nozzles are fabricated from austenitic stainless steel. There have been no reported in. service problems noted with spray l nozzle testing from plants with stainless steel headers and nozzles and there is no i indir > s that the lines would corrode and become obstructed.

For .

.mns, this change will not result in a significant increase in the probabiluv or consequences of a previously evaluated accident, nor will it result in a significant reduction in a margin of safety.

11.1 his Technical Specification change will revise the containment hydrogen recombiner testing surveillance from every six months to every refueling interval.

The two independent containment hydrogen recombiners provide post-accident hydrogen control of the containment atmosphere. This equipment is designed to be passive until an accident occurs.

The two independent containment hydrogen recombiners provide post-accident hydrogen control of the containment atmosphere. This equipment is highly reliable.

27 l

-1

, ;i

, ij l

The backup purge system can be used if recombiner operation is not possible. The backup purge system can purge the containment at a controlled rate while replacing '

the purged gas with clean compressed air. - This redundancy along with the.high.

reliability of the hydrogen recombiners ensures post-accident hydrogen control. [

For these reasons, this change will not relt in a si;,ninemt increase in the probability or consequences of a previously evaluated accident, for will it result in' -j a signincant reduction in a margin of safety.  ;

1

12. This. Technical Speci0 cation will revise the frequency for testing the emergency _

feedwater pumps and the startup feedwater pump from once every 31 days on a l STAGGERED TEST BASIS to once every 92 days on a STAGGERED TEST

. ll ASIS.

Three pumps (two emergency feedwater pumps and one startup feedwater pump) are used to perform the function of the auxiliary feedwater system. The industry has  !

experienced problems running these pumps'on a recirculation test lineup. Generally -  !

these lineups have provided a flow path of only between 5 to 15% of the best  !

cf0ciency point How. This can result in degradation of the pump if continued over a substantial time or if continually repeated for short duration. At Seabrook Station, the recirculation Dow is properly sized to be above 25% of best efTiciency flow. This ,

is consistent with pump manufacturer's recommendations. Ilowever, monthly testing of each pump does cause other components such as valves to undergo substantial wear ' '

i during each pump test. .

Each pump has a 100% capacity to provide emergency feedwater to the steam r generators. This redundancy along with the high reliability of the Seabrook Station pumps ensures post-accident feedwater flow.

For these reasons, this change will not ' result in a signincant increase .in the probability or consequences of a prev.iously evaluated accident, nor will it result in a signincant reduction in a margin of safety.

13. This Technical Specification change revises the ACTION requirements for startmg a o non-affected emergency diesel generator when the limiting conditions for operation  !

of the electrical distribution system are degraded. Current ACTION statements- H require alternate testing of a non-afTected emergency diesel generator. This is done  !

to enhance reliability. Industry experience has shown that alternate testing has in fact reduced reliability because reliability decreases as the number of quick stants . 'I increases.

This change will improve emergency diesel generator performance by reducing the number of unnecessary quick starts and by requiring more appropriate testing of the j i emergency diesel genenitors when there is a potential common mode failure, i

For these reasons, this change will not result in a significant increase in the. ' I

- probability or consequences of a previously evaluated accident, nor will it result in q a significant reduction in .: margin of safety. l 28

.1 si

' i, g.- m,.-g .-.;yg .

+ ,-

r w ,--- iew i-. = ee- p.

9 e

e it The proposed ch' 4 frcm any accident previously evaluated.do not create the possibility of a new The extension of the surveillance intervals will not result in any changes in configuration or operation. Therefore, the extensions will not create a possibilit or different kind of accident from ary previously evaluated or analyzed.

C.

The proposed changes do not insolve a significant reduction in a margin of The changes proposed in this License Amendment Request do not reduce any system or component to perform its safety related function. The basis of NUREG-1366 Generic Letter 93-05, and the analysis perfonned in support of this Licens Amendment Request is that the reduction in the surveillance testing and u emergency diesel engine starts listed herein can improve safety by reducing chall plant systems, personnel exposure, and equipment wear or degradation. Th changes involve performing any only surveillance frequencies and do not change the method o surveillance.

unchanged. The operation of systems and equipment remains Therefore, reducing surveillance frequencies and climinating unnecess emergency diesel starts does not insolve a reduction in the margin of safety l

}

l l

l l

l 29

.e e

VI .- Proposed Schedule for Amendment Issuance and Effectiveness North Atlantic requests NRC review of License Amendment Request 93-14 and issuance of a license amendment having immediate efTectiveness by April 30,1994.

1 I

l i

30

, . . ~ . - . . - . - . . - . - - .. .

9

. .* q 4 ,,

9 Vll. Environmental Impact Statement North Atlantic has reviewed the proposed license amendment against the criteria of 10CFR51.22  ;

for environmental considerations. The proposed changes do not involve a signincant hazard consideration, nor increase the types and amounts of effluent whicn may be released oft site,' nor signi0cantly increase individual or cumulative occupational radiation exposures. Based on the -

foregoing, North Atlantic concludes that the proposed changes meet the criteria delineated in 10CFR51.22(c)(9) for a categorical exclusion from the requirements for an Environmental Impact Statement.

b

{