REACTOR'C00LANT SYSTEM REACTOR COOLANT SYSTEM LEAKAGI OPERATIONAL LEAKAGE
~
' SURVEILLANCE REOUIREMENTS 4.4.6.2.2 a
Re or Coolant System Pressure Isolation Valve - w--* > ir.
T:5':
?.' _ shall be demonstrated OPERABLE by verifying e wi n ts limit:
age a.
'At least once per 18 months, b.'
Prior to entering MODE 2 whenever the plant has been in COLD SHUTDOWN for 7. days or more and if leakage testing has not been l
performed in the previous 9 months, Prior.to returning the valve to service following maintenance, c.
' repair, or replacement work on the valve, and d.
Within 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> following valve actuation due to automatic or 1
manual action or flow through the valve.t l
As outlined in the ASME Code,Section XI, paragraph IW-3427_(b).
e.
The provisions of Specification 4.0.4 are not applicable for. entry inte MODE 3 or 4.
l l
& Not app /s'alle. +c BHM pumps gA sod te CucPion (So/afion yclV43 Gnd fbLlY bffGSS c h u A.
valves.