ML20210R80510 August 1999Startup Test Rept for Cycle 7Power change
ML20210K36330 July 1999Marked-up & Revised TS Bases Page B 3/4 5-2 Re ECCS
ML20196G36723 June 1999Proposed Tech Specs Increasing AOT for Crac from 30 Days to 60 Days on One Time Basis for Each Train to Facilitate on- Line Implementation of Design Enhancements During Current Operating CycleProbabilistic Risk Assessment
ML20198E74116 December 1998Proposed Tech Specs Pages Re LAR-98-15,involving Relocation of TS 3/4.7.10 & Associated TS Table 3.7-3 to Technical Requirements ManualHigh Radiation Area
Ultimate heat sink
ML20198E78316 December 1998Proposed Tech Specs Pages to LAR 98-09,re Editorial & Administrative Changes to TSShutdown Margin
High Radiation Area
Process Control Program
Power change
ML20155J1824 November 1998Proposed Tech Specs 4.5.2b.1,removing Prescriptive Requirements of Using Venting Process as Sole Means to Verify That ECCS Piping Is Full of Water
ML20249B41817 June 1998Proposed Tech Specs 3.7.6 Re Control Room Emergency Makeup Air & Filtration Subsystem
ML20247R70220 May 1998Proposed Tech Specs Re Rev of Refueling Water Storage Tank low-low Level Setpoint
ML20217E88722 April 1998Proposed Tech Specs Re Surveillance Intervals to Accommodate 24-month Fuel Cycle,Per GL 91-04Boric Acid
Shutdown Margin
ML20217F96521 April 1998Proposed Tech Specs Page 3/4 5-5 Re Venting of Operating Chemical Vol & Control Sys Centrifugal Charging Pump
ML20216C5928 April 1998Proposed Tech Specs Changing Surveillance Intervals to Accommodate 24-month Fuel Cycle Per GL 91-04Operating Basis Earthquake
Earthquake
Pressure Boundary Leakage
ML20217Q2983 April 1998Proposed Tech Specs Pages Re LAR 98-02,proposing Changes to TS to Accommodate Fuel Cycles of Up to 24 MonthsBoric Acid
Shutdown Margin
Ultimate heat sink
ML20217M37727 March 1998Proposed Tech Specs 3.7.6 Re Control Room Emergency Makeup Air & Filtration SubsystemShutdown Margin
ML20217F09623 March 1998Proposed Tech Specs Pages,Incorporating New Spec 3.0.5 Administrative Controls,Currently Approved for Use in NUREG-1431
ML20217Q1035 March 1998Proposed Tech Specs Incorporating Programmatic Controls for Radioactive Effluents & for Environ Monitoring Conforming to Applicable Regulatory RequirementsShutdown Margin
Pressure Boundary Leakage
ML20217N8212 March 1998Proposed Tech Specs 4.5.2B.1,excluding Prescriptive Requirement to Vent Operating CVCS CCP Casing
ML20217N7322 March 1998Proposed Tech Specs Pages,Revising Frequency for Performance of Specific Surveillances & Deleting Requirements for Accelerated Testing When Number of Valid Test Failures Associated W/Edgs Is Met or ExceededSafe Shutdown
Ultimate heat sink
Maintenance Rule Program
ML20217Q11125 February 1998Rev 18 to OdcmGrab sample
Offsite Dose Calculation Manual
Annual Radioactive Effluent Release Report
Annual Radiological Environmental Operating Report
Process Control Program
Power change
ML20211F44026 September 1997Cycle 6 Startup Test Rept for Seabrook Station,Unit 1Power change
ML20211E99826 September 1997Proposed Tech Specs 3.7.6,separating Requirements for CR HVAC Sys Re Operation of CR Emergency Makeup Air & Filtration Sys Subsystem & CR Air Conditioning SubsystemSafe Shutdown
High Radiation Area
Ultimate heat sink
ML20195J14523 July 1997Rev 15 to Seabrook Station Operating Experience Manual (Ssoe)Fitness for Duty
Condition Adverse to Quality
ML20148G00129 May 1997Proposed Tech Specs Replacing Term Zircaloy W/Terminology That Identifies NRC Approved Westinghouse Fuel Assembly Design Consisting of Assemblies W/Either ZIRLO or Zircaloy- 4 Fuel Cladding MatlFuel cladding
ML20148K1257 May 1997Rev 6 to Part I, Seabrook Station Pump & Valve IST Program PlanSafe Shutdown
Boric Acid
High Radiation Area
Ultimate heat sink
Grab sample
Stroke time
Safe Shutdown Earthquake
Operating Basis Earthquake
Locked High Radiation Area
Cold shutdown justification
Power-Operated Valves
Power Operated Valves
ML20135C35426 February 1997Proposed Tech Specs,Providing Retyped Page of Proposed Changes Re Design Features Fuel Assembly Reconstitution
ML20134Q34518 February 1997Proposed Tech Specs 5.3.1 Re Fuel Assemblies
ML20134L86812 February 1997Proposed Tech Specs 6.0 Re Administrative ControlsHigh Radiation Area
Offsite Dose Calculation Manual
Annual Radioactive Effluent Release Report
Process Control Program
Fire Protection Program
ML20138J33519 December 1996Rev 16 to Offsite Dose Calculation ManualOffsite Dose Calculation Manual
ML20129B83617 October 1996Proposed Tech Specs,Consisting of Change Request 96-02, Proposing Changes That Involve Relocation of Four TS Re Instrumentation Requirements Contained in TS Section 3/4.3 & Relocation of Selected RequirementsSafe Shutdown
ML20129B77616 October 1996Proposed Tech Specs,Consisting of Change Request 96-06, Proposing Four Changes Re EDG Requirements Contained in TS 3/4.8.1, AC SourcesSafe Shutdown
Ultimate heat sink
Hydrostatic
Offsite Circuit
ML20113B20320 June 1996Proposed Tech Specs Re Svc Water Cooling Tower Loop Electrical SupplySafe Shutdown
Ultimate heat sink
ML20117K3114 June 1996Proposed Tech Specs Re Containment Leakage Testing Modifying Implementing Performance Based Program at Seabrook Station IAW 10CFR50,App J,Option B & Reg Guide 1.163 Requirements
ML20115J74826 March 1996Procedure for Ultrasonic Examination of Centrifugally Cast Stainless Steel Piping Using Low Frequency SAFT-UT SystemCoatings
Nondestructive Examination
Dissimilar Metal Weld
ML20138J36221 March 1996Process Control ProgramOffsite Dose Calculation Manual
Annual Radioactive Effluent Release Report
Process Control Program
ML20100G83516 February 1996Startup Test Rept,Cycle 5. W/
ML20094D53430 October 1995Proposed Tech Spec 3.4.6.2, RCS Operational Leakage Pressure Isolation Valve Table
ML20092M10722 September 1995Proposed TS 3.3.2,Table 3.3-3, ESFAS Instrumentation, Correcting Action Ref for Functional Unit 8.b Re Automatic Switchover to Containment Sump/Rwst Level low-low
ML20092K22020 September 1995Proposed Tech Specs,Changing Plant TS Bases Section 3/4.9.1 for Refueling B ConcentrationBoric Acid
Shutdown Margin
ML20098A47220 September 1995Proposed Tech Specs,Relocating Functional Unit 6.b, FW Isolation-Low RCS Tavg Coincident W/Rt from TS Requirements Manual Licensee Controlled DocumentFuel cladding
ML20092F91712 September 1995Proposed Tech Specs Bases Section Clarifying What Specifically Constitutes Operable Pressurizer Safety Valve in Mode 5
ML20092A6335 September 1995Proposed Tech Specs,Revising Main Steam Safety Valve Setpoints & Max Allowable Power Range Neutron Flux High Setpoints W/Inoperable Main Steam Safety Valves
ML20091S16028 August 1995Proposed Tech Specs Re Positive Moderator Temp CoefficientBoric Acid
Shutdown Margin
ML20086R21124 July 1995Proposed Tech Specs,Relocating Table 3.4-1, RCS PIVs from TS 3.4.6.2, RCS Operational Leakage to Techical Requirements ManualPressure Boundary Leakage
ML20085L11616 June 1995Proposed Tech Specs Re Increased Requirements for Core Reactivity Control Available from Borated Water SourcesBoric Acid
Shutdown Margin
ML20084U5527 June 1995Proposed Tech Specs,Consisting of Amend Request 95-02, Revising Footnote to SR 4.4.7 & Table 3.4-2 to Increase Temp Limit at Which Rc O Levels Determined by Sampling from 180 Degrees F to 250 Degrees F
ML20084N95631 May 1995Proposed Tech Specs Re Operation of Core W/Positive Moderator Temp CoefficientBoric Acid
Shutdown Margin
ML20083K73519 April 1995Rev 74 to Emergency Response Manual (Sser)Safe Shutdown
Health Physics Network
Ultimate heat sink
Grab sample
Met Tower
Temporary Modification
Earthquake
Deep Dose Equivalent
Pressure Boundary Leakage
Siren
Overexposure
ML20082L52116 April 1995Proposed Tech Specs,Revising TS 3.9.4 That Addresses Containment Bldg Penetrations to Allow Use of Alternate Containment Bldg Penetration Closure Methodologies for Postulated Accident Scenarios During Core Alterations
ML20081J60222 March 1995Revised Table A.3-1, Radioactive Liquid Waste Sampling & Analysis Program, to ODCMGrab sample
ML20078E04925 January 1995Proposed Tech Specs Re Changing of Surveillance Requirement 4.6.1.2.a from Specific Schedule for Performance of Containment ILRTs
ML20079B24927 December 1994Proposed Changes to Part a of ODCMGrab sample
Annual Radioactive Effluent Release Report
Power change