ML041890072

From kanterella
Revision as of 17:44, 24 March 2020 by StriderTol (talk | contribs) (StriderTol Bot change)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search

Southtexas - Deferral of Review of Licensing Actions for South Texas Project, Units 1 and 2
ML041890072
Person / Time
Site: South Texas  STP Nuclear Operating Company icon.png
Issue date: 07/02/2004
From: Jaffe D
NRC/NRR/DLPM/LPD4
To: Sheppard J
South Texas
Jaffe D, NRR/DLPM, 415-1439
References
TAC MC0822, TAC MC0823, TAC MC1014, TAC MC1015
Download: ML041890072 (5)


Text

July 2, 2004 Mr. James J. Sheppard President and Chief Executive Officer STP Nuclear Operating Company South Texas Project Electric Generating Station P. O. Box 289 Wadsworth, TX 77483

SUBJECT:

DEFERRAL OF REVIEW OF LICENSING ACTIONS FOR SOUTH TEXAS PROJECT, UNITS 1 AND 2 (TAC NOS. MC0822, MC0823, MC1014 AND MC1015)

Dear Mr. Sheppard:

The purpose of this letter is to inform you that the Nuclear Regulatory Commission (NRC) review of your request for license amendments for the following has being deferred until the beginning of fiscal year 2005 (FY05) that starts October 1, 2004:

 Tac Nos. MC0822 and MC0823 Technical Specification Changes for the Engineered Safety Features Load Sequencer

 Tac Nos. MC1014 and MC1015 Technical Specification Changes for the Loss-of-Power Instrumentation The NRC is deferring review of these actions to support the review of security plan, safeguard contingency, and security personnel training and qualification plan changes required by an April 29, 2003, Commission Order. I have discussed the deferral of these actions with Mr. S. Head of your staff.

Please have a member of your staff inform me if circumstances change with regard to the impact on your ability to safely operate your facility as a result of the deferral of these actions I can be contacted at 301-415-1439.

Sincerely,

/RA/

David H. Jaffe, Senior Project Manager, Section 1 Project Directorate IV Division of Licensing Project Management Office of Nuclear Reactor Regulation Docket Nos. 50-498 and 50-499 cc: See next page

July 2, 2004 Mr. James J. Sheppard President and Chief Executive Officer STP Nuclear Operating Company South Texas Project Electric Generating Station P. O. Box 289 Wadsworth, TX 77483

SUBJECT:

DEFERRAL OF REVIEW OF LICENSING ACTIONS FOR SOUTH TEXAS PROJECT, UNITS 1 AND 2 (TAC NOS. MC0822, MC0823, MC1014 AND MC1015)

Dear Mr. Sheppard:

The purpose of this letter is to inform you that the Nuclear Regulatory Commission (NRC) review of your request for license amendments for the following has being deferred until the beginning of fiscal year 2005 (FY05) that starts October 1, 2004:

 Tac Nos. MC0822 and MC0823 Technical Specification Changes for the Engineered Safety Features Load Sequencer

 Tac Nos. MC1014 and MC1015 Technical Specification Changes for the Loss-of-Power Instrumentation The NRC is deferring review of these actions to support the review of security plan, safeguard contingency, and security personnel training and qualification plan changes required by an April 29, 2003, Commission Order. I have discussed the deferral of these actions with Mr. S. Head of your staff.

Please have a member of your staff inform me if circumstances change with regard to the impact on your ability to safely operate your facility as a result of the deferral of these actions I can be contacted at 301-415-1439.

Sincerely,

/RA/

David H. Jaffe, Senior Project Manager, Section 1 Project Directorate IV Division of Licensing Project Management Office of Nuclear Reactor Regulation Docket Nos. 50-498 and 50-499 cc See next page DISTRIBUTION:

PUBLIC RidsAcrsAcnwMailCenter PDIV-1 r/f RidsOgcRp RidsRgn4MailCenter (AHowell) RidsNrrDlpmDpr(SWall)

RidsNrrDlpmLpdiv1 (Rgramm) RidsNrrPMDJaffe RidsNrrLADBaxley RidsNrrDripRorp (TBoyce)

ACCESSION NO: ML041890072 Nrr-106 OFFICE PDIV-1/PM PDIV-1/LA PDIV-1/SC NAME DJaffe DBaxley RGramm DATE 7/2/04 7/1/04 7/2/04 OFFICIAL RECORD COPY DOCUMENT NAME: C:\ORPCheckout\FileNET\ML041890072.wpd

South Texas Project, Units 1 & 2 cc:

Senior Resident Inspector A. H. Gutterman, Esq.

U.S. Nuclear Regulatory Commission Morgan, Lewis & Bockius P. O. Box 910 1111 Pennsylvania Avenue, NW Bay City, TX 77414 Washington, DC 20004 A. Ramirez/C. M. Canady Mr. T. J. Jordan, Vice President City of Austin Engineering & Technical Services Electric Utility Department STP Nuclear Operating Company 721 Barton Springs Road P. O. Box 289 Austin, TX 78704 Wadsworth, TX 77483 Mr. L. K. Blaylock S. M. Head, Manager, Licensing Mr. W. C. Gunst Nuclear Quality & Licensing Department City Public Service Board STP Nuclear Operating Company P. O. Box 1771 P. O. Box 289, Mail Code: N5014 San Antonio, TX 78296 Wadsworth, TX 77483 Mr. C. A. Johnson/A. C. Bakken Environmental and Natural Resources AEP Texas Central Company Policy Director P. O. Box 289 P. O. Box 12428 Mail Code: N5022 Austin, TX 78711-3189 Wadsworth, TX 77483 Jon C. Wood INPO Matthews & Branscomb Records Center 112 East Pecan, Suite 1100 700 Galleria Parkway San Antonio, TX 78205 Atlanta, GA 30339-3064 Arthur C. Tate, Director Regional Administrator, Region IV Division of Compliance & Inspection U.S. Nuclear Regulatory Commission Bureau of Radiation Control 611 Ryan Plaza Drive, Suite 400 Texas Department of Health Arlington, TX 76011 1100 West 49th Street Austin, TX 78756 D. G. Tees/R. L. Balcom Texas Genco, LP Brian Almon P. O. Box 1700 Public Utility Commission Houston, TX 77251 William B. Travis Building P. O. Box 13326 Judge, Matagorda County 1701 North Congress Avenue Matagorda County Courthouse Austin, TX 78701-3326 1700 Seventh Street Bay City, TX 77414 June 2004

2 Susan M. Jablonski Office of Permitting, Remediation and Registration Texas Commission on Environmental Quality MC-122 P.O. Box 13087 Austin, TX 78711-3087 Mr. Terry Parks, Chief Inspector Texas Department of Licensing and Regulation Boiler Division P. O. Box 12157 Austin, TX 78711 Mr. Ted Enos 4200 South Hulen Suite 630 Ft. Worth, Texas 76109