MONTHYEARML24009A1112024-01-0909 January 2024 NRR E-mail Capture - Acceptance Review - Hatch 1&2 LAR - Revise TS 3.7.1 & 3.7.2 to Adopt Risk-Informed Completion Times for RHRSW and Psw Systems (L-2023-LLA-0169) ML23354A2032023-12-18018 December 2023 Document Request for Hatch Nuclear Plant - Radiation Protection Inspection - Inspection Report 2024-01 ML23264A0142023-09-14014 September 2023 NRR E-mail Capture - (External_Sender) Draft Round-2 RAI - Hatch, Units 1 and 2, Revise TS 1.1-1 Modes LAR ML23249A2082023-09-0606 September 2023 NRR E-mail Capture - Change in Estimated Review Schedule and Level of Effort for Hatch 'Revise TS Table 1.1-1 (Modes)' LAR (L-2022-LLA-0120) ML23223A0142023-08-10010 August 2023 NRR E-mail Capture - Acceptance Review - SNC Fleet Exemption to 10 CFR 73.2, Physical Barriers ML23198A1552023-07-17017 July 2023 NRR E-mail Capture - for Your Action - Request for Additional Information (RAI) - Hatch, Farley, and Vogtle, Units 1 and 2 Quality Assurance Topical Report (QATR) Submittal Dated June 15, 2023 ML23135A0922023-05-11011 May 2023 NRR E-mail Capture - Acceptance Review - SNC Fleet Request to Use Specific Provision of a Later Edition of the ASME BPV Code, Section XI (L-2023-LLR-0016) ML23073A0252023-03-13013 March 2023 NRR E-mail Capture - Fyi - Closeout the Evacuation Time Estimate (ETE) Reviews for SNC Fleet ML23065A0922023-03-0505 March 2023 NRR E-mail Capture - Revised Estimate Hours and Completion Date - Hatch RPV Head Closure Bolts LAR (L-2022-LLA-0120) ML23033A0952023-02-0202 February 2023 NRR E-mail Capture - (External_Sender) Re for Your Comments - State of Georgia - Hatch Units 1 and 2 - Relax Required Number of Fully Tensioned Reactor Pressure Vessel Head Closure Studs ML23033A0282023-01-30030 January 2023 NRR E-mail Capture - Revised Estimates for Hatch RPV Studs LAR ML23026A0132023-01-19019 January 2023 NRR E-mail Capture - Revised Estimates for Hatch RPV Studs LAR ML23018A1872023-01-17017 January 2023 2023 HNP CGD Inspection Information Request ML23006A0662023-01-0505 January 2023 NRR E-mail Capture - (External_Sender) for Your Comments - State of Georgia - Hatch Units 1 and 2 - Revise NFPA-805 License Amendment Request ML22355A2082022-12-21021 December 2022 NRR E-mail Capture - RAI - Hatch, Units 1 and 2, Reactor Pressure Vessel 'Rpv Head Studs' LAR ML23006A0252022-12-13013 December 2022 NRR E-mail Capture - (External_Sender) for Your Comments - State of Georgia - Hatch Units 1 and 2 - TSTF-208 License Amendment Request ML22341A1212022-12-0606 December 2022 NRR E-mail Capture - Recap of Takeaways from Hatch Audit on Dec 1, 2022 ML23026A2372022-11-16016 November 2022 2023001 Hatch RP RFI Final ML22305A7032022-11-0101 November 2022 NRR E-mail Capture - Potential Audit for Hatch'S 'Rpv Head Studs' LAR ML22258A1532022-09-15015 September 2022 NRR E-mail Capture - Acceptance Review - Hatch Closure Studs in TS Table 1.1-1 Modes LAR (L-2022-LLA-0120) ML22251A1322022-09-0808 September 2022 NRR E-mail Capture - Fyi - Hatch TSTF-505 LAR ML22208A1332022-07-26026 July 2022 NRR E-mail Capture - RAI - Hatch, Units 1 and 2, TSTF-208 LAR ML22207B8532022-07-25025 July 2022 NRR E-mail Capture - RCI - Hatch, Units 1 and 2, Revision to NFPA-805 LAR ML22157A3552022-06-0606 June 2022 NRR E-mail Capture - Revised Estimates - Hatch TSTF-505 LAR ML22157A3542022-06-0606 June 2022 NRR E-mail Capture - RAI - Hatch, Units 1 and 2, TSTF-505 LAR ML22140A1192022-05-20020 May 2022 NRR E-mail Capture - RAIs - Hatch, Units 1 and 2, TSTF-505 LAR ML22138A4122022-05-18018 May 2022 NRR E-mail Capture - Acceptance Review - Hatch TSTF-208 LAR (L-2022-LLA-0045) ML22140A1182022-05-13013 May 2022 NRR E-mail Capture - for Your Action: Hatch TSTF-505 - Follow Up from Audit Question 12 ML22116A1492022-04-26026 April 2022 NRR E-mail Capture - Acceptance Review - Hatch Revise NFPA 805 LAR (L-2022-LLF-0000) ML22055A6652022-02-24024 February 2022 NRR E-mail Capture - Acceptance Review - Hatch TSTF-580 LAR (L-2022-LLA-0022) ML22018A0272022-01-18018 January 2022 2022 All RFI Responses - Exercise and Program Inspections - Revl ML21357A0912021-12-23023 December 2021 NRR E-mail Capture - Acceptance Review - Hatch TSTF-207-A LAR (L-2021-LLA-0219) ML21354A5942021-12-20020 December 2021 NRR E-mail Capture - Acceptance Review - Hatch TSTF-227 and TSTF-297 LAR (L-2021-LLA-0227) ML21347A8532021-12-13013 December 2021 NRR E-mail Capture - Required: Hatch TSTF-505 LAR - Audit Plan - Additional Documents to Be Uploaded to the Portal ML21347A9002021-12-13013 December 2021 NRR E-mail Capture - Updated Request: Additional Request for SNC to Place Document on the Portal ML21363A0872021-12-0606 December 2021 NRR E-mail Capture - (External_Sender) Question - Hatch - Eliminate Automatic Main Steam Line Isolation on High Turbine Building Area Temperature (L-2021-LLA-0188) ML21321A3812021-11-16016 November 2021 NRR E-mail Capture - Acceptance Review - Hatch TSTF-505 LAR (L-2021-LLA-0199) ML21306A3272021-11-0202 November 2021 NRR E-mail Capture - Acceptance Review - Hatch Eliminate Ms Line Isolation on High Turbine Building Area Temperature LAR (L-2021-LLA-0188) ML21292A1562021-10-19019 October 2021 NRR E-mail Capture - Acceptance Review - SNC Operating Fleet TSTF-554 LAR ML21265A3402021-09-22022 September 2021 NRR E-mail Capture - Request for Additional Information - Hatch, Unit 1, Emergency TS 3.7.2 LAR ML21253A1992021-09-10010 September 2021 NRR E-mail Capture - Clarification Call Summary - Hatch Pre-Submittal Meeting TSTF-505 LAR ML21174A1182021-06-23023 June 2021 NRR E-mail Capture - Acceptance Review - SNC Fleet - Remove Table of Contents LAR (L-2021-LLA-0115) ML21132A0132021-05-11011 May 2021 NRR E-mail Capture - Acceptance Review - SNC Fleet QATR Reduction in Commitment Licensing Action - L-2021-LLQ-0002 ML21111A3032021-04-21021 April 2021 NRR E-mail Capture - RAI - Hatch Unit 2 - One-Time Emergency RHR LAR (L-2020-LRO-0068) ML21110A6842021-04-20020 April 2021 NRR E-mail Capture - RAI - Hatch Unit 2 - One-Time Emergency RHR LAR (L-2020-LRO-0068) ML21105A0132021-04-14014 April 2021 NRR E-mail Capture - Acceptance Review - SNC Fleet LAR to Change TS 5.7, High Radiation Area (L-2021-LLA-0052) ML20338A3472020-12-0202 December 2020 Notification of Inspection and Request for Information ML20318A0212020-11-12012 November 2020 NRR E-mail Capture - Fyi - Acceptance Review - SNC Fleet TSTF-541 LAR (L-2020-LLA-0232) ML20293A0752020-10-14014 October 2020 NRR E-mail Capture - RAIs for SNC Fleet EP LAR (L-2020-LLA-0150 and L-2020-LLA-0151) ML20258A0272020-09-11011 September 2020 Acceptance Review - Hatch TSTF-582 LAR (EPID L-2020-LLA-0194) (e-mail) 2024-01-09
[Table view] |
Text
Q. *. m "', sm' ..
iaI.. -1.... ... ....
From: Robert Schin j R-To: Nelson (HQ-OE), David Date: 1/22/04 3:29PM
Subject:
Re: Hatch NCV Denial Dave, No - The licensee requested an exemption from Appendix R Section III.J related to the power supply to control room emergency lights.Section III.J requires 8-hour battery powered lights; the licensee requested and the NRC approved a power supply from the station battery, backed by the EDGs and battery charger.
The manual action of repowering the battery charger to keep the control room emergency lights lit was stated. However, no exemption from Ill.G.2 was requested for power to equipment required to maintain the reactor in hot shutdown. Also, it was not stated that the manual action of repowering the battery charger was needed to maintain instrumentation & control for the reactor. (e.g., for control of HPCI, RCIC, ADS).
Carolyn Evans reviewed the referenced letters from the licensee and the NRC SER and concluded that the NRC did not approve an exemption from III.G.2 for power to instrumentation & control needed to maintain the reactor in hot shutdown.
Bob
>>> David Nelson (HQ-OE) 01/22/04 03:09PM >>>
Bob - one quick question based only on a quick read:
For item 3 concerning the battery chargers, did the 1986/87 information exchange related to the SER reasonably represent NRC tacit approval of the manual actions? In other words, regardless of whether we approved or disapproved of anything else, was enough information given to the NRC at that time for us to know that the licensee was relying upon manual actions and we should have concluded then that a violation of III.G.2 existed? If so, we should follow the rules for a compliance backfit for this example and consider VII.B.6 discretion. A backfit conclusion could be necessary if we're now taking a different position than we did in the past. This doesn't mean it's not a violation and they don't have to fix it - only that we knew about it before and we made a mistake by not saying it was a violation then, thus we shouldn't take an enforcement action now after all these years. Did the licensee claim backfit?
Dave
>>> Robert Schin 01/22104 02:46PM >>>
Dave, Our DRAFT letter responding to a Hatch request that NRC withdraw an NCV is attached for your concurrence. All of the required concurrences have been obtained, except for yours. Also; C. Casto, H.
Christensen, L. Plisco, and L. Reyes have been briefed, have read the DRAFT letter, and have no objections.
The concurrence copy of the letter is on Scott's desk.
Bob Schin CC: Ogle, Charles R.; Sparks, Scott
Mail Enve
- lop Polrv l 0i 51767 . . ... . . . . .... .. .. ... . .
Page 1 Rail Envelope Properties (4010329F.543 : 0: 51767)
Subject:
Re: Hatch NCV Denial Creation Date: 1/22/04 3:29PM From: Robert Schin Created By: RPS @nrc.gov Recipients nic.gov ATLPO.ATL_DO CRO CC (Charles R. Ogle)
SES CC (Scott Sparks) nrc.gov owf2_po.OWFNDO DJN (David Nelson (HQ-OE))
Post Office Route ATh_PO.ATIDO nrc.gov owvf2po.OWFNDO nrc.gov Files Size Date & Time MESSAGE 3746 01/22/04 03:29PM Options Expiration Date: None Priority: Standard Reply Requested: No Return Notification: None Concealed
Subject:
No Security: Standard