ML030910186

From kanterella
Revision as of 11:10, 23 March 2020 by StriderTol (talk | contribs) (StriderTol Bot insert)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
Notice of Meeting with Firstenergy Nuclear Operating Company Annual Assessment of Safety Performance of Beaver Valley, Unit 1 and Unit 2
ML030910186
Person / Time
Site: Beaver Valley
Issue date: 03/31/2003
From: Roxanne Summers
NRC/RGN-I/DRP/PB7
To:
Shared Package
ml030910164 List:
References
MN 03-019
Download: ML030910186 (5)


Text

U.S. NUCLEAR REGULATORY COMMISSION REGION I No.03-019 NOTICE OF SIGNIFICANT LICENSEE MEETING March 31, 2003 Licensee: FirstEnergy Nuclear Operating Company (FENOC)

Facility: Beaver Valley Power Station, Unit 1 and Unit 2 Docket Nos.: 05000334, 05000412 Time and Date: 7:00 p.m., Tuesday, April 22, 2003 Location: Beaver County Court House Jurors Lounge Third Street Beaver, PA 15009

Purpose:

The NRC staff and FirstEnergy Nuclear Operating Company (FENOC) management will discuss the results of the NRCs assessment of the safety performance at Beaver Valley Power Station for the period January 1, 2002 to December 31, 2002. This assessment is described in the annual assessment letter dated March 4, 2003 and can be found at:

http://www.nrc.gov/NRR/OVERSIGHT/ASSESS/LETTERS/bv_2002q4.pdf The agenda for this meeting will consist of an overview of the NRCs Reactor Oversight process and a presentation on the annual safety assessment of Beaver Valley Power Station given by NRC staff, followed by a FENOC management response to the assessment. Information relative to this annual safety performance assessment can be found at:

http://www.nrc.gov/NRR/OVERSIGHT/ASSESS/BV1/bv1_chart.html and http://www.nrc.gov/NRR/OVERSIGHT/ASSESS/BV2/bv2_chart.html Following the meeting there will be a brief break followed by a public Q&A session for those who have additional questions for the NRC.

NRC Attendees: J. Rogge, Deputy Director, Division of Reactor Projects (DRP)

R. Summers, Acting Chief, Projects Branch 7, DRP D. Kern, Senior Resident Inspector - Beaver Valley, DRP G. Smith, Resident Inspector - Beaver Valley, DRP Licensee Attendees: M. Bezilla, Vice President, FENOC J. Lash, Plant General Manager F. von Ahn, Director, Nuclear Engineering R. Donnellon, Director, Maintenance M. Pearson, Director, Services and Projects T. Cosgrove, Director, Work Management

2 NOTE: This is a Category 1 Meeting. The public is invited to observe this meeting and will have an opportunity to communicate with the NRC after the business portion of the meeting, but before the meeting is adjourned. Disabled persons requiring assistance to attend or participate in this meeting shall make their request known to the NRC point-of-contact no later than two business days prior to the meeting.

Attendance by other NRC personnel should be made known by April 11, 2003.

The NRC point-of-contact for this meeting is Robert J. Summers and can be contacted as follows:

Mail: U.S. Nuclear Regulatory Commission, Region I 475 Allendale Road King of Prussia, PA 19406 Telephone: 610-337-5109, or toll-free at 1-800-432-1156 Email: rjs@nrc.gov Approved By: /RA/

Robert J. Summers, Acting Chief Projects Branch 7 Division of Reactor Projects

3 Distribution:

L. W. Myers, Senior Vice President FirstEnergy Nuclear Operating Company Commonwealth of Pennsylvania State of Ohio State of West Virginia Regional Administrator Secretary, RI Deputy Regional Administrator Secretary, RI DRP Division Secretary, RI DRS Division Secretary, RI DRM Division Secretary, RI DNMS Division Secretary, RI Region I Receptionist Region I Docket Room with concurrences

4 Distribution (Via E-Mail):

W. Travers, Executive Director for Operations, OEDO (RIDSEDOMAILCENTER)

W. Kane, Deputy Executive Director for Regulatory Programs, OEDO (RIDSEDOMAILCENTER)

S. Collins, Director, Office of Nuclear Reactor Regulation (NRR) (RIDSNRROD)

Deputy Director, Office of Nuclear Regulatory Research (NRR) (RIDSNRR/OD)

C. Grimes, Director, Division of Regulatory Improvement Programs, NRR B. Boger, Director, Division of Inspection Program Management, NRR F. Congel, Director, Office of Enforcement D. Matthews, Director, Division of Regulatory Improvement Programs, NRR J. Zwolinski, Director, Division of Licensing Project Management, NRR T. McGinty, RI EDO Coordinator, OEDO R. Laufer, Project Directorate I-1 (PD1/2), NRR D. Collins, Project Manager, NRR W. Lanning, DRS R. Crlenjak, DRS D. Screnci, Sr. Public Affairs Officer, RI N. Sheehan, Field Public Affairs Officer, RI R. Bores, ORA G. Matakas, ORA PMNS NRCWEB OEWEB OEMAIL DOCUMENT NAME: C:\ORPCheckout\FileNET\ML030910186.WPD After declaring this document An Official Agency Record it will be released to the Public.

To receive a copy of this document, indicate in the box: "C" = Copy without attachment/enclosure "E" = Copy with attachment/enclosure "N" = No copy 2)),& 5'53   

(

1$0( 56XPPHUV5-6

'$7( 

2)),&,$/5(&25'&23<