MONTHYEARML23331A8922023-11-22022 November 2023 Supplement - Braidwood Security Rule Exemption Request ISFSI Docket No. Reference ML23317A2012023-11-22022 November 2023 (External_Sender) Supplement - Byron Security Rule Exemption Request ISFSI Docket No. Reference ML23321A2012023-11-17017 November 2023 NRR E-mail Capture - Constellation Energy Generation, LLC - Fleet Request - Acceptance of Proposed Alternative for Examination of Pressurizer Circumferential and Longitudinal Shell-to-Head Welds and Nozzle-to-Vessel Welds (L-2023-LLR-0062) ML23311A1692023-11-0707 November 2023 NRR E-mail Capture - Constellation - Fleet Request - Acceptance of Proposed Alternative for Examinations of Exam Categories B-B, B-D, and C-A SG Pressure Retaining Welds and Full Penetration Welded Nozzles (L-2023-LLR-0055 and L-2023-LLR-00 ML23311A1682023-11-0707 November 2023 NRR E-mail Capture - Constellation - Fleet Request - Acceptance of Proposed Alternative for Examinations of Examination Category C-B Steam Generator Nozzle-to-Shell Welds and Nozzle Inside Radius Sections (L-2023-LLR-0053 and L-2023-LLR-005 ML23305A2992023-11-0101 November 2023 NRR E-mail Capture - NRC Acceptance Review of Byron, Unit 2, Relief Request I4R-24 ML23304A0222023-10-30030 October 2023 NRR E-mail Capture - Final RCI - Constellation Energy Generation, LLC - Braidwood 1 & 2 - Exemption from Security Rule (L-2023-LLE-0030) ML23304A0202023-10-30030 October 2023 NRR E-mail Capture - Final RCI - Constellation Energy Generation, LLC - Byron 1 & 2 - Exemption from Security Rule (L-2023-LLE-0027) ML23272A0602023-09-29029 September 2023 NRR E-mail Capture - NRC Acceptance Review of Byron, Unit 1, Relief Request I4R-25 ML23187A0092023-07-0606 July 2023 NRR E-mail Capture - NRC Acceptance Review of Byron and Braidwood Request to Adopt TSTF-370 ML23103A4692023-04-12012 April 2023 NRR E-mail Capture - NRC Acceptance Review of Braidwood Request for Amendment to Revise TS 3.7.9 ML23069A0332023-03-0606 March 2023 Email to K. Lueshen Byron and Braidwood Commitment 10 - Request for Additional Information Set 1 ML23115A2412023-01-20020 January 2023 NRR E-mail Capture - Preliminary RAIs Related to L-2022-LLA-0131 - Byron, Unit 2, Reinsertion of an Accident Tolerant Fuel Lead Test Assembly ML22354A2622022-12-20020 December 2022 NRR E-mail Capture - Constellation Energy Generation, LLC - Fleet Request - Acceptance of Request to Use Certain Provisions of the 2019 Edition of the ASME BPV Code, Section XI ML22284A1022022-10-0606 October 2022 NRR E-mail Capture - NRC Acceptance Review for Byron, Unit 2, License Amendment Request (LAR) to Reinsert an Accident Tolerant Fuel (ATF) Lead Test Assembly (LTA) (L-2022-LLA-0131) NRC-2100-2022, EN 55999 Valcor Coil Shell Assemblies Final Notification (004)2022-09-12012 September 2022 EN 55999 Valcor Coil Shell Assemblies Final Notification (004) ML22255A0132022-09-0909 September 2022 NRR E-mail Capture - NRC Acceptance Review of Braidwood, Byron, Calvert Cliffs, Ginna - License Amendment Request to Adopt TSTF-577 ML22200A0782022-07-19019 July 2022 NRR E-mail Capture - Constellation Energy Generation, LLC - Fleet Request to Use Honeywell Mururoa V4F1 R Supplied Air Suits NRC 2110-2022, EN 55999 - Valcor Engineering Corporation (009)2022-07-18018 July 2022 EN 55999 - Valcor Engineering Corporation (009) ML22189A0602022-07-0707 July 2022 NRR E-mail Capture - Draft RAI for Byron/Braidwood TSTF-501 ML22136A2722022-05-16016 May 2022 NRR E-mail Capture - NRC Acceptance Review of Braidwood and Byron Adoption of TSTF-501 ML22129A0132022-05-0606 May 2022 NRR E-mail Capture - Draft RAIs for Requests for Alternatives I4R-17, I4R-23, ISI-05-018, I6R-10 ML22271A0772022-05-0606 May 2022 NRR E-mail Capture - Final RAIs 9.1.2021 Constellation Relief Request ML22116A0242022-04-25025 April 2022 NRR E-mail Capture - NRC Acceptance Review of Braidwood, Byron, and Ginna Request to Adopt TSTF-246 ML22105A0722022-04-15015 April 2022 NRR E-mail Capture - Braidwood/Byron Verbal Authorization for Proposed Alternative I4R-15/I4R-21 ML22091A0852022-04-0101 April 2022 NRR E-mail Capture - Braidwood and Byron - Final RAI Regarding Proposed Alternative for Various Pressurizer Welds (EPID L-2021-LLR-0035 and 0036) ML22088A1562022-03-0202 March 2022 NRR E-mail Capture - Byron, Braidwood, Calvert Cliffs, and Ginna - Non-acceptance of Application to Revise Technical Specifications 5.6.5.b, the Core Operating Limits Report (COLR) ML22091A0842022-02-24024 February 2022 NRR E-mail Capture - Braidwood and Byron - Withdrawal of Draft RAI Regarding Proposed Alternative for Various Pressurizer Welds (EPID L-2021-LLR-0035 and 0036) ML22041B5362022-02-10010 February 2022 NRR E-mail Capture - Constellation Energy Generation, LLC - Request for Additional Information Regarding Fleet License Amendment Request to Adopt TSTF-541 ML23089A0152022-01-0505 January 2022 NRR E-mail Capture - NRC Acceptance Review of Byron - Proposed Alternative for Examinations of Categories B-B, B-D, and C-A SG Welds and Nozzles ML23089A0172022-01-0505 January 2022 NRR E-mail Capture - NRC Acceptance Review of Braidwood - Proposed Alternative for Examinations of Categories B-B, B-D, and C-A SG Welds and Nozzles ML21301A0672021-10-28028 October 2021 NRR E-mail Capture - Exelon Generation Company, LLC - Acceptance of License Amendment Request to Adopt TSTF-541 ML21272A1492021-09-29029 September 2021 NRR E-mail Capture - NRC Acceptance Review of Braidwood and Byron - Proposed Alternative for Examinations of Category C-B Steam Generator Nozzle-to-Shell Welds and Nozzle Inside Radius Sections ML21256A1902021-09-10010 September 2021 NRR E-mail Capture - Exelon Generation Company, LLC - Request for Additional Information Regarding License Transfer Application ML21252A0172021-09-0303 September 2021 NRR E-mail Capture - NRC Acceptance Review - Braidwood - License Amendment to Revise Technical Specification 3.7.9, Ultimate Heat Sink ML21252A0042021-08-26026 August 2021 NRR E-mail Capture - NRC Acceptance Review - Braidwood/Byron/Clinton - Adoption of TSTF-273, Safety Function Determination Program Clarifications ML21215A3502021-08-0303 August 2021 NRR E-mail Capture - Exelon Generation Company, LLC - Acceptance of License Amendment Request to Adopt TSTF-554 ML21203A3112021-07-21021 July 2021 NRR E-mail Capture - Final Byron Permanently Defueled Technical Specifications (PDTS) - Second Round RAI ML21189A1602021-07-0808 July 2021 NRR E-mail Capture - Request for Additional Information - Braidwood, Byron, and Ginna - Amendment to Address the Issues in Westinghouse NSALs ML21189A1612021-07-0808 July 2021 NRR E-mail Capture - Second Round Request for Additional Information - Byron Permanently Defueled Technical Specification Amendment ML21154A0162021-06-0202 June 2021 NRR E-mail Capture - NRC Acceptance Review of Braidwood - Proposed Alternative for Exam of Pzr Circumferential and Longitudinal Shell-to-Head Welds and Nozzle-to-Shell Welds ML21154A0172021-06-0202 June 2021 NRR E-mail Capture - Acceptance Review of Byron - Proposed Alternative for Exam of Pzr Circumferential and Longitudinal Shell-to-Head Welds and Nozzle-to-Shell Welds ML21154A0132021-05-28028 May 2021 NRR E-mail Capture - Extension of Comment Period for the Exelon Generation Company, LLC License Transfer Application ML21154A0112021-05-28028 May 2021 NRR E-mail Capture - Extension of Comment Period for the Exelon Generation Company, LLC License Transfer Application ML21154A0142021-05-28028 May 2021 NRR E-mail Capture - Extension of Comment Period for the Exelon Generation Company, LLC License Transfer Application ML21144A2132021-05-24024 May 2021 NRR E-mail Capture - Exelon Generation Company, LLC - Request for Additional Information Regarding License Transfer Application ML21123A2442021-05-0303 May 2021 NRR E-mail Capture - NRC Acceptance Review of Braidwood/Byron/Ginna - Application to Address the Issues Identified in Westinghouse Documents NSAL-09-5 and NSAL-15-1 (L-2021-LLA-0066) ML21117A0442021-04-26026 April 2021 NRR E-mail Capture - Exelon Generation Company, LLC - Proposed Fleet Alternative to Documentation Requirements for Pressure Retaining Bolting ML21084A2532021-03-24024 March 2021 NRR E-mail Capture - Exelon Generation Company, LLC - Acceptance of License Transfer Application ML21081A0972021-03-19019 March 2021 Acceptance Review for Byron Order EA-12-049, Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis-External Events (EPID L-2021-JLD-0004) (E-mail) 2023-09-29
[Table view] |
Text
From: George Dick To: INTERNET:Joseph.Bauer@exeloncorp.com Date: 10/07/2003 9:21AM
Subject:
Questions Regarding SX AOT Extension Request
- Joe, We will try again. If this doesnt work I will FAX them.
Please review the attachment and let me know if there is a need to clarify any of the questions.
- Thanks, George
- 1. In Attachment 1, Section 4.1 (1st paragraph) of the June 11, 2003, submittal, the licensee states that, ".....However, the actual plant design and supporting analyses demonstrate that the plant has additional capability to prevent and mitigate a loss of SX to a unit than credited in the current plant licensing basis, (e.g., the backup fire protection system the cooling to the Chemical and Volume Control (CV) centrifugal charging pumps which is not credited in the licensing basis)." Discuss fully the additional capabilities that exist, and to what extent these capabilities satisfy licensing basis requirements for safety-related applications (e.g.,
Seismic Category I, QA-1, EQ). Also, discuss the compensatory measures that will be taken to assure that these additional capabilities will be available.
- 2. In Attachment 1, Table -2, the licensee indicated that the defenses against human errors are preserved. However, the staff notes that the licensees compensatory measures credit additional operator actions. This would suggest that the potential for human error has increased. Please explain.
- 3. Describe the compensatory measures that will be taken to preserve the SX function against the adverse affects of inclement weather conditions that might arise, and to preserve on-site and off-site electrical sources during the period of allowed outage time (AOT) extension.
5 In its application the licensee has stated, Credit for the dedicated operator to maintain and respond to SX-related problems is recognized as a key compensatory measure. In the six bullets that follow this statement the term dedicated operator occurs three times and designated operator appears twice. The staff position on dedicated does not necessarily mean that operator has no other duties as long as the other duties do not interfere with performing the required tasks. A dedicated operator is located in the immediate vicinity of where the task is to be performed and is capable of performing the task on demand. Therefore, no decision time, preparation time, or travel time is involved. A designated operator is available to perform the specific task when required, but may have other responsibilities that require him/her to be away from the immediate vicinity of where the required task is to be performed. Implied in both dedicated and designated is that the individual is qualified to do the task. Please clarify whether the operators are dedicated or designated in each of the five instances in this case. If these are designated operators, what tasks take precedence and how does the operator know when and what tasks to perform?
6 The submittal further indicates, These personnel represent additional operators (i.e., one senior reactor operator (SRO) in the control room, one
reactor operator (RO), and one equipment operator) assigned to monitor SX performance and take these actions as a back up to the normal shift staff;(.)
- a. Please describe the command, control, and communication arrangement and protocol these additional operators have with the normal control room crew.
- b. What are the tasks anticipated to be required in this case and what is the level of complexity/difficulty of each? What are the consequences of not successfully accomplishing the tasks?
- c. How much time is available to accomplish the above tasks and how much time have the tasks been demonstrated to take? If these are designated operators how has travel time been accounted for?
Please describe the demonstration.
- d. What are the communication requirements and how have they been demonstrated acceptable?
- e. Please describe the environmental conditions at each task location.
Please describe the access to required equipment.
7 Section 9.2.1.2.2 of the Byron and Braidwood (B/B) UFSAR states that the essential service water pumps are located at the lowest level of the auxiliary building to ensure net positive suction head. Section 9.2.1.2.7 of the B/B-UFSAR states that Pumps 1A and 2A are located in one compartment, and that Pumps 1B and 2B are located in a separate adjacent compartment. Each compartment has a watertight door. During replacement of the SX pump suction isolation valves, a postulated flood originating in one of the SX pump rooms (caused, for example, by spurious opening of the common upstream suction isolation valve) could propagate to other areas of the auxiliary building since the watertight door would be opened to allow personnel and equipment access.
Please describe how internal floods that may originate in one of the SX pump rooms during replacement of the SX pump suction isolation valves have been addressed in the risk evaluation. Provide relevant flood initiating event frequencies, sequence descriptions, core damage frequency estimates, and large early release frequency estimates.
8 Section 4.3.1.2 (Page 16 of 52) in Attachment 1 of Exelons request states that The risk evaluation of internal events incorporates a number of compensatory measures that the plant will take to assure the risk impacts are acceptably low. In order to: (a) ensure that the proposed
compensatory measures are not being relied upon to compensate for weaknesses in plant design, and (b) clearly understand which compensatory measures should be referenced the staffs safety evaluation supporting the license amendment. Please provide the results of a sensitivity study that shows how the incremental conditional core damage probability and the incremental conditional large early release probability change if none of the compensatory measures are implemented.
9 Provide the details of any significant findings and observations from the probabilistic risk assessment (PSA) peer review certification conducted for the Byron Station. Include in the discussion any improvements or corrections that were made in the plant as a result of the findings. Note that it is not necessary to provide this information for the Braidwood Station since it was previously sent to the NRC staff on July 7, 2000 as a response to a request for additional information issued in conjunction with Exelons request to extent allowable completion times and change surveillance requirements for emergency diesel generators.
10 Attachment 4, Table 2-1 of Exelons request summarizes the major changes made to the Braidwood and Byron PRA models since Exelons request to extent allowable completion times and change surveillance requirements for emergency diesel generators was submitted (January 20, 2000). Please provide the following information:
- a. Describe the quality process used to control how the PRA model changes were reviewed and approved. Discuss internal, external, and peer reviews as applicable.
- b. What is the current freeze date of the Braidwood and Byron PRA models? List all PRA model changes that have been identified/planned but not yet implemented, indicating their anticipated impacts (if any) on the risk results and conclusions concerning the extension of the SX train completion time request that is currently under consideration.
Mail Envelope Properties (3F82BDBF.86D : 22 : 21110)
Subject:
Questions Regarding SX AOT Extension Request Creation Date: 10/07/2003 9:21AM From: George Dick Created By: GFD@nrc.gov Recipients Joseph Bauer (INTERNET:Joseph.Bauer@exeloncorp.c Post Office Route Joseph INTERNET:exeloncorp.com Files Size Date & Time RAI.SX.AOT.Questions.wpd 13123 10/07/03 06:50AM MESSAGE 925 10/07/03 09:21AM Options Expiration Date: None Priority: Standard Reply Requested: No Return Notification: None Concealed