NRR E-mail Capture - Cooper - Relief Request (RR) RP-08 Associated with Comprehensive Pump Test Upper Limit and RR RP-09 Regarding Variance Around the Reference Values for Fifth Ten-Year Interval Pump IST Program
ML15153A828
Person / Time
Site: Cooper Entergy icon.png
Issue date: 06/02/2015
From: Siva Lingam
Plant Licensing Branch IV
To: Shaw J
Nebraska Public Power District (NPPD)
References
TAC MF5919, TAC MF5920
Download: ML15153A828 (2)


Text

NRR-PMDAPEm Resource From: Lingam, Siva Sent: Tuesday, June 02, 2015 8:35 AM To: jdshaw@nppd.com Cc: Markley, Michael; Alley, David; Robert Wolfgang; Mitchell, Eliza

Subject:

Cooper - Relief Request (RR) RP-08 Associated with Comprehensive Pump Test Upper Limit and RR RP-09 Regarding Variance Around the Reference Values for Fifth Ten-Year Interval Pump IST Program (TAC Nos. MF5919 and MF5920)

Please note the following official requests for additional information (RAIs), and provide your responses within 30 days from the date of this e-mail.

By letter dated March 19, 2015 (Agencywide Documents Access and Management System Accession No. ML15084A221), Nebraska Public Power District (the licensee) submitted alternative requests RP-08 and RP-09 for the fifth ten-year inservice testing (IST) program for Cooper Nuclear Station (CNS). The submitted alternative requests propose to perform alternate pump tests specified in Code Cases in the American Society of Mechanical Engineers (ASME) Code for Operation and Maintenance of Nuclear Power Plants (OM Code).

The fifth ten-year IST interval begins on March 1, 2016 and is scheduled to end on February 28, 2026.

Specifically, pursuant to Title 10 of the Code of Federal Regulations (10 CFR), Part 50, Section 50.55a(a)(z)(1), the licensee requested to use the proposed alternative in relief requests RP-08 and RP-09 on the basis that the alternative provides an acceptable level of quality and safety. To complete its review of this request, the Nuclear Regulatory Commission staff requires the following additional information:

RAI RP-08-1 Provide a list of pumps that this alternative request applies to. Include the pump name and number, the pump type, the ASME Code class, the ASME OM Code category (Group A or B), the design basis accident flow rate (indicate if not applicable), and the IST comprehensive pump test or Group A pump test flow rate that will be used to determine if a pump periodic verification test is required.

RAI RP-08-02 Explain what is meant by the statement in Section 5 that says, Therefore, any IST pump that is utilizing the 1.06 multiplier for the comprehensive pump test will meet this condition.

RAI RP-09-1 Provide a list of pumps that this alternative request applies to. Include the pump name and number, the pump type, the ASME Code class, and the ASME OM Code category (Group A or B).

Siva P. Lingam U.S. Nuclear Regulatory Commission Project Manager (NRR/DORL/LPL4-1)

Cooper Nuclear Station Diablo Canyon Nuclear Power Plant Location: O8-D5; Mail Stop: O8-B3 Telephone: 301-415-1564; Fax: 301-415-1222 E-mail address: siva.lingam@nrc.gov 1

Hearing Identifier: NRR_PMDA Email Number: 2127 Mail Envelope Properties (Siva.Lingam@nrc.gov20150602083500)

Subject:

Cooper - Relief Request (RR) RP-08 Associated with Comprehensive Pump Test Upper Limit and RR RP-09 Regarding Variance Around the Reference Values for Fifth Ten-Year Interval Pump IST Program (TAC Nos. MF5919 and MF5920)

Sent Date: 6/2/2015 8:35:08 AM Received Date: 6/2/2015 8:35:00 AM From: Lingam, Siva Created By: Siva.Lingam@nrc.gov Recipients:

"Markley, Michael" <Michael.Markley@nrc.gov>

Tracking Status: None "Alley, David" <David.Alley@nrc.gov>

Tracking Status: None "Robert Wolfgang" <wolfgangrj@aol.com>

Tracking Status: None "Mitchell, Eliza" <Eliza.Mitchell@nrc.gov>

Tracking Status: None "jdshaw@nppd.com" <jdshaw@nppd.com>

Tracking Status: None Post Office:

Files Size Date & Time MESSAGE 2372 6/2/2015 8:35:00 AM Options Priority: Standard Return Notification: No Reply Requested: No Sensitivity: Normal Expiration Date:

Recipients Received: