L-MT-04-009, January 2004 Monthly Operating Report for Monticello

From kanterella
Revision as of 12:08, 19 March 2020 by StriderTol (talk | contribs) (StriderTol Bot insert)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
January 2004 Monthly Operating Report for Monticello
ML040370625
Person / Time
Site: Monticello Xcel Energy icon.png
Issue date: 02/06/2004
From: Thomas J. Palmisano
Nuclear Management Co
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
L-MT-04-009
Download: ML040370625 (4)


Text

Monticello Nuclear Generating Plant Operated by Nuclear Management Company, LLC L-MT-04-009 February 6, 2004 Technical Specification 6.7.A.3 U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, DC 20555 Monticello Nuclear Generating Plant Docket 50-263 License No. DPR-22 Monticello Monthly Operating Report In accordance with Technical Specification 6.7.A.3, attached is the Monthly Operating Report for January 2004 for the Monticello Nuclear Generating Plant. Nuclear Management Company has not made new or revised commitments in this letter or the attachment.

Thomas J. Palmisano Site Vice President, Monticello Nuclear Generating Plant Nuclear Management Company, LLC Enclosure cc: Administrator, Region III, USNRC Project Manager, Monticello, USNRC Resident Inspector, Monticello, USNRC Minnesota Department of Commerce 2807 West County Road 75

  • Monticello, Minnesota 55362-9637 Telephone: 763-295-5151
  • Fax: 763-295-1454

ENCLOSURE MONTICELLO OPERATING DATA REPORT AND UNIT SHUTDOWNS JANUARY 2004 2 pages follow

DOCKET NO. 50-263 UNIT NAME Monticello DATE February 2, 2004 COMPLETED BY J. I. Helland TELEPHONE 763-295-1333 OPERATING DATA REPORT REPORTING PERIOD: January 2004

1. Design Electrical Rating (MWe-Net) 600.0
2. Maximum Dependable Capacity (MWe-Net) 578.1 MONTH YEAR TO DATE CUMULATIVE
3. Number of Hours the Reactor Was Critical 744.0 744.0 237,616.5
4. Number of Hours the Generator Was On Line 744.0 744.0 234,132.5
5. Unit Reserve Hours 0.0 0.0 0.0
6. Net Electrical Energy (MWHe) 433,230 433,230 121,191,233

UNIT SHUTDOWNS DOCKET NO. 50-263 UNIT NAME Monticello DATE 2 04 COMPLETED BY J. I. Helland REPORTING PERIOD: January 2004 TELEPHONE 763-295-1333 No. Type Method of Cause/Corrective Actions (Year F:Forced Duration Reason Shutting Down

- to - Date S:Scheduled (hours) (1) (2) Comments date)

None 1 2 Reason: Method:

A Equipment Failure (Explain) 1 Manual B Maintenance or Test 2 Manual Scram C Refueling 3 Automatic Trip/Scram D Regulator Restriction 4 Continuation E Operator Training & Licensing Examination 5 Other (Explain)

F Administrative G Operational Error (Explain)

H Other (Explain)

SUMMARY

The plant operated at essentially 100% power for the month of January except for 2 planned thermal power reductions. The first was a slight power reduction for about 15 minutes on December 9th for a control rod pattern adjustment. The second was a slight power reduction for about 50 minutes on December 22nd for a control rod pattern adjustment.