February 2004 Monthly Operating Report for Beaver Valley, Units 1 and 2
ML040760714
Person / Time
Site: Beaver Valley
Issue date: 03/08/2004
From: Pearce L
FirstEnergy Nuclear Operating Co
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
GL-97-002, L-04-031
Download: ML040760714 (3)


Text

FENO C Beaver Valley PowerStation P. O. Box 4 Shippingport,PA 15077 L-04-031 March 8, 2004 Beaver Valley Power Station Unit 1 - Docket No. 50-334, License No. DPR-66 Unit 2-- Docket No. 50-412, License No:NPF -

Monthly Operating Report U. S. Nuclear Regulatory Commission Document Control Desk Washington, DC 20555 Gentlemen:

In accordance with NRC Generic Letter 97-02, "Revised Contents of the Monthly Operating Report", and Unit 1 and 2 Technical Specification 6.9.4, the "Monthly Operating Report" is submitted for Unit I and Unit 2 for the month of February, 2004. This information has also been inputted into the INPO Consolidated Data Entry (CDE) System. No regulatory commitments are contained in this submittal.

Respectfully, LNtQ.

L. W. Pearce Vice-President BVPS DTJ/cmg Enclosures cc: NRC Regional Office King of Prussia, PA

OPERATING DATA REPORT DOCKET NO. 50-334 UNIT NAME Beaver Valley 1 DATE March 01, 2004 COMPLETED BY David T. Jones TELEPHONE (724) 682-4962 REPORTING PERIO February 2004

1. Design Electrical Rating 835.00
2. Maximum Dependable Capacity (MWe-Net) 821.00 This Month Yr-to-Date Cumulative
3. Number of Hours the Reactor was Critical 696.00 1,440.00 169,467.27
4. Number of Hours Generator On-line 696.00 1,440.00 166,937.82
5. Reseive Shutdown Hours - - 0.00 0.00 0.00
6. Net Electrical Energy Generated (MWHrs) 588,130.00 1,211,120.00 125,852,492.0 UNIT SHUTDOWNS Type Method of F.: Forced Duration l Shutting Cause & Corrective Action No. Date S: Scheduled (Hours) Reason 1 Down 2 Comments NONE.

2 Reason: Method:

A Equipment Failure (Explain) 1 Manual B Maintenance or Test 2 Manual Trip/Scram C Refueling 3 Automatic Trip/Scram D Regulatory Restriction 4 Continuation E Operator Training & License Examination 5 Other (Explain)

F Administration G Operational Error (Explain)

H Other (Explain)

SUMMARY

The Unit operated at a nominal-value of 100% output for the entire report period.-- --

Page 1 of 1

d OPERATING DATA REPORT DOCKET NO. 50-412 UNIT NAME Beaver Valley 2 DATE March 01, 2004 COMPLETED BY David T. Jones .

TELEPHONE (724) 682-4962 REPORTING PERIC February 2004

1. Design Electrical Rating 836.00
2. Maximum Dependable Capacity (MWe-Net) 831.00 This Month Yr-to-Date Cumulative
3. Number of Hours the Reactor was Critical 696.00 1,440.00 119,048.48
4. Number of Hours Generator On-line 696.00 1,440.00 118,304.38
5. Reserve Shutdown Hours 0.00 0.00 0.00
6. Net Electrical Energy Generated (MWHrs) 589,812.00 1,218,479.00 93,037,877.00 UNIT SHUTDOWNS Type Method of F.: Forced Duration l Shutting Cause & Corrective Action No. Date S: Scheduled (Hours) Reason 1 Down 2 Comments NONE.

1 2 Reason: Method:

A Equipment Failure (Explain) 1 Manual B Maintenance or Test 2 Manual Trip/Scram C Refueling 3 Automatic Trip/Scram D Regulatory Restriction 4 Continuation E Operator Training & License Examination 5 Other (Explain)

F Administration G Operational Error (Explain)

H Other (Explain)

SUMMARY

The Unit operated at a nominal value of 100% output for the entire report period.

Page 1 of 1

Text

FENO C Beaver Valley PowerStation P. O. Box 4 Shippingport,PA 15077 L-04-031 March 8, 2004 Beaver Valley Power Station Unit 1 - Docket No. 50-334, License No. DPR-66 Unit 2-- Docket No. 50-412, License No:NPF -

Monthly Operating Report U. S. Nuclear Regulatory Commission Document Control Desk Washington, DC 20555 Gentlemen:

In accordance with NRC Generic Letter 97-02, "Revised Contents of the Monthly Operating Report", and Unit 1 and 2 Technical Specification 6.9.4, the "Monthly Operating Report" is submitted for Unit I and Unit 2 for the month of February, 2004. This information has also been inputted into the INPO Consolidated Data Entry (CDE) System. No regulatory commitments are contained in this submittal.

Respectfully, LNtQ.

L. W. Pearce Vice-President BVPS DTJ/cmg Enclosures cc: NRC Regional Office King of Prussia, PA

OPERATING DATA REPORT DOCKET NO. 50-334 UNIT NAME Beaver Valley 1 DATE March 01, 2004 COMPLETED BY David T. Jones TELEPHONE (724) 682-4962 REPORTING PERIO February 2004

1. Design Electrical Rating 835.00
2. Maximum Dependable Capacity (MWe-Net) 821.00 This Month Yr-to-Date Cumulative
3. Number of Hours the Reactor was Critical 696.00 1,440.00 169,467.27
4. Number of Hours Generator On-line 696.00 1,440.00 166,937.82
5. Reseive Shutdown Hours - - 0.00 0.00 0.00
6. Net Electrical Energy Generated (MWHrs) 588,130.00 1,211,120.00 125,852,492.0 UNIT SHUTDOWNS Type Method of F.: Forced Duration l Shutting Cause & Corrective Action No. Date S: Scheduled (Hours) Reason 1 Down 2 Comments NONE.

2 Reason: Method:

A Equipment Failure (Explain) 1 Manual B Maintenance or Test 2 Manual Trip/Scram C Refueling 3 Automatic Trip/Scram D Regulatory Restriction 4 Continuation E Operator Training & License Examination 5 Other (Explain)

F Administration G Operational Error (Explain)

H Other (Explain)

SUMMARY

The Unit operated at a nominal-value of 100% output for the entire report period.-- --

Page 1 of 1

d OPERATING DATA REPORT DOCKET NO. 50-412 UNIT NAME Beaver Valley 2 DATE March 01, 2004 COMPLETED BY David T. Jones .

TELEPHONE (724) 682-4962 REPORTING PERIC February 2004

1. Design Electrical Rating 836.00
2. Maximum Dependable Capacity (MWe-Net) 831.00 This Month Yr-to-Date Cumulative
3. Number of Hours the Reactor was Critical 696.00 1,440.00 119,048.48
4. Number of Hours Generator On-line 696.00 1,440.00 118,304.38
5. Reserve Shutdown Hours 0.00 0.00 0.00
6. Net Electrical Energy Generated (MWHrs) 589,812.00 1,218,479.00 93,037,877.00 UNIT SHUTDOWNS Type Method of F.: Forced Duration l Shutting Cause & Corrective Action No. Date S: Scheduled (Hours) Reason 1 Down 2 Comments NONE.

1 2 Reason: Method:

A Equipment Failure (Explain) 1 Manual B Maintenance or Test 2 Manual Trip/Scram C Refueling 3 Automatic Trip/Scram D Regulatory Restriction 4 Continuation E Operator Training & License Examination 5 Other (Explain)

F Administration G Operational Error (Explain)

H Other (Explain)

SUMMARY

The Unit operated at a nominal value of 100% output for the entire report period.

Page 1 of 1