NRR E-mail Capture - Diablo Canyon Power Plant Units 1 and 2 - Request to Adopt Emergency Action Level (EAL) Schemes Pursuant to Nuclear Energy Institute (NEI) 99-01, Revision 6
ML16319A429
Person / Time
Site: Diablo Canyon  Pacific Gas & Electric icon.png
Issue date: 11/14/2016
From: Balwant Singal
Plant Licensing Branch IV
To: Richardson M
Pacific Gas & Electric Co
References
MF8528, MF8529
Download: ML16319A429 (3)


Text

NRR-PMDAPEm Resource From: Singal, Balwant Sent: Monday, November 14, 2016 4:22 PM To: Richardson, Michael; Schrader, Kenneth (KJSe@pge.com); DeVaughn, Elijah Cc: Burkhardt, Janet

Subject:

Diablo Canyon Power Plant units 1 and 2 - Request to Adopt Emergency Action Level (EAL) Schemes Pursuant to Nuclear Energy Institute (NEI) 99-01, Revision 6 (CAC Nos.

MF8528 and MF8529)

By letter dated October 25, 2016 (Agencywide Access and management System (ADAMS) Accession No. ML16315A184), Pacific Gas and Electric Company submitted a license amendment request for Diablo Canyon Power Plant, Units 1 and 2, to adopt EAL scheme pursuant to NEI 99-01, Revision 6, Development of Emergency Action Levels for Non-Passive Reactors. The purpose of this e-mail is to provide the results of the U.S. Nuclear Regulatory Commission (NRC) staffs acceptance review of this amendment request. The acceptance review was performed to determine if there is sufficient technical information in scope and depth to allow the NRC staff to complete its detailed technical review. The acceptance review is also intended to identify whether the application has any readily apparent information insufficiencies in its characterization of the regulatory requirements or the licensing basis of the plant.

The NRC staff has reviewed your application and concluded that it does provide technical information in sufficient detail to enable the NRC staff to complete its detailed technical review and make an independent assessment regarding the acceptability of the proposed amendment in terms of regulatory requirements and the protection of public health and safety and the environment. Given the lesser scope and depth of the acceptance review as compared to the detailed technical review, there may be instances in which issues that impact the NRC staffs ability to complete the detailed technical review are identified despite completion of an adequate acceptance review. If additional information is needed, you will be advised by separate correspondence.

Based on the information provided in your submittal, the NRC staff has estimated that this licensing request will take approximately 330 hours13.75 days <br />1.964 weeks <br />0.452 months <br /> to complete. The NRC staff expects to complete this review in approximately 12 months, which is October 2017. If there are emergent complexities or challenges in our review that would cause changes to the initial forecasted completion date or significant changes in the forecasted hours, the reasons for the changes, along with the new estimates, will be communicated during the routine interactions with the assigned project manager.

These estimates are based on the NRC staffs initial review of the application and they could change, due to several factors including requests for additional information, unanticipated addition of scope to the review, and review by NRC advisory committees or hearing-related activities. Additional delay may occur if the submittal is provided to the NRC in advance or in parallel with industry program initiatives or pilot applications.

If you have any questions, please contact me.

Balwant K. Singal Senior Project Manager (Diablo Canyon and Wolf Creek)

Nuclear Regulatory Commission Division of Operating Reactor Licensing Balwant.Singal@nrc.gov Tel: (301) 415-3016 Fax: (301) 415-1222 1

2 Hearing Identifier: NRR_PMDA Email Number: 3161 Mail Envelope Properties (Balwant.Singal@nrc.gov20161114162100)

Subject:

Diablo Canyon Power Plant units 1 and 2 - Request to Adopt Emergency Action Level (EAL) Schemes Pursuant to Nuclear Energy Institute (NEI) 99-01, Revision 6 (CAC Nos. MF8528 and MF8529)

Sent Date: 11/14/2016 4:21:50 PM Received Date: 11/14/2016 4:21:00 PM From: Singal, Balwant Created By: Balwant.Singal@nrc.gov Recipients:

"Burkhardt, Janet" <Janet.Burkhardt@nrc.gov>

Tracking Status: None "Richardson, Michael" <MJRm@pge.com>

Tracking Status: None "Schrader, Kenneth (KJSe@pge.com)" <KJSe@pge.com>

Tracking Status: None "DeVaughn, Elijah" <E1D7@pge.com>

Tracking Status: None Post Office:

Files Size Date & Time MESSAGE 2968 11/14/2016 4:21:00 PM Options Priority: Standard Return Notification: No Reply Requested: No Sensitivity: Normal Expiration Date:

Recipients Received: