Letter from Mark J. Wetterhahn to Diane Curran Responding to 10/20/2004 Letter and e-mail of 10/21/2004 Requesting That Blue Ridge Environmental Defense League Be Given Access to a Number of Documents Through Informal Discovery
ML043170395
Person / Time
Site: Catawba  Duke Energy icon.png
Issue date: 11/02/2004
From: Wetterhahn M
Duke Energy Corp, Winston & Strawn, LLP
To: Curran D
Blue Ridge Environmental Defense League, Harmon, Curran, Harmon, Curran, Spielberg & Eisenberg, LLP, Office of Nuclear Reactor Regulation
Byrdsong A T
References
50-413-OLA, 50-414-OLA, ASLBP 03-815-03-OLA, RAS 8792
Download: ML043170395 (4)


Text

RAs 9-75 RELATEC1 CORRESPONDZE WINSTON & STRAWNLLP 1400 L STREEr, N.W., WASHINGTON DC 20005-3502 Electronic Letterhead 202-371-5700 5 W 8 Do 200 Pi A--A 30- fe. 333 En ow0 A. I 1 Cop iM 43 VA w e 6 Ae I Z oV Pout I Dr6 aw CodoL 006064703 d. MY I 00'60lo3 A l&a.6OU CA @0071-6843 S mcA 1 1-84 04oA G..8 . 7516to P6..r-e 1660. c-a.c.reyor 311-5850-000 a1 22447co 213418.1700 465801.1000 41-2-31775-75 32-1-634-6022 44207-1531025 November 2, 2004 DOCKETED USNRC November 9, 2004 (11
07AM)

Diane Curran, Esq. OFFICE OF SECRETARY Harmon, Curran, Spielberg & Eisenberg, LLP RULEMAKINGS AND 1726 M Street, N.W. ADJUDICATIONS STAFF Suite 600 Washington, DC 20036 Re: Duke Energy Corporation Catawba Nuclear Station, Units 1 and 2 (Docket Nos. 50-413-OLA, 50-414-OLA)

Dear Ms. Curran:

This letter is in response to your October 20, 2004 letter and your e-mail of October 21, 2004 requesting that your client, Blue Ridge Environmental Defense League, be given access to a number of documents through informal discovery. The letter also updates my October 20, 2004 letter on the status of document production and addresses a proposed schedule for depositions of Duke Energy Corporation ("Duke") witnesses..

The items listed in your October 20, 2004 letter are addressed below, corresponding to your numbered requests:

1. You will be given access to NEI-03-01, Revision 1, Nuclear Power Plant Access Authorization Program.
2. You will be given access to Procedure No. 414, "Hostage Situation," Rev. 6
3. You will be given access to Procedure No. 415, "Extortion," Rev. 4
4. You will be given access to a map which shows the requested area and features.
5. You have already been given access to diagrams showing the locations of microwave zones and camera locations in the Owner Controlled Area and Protected Area. You will be given access to the security door numbers at elevations 594 and 605 leading to the Fuel Building.

JRean1) late- ssrCY- 03 c I-o OP

j WINSTON & STRAWN LLP Diane Curran, Esq..

November 1,2004 Page 2

6. You will be given access to a drawing which shows which doors leading to the Fuel Building are hardened for security reasons (denial barriers).
7. There are no drawings which show the temporary locations of the MTUs. The position of MTUs during an outage are determined based upon available space and activities being conducted during the outage.

This completes action on your October 20, 2004 letter.

With regard to your October 21, 2004 e-mail to me and the service list, the two additional requested documents, the "Critical Incident Response Plan" and "Integrated Response Plan," are actually one document, with the latter title being an industry-wide generic reference.

The Critical Incident Response Plan was authored by the South Carolina Law Enforcement Division and contains law enforcement sensitive material. It was provided to Duke with the proviso that it be kept confidential and not copied. On that basis, Duke may not provide the document through informal discovery.

With regard to my October 20, 2004 letter to you, I stated that I would notify you when the implementing procedures prepared in connection with Duke's Security Plan Submittal were available for your review. The attached table entitled "Procedures Modified or Deleted as a Result of Revision of Catawba Physical Security Plan" shows the disposition of those procedures which previously been made available to you. The revised and replacement procedures will be made available to you after completion of the NRC Staffs "need-to-know" review.

The MOX-specific Procedure entitled "Receipt and Storage of Unirradiated MOX Fuel Assemblies," Rev. 0, referred to in my October 20, 2004 letter, is now available for your review. It has not yet been through the Duke formal approval process. Under separate cover, Duke is supplementing its response to BREDL Interrogatories Nos. 2 and 3 dated June 19, 2004, to identify an additional potential witness and the facts and opinions to which the designated witnesses will testify. These actions close out all open items in my October 20, 2004 letter to you.

At the October 25, 2004 oral argument, you noted the possibility of your taking the depositions of designated Duke witnesses (Tr. 3726). Because of the need to complete these depositions in a timely manner and in an effort to accommodate the two week period in November when you will be out of the country, I would suggest that any such depositions be scheduled, at the latest, for Monday, November 22, 2004, the morning of Tuesday, November 23, 2004, and be completed, if necessary, on Wednesday morning, November 24, 2004. Any later time would significantly interfere with the preparation of testimony and for trial of Security Contention 5. Please let me know as soon as possible whether you are still planning

WINSTON & STRAWN LLP Diane Curran, Esq.

November 1, 2004 Page 3 to take any depositions of Duke witnesses, their identity, and whether the proposed dates are acceptable as travel arrangements for this holiday period will have to be made at an early time.

Sincerely, Mark J. Wetterhahn Counsel for Duke Energy Corporation cc: Service List

PROCEDURES MODIFIED, REPLACED OR DELETED AS A RESULT OF REVISION OF CATAWVBA PHYSICAL SECURITY PLAN*

Discovery Index Item No. Procedure Provided and Disposition 67 Procedure 213 revised (Rev. 14) 68 Procedure 401 replaced by Procedure 1601 75 Procedure 412 revised (Rev. 33) 85 Procedure 101 replaced by Procedure 1101 86 Procedure 105 replaced by Procedure 1201 88, 89, 90 Procedures 201, 202 and 203 replaced by Procedures 1303 and 1305 92 Procedure 211 replaced by Procedure 1304 93 Procedure 93 replaced by Procedure 1404 94 Procedure 312 deleted TITLES OF PROCEDURES MODIFIED OR REPLACED Number Title Revision SP/C/213 Armed Responder 14 SP/C/412 Significant Security Equipment Degradation Singly and in 33 Combination SP/A/1101-C Security Organizational Structure and Duties of Personnel 0 SP/E/1201-C Security Locks and Keys 0 SP/C/1303-C Security Patrol Requirements 0 SP/O/1304-C Central and Secondary Alarm Station (CAS/SAS) 0 Operations SP/0/1305-C Vehicle Barrier System (VBS) Access Control and Search 0 Other procedures previously provided were not revised.

DC 383612.1