(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
|
---|
Category:Letter
MONTHYEARML23276B4592023-12-12012 December 2023 University of California - Irvine, Examination Report Letter No. 50-326/OL-24-01, ML23276B4602023-12-12012 December 2023 Examination Result Letter No. 50-326/OL-24-01, University of California - Irvine ML23222A2632023-08-25025 August 2023 University of California - Irvine, Examination Confirmation Letter No. 50-326/OL-24-01 ML23234A3022023-08-22022 August 2023 University of California - Irvine, Annual Report Submittal in Accordance with Technical Specification 6.7.1 ML23047A3482023-03-10010 March 2023 Cover Letter for the Security Inspection Report for the University of California (Public) - December 2022 IR 05000326/20222012023-02-0808 February 2023 Board of Regents of the University of California U.S. Nuclear Regulatory Commission Routine Inspection Report No. 05000326/2022201 ML22273A1342022-09-29029 September 2022 University of California - Irvine, Annual Report Submittal in Accordance with Technical Specification 6.7.1 ML22056A2202022-03-14014 March 2022 Examination Confirmation Letter No. 50-326/OL-22-01, University of California - Irvine IR 05000326/20212012022-02-0303 February 2022 Board of Regents of the University of California - Us Nuclear Regulatory Commission Routine Safety Inspection Report No. 05000326/2021201 ML21322A3562021-11-18018 November 2021 University of California Irvine - Reactor Fast Transient Rod Drive Failure and Repair ML21209A9992021-07-28028 July 2021 University of California - Irvine, Docket Number 50-326, License Number R-116, Annual Report Submittal in Accordance with Technical Specification 6.7.1 ML21196A5422021-07-15015 July 2021 University of California - Irvine, Reactor Director Transition IR 05000326/20202012021-05-0707 May 2021 University of California Irvine - U.S. Nuclear Regulatory Commission Routine Inspection Report No. 05000326/2020201 ML20329A3242021-01-14014 January 2021 the Board of Regents of the University of California - Issuance of Amendment No. 7 to Renewed Facility Operating License No. R-116 for the University of California, Irvine, Nuclear Reactor Facility Changes to Technical Specification 6.1 Fig ML20295A4242020-11-16016 November 2020 Notification of Mailing Address Change Regarding Submittal of Fingerprint Cards ML20309A9832020-11-13013 November 2020 Board of Regents of the University of California - University of California Irvine - Acceptance of the Application for a License Amendment Changes to Technical Specification Organization Chart ML20303A3172020-10-29029 October 2020 University of California, Irvine - Technical Specification Revision - Organization Chart Revision - Supplemental Information ML20297A6802020-10-15015 October 2020 University of California, Irvine: Technical Specification Revision - Organization Chart Revision - Supplemental Information ML20288A5222020-10-14014 October 2020 Examination Confirmation Letter No. 50-326/OL 21-01, University of California - Irvine ML20289A5492020-10-14014 October 2020 University of California, Irvine - Confirmation of Level 1 Personnel Change ML20274A3772020-08-31031 August 2020 Technical Specification Revision - Organization Chart ML20262H2542020-07-30030 July 2020 Annual Report University of California - Irvine ML20080J7072020-03-24024 March 2020 University of California Irvine - Change of Facility Backup Project Manager ML20070N8852020-03-10010 March 2020 Examination Confirmation Letter No. 50-326/OL 20-01, University of California - Irvine IR 05000326/20192012019-12-0303 December 2019 University of California, Irvine - U.S. Nuclear Regulatory Commission Routine Inspection Report No. 05000326/2019-201 ML19273A8772019-09-25025 September 2019 University of California-Irvine, Annual Report Submittal in Accordance with Technical Specification 6.7.1 for July 2018 Through June 2019 ML19224C6122019-08-12012 August 2019 University of California - Irvine - Informing NRC of Change in Person Assigned the Role of the Reactor Director ML19210D3192019-07-29029 July 2019 University of California-Irvine, Docket Number 50-326, License Number R-116, Personnel Changes ML19190A2582019-07-10010 July 2019 Examination Confirmation Letter No.50-326/OL-19-02, University of California-Irvine ML19169A3102019-07-0202 July 2019 University of California - Irvine the Nuclear Regulatory Commission Staff Review and Approval of the University of California - Irvine Nuclear Reactor Facility Emergency Plan ML19136A2672019-05-16016 May 2019 Univ. of California, Irvine - Emergency Plan Revision 4.2 Incorporated Under 10 CFR 50.54(q)- Corrected Submission ML19078A2582019-03-20020 March 2019 Examination Confirmation Letter No.50-326/OL-19-01, University of California - Irvine IR 05000326/20182012019-03-19019 March 2019 University of California Irvine, U.S. Nuclear Regulatory Commission Routine Inspection Report No. 50-326/2018-201 ML19057A1182019-02-26026 February 2019 University of California - Irvine, Docket Number 50-326, License Number R-116, Emergency Plan Revision 4.2 Incorporated Under 10 CFR 50.54(q) ML18269A0902018-09-26026 September 2018 University of California- Irvine, Docket Number 50-326, License Number R-116, Annual Report Submittal in Accordance with Technical Specification 6.7.1 ML18005A0912018-01-12012 January 2018 Examination Report No 50-326/OL-18-01, University of California - Irvine ML17270A1282017-09-28028 September 2017 Examination Confirmation Letter 50-326-OL-18-01, University of California - Irvine ML17269A1332017-09-25025 September 2017 University of California, Irvine - Annual Report Submittal in Accordance with Technical Specification 6.7.1 IR 05000326/20172012017-07-31031 July 2017 University of California Irvine, NRC Routine Inspection Report No. 50-326/2017-201 ML17067A3692017-03-27027 March 2017 Non-Power Reactor Closeout of Generic-Letter 2016-01, Monitoring of Neutron Absorbing Materials in Spent Fuel Pools for the University of California-Irvine Nuclear Reactor Facility, Docket No. 50-326 (CAC No. A11010) ML17023A1752017-02-16016 February 2017 Examination Report No 50-326/OL-17-01-University of California-Irvine ML16354A4112017-02-0606 February 2017 University of California, Irvine, Nuclear Reactor Facility - Closure of Confirmatory Action Letter No. NRR-04-007 on Site-Specific Compensatory Measures Implementation Plan ML16292A2722016-10-20020 October 2016 Examination Confirmation Letter, No. 50-326/OL-17-01, University of California-Irvine ML16272A0862016-09-26026 September 2016 University of California, Irvine - Annual Report Submittal in Accordance with Technical Specification 6.7.1 IR 05000326/20162022016-07-22022 July 2016 University of California - Irvine, U.S. NRC Routine Inspection Report No. 05000326/2016202, June 14-16, 2016 ML1203100162016-07-0808 July 2016 University of California Irvine - Letter to Licensee Issuing Renewed Facility Operating License No. R-116 (Tac No. ME1579) ML16162A1672016-05-27027 May 2016 Univ. of California-Irvine - Response to Generic Letter GL 2016-01 ML16141A1152016-05-13013 May 2016 University of California Irvine - Letter Dated 05/13/2016 Requesting Revision to Proposed Technical Specifications ML16125A1492016-04-29029 April 2016 University of California, Irvine Request That License Limits for Triga Mark I Nuclear Reactor Facility Be Established ML16125A4872016-04-22022 April 2016 Univ. of California-Irvine - Proposed Technical Specifications 2023-08-25
[Table view] Category:Licensee Response to Notice of Violation
MONTHYEARML12073A3272012-02-14014 February 2012 University of California - Irvine, Reply to a Notice of Violation, Dated January 17th 2012 ML1104601192011-02-0202 February 2011 UC Irvine Nuclear Reactor Facility - Response to NRC Inspection Report 50-326-10-201 Notice of Violation ML0435704992004-12-20020 December 2004 Univ of California, Irvine Nuclear Reactor Facility Reply to Notice of Violation ML0319104312002-10-25025 October 2002 NRC Inspection Report and Notice of Violation 50/326/2002-201-01 2012-02-14
[Table view] |
Text
UNIVERSITY OF CALIFORNIA, IRVINE BERKELEY
- SAN FRANCISCO l SANTA BARBARA
- SANTA CRUZ Office of the Executive Vice Chancellor 509 Administration Irvine, California 92697-1000 (949) 824-6296 (949) 824-2438 Fax December 20, 2004 U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, D.C. 20555 Reply to a Notice of Violation.
References:
Docket 50-326. License R-1 16 UC Irvine Nuclear Reactor Facility NRC Inspection Report 50-326/2004-201 Notice of Violation
- 1. Discussion of Violation As noted in our prior response to a similar violation in October, 2002, we regret that our documentation was incomplete and/or incorrect. The short half-lives of the major isotope in this shipment of samples (manganese 56, 2.3 hours3.472222e-5 days <br />8.333333e-4 hours <br />4.960317e-6 weeks <br />1.1415e-6 months <br />) and the physical and chemical form (solid meteorite and rock fragments) fortunately precluded there being a significant safety hazard. The shipment would be below TI of Yellow II, even if the numbers present on the sheet were correct, by the time it entered main highways.
Unfortunately the individual responsible for this shipment has since retired from the University, and the addressee has apparently retained no records from this shipment, so we are unable to reconstruct the actual course of events.
- 2. Corrective Steps Taken We have instituted a checklist (copy attached) for radioactive shipments from the facility that requires review of all items needed. Further, a requirement is in place for a second knowledgeable individual (not an authorized shipper) to review the paperwork before the shipment is permitted to leave. Staff have been trained in the use of this checklist.
- 3. Further Corrective Steps We are confident that the checklist use will establish fully correct shipping procedures for Yellow II shipments (True Yellow III are very rare from this facility)._The checklist will be incorporated into Standard Operating Procedures (SOP) for the facility and appropriate training conducted at intervals not to exceed two years. A separate checklist will be created to address yellow III issues, and appropriate training conducted.
- 4. Full Compliance As indicated, full compliance with proper shipping procedures (49CFR 171-177) is already in place. The additional steps will help maintain compliance.
Ao')Lc
We appreciate the opportunity to respond to the referenced Notice of Violation, and also appreciate that all other aspects of facility operations that were inspected during the visit were found to be in compliance.
Sincerely Michael R. Gottfredson Executive Vice-Chancellor Cc: Mr. Craig Bassett, NRC Office of Nuclear Reactor Regulation Dean Ron Stem, UCI School of Physical Sciences Members, UCI Reactor Operations Committee
50-326 NOV December It 1 2004 Response Attachment UCI Radioactive Sample Shipping Checklist.
To be filed with shipping papers AT UCI.
Note: This is NOT a substitute for official shipping documents.
Date . ._Shipment to BEFORE PACKAGING YELLOW II FOR SHIPMENT.
- 1. Estimation of ISOTOPE (main) content in Bq (or MBq, etc) AND in Ci units. (previous similar shipments can be used for this).
USERS LICENSE INSPECTED
- 2. Isotope quantities and ID are OK.
- 3. verified expiry date beyond today's date DURING OR AFTER PACKAGING FOR SHIPMENT as YELLOW II*.
Package Measurements
- 4. SURFACE LEVEL ON PACKAGE is measured, recorded and is LESS THAN 50 mr/hr.
5.E 1 meter from surface of PACKAGE is MEASURED AND RECORDED and is LESS THAN 1 mr/hr.
AUTHORIZATION
- 6. Second person (usually Reactor SRO) has verified that these numbers have been recorded and meet the above criteria. RSO signs below to verify this.
- 7. Official Shipping paper finalized. Document has:
. identities of main isotopes,
- quantities in Bq (kBq,MBq, etc),
. physical and chemical form of isotopes,
- Transport Index (TI) Value
- Signature of K. Harkness ONLY is authorized.
- Emergency Telephone Number
- 8. Copies properly placed in vehicle.
- Yellow I or Yellow III shipments follow similar but rare practices.
Filled out by Signed as checked by:y