Tech Spec Pages for Amendments 188 & 190 Request for Recovery of Low-Power Testing Time - Impact on the Reactor Vessel Integrity Assessments
ML062270019
Person / Time
Site: Diablo Canyon  Pacific Gas & Electric icon.png
Issue date: 07/17/2006
From:
NRC/NRR/ADRO/DORL/LPLIV
To:
Wang A, NRR/DORL/LPLIV, 415-1445
Shared Package
ML062260278 List:
References
TAC MC8207, TAC MC8206
Download: ML062270019 (4)


Text

(4) Pursuant to the Act and 10 CFR Parts 30, 40, and 70, to receive, possess, and use in amounts as required any byproduct, source or special nuclear material without restriction to chemical orphysical form, for sample analysis or Instrument calibration or associated with radioactive apparatus or components; and (5) Pursuant to the Act and 10 CFR Parts 30, 40, and 70, to possess, but not separate, such byproduct and special nuclear materials as may be produced by the operation of the'facility.

C. This License shall be deemed to contain and is subject to the conditions specified in the Commission's regulations set forth in 10 CFR Chapter I and is subject to all applicable provisions of the Act and to the rules, regulations, and orders of the Commission now or hereafter In effect; and Is subject to the additional conditions specified or incorporated below:

(1) Maximum Power Level The Pacific Gas and Electric Company is authorized to operate the facility at reactor core power levels not in excess of 3411 megawatts thermal (100% rated power) in accordance with the conditions specified herein.

(2) Technical Specifications The Technical Specifications contained in Appendix A and the Environmental

-. Protection Plan contained In Appendix B, as revised through Amendment No.

1 88 , are hereby Incorporated in the license. Pacific Gas & Electric Company shall operatt the facility In accordance with the Technical Spe ifications and the Environmental Protection Plan, except where otherwise stated in specific license conditions.

(3) Initial Test Program The Pacific Gas and Electric Company shall conduct the post-fuel-loading initial test program (set forth in Section 14 of Pacific Gas and Electric Company's Final Safety Ahalysis Report, as amended), without making any major modifications of this program unless modifications have been Identified and have received prior NRC approval. Major modifications are defined as:

a. Elimination of any test Identified In Section 14 of PG&E's Final Safety Analysis Report as amended as being essential; Amendment No.-4-, 188 J OCT 26 2WO'

\ E. Physical Protection The licensee shall fully implement and maintain in effect all provisions of the Commission-approved physical security, training and qualification, and safeguards contingency plans Including amendments made pursuant to provisions of the Miscellaneous Amendments and Search Requirements revisions to 10 CFR 73.55 (51 FR 27817 and 27822) and to the authority of 10 CFR 50.90 and 10 CFR 50.54(p).

The combined set of plans, which contains Safeguards Information protected under 10 CFR 73.21, is entitled: "Diablo Canyon Power Plant, Units 1 and 2 Physical Security Plan, by Training and Qualification Plan, and Safeguards Contingency Plan," submitted by letter dated October 8, 2004, as supplemented by letters dated October 14, 2004 and October 19, 2004.

F. Antitrust Pacific Gas and Electric Company shall comply with the antitrust conditions In Appendix C to this license.

G. Reportinq PG&E shall report any violations of the requirements contained In Sections 2.C(3) and 2.C(4), 2.C(6) through 2.C(1 0), 2.E and 2.F, of this License within 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />. Initial notification shall be made In accordance with the provisions of 10 CFR 50.72, with written follow-up in accordance with the procedures described In 10 CFR 50.73(b), (c),

(d) and (e).

H. Financial Protection PG&E shall have and maintain financial protection of such type and in such amonts as the Commission shall require In accordance with Section 170 of the Atomic Energy Act of 1954, as amended, to cover public liability claims.

I. Term of License This License is effective as of the date of Issuance and shall expire at midnight on November 2, 2024.

FOR THE NUCLEAR REGULATORY COMMISSION Original Signed by.

Edson G. Case for Harold R. Denton, Direct6r Office of Nuclear Reactor Regulation Attachments:

1. Appendix A - Technical Specifications
2. Aipp-eGfd B- EnVirornrm~htaI Proteetlon Plan
3. Appendix C - Antitirst Conditions
4. Appendix D - Additional Conditions Date of Issuance: November 2, 1984 Amendment No. 82,:75,97,129,188 Revised by lefter dated October 28, 2004'

(4) Pursuant to the Act and 10 CFR Parts 30, 40, and 70, to recei've, possess, and use in amounts as required any byproduct, source or special nuclear material without restriction to chemical or physical form, for sample analysis or instrument calibration or associated with radioactive apparatus or components; and (5) Pursuant to the Act and 10 CFR Parts 30, 40, and 70, to possess, but not separate, such byproduct and special, nuclear materials as may be produced by the operation of the facility.

C. This License shall be deemed to contain and is subject to the conditions specified in the Comission's regulations.set forth in 10 CFR Chapter I and is subject to all applicable provisions of the Act and to the rules, regulations, and orders of the Commission now or hereafter in effect; and is subject to the additional conditions specified or incor-porated below:*

(I) Maximum Power Level The Pacific Gas and Electric Company is authorized to operate the facility at reactor core power levels not in excess of 3411 megawatts..ther.al. (1QQnr.ted powerr.. in.accordance..with.........

the conditilons specified herein.

(2) Technical Specifications (SSER 32, Section 8)* and. Environmental P-rotection Plan The Technical Specifications-tontained in Appendix A and the Environmental Protection Plan contained in Appendix B, as revised through Amendment No. 190 g are hereby incorporated in the license.

Pacific Gas & Electric Company shall operate the facility in' accordance with the ltechnical Specifications and the Environmental Protection Plan, ekcept ihere otherwise stated In specific license

.conditions.

(3) Initial Test Program (SSEP 31, Section 4.4.1)

.Any ch'angei tý"the Initial Test Program -described ip Sect~ion 14 of the FSAR made in accbrdance with the proVisions of 10 CFR 50.59 shall be reported In accordance with 50.59(b) within one month of-such" change..

,The arentheti~al notation following the title of many 3i~ens conditions denotes. the section of the Safety Evaluation" Report ahd/or its supplements wherein the license condition is discussed. t" s

" , .. . .. .* . 5

  • .. . I.. . .. ..

F. Antitrust PG&E shall comply with the antitrust conditions in Appendix C to this license.

G. Reportifia Except as otherwise provided in the Technical Specifications or Environmental Protection Plan, the licensee shall report any violations of the requirements contained in Sections 2.C(3), 2.C(5) through 2.C(10), 2.E and 2.F of this license in the following manner: initial notification shall be made within 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> to the NRC Operations Center via the Emergency Notification System with written followup within thirty days In accordance with the procedures described in 10 CFR 50.73(b), (c), and (e).

H. Financial Protection PG&E shall have and maintain financial protection of such type and in such amounts as the Commission shall require in accordance with Section 170 of the Atomic Energy Act of 1954, as amended, to cover public liability claims.

1. Term of License This License is effective as of the date of issuance and shall expire at midnight on August 26, 2025.

FOR THE NUCLEAR REGULATORY COMMISSION Original Signed by:

Harold R. Denton Harold R. Denton, Director Office of Nuclear Reactor Regulation Attachments:

1. Appendix A Technical Specifications (NUREG-1151)
2. Appendix B - Environmental Protection Plan
3. Appendix C - Antitrust Conditions 4.-'. Appendix D - Additional Conditions Date of Issuance: August 26, 1985 Amendment No. 96-.118 , 190