MONTHYEARDCL-24-087, License Renewal - Historic and Cultural Resources Reference Documents (Redacted)2024-09-12012 September 2024 License Renewal - Historic and Cultural Resources Reference Documents (Redacted) DCL-24-083, CFR Part 21 Notification: Commercially Dedicated Snubber Valve Not Properly Heat Treated2024-09-0909 September 2024 CFR Part 21 Notification: Commercially Dedicated Snubber Valve Not Properly Heat Treated DCL-24-078, Pre-Notice of Disbursement from Decommissioning Trust2024-09-0303 September 2024 Pre-Notice of Disbursement from Decommissioning Trust DCL-24-082, Decommissioning Draft Biological Assessment and Draft Essential Fish Habitat Assessment2024-08-28028 August 2024 Decommissioning Draft Biological Assessment and Draft Essential Fish Habitat Assessment DCL-24-077, Responses to NRC Requests for Additional Information on Diablo Canyon Power License Renewal Application Severe Accident2024-08-15015 August 2024 Responses to NRC Requests for Additional Information on Diablo Canyon Power License Renewal Application Severe Accident DCL-24-075, Response to Request for Additional Information for License Amendment Request 23-02, Application to Adopt 10 CFR 50.69, Risk-Informed Categorization and Treatment of Structures, Systems and Components for Nuclear Power React2024-08-0808 August 2024 Response to Request for Additional Information for License Amendment Request 23-02, Application to Adopt 10 CFR 50.69, Risk-Informed Categorization and Treatment of Structures, Systems and Components for Nuclear Power React DCL-24-070, License Amendment Request 24-03 Revision to Technical Specification 5.5.16 for Permanent Extension of Type a and Type C Leak Rate Test Frequencies2024-07-31031 July 2024 License Amendment Request 24-03 Revision to Technical Specification 5.5.16 for Permanent Extension of Type a and Type C Leak Rate Test Frequencies DCL-24-071, Core Operating Limits Report for Unit 2 Cycle 252024-07-22022 July 2024 Core Operating Limits Report for Unit 2 Cycle 25 DCL-2024-523, Submittal of Report on Discharge Self-Monitoring2024-07-18018 July 2024 Submittal of Report on Discharge Self-Monitoring DCL-2024-527, Sea Turtle Stranding Report (Loggerhead Sea Turtle) Diablo Canyon Power Plant2024-07-0101 July 2024 Sea Turtle Stranding Report (Loggerhead Sea Turtle) Diablo Canyon Power Plant DCL-24-066, Request to Extend the Nrg Approval of Alternative for Use of Full Structural Weld Overlay, REP-RHR-SWOL2024-06-27027 June 2024 Request to Extend the Nrg Approval of Alternative for Use of Full Structural Weld Overlay, REP-RHR-SWOL DCL-24-054, LCO 3.0.3 Completion Time Limits2024-05-17017 May 2024 LCO 3.0.3 Completion Time Limits DCL-24-052, Responses to NRC Requests for Additional Information on the Diablo Canyon Power Plant License Renewal Application Environmental Report2024-05-16016 May 2024 Responses to NRC Requests for Additional Information on the Diablo Canyon Power Plant License Renewal Application Environmental Report DCL-24-051, One Hundred Eighty Day Steam Generator Report for Twenty-Fourth Refueling Outage2024-05-0808 May 2024 One Hundred Eighty Day Steam Generator Report for Twenty-Fourth Refueling Outage DCL-24-049, 2023 Annual Radiological Environmental Operating Report2024-05-0101 May 2024 2023 Annual Radiological Environmental Operating Report DCL-24-047, 2023 Annual Non-radiological Environmental Operating Report2024-05-0101 May 2024 2023 Annual Non-radiological Environmental Operating Report DCL-24-048, O CFR 50.59 and 1 O CFR 72.48 Summary Report for the Period of January 1, 2022, Through December 31, 20232024-04-30030 April 2024 O CFR 50.59 and 1 O CFR 72.48 Summary Report for the Period of January 1, 2022, Through December 31, 2023 DCL-24-027, 2023 Annual Radioactive Effluent Release Report2024-04-28028 April 2024 2023 Annual Radioactive Effluent Release Report DCL-24-045, Annual Report of Occupational Radiation Exposure for 20232024-04-24024 April 2024 Annual Report of Occupational Radiation Exposure for 2023 DCL-24-042, Response to NRC Regulatory Issue Summary 2024-01, Preparation and Scheduling of Operator Licensing Examinations2024-04-17017 April 2024 Response to NRC Regulatory Issue Summary 2024-01, Preparation and Scheduling of Operator Licensing Examinations DCL-24-022, Notification of Changes to Decommissioning Schedule2024-04-0202 April 2024 Notification of Changes to Decommissioning Schedule DCL-24-023, Revised Certification of Permanent Cessation of Power Operations2024-04-0202 April 2024 Revised Certification of Permanent Cessation of Power Operations DCL-24-031, Decommissioning Funding Report2024-03-27027 March 2024 Decommissioning Funding Report DCL-24-032, 2024 Annual Statement of Insurance for Pacific Gas and Electric Company’S Diablo Canyon Power Plant2024-03-27027 March 2024 2024 Annual Statement of Insurance for Pacific Gas and Electric Company’S Diablo Canyon Power Plant DCL-24-028, Request for Enforcement Discretion Regarding Compliance with Technical Specification 3.0.3, Limiting Condition for Operation Applicability2024-03-21021 March 2024 Request for Enforcement Discretion Regarding Compliance with Technical Specification 3.0.3, Limiting Condition for Operation Applicability DCL-24-018, License Amendment Request 24-01 Revision to Technical Specification 5.6.6, Reactor Coolant System (RCS) Pressure and Temperature Limits Report (PTLR)2024-02-28028 February 2024 License Amendment Request 24-01 Revision to Technical Specification 5.6.6, Reactor Coolant System (RCS) Pressure and Temperature Limits Report (PTLR) DCL-2024-507, 2023 Annual Report on Discharge Self-Monitoring2024-02-27027 February 2024 2023 Annual Report on Discharge Self-Monitoring DCL-24-020, Nuclear Material Transaction Report for New Fuel2024-02-21021 February 2024 Nuclear Material Transaction Report for New Fuel DCL-24-014, Owners Activity Report for Unit 1 Twenty-Fourth Refueling Outage2024-02-12012 February 2024 Owners Activity Report for Unit 1 Twenty-Fourth Refueling Outage DCL-24-013, Nuclear Material Transaction Report for New Fuel2024-02-0707 February 2024 Nuclear Material Transaction Report for New Fuel DCL-24-010, Nuclear Material Transaction Report for New Fuel2024-01-29029 January 2024 Nuclear Material Transaction Report for New Fuel DCL-2024-502, 2023 Annual Sea Turtle Report for Diablo Canyon Power Plant (DCPP)2024-01-25025 January 2024 2023 Annual Sea Turtle Report for Diablo Canyon Power Plant (DCPP) DCL-2024-501, Sea Turtle Stranding Report (Green Sea Turtle)2024-01-24024 January 2024 Sea Turtle Stranding Report (Green Sea Turtle) DCL-2024-500, Transmittal of the 4th Quarter of 2023 Report on Discharge Self-Monitoring2024-01-18018 January 2024 Transmittal of the 4th Quarter of 2023 Report on Discharge Self-Monitoring DCL-24-008, Schedule Considerations for Review of the DCPP License Renewal Application2024-01-17017 January 2024 Schedule Considerations for Review of the DCPP License Renewal Application DCL-24-009, Nuclear Material Transaction Report for New Fuel2024-01-17017 January 2024 Nuclear Material Transaction Report for New Fuel DCL-24-004, Supplement to License Amendment Request 23-01 Revision to Technical Specifications to Adopt Risk-Informed Completion Times TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 4b2024-01-15015 January 2024 Supplement to License Amendment Request 23-01 Revision to Technical Specifications to Adopt Risk-Informed Completion Times TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 4b DCL-23-129, Nuclear Material Transaction Report for New Fuel2023-12-27027 December 2023 Nuclear Material Transaction Report for New Fuel DCL-23-122, Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation2023-12-14014 December 2023 Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation DCL-23-128, Emergency Plan Update2023-12-13013 December 2023 Emergency Plan Update DCL-23-125, Core Operating Limits Report for Unit 1 Cycle 252023-12-0606 December 2023 Core Operating Limits Report for Unit 1 Cycle 25 DCL-23-121, Supplement to License Amendment Request 23-03, Revision to Technical Specification3.7.8, Auxiliary Saltwater System2023-11-16016 November 2023 Supplement to License Amendment Request 23-03, Revision to Technical Specification3.7.8, Auxiliary Saltwater System DCL-23-120, License Amendment Request 23-03 Revision to Technical Specification 3.7.8, Auxiliary Saltwater (Asw) System2023-11-14014 November 2023 License Amendment Request 23-03 Revision to Technical Specification 3.7.8, Auxiliary Saltwater (Asw) System DCL-23-118, License Renewal Application2023-11-0707 November 2023 License Renewal Application DCL-2023-520, Discharge Self-Monitoring at Diablo Canyon Power Plant (DCPP)2023-10-19019 October 2023 Discharge Self-Monitoring at Diablo Canyon Power Plant (DCPP) DCL-23-103, Independent Spent Fuel Storage Installation - Withdrawal of License Amendment Request 22-01, Request for Approval of Alternative Security Measures for Early Warning System2023-10-13013 October 2023 Independent Spent Fuel Storage Installation - Withdrawal of License Amendment Request 22-01, Request for Approval of Alternative Security Measures for Early Warning System DCL-23-092, Material Status Report for the Period Ending August 31, 20232023-09-28028 September 2023 Material Status Report for the Period Ending August 31, 2023 DCL-23-077, License Amendment Request 23-02 Application to Adopt 10 CFR 50.69, Risk-Informed Categorization and Treatment of Structures, Systems and Components for Nuclear Power Reactors2023-09-27027 September 2023 License Amendment Request 23-02 Application to Adopt 10 CFR 50.69, Risk-Informed Categorization and Treatment of Structures, Systems and Components for Nuclear Power Reactors DCL-23-083, Upcoming Meeting with Nuclear Security and Incident Response Staff2023-09-13013 September 2023 Upcoming Meeting with Nuclear Security and Incident Response Staff DCL-23-078, Nuclear Material Transaction Report for New Fuel2023-09-0606 September 2023 Nuclear Material Transaction Report for New Fuel 2024-09-09
[Table view] |
Text
Pacific Gas and El.-ctric Companye Donna Jacobs Diablo Canton Power Plant Vice President P.0. Box 5"3 Nuclear Services Avila Beacdt, CA 93424 805.545.4300 April 6, 2006 Fax: 805.5*5.4234 PG&E Letter DCL-06-045 U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, D.C. 20555-0001 Docket No. 50-275, OL-DPR-80 Docket No. 50-323, OL-DPR-82 Diablo Canyon Units 1 and 2 Response to Request for Additional Information Regarding License Amendment Request 05-03, "Request for Amendment to Recapture Low-Power Testing Time."
Dear Commissioners and Staff:
Pacific Gas and Electric Company Letter DCL-05-098, dated August 23, 2005, submitted License Amendment Request (LAR) 05-03, "Request for Amendment to Recapture Low-Power Testing Time Revision," to revise the expiration dates of the Units 1 and 2 facility-operating licenses to recapture low-power testing time.
Specifically, the expiration date of each unit's full-power operating license (FPOL) would be revised to reflect a 40-year term measured from the date of issuance o: the FPOL, as permitted by 10 CFR 50.51.
On January 27, 2006, the NRC staff requested additional information required to complete the review of LAR 05-03. During a March 29, 2006, telephone conference, the staff provided clarification to its request for additional information. Enclosure 1 provides additional information required by the NRC staff to complete its review of LAR 05-03. Enclosure 2 provides the fluences at the clad base metal interface.
If you have any questions or require additional information, please contact Mr. Terence Grebel at (805) 545-4160.
Sincerely, Don J A member of the STARS (Strategic Teaming and Resource Sharing) Alliance CzAtaway
Document Control Desk PG&E Letter DCL-06-045 April 6, 2006 Page 2 gwh/41 62 Enclosures cc: Edgar Bailey, DHS Terry W. Jackson Bruce S. Mallett Diablo Distribution ccI'enc: Alan B. Wang A member of the STARS (Strategic Teaming and Resource Sharing) Alliance Callaway
PG&E Letter DCL-06-045 UNITED STATES OF AMERICA NUCLEAR REGULATORY COMMISSION Docket No. 50-275 In the Matter of ) Facility Operating License PACIF:IC GAS AND ELECTRIC COMPANY) No. DPR-80
)
Diablo Canyon Power Plant ) Docket No. 50-323 Units I and2 ) Facility Operating License
) No. DPR-82 AFFIDAVIT Donna Jacobs, being of lawful age, first being duly sworn upon oath states that she is Vice President - Nuclear Services of Pacific Gas and Electric Company; that she has executed this response to the NRC request for additional information regarding License Amendment Request 05-03 on behalf of said company with full power and authority to do so; that she is familiar with the content thereof; and that the facts stated therein are true and correct to the best of her knowledge, information, and belief.
Donna 4acobs Vice Pre dent - Nuclear Services Subscribed and sworn to before me this 6th day of April, 2006, by Donna Jacobs, personally known to me or proved to me on the basis of satisfactory evidence to be ihe person who appeared before me.
. I5ANT. AO
- it CammlWn $ 14284541 Notary Public .ox OrWC- 60=0 t
. aSn tub Oblbpo Cm*e I County of San Luis Obispo COrbWW3.07 State of California
Enclosure I PG&E Letter DCL-06-045 Response to Request for Additional Information Regarding License Amendment Request 05-03, "Request for Amendment to Recapture Low-Power Testing Time" NRC Question The license amendment request proposes to add approximately 37 months of full power operation for the DCPP-1 reactor and approximately 4 months of full power operation for the DCPP-2 reactor. The additional time at full power operations will expose the RV beltline materials for the DCPP-1/2 RVs to additional neutron radiation (i.e., increasing the neutron fluence - in units of n/cm2, E > 1.0 MeV). Therefore, to support anticipated approval of the license amendment, the NRC staff requests that PGE provide the "Low-power Test Recovery-impacted" PTS and USE calculations for the DCPP-1/2 RV beltline materials, as assessed through to the revised "Low-Power Test Recovery" expiration dates for the units.
During a telephone conference call on March 29, 2006, the staff requested that PG&E provid9 the fluences at the clad base metal interface.
PG&E Response to NRC Question For the proposed Unit 1 end of operating license (EOL) at approximately 35.2 effective full-power years (EFPY) on November 2, 2024, the limiting RTpTs values calculated and their respective 10 CFR 50.61 screening limits are:
RTpTs(weld 3-442C) = 258.70 F, which is < 2700 F plate or axial weld limit RTpTs(weld 9-442) = 198.70 F, which is < 3000F circumferential weld limit For the proposed Unit 2 EOL at approximately 35.8 EFPY on August 26, 2025, the limiting RTPTS values calculated and their respective 10 CFR 50.61 screening limits are:
RTpTs(plate B5454-2) = 214.8 0F, which is < 2700 F plate or axial weld limit RTPTS(weld 9-201) = 20.5 0F, which is < 3000 F circumferential weld limit Appendix G of 10 CFR 50 requires that the upper shelf energy (USE) remain > 50 ft-lbs throughout the life of the vessel at T/4. For Unit 1, the limiting (minimum) T/4 USE at EVOL is 61.1 ft-lbs. This is predicted to occur for axial weld 3-442C.
Similarly, for Unit 2, the limiting (minimum) T/4 USE at EOL is 57.7 ft-lbs. This is predicted to occur for axial weld 3-201 B. contains the fluences at the clad base metal interface for Units 1 and 2.
Enclosure 2 PG&E Letter DCL-06-045 Page 1 of 2 Fluences at the Clad Base Metal Interface for Units 1 and 2 The following information was derived from Pacific Gas and Electric Company Calculation N-297, Revision 0, which estimates the pressurized thermal shock reference temperature and upper shelf energy for all reactor vessel beltline materials at the projecaed end of operating license for both Diablo Canyon units.
DCPP I Fluences On November 2, 2024 Material Fast Fluences (n/cm 2 )
Intermed. Shell Plates B4106-1 1.43E+19 B4106-2 1.43E+19 B4106-3 1.43E+19 Lower Shell Plates B4107-1 1.43E+19 B4107-2 1.43E+19 B4107-3 1.43E+19 Intermed. Shell Long.
Welds 2-442 A,B 1.10E+19 2-442 C 5.46E+18 Intermed. Shell to Lower Shell Weld 9-442 1.43E+19 Lower Shell Long.
Welds 3-442 A,B 9.08E+18 3-442 C 1.43E+19
Enclosure 2 PG&E Letter DCL-06-045 Page 2 of 2 DCPP 2 Fluences On August 26, 2025 Material Fast Fluence (n/cm 2)
Intermed. Shell Plate B5454-1 1.68E+19 B5454-2 1.68E+19 B5454-3 1.68E+19 Lower Shell Plate B5455-1 1.68E+19 B5455-2 1.68E+19 B5455-3 1.68E+19 Intermed. Shell Long.
Welds 2-201 A 9.15E+18 2-201 B 8.64E+18 2-201 C 7.25E+18 Intermed. Shell to Lower Shell Weld 9-201 1.68E+19 Lower Shell Long.
Welds 3-201 A 7.25E+18 3-201 B 9.15E+18 3-201 C 8.64E+18