ML20055C052

From kanterella
Revision as of 20:03, 13 March 2020 by StriderTol (talk | contribs) (StriderTol Bot insert)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
Revised Tech Spec Table 4.1-2A Re Min Frequencies for Equipment Tests.Licensing Fee Determination Encl
ML20055C052
Person / Time
Site: Prairie Island  Xcel Energy icon.png
Issue date: 08/06/1982
From:
NORTHERN STATES POWER CO.
To:
Shared Package
ML20055C034 List:
References
NUDOCS 8208100074
Download: ML20055C052 (2)


Text

_ _ _ _ _ _ _ - _ - _ _ _ - _ _ - - _ _ _ _ _ _ _ _ _ - _ _ _ _ _ _ . _ _ _ . _ ._

TABLE TS.4.'l-2A REV MINIMUM FREQUENCIES FOR EQUIPMENT TESTS FSAR-Section Test Frequency Reference

1. Control Rod Assemblies Rod drop times All rods during each 7 of full length refueling shutdown rods or following each removal of the reac .

tor vessel head:

affected rods follow-ing maintenance on or modification to the control rod drive system which could affect performance of those specific rods la. Reactor Trip Breakers Open trip . Monthly -

~

2. Control Rod Assemblies Partial move- Every 2 weeks 7 ment of all.

rods

3. Pressurizer Safety Set point Each refueling 4 Valves shutdown
4. Main Steam Safety Set point Each refueling 10

, Valve shutdown

5. Reactor Cavity Water level- . Prior to moving fuel -

assemblies or control rods and at least

once every day while

' the cavity is flooded, i

6. Pressurizer PORV Functional Quarterly -

Block Valves i 7. Pressurizer PORV's Functional Every 18 months -

8. (Deleted)
9. Primary System Leakage Evaluate Daily 4

! 10. (Deleted)

11. Turbine stop valves, Functional Monthly (1) 10 governor valves, and intercept valves. (Part of turbine overspeed protection.)

8208100074 820806 l 12. (Deleted) PDR ADOCK 05000282 P PDR NOTE 1 This test may be waived for end of cycle operations when boron concentrations are less than 150 ppm provided more than 60 days do not elapse following the last test.

/

To: ' D'irector of Nucicar Reactor R!gulation Date: July 1, 1982 U S Nuclear Regulatory Commission Washington, DC 20555 Licensinn Fee Determination Fee Type: Facility License Amendment X Required Approval Materials License Application Materials License Renewal Other (Description )

Licensee: Northern States Power Company Plant: Prairie sland Nuclear Generating Plant DocketNo.50-282I License No. DPR 42 Materials License No.

50-306 DPR 60 Date and subject of Licensing Request:

License Amendment Request dated July 9, 1982 Turbine Valve Test Waiver ,

License Amendment or Approval Class: I Fee: $400 Class: III Fee: $4,000 Materials License Category: Fee:

Total Fee Enclosed: $4,400 Basis for determination of fee class:

This License Amendment Request involves a waiver of the end-of-cycle Turbine Valve Test for special instances. This change should involve minimum review by your staff since the waiver was granted on a one time basis on several occasions for different plants.

This is a required approval involving a single safety issue. Standards of acceptability have been clearly identified.

i l

l g . -

E j t

E '

.c M

  • Prepared by: Nuclear Support Services Department U Northern States Power Ccepony 414 Nicollet Mall - 8th Floor Minneapolis, MN 55401 (612) 330-6763 cc: NSS File