ML20055C052
| ML20055C052 | |
| Person / Time | |
|---|---|
| Site: | Prairie Island |
| Issue date: | 08/06/1982 |
| From: | NORTHERN STATES POWER CO. |
| To: | |
| Shared Package | |
| ML20055C034 | List: |
| References | |
| NUDOCS 8208100074 | |
| Download: ML20055C052 (2) | |
Text
_ _ _ _ _ _ _ - _ - _ _ _ - _ _ - - _ _ _ _ _ _ _ _ _ - _ _ _ _ _ _
TABLE TS.4.'l-2A REV MINIMUM FREQUENCIES FOR EQUIPMENT TESTS FSAR-Section Test Frequency Reference
- 1. Control Rod Assemblies Rod drop times All rods during each 7
of full length refueling shutdown rods or following each removal of the reac.
tor vessel head:
affected rods follow-ing maintenance on or modification to the control rod drive system which could affect performance of those specific rods la. Reactor Trip Breakers Open trip.
Monthly
~
- 2. Control Rod Assemblies Partial move-Every 2 weeks 7
ment of all.
rods
- 3. Pressurizer Safety Set point Each refueling 4
Valves shutdown
- 4. Main Steam Safety Set point Each refueling 10 Valve shutdown
- 5. Reactor Cavity Water level-
. Prior to moving fuel assemblies or control rods and at least once every day while the cavity is flooded, i
- 6. Pressurizer PORV Functional Quarterly Block Valves i
- 7. Pressurizer PORV's Functional Every 18 months
- 8. (Deleted)
- 9. Primary System Leakage Evaluate Daily 4
- 10. (Deleted)
- 11. Turbine stop valves, Functional Monthly (1) 10 governor valves, and intercept valves. (Part of turbine overspeed protection.)
8208100074 820806 PDR ADOCK 05000282 l
- 12. (Deleted)
P PDR NOTE 1 This test may be waived for end of cycle operations when boron concentrations are less than 150 ppm provided more than 60 days do not elapse following the last test.
/
To: ' D'irector of Nucicar Reactor R!gulation Date:
July 1, 1982 U S Nuclear Regulatory Commission Washington, DC 20555 Licensinn Fee Determination Fee Type:
Facility License Amendment X
Required Approval Materials License Application Materials License Renewal Other (Description
)
Licensee: Northern States Power Company Plant:
Prairie sland Nuclear Generating Plant DocketNo.50-282I License No. DPR 42 Materials License No.
50-306 DPR 60 Date and subject of Licensing Request:
License Amendment Request dated July 9, 1982 Turbine Valve Test Waiver License Amendment or Approval Class:
I Fee:
$400 Class:
III Fee: $4,000 Materials License Category:
Fee:
Total Fee Enclosed: $4,400 Basis for determination of fee class:
This License Amendment Request involves a waiver of the end-of-cycle Turbine Valve Test for special instances. This change should involve minimum review by your staff since the waiver was granted on a one time basis on several occasions for different plants.
This is a required approval involving a single safety issue. Standards of acceptability have been clearly identified.
i l
l g
- E j
t E
.c M
Prepared by:
Nuclear Support Services Department U
Northern States Power Ccepony 414 Nicollet Mall - 8th Floor Minneapolis, MN 55401 (612) 330-6763 cc: NSS File