Category:TECHNICAL SPECIFICATIONS
MONTHYEARML20196D0241999-06-16016 June 1999 Proposed Tech Specs Re Reactivity Control Incorporating Operating Requirements That Are Consistent with NEDO-21231, Banked Position Withdrawal Sequence ML20206R8161999-05-11011 May 1999 Proposed Tech Specs Re HPCI & RCIC Surveillance Testing ML20206H9771999-05-0505 May 1999 Proposed Tech Specs Modifying Licensing Basis for EDG on- Site Diesel Fuel Storage Requirements & Corresponding TSs ML20207F1171999-03-0303 March 1999 Proposed Tech Specs Page 3/4.6-13 Re Reactor Vessel Matl Surveillance Program Withdrawal Schedule ML20237E0851998-08-24024 August 1998 Proposed Tech Specs Pages Supporting Proposed TS Amend Related to EDG AOT ML20236X7191998-07-31031 July 1998 Proposed Tech Specs Page 3/4.9-5 Re Suppl to EDG for Allowed Outage Time ML20249C7101998-06-26026 June 1998 Proposed Tech Specs Correcting Typos & Updating Bases ML20249B3231998-06-15015 June 1998 Revised Complete Set of TS Pages Re Relocation of Radioactive Effluent TS & Radiological Environ Monitoring Program to ODCM ML20217F9341998-03-26026 March 1998 Proposed Tech Specs Re EDG Allowed Outage Time ML20217H2791998-03-25025 March 1998 Proposed Tech Specs 3.6.A.1 & 4.6.A.1,pertaining to Primary Sys Boundary,Thermal & Pressurizations Limitations & Surveillance Requirements & Basis 3/4.6.A ML20203D4981998-02-20020 February 1998 Proposed Tech Specs Pages,Incorporating Ultimate Heat Sink Temperature of 75 F Into TS 3/4.5.B & Bases,As Required by Amend 173 ML20217K5691997-10-24024 October 1997 Proposed Tech Specs Page Adding Footnote Declaring One Containment Isolation valve,30-CK-432,operate for Limited Period Despite Not Being within IST Interval for Reverse Flow Testing ML20211G2311997-09-12012 September 1997 Proposed Tech Specs Re Radiological Environ Monitoring Program Moved to ODCM ML20210K4381997-08-0808 August 1997 Revised TS Pages 3/4.5-7,B3/4.5-6 & B3/4/.5-7 Requiring Verification That SBO-DG Is Operable Prior to Voluntarily Entering LCO ML20196J0041997-07-22022 July 1997 Proposed Revised TS Bases for Section 3.5.F,correcting Volume of Water Available in Refuel Cavity & Dryer/Separator Pool When Flooded to Elevation 114 Ft & Revising Torus Water Volume to Reflect Volume Above Min Pump NPSH ML20136J5501997-03-0707 March 1997 Proposed Tech Specs Rev for Section 3.10, Core Alterations Allowing Removal of Suspect Fuel Bundles Out of Planned Sequence ML20134C9671997-01-24024 January 1997 Proposed Tech Specs 2.0 Re Safety Limits ML20133A6511996-12-23023 December 1996 Proposed Revised Tech Specs 1.0 Re definitions,3.4 Re Standby Liquid Control sys,3.5 Re Core & Containment Cooling systems,3.7 Re Containment Systems & 3.9 Re Auxiliary Electrical Sys ML20132E5491996-12-10010 December 1996 Proposed Tech Specs Table 3.2.C.1 Re Instrumentation That Initiates Rod Blocks,Table 3.2.C.2 Re Control Rod Block Instrumentation Setpoints & Table 4.2.C Re Minimum Test & Calibr Frequency for Control Rod Blocks Actuation ML20135C1461996-11-26026 November 1996 Proposed Tech Specs,Modifying Definition 1.M, Primary Containment Integrity, to Include All Instrument Line Flow Check Valves to Make Definition Consisten W/Lco 3/4.7.A.2.a.4 ML20134K4361996-11-0707 November 1996 Proposed Tech Specs Re Installation of BWROG Enhanced Option 1A ML20117K6551996-09-0505 September 1996 Proposed Tech Specs,Providing Revised TS Pages 3/4.5-7 & 3/4.5-6 ML20116M1561996-08-12012 August 1996 Proposed Tech Specs to Plant TS Section 6.0,Administrative Controls & Sections 6.5.B.10.C & 6.14 of Util Quality Assurance Manual ML20111B4201996-05-0101 May 1996 Proposed Tech Specs,Reflecting Implementation of 10CFR50 App J,Option B ML20108C1071996-05-0101 May 1996 Proposed Tech Specs,Relocating Administrative Controls Re QA Review & Audit Requirements of Section 6 from Plant TS to Boston Edison QA Manual ML20111C2761996-05-0101 May 1996 Proposed Tech Specs 3.1.1 Re Reactor Protection Sys (Scram) instrumentation,3.2.C.1 Re Instrumentation That Initiates Rod Blocks & 3/4.4 Re Standby Liquid Control ML20108C0581996-05-0101 May 1996 Proposed Tech Specs Re Core Alteration to LCO & Surveillance Conditions Associated W/Secondary Containment ML20108A6561996-04-25025 April 1996 Proposed Tech Specs Re Part of Overall Effort to Improve Outage Performance at Plant ML20095E0771995-12-0808 December 1995 Proposed Tech Specs Bases Page B2-2,including GE11 GEXL Correlation Axial Power Profile & R-factor Ranges & Correcting Error in GE11 GEXL Correlation Mass Flux Range in GE Design ref,NEDE-31152-P, GE Fuel Bundle Designs ML20092A4421995-08-31031 August 1995 Corrected Tech Spec Page Re Reactor High Pressure Trip Setting ML20086K2661995-07-14014 July 1995 Proposed Tech Specs Re Section 2.1,Bases:Safety Limits; Section 3.3.C,scram Insertion Times & Section 4.11.C, Minimum Critical Power Ratio to Reflect Use of Advanced GE-11 Fuel Design in Cycle 11 ML20078R6221995-02-15015 February 1995 Proposed Tech Specs Substituting for Pages Contained in Proposed TS Amends Submitted Prior to 950130 Authorization ML20078N4861995-02-0909 February 1995 Proposed Tech Specs,Increasing Reactor High Water Level Isolation Trip Level Setting ML20077M6921995-01-0909 January 1995 Proposed Reformatted Tech Specs & Bases ML20078K8151994-11-22022 November 1994 Proposed TS Pages 3/4.2-20 & 3/4.2-35 Re Tables 3.2.C-1 & 4.2.C ML20078K7961994-11-22022 November 1994 Proposed Tech Specs Re Changes to MSIV Leakage Requirement ML20077A8991994-11-22022 November 1994 Proposed Tech Specs Re Suppression Chamber Water Level ML20077B1861994-11-22022 November 1994 Proposed Tech Specs 3.5.F,4.5.F.1 & 3.9.B.1 & 2 Re EDG Allowed out-of-svc Time ML20072T0521994-09-0606 September 1994 Proposed Tech Specs Modification to Append a of Operating License DPR-35 Re Maintenance of Filled Discharge Pipe ML20072S0501994-09-0606 September 1994 Proposed Tech Specs Re Instrumentation That Initiates Primary Containment Isolation & Initiates or Controls Core & Containment Systems ML20072S0081994-09-0606 September 1994 Proposed Tech Specs Re Primary Containment,Oxygen Concentration & Vacuum Relief ML20072S0861994-09-0606 September 1994 Proposed Tech Specs Re Standby Gas Treatment & Control Room High Efficiency Air Filtration Sys Requirements ML20069M3311994-06-0909 June 1994 Proposed Tech Specs,Increasing Allowed out-of-service Time from 7 Days to 14 Days for Ads,Hpci & RCIC Sys,Including Section 4.5.H, Maint of Filled Discharged Pipe ML20067B7111994-02-0909 February 1994 Proposed Tech Specs Revising Wording for Page 3 of License DPR-35,clarifying Words to Aid Operators & Removing Obsolete Mechanical Snubber Acceptance Criterion BECO-93-156, Proposed Tech Specs Requesting Changes Supporting 24 Month Fuel Cycle (Submittal 3)1993-12-10010 December 1993 Proposed Tech Specs Requesting Changes Supporting 24 Month Fuel Cycle (Submittal 3) ML20059A9361993-10-19019 October 1993 Proposed Tech Specs for Removal of Scram & Group 1 Isolation Valve Closure Functions Associated W/Msl Radiation Monitors BECO-93-132, Proposed Tech Specs Removing Low Condenser Vacuum Scram in Order to Reduce Spurious Scrams,Unnecessary Plant Transients & Turbine First Stage Pressure Setpoint1993-10-19019 October 1993 Proposed Tech Specs Removing Low Condenser Vacuum Scram in Order to Reduce Spurious Scrams,Unnecessary Plant Transients & Turbine First Stage Pressure Setpoint ML20046D0441993-08-0909 August 1993 Proposed Tech Specs,Proposing 24 Month Fuel Cycle ML20044G1331993-05-20020 May 1993 Proposed Tech Specs Reducing MSIV Low Turbine Inlet Pressure Setpoint from Greater than or Equal to 880 Lb Psig to Greater than or Equal to 810 Psig & Reducing Min Pressure in Definition of Run Mode from 880 Psig to 785 Psig BECO-93-016, Proposed TS 3.5.C,D & E Re k-infinity Factor,Spent Fuel Pool Storage Capacity & Max Loads Allowed to Travel Over Fuel Assemblies,Respectively1993-02-11011 February 1993 Proposed TS 3.5.C,D & E Re k-infinity Factor,Spent Fuel Pool Storage Capacity & Max Loads Allowed to Travel Over Fuel Assemblies,Respectively 1999-06-16
[Table view] Category:TECHNICAL SPECIFICATIONS & TEST REPORTS
MONTHYEARML20196D0241999-06-16016 June 1999 Proposed Tech Specs Re Reactivity Control Incorporating Operating Requirements That Are Consistent with NEDO-21231, Banked Position Withdrawal Sequence ML20206R8161999-05-11011 May 1999 Proposed Tech Specs Re HPCI & RCIC Surveillance Testing ML20206H9771999-05-0505 May 1999 Proposed Tech Specs Modifying Licensing Basis for EDG on- Site Diesel Fuel Storage Requirements & Corresponding TSs ML20205A1451999-03-23023 March 1999 Core Shroud Insp Plan ML20207F1171999-03-0303 March 1999 Proposed Tech Specs Page 3/4.6-13 Re Reactor Vessel Matl Surveillance Program Withdrawal Schedule ML20151S3851998-08-31031 August 1998 Long-Term Program:Semi-Annual Rept ML20237E0851998-08-24024 August 1998 Proposed Tech Specs Pages Supporting Proposed TS Amend Related to EDG AOT ML20236X7191998-07-31031 July 1998 Proposed Tech Specs Page 3/4.9-5 Re Suppl to EDG for Allowed Outage Time ML20249C7101998-06-26026 June 1998 Proposed Tech Specs Correcting Typos & Updating Bases ML20249B3231998-06-15015 June 1998 Revised Complete Set of TS Pages Re Relocation of Radioactive Effluent TS & Radiological Environ Monitoring Program to ODCM ML20217F9341998-03-26026 March 1998 Proposed Tech Specs Re EDG Allowed Outage Time ML20217H2791998-03-25025 March 1998 Proposed Tech Specs 3.6.A.1 & 4.6.A.1,pertaining to Primary Sys Boundary,Thermal & Pressurizations Limitations & Surveillance Requirements & Basis 3/4.6.A ML20203D4981998-02-20020 February 1998 Proposed Tech Specs Pages,Incorporating Ultimate Heat Sink Temperature of 75 F Into TS 3/4.5.B & Bases,As Required by Amend 173 ML20217K5691997-10-24024 October 1997 Proposed Tech Specs Page Adding Footnote Declaring One Containment Isolation valve,30-CK-432,operate for Limited Period Despite Not Being within IST Interval for Reverse Flow Testing ML20211N6871997-09-16016 September 1997 Rev 9 to Procedure 8.I.1.1, Inservice Pump & Valve Testing Program ML20211G2381997-09-15015 September 1997 Rev 8 to PNPS-ODCM, Pilgrim Nuclear Power Station Odcm ML20211G2311997-09-12012 September 1997 Proposed Tech Specs Re Radiological Environ Monitoring Program Moved to ODCM ML20216C0631997-08-29029 August 1997 Semi-Annual Long Term Program Schedule ML20210K4381997-08-0808 August 1997 Revised TS Pages 3/4.5-7,B3/4.5-6 & B3/4/.5-7 Requiring Verification That SBO-DG Is Operable Prior to Voluntarily Entering LCO ML20196J0041997-07-22022 July 1997 Proposed Revised TS Bases for Section 3.5.F,correcting Volume of Water Available in Refuel Cavity & Dryer/Separator Pool When Flooded to Elevation 114 Ft & Revising Torus Water Volume to Reflect Volume Above Min Pump NPSH ML20210K3551997-07-0101 July 1997 Rev 16 to Procedure 7.8.1, Water Quality Limits ML20136J5501997-03-0707 March 1997 Proposed Tech Specs Rev for Section 3.10, Core Alterations Allowing Removal of Suspect Fuel Bundles Out of Planned Sequence ML20134C9671997-01-24024 January 1997 Proposed Tech Specs 2.0 Re Safety Limits ML20133A6511996-12-23023 December 1996 Proposed Revised Tech Specs 1.0 Re definitions,3.4 Re Standby Liquid Control sys,3.5 Re Core & Containment Cooling systems,3.7 Re Containment Systems & 3.9 Re Auxiliary Electrical Sys ML20132E5491996-12-10010 December 1996 Proposed Tech Specs Table 3.2.C.1 Re Instrumentation That Initiates Rod Blocks,Table 3.2.C.2 Re Control Rod Block Instrumentation Setpoints & Table 4.2.C Re Minimum Test & Calibr Frequency for Control Rod Blocks Actuation ML20135C1461996-11-26026 November 1996 Proposed Tech Specs,Modifying Definition 1.M, Primary Containment Integrity, to Include All Instrument Line Flow Check Valves to Make Definition Consisten W/Lco 3/4.7.A.2.a.4 ML20134K4361996-11-0707 November 1996 Proposed Tech Specs Re Installation of BWROG Enhanced Option 1A ML20117K6551996-09-0505 September 1996 Proposed Tech Specs,Providing Revised TS Pages 3/4.5-7 & 3/4.5-6 ML20116M1561996-08-12012 August 1996 Proposed Tech Specs to Plant TS Section 6.0,Administrative Controls & Sections 6.5.B.10.C & 6.14 of Util Quality Assurance Manual ML20117K6611996-07-17017 July 1996 Rev 15 to PNPS Procedure 1.2.2 Administrative OPS Requirements ML20108C0581996-05-0101 May 1996 Proposed Tech Specs Re Core Alteration to LCO & Surveillance Conditions Associated W/Secondary Containment ML20111B4201996-05-0101 May 1996 Proposed Tech Specs,Reflecting Implementation of 10CFR50 App J,Option B ML20111C2761996-05-0101 May 1996 Proposed Tech Specs 3.1.1 Re Reactor Protection Sys (Scram) instrumentation,3.2.C.1 Re Instrumentation That Initiates Rod Blocks & 3/4.4 Re Standby Liquid Control ML20108C1071996-05-0101 May 1996 Proposed Tech Specs,Relocating Administrative Controls Re QA Review & Audit Requirements of Section 6 from Plant TS to Boston Edison QA Manual ML20108A6561996-04-25025 April 1996 Proposed Tech Specs Re Part of Overall Effort to Improve Outage Performance at Plant ML20095E0771995-12-0808 December 1995 Proposed Tech Specs Bases Page B2-2,including GE11 GEXL Correlation Axial Power Profile & R-factor Ranges & Correcting Error in GE11 GEXL Correlation Mass Flux Range in GE Design ref,NEDE-31152-P, GE Fuel Bundle Designs ML20100J2521995-11-22022 November 1995 Rev 7 to Pilgrim Nuclear Power Station Odcm ML20092B5861995-09-0101 September 1995 Rev 0 to Third Ten-Yr Interval ISI Plan for Pilgrim Nuclear Power Station ML20092C4331995-09-0101 September 1995 Startup Test Rept for Pilgrim Nuclear Power Station Cycle 11 ML20092A4421995-08-31031 August 1995 Corrected Tech Spec Page Re Reactor High Pressure Trip Setting ML20086K2661995-07-14014 July 1995 Proposed Tech Specs Re Section 2.1,Bases:Safety Limits; Section 3.3.C,scram Insertion Times & Section 4.11.C, Minimum Critical Power Ratio to Reflect Use of Advanced GE-11 Fuel Design in Cycle 11 ML20078R6221995-02-15015 February 1995 Proposed Tech Specs Substituting for Pages Contained in Proposed TS Amends Submitted Prior to 950130 Authorization ML20078N4861995-02-0909 February 1995 Proposed Tech Specs,Increasing Reactor High Water Level Isolation Trip Level Setting ML20077Q1181995-01-13013 January 1995 Owner'S Specification for Reactor Shroud Repair ML20077M6921995-01-0909 January 1995 Proposed Reformatted Tech Specs & Bases ML20077A8991994-11-22022 November 1994 Proposed Tech Specs Re Suppression Chamber Water Level ML20077B1861994-11-22022 November 1994 Proposed Tech Specs 3.5.F,4.5.F.1 & 3.9.B.1 & 2 Re EDG Allowed out-of-svc Time ML20078K7961994-11-22022 November 1994 Proposed Tech Specs Re Changes to MSIV Leakage Requirement ML20078K8151994-11-22022 November 1994 Proposed TS Pages 3/4.2-20 & 3/4.2-35 Re Tables 3.2.C-1 & 4.2.C ML20078N8421994-11-18018 November 1994 Rev 32 to Procedure 8.7.3, Secondary Containment Leak Rate Test 1999-06-16
[Table view] |
Text
_______ ._
LIMITING CONDITIONS FOR OPERATION SURVEILLANCE EQUIPMENT 3.5.A Core Spray and LPCI Subsystems 4.5.A Core Spray and LPCI Subsystems (con t ' d) (cont'd)
Check Once/ day Calibrate Once/3 months Test Once/3 months
- 2. From and after the date that one 2. When it is determined that one core of the core spray subsystems is spray subsystem is inoperable, made or found to be inoperable the operable core spray subsystem, for any reason, continued reactor the LPCI subsystem and the diesel operation is permissible during generators shall be demonstrated to the succeeding seven days, pro- be operable immediately. The oper-vided that during such seven days able core spray subsystem shall be all active components of the other demonstrated to be operable daily core spray subsystem and active thereafter.
components of the LPCI subsystem and the diesel generators are op-erable.
- 3. The LPCI Subsystems shall be oper- 3. LPCI Subsystem Testing shall be as able whenever irradiated fuel is follows:
in the reactor vessel, and prior to reactor startup from a Cold a. Simulated Automa- Once/ Operating
') Condition, except as specified tic Actuation Test Cycle in3.5.A.4,3.5.A.5and3.5.F.5.l b. Pump Operability Once/ month
- c. Motor Operated Once/ month valve operability
- d. Pump Flow Rate Once/3 months Three LPCI pumps shall deliver 14,400 gpm against a system head corresponding to a vessel pressure of 20 psig.
- 1367 !44
LIMITING CONDITION FOR OPERATION SURVEILLANCE REQUIREMENT 3.5,F Minimum Low Pressure Cooling and Diesel Generator Avail-ability (Cont'd)
- 3. When irradiated fuel is in the re-actor vessel and the reactor is in the Cold shutdown Condition, both core spray systems, the LPCI and containment cooling subsystems may be inoperable, provided no work is being done which has the potential for draining the reactor vessel.
- 4. During a refueling outage, for a period of thirty days, refueling operation may continue provided that one core spray system or the LPCI system is operable or spec-ification 3.5.F.5 is met.
- 5. When irradiated fuel is in the reactor vessel and the reactor is in the Refueling Condition.with the torus drained, a single control rod drive mechanism may be removed,1f both of the following conditions are satis-fied:
a) No work on the reactor vessel, in addition to CRD removal, will be performed which has the po-tential for exceeding the maximum leak rate from a single control blade seal if it became unseated.
b) 1) the core spray systems are operable and aligned with a suction path from the condensate storage tanks, 11) the conden-sate storage tanks shall contain at least 200,000 gallons of usable water and the refueling cavity and dryer / separator pool shall be flooded to at 1 cast elevation 114'-0".
i i
9
. 1367 145 (Intentionally left blank) ,
I l
l 111
SURVEILLANCE REQUIREMENT LIMITING CONDITION F0F OPERATION 4.5.H Maintenance of Filled Discharge 3.5.H Maintenance of Filled Dis-charge Pipe P,ipe i
Whenever core spray subsystems, LPCI The following surveillance requirements subsystem, HPCI, or RCIC are required shall be adhered to to assure that the to be operable, the discharge piping discharge piping of the core spray sub-from the pump discharge of these sys- systems, LPCI subsystem, HPCI and RCIC are filled:
tems to the last block valve shall be filled. Evety month prior to the testing of 1.
the LPCI subsystem and core spray subsystem, the discharge piping of these systems shall be vented from the high point and water flow ob-served.
- 2. Following any period where the LPCI subsystem or core spray subsystems have not been required to be oper-able, the discharge piping of the inoperable system shall be ventea from the high point prior to the return of the system to service.
- 3. Whenever the HPCI or RCIC system is lined up to take suction from the torus, the discharge piping of the HPCI and RCIC shall be vented from the high point of the system and water flow observed on a monthly basis.
- 4. The pressure switches which monitor the discharge lines to ensure that they are full shall be functionally tested every month and calibrated every three months.
-- -~, -_-
1367 146 112
BASES:
3.5.F Minimum Low Pressure Cooling and Diesel Generator Availability The purpose of Specification F is to assure that adequate core cooling equip-ment is nvailable at all times. If, for example, one core spray were out of service and the diesel which powered the opposite core spray were out of service, only 2 LPCI pumps would be available. It is during refueling outages that major maintenance is performed and during such time that all low pres-sure core cooling systems may be out of service. This specification provides that should this occur, no work will be performed on the primary system which could lead to draining the vessel. This work would include work on certain control rod drive components and recirculation system. Specification F allows removal of one CRD mechanism while the torus is in a drained condition without compromising core cooling capability. The available core cooling capability for a potential draining of the reactor vessel while this work is performed is based on an estimated drain rate of 300 gpm if the control rod blade seal is unseated. Flooding the refuel cavity and dryer / separator pool to elevation 114' 0" corresponds to approximately 350,000 gallons of water and will provide core cooling capability in the event leakage from the control rod drive does occur.
A potential draining of the reactor vessel (via control rod blade leakage) would allow this water to enter into the torus and after approximately 140,000 gallons have accumulated (needed to meet minimum NPSH requirements for the LPCI and/or core spray pumps), the torus would be able to serve as a common suction header.
This would allow a closed loop operation of the LPCI system and the core spray system (once re-aligned) to the torus. In addition, the other core spray system is lined up to the condensate storage tanks which can supplement the refuel cavity and dryer / separator pool water to provide core flooding, if required.
/
Specification 3.9 must also be consulted to determine other requirements for the diesel generators.
1367 147 119
SURVEILLANCE REQUIREMENTS LIMITING CONDITIONS FOR OPERATION 4.7 CONTAINMENT SYSTEMS 3.7 CONTAINMENT SYSTEMS Applicability:
Applicability: ,
Applies to the operating status of the primary Applies to the primary and secondary containment integrity.
and secondary containment systems.
Objective: Objective:
To assure the integrity of the primary and To verify the integrity of the primary secondary containment systems. and secondary containment.
Specification: Specification:
Primary Containment A. Primary Containment A.
At any time that the nuclear system is 1. a. The suppression chamber water
- 1. level and temperature shall pressurized above atmospheric pressure be checked once per day.
or work is oeing done which has the potential to drain the vessel, the pressure suppression pool water volume b. Whenever there is indication of relief valve operation or and temperature shall be maintained within the following limits except as testing which adds heat to the specified in 3.7. A.2 and 3.7. A. 3. f suppression pool, the pool temperature shall be con-
- a. Minimum water volume - 84,000 ft 3 tinually monitored and also observed and logged every 5 3
- b. Maximum water volume - 94,000 ft minutes until the heat addition is terminated.
- c. Maximum suppression pool temperature during normal continuous power c. Whenever there is indication of reliaf valve operation with operation shall be $ 80 F, except as specified in 3.7.A.I.e. the temperature of the suppression pool reaching 160 F
- d. Maximum suppression pool temperature or inore and the primary coolant during RCIC, HPCI or ADS operation system pressure greater than shall be 1 90 F, except as specified 200 psig, an external visual in 3.7.A.I.e.
examination of the suppression chamber shall be conducted
- e. In order to continue reactor power before resuming power operation, operation, the suppression chamber pool temperature must be reduced to d. A visual inspection of the 180 F within 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />, suppression chamber interior, including water line regions, shall be made at each major
- f. If the suppression pool temperature exceeds the limits of Specification refueling outage.
3.7.A.I.d RCIC, HPCl or ADS testing shall be termineled and suppression pool cooling shall be initiated.
7 i48
- g. If the suppression pool temperature during reactor power operation exceeds 110 F, the reactor shall be scrammed.
152
LIMITING CONDITIONS FOR OPERATION SURVEILLANCE REQUIREMENTS
- 2. Primary containment integrity shall be 2. Integrated Leak Rate Testing maintained at all times when the reactor is critical a. The primary containment or when the reactor water integrity shall be demon-temperature is above 212 F and strated by performing an fuel is in the reactor vessel except Integrated Primary Con-while performing "open vessel" physics tainment Leak Test (IPCLT) te9ts at power levels not to exceed in accordance with either 5 Mw(t). Method A or Method B, as follows:
Method A Perform leak rate test prior to initial unit operation at the test pressure 45 psig, P t (45), to obtain measured leak rate Lm (45), or Method B Perform leak rate test prior to initial unit operation at the test pressure of 45 psig,
?g (45), and 23 psig, P g (23),
to obtain the measured leak rates, L, (45) and to (23),
respectively.
- 3. The suppression chamber can be drained if the conditions as specified in Sections 3.5.F.3 and 3.5.F.5 of this Technical Specification are adhered to.
152B 1367 !49
BASES:
- 3. 7. A & 4. 7. A Primary Containment The integrity of the primary containment and operation of the core, standby cooling system in combination limit the off-site doses to values less than those suggested in 10 CFR 100 in the event of a break in the primary system piping.
Thus, containment integrity is specified whenever the potential for violation of the primary reactor system integrity exists. Concern about such a violation exists whenever the reactor is critical and above atmospheric pressure.
An exception is made to this requirement during initial core load-ing and while the low power test program is being conducted and ready access to the reactor vessel is required. There will be no pressure on the system at this time, thus greatly reducing the chances of a pipe break. The reactor may be taken critical during this period; however, restrictive operating procedures will be in effect again :o minimize the probability of an accident occurring. Procedures and the Rod Worth Minimirtr would limit control worth such that a rod drop would not result in any fuel damage. In addition, in the unlikely event that an excursion did occur, the reactor building and standby gas treatment system, which shall be operational during this time, offer a sufficient barrier to keep off-site doses well below 10 CFR 100 limits.
The pressure suppression pool water provides the heat sink for the reactor primary system energy release following a postulated rupture of the system.
The pressure suppression chamber water volume must absorb the associated decay and 1035structural psig. sensible heat released during primary system blowdown from Since all of the gases in the drywell are purged into the pressure supression chamber air space during a loss-of-coolant accident, the pressure resulting from isothermal compression plus the vapor pressure of the liquid must not exceed 62 psig, the suppression chamber maximum pressure. The design volume that of the suppression chamber (water and air) was obtained by considering the total volume of reactor coolant to be condensed is discharged to the suppression chamber. chamber and that the drywell volume is purged to the suppression Using the minimum or maximum water volumes given in the specification, containment pressure during the design basis accident is approximately 45 p*ig which is below the maximum of 62 psig. Maximum water volume of 94,000 ft3 results in a downcomer submergency of 4'9" and the minimum volume of 84,000 f t 3 results in a' submergence approximately 12-inches less. The majority of the Bodega tests were run with a submerged length of 4 feet and with complete condensation. Thus, with respect to downcomer submergency, this specification is adequate.
Should it be necessary to drain the suppression chamber, provision will be made to maintain those requirements as described in Section 3.5.F BASES of this Tehenical Specification. '
Experimental data indicates that excessive steam condensing loads can be avoided if the peak temperature of the pressure suppression pool is maintained below at 1600F during the discharge exit.any period of relief-valve operation with sonic conditions Specifications have been placed on the envelope of reactor operating conditions so that the reactor can be depressurized in a timely manner chamber to avoid the regime of potentially high pressure suppression loadings.
1367 150 166