MONTHYEARML20216G0881999-09-19019 September 1999 Proposed Tech Specs Pages,Changing TS 4.18.5.a.9 & Associated Bases for One Cycle of Operation Through End of Cycle 16 for Suppl Use of OTSG Repair Roll Technology ML20216G0721999-09-17017 September 1999 Proposed Tech Specs,Revising Once Through SG Tubing Surveillance Requirements to Provide Alternate Repair Criteria for Volumetric Integranular Attack ML20212F5851999-09-17017 September 1999 Proposed Tech Specs Pages,Changing TS by Revising Curie Limits for Radioactive Gas Storage Tanks ML20211P0061999-09-0707 September 1999 Proposed TS in Support of SG Outer Diameter Intergranular Attack Alternate Repair Criteria ML20211B3291999-08-19019 August 1999 Proposed TS 4.18.3.a.4 Clarification Supporting Tube End Cracking Alternative Repair Criteria ML20211C1701999-08-18018 August 1999 Proposed Tech Specs Revising ESAS Low RCS Pressure Setpoint to Ensure That TS Adequately Bounds Safety Analysis ML20211C4101999-08-18018 August 1999 Proposed Tech Specs Removing Requiremets for Tube Repair (Sleeving) & Clarifying Requirements for Preservice & ISI of Tubes to Facilitate Replacement of Original SGs ML20210K5121999-07-29029 July 1999 Proposed Tech Specs,Revising Requirements Associated with Plant Station Batteries & DC Sources to 125 Vdc Switchyard Distribution Sys ML20210K3571999-07-29029 July 1999 Proposed Tech Specs Revising SRs Pertaining to ISI Requirements for SG Tube Circumferential Cracking at top-of-tubesheet During 2P99 Planned mid-cycle Outage ML20209H5811999-07-14014 July 1999 Proposed Tech Specs Revising RB Structural Integrity Requirements Re ISI Reporting for Containment Structures, Tendons & Anchorages ML20209H8701999-07-14014 July 1999 Proposed Tech Specs 6.2.2 & 6.2.2.h,replacing Functional Description of Operations Staff Middle Manager with Ref to Functional Description Assistant Operations Manager & Revising TS Table 6.2-1 Item 5 & TS 6.2.2.f ML20209H9721999-07-14014 July 1999 Proposed Tech Specs Changes for Elimination of Programmatic Requirements Associated with PASS & Regulatory Relief from PASS Requirements of NUREG-0737 & RG 1.97 ML20195D2371999-06-0101 June 1999 Proposed Tech Specs Re Surveillance Requirements & Applicable Bases Relevant to ISI Requirements for Portions of once-through SG (OTSG) Tubes Adjacent to Primary Cladding Region of tube-to Tubesheet Roll ML20206T2651999-05-14014 May 1999 Proposed Tech Specs Revising SG Tubing SRs ML20206Q1281999-05-10010 May 1999 Proposed Tech Specs Bases,Page B 2-2,discussing Guidance to Be Used When Applying Later Editions & Addendas of ASME Code to RCS Components ML20205P4081999-04-0909 April 1999 Proposed Tech Specs Changes,Revising Reactor Bldg Structural Integrity Requirements ML20205P6291999-04-0909 April 1999 Proposed Tech Specs Changes,Revising Battery Requirements ML20205P3731999-04-0909 April 1999 Revised Proposed TS Page 5-1 Re Design Features Conversion ML20205P6931999-04-0909 April 1999 Proposed Tech Specs Change,Adding Specification 3.0.6 & Associated Bases to ANO-2 ML20207C0631999-02-25025 February 1999 Proposed Tech Specs Change Revising Action 2 Associated with Table 3.3-1, Reactor Protective Instrumentation. Change Adds Footnote to Action 2 Allowing Startup with Functional Units Associated with Channel D Excore Inoperable ML20207M7561999-02-24024 February 1999 Proposed Tech Specs,Allowing Startup & Continued Operation of Plant with Channel D Detector Until New Detector Is Installed During mid-cycle Outage Scheduled for Nov 1999 ML20198K1341998-12-17017 December 1998 Corrected Tech Specs Pages to 980629 Application for Amend to License NPF-6 ML20198A3661998-12-0808 December 1998 Proposed Tech Specs B3/4 6-3 & B3/4 6-4,deleting All Requirements Associated with Sodium H Addition Sys & Adding New Requirements for Trisodium Phosphate to Be Stored in Containers Located on Floor of Cb ML20196B4381998-11-24024 November 1998 Proposed Tech Specs Pages,Changing Administrative Controls Section to Implement Consolidated QA Plan Manual & Clarifying Responsibilities on STA Position on Shift ML20153D8491998-09-17017 September 1998 Proposed Tech Specs 2.2.1,3.3.1.1 & 3.3.2.1 Re Operating Bypass Setpoint ML20236Y5081998-08-0606 August 1998 Proposed Tech Specs Section 3.3.4.B Re Sodium Hydroxide Tank Limits ML20236Y5251998-08-0606 August 1998 Proposed Tech Specs Section 3.1.3.2,revising Action Requirements for CEA Position Indicator Channels ML20236Y5951998-08-0606 August 1998 Proposed Tech Specs,Revising Requirements Associated W/Units 1 & 2 Control Room Emergency Ventilation Sys ML20236Q2781998-07-13013 July 1998 Proposed Tech Specs Re Safety Limits & Limiting Safety Settings ML20236G6921998-06-29029 June 1998 Proposed Tech Specs,Revising TS 3.4.2 & TS 3.4.12 Re Reactor Coolant Sys Safety Valves & Low Temp Overpressure Protection ML20236G5421998-06-29029 June 1998 Proposed Tech Specs,Revising Surveillance Testing Requirements for Unit 2 Direct Current Electrical Distribution Sys ML20236G4911998-06-29029 June 1998 Proposed Tech Specs Re MSSVs & Pressurizer Safety Valves ML20236G5631998-06-29029 June 1998 Proposed Tech Specs,Revising Table 3.3-4 to Provide Range of Acceptable Values for 4160 Volt Bus Loss of Voltage Values ML20217M2621998-04-30030 April 1998 Proposed Tech Specs Re DG Load Rejection Testing ML20217N6141998-04-30030 April 1998 Proposed Tech Specs 1.6.1,revising Definition of Quadrant Power Tilt ML20217M4871998-04-28028 April 1998 Proposed Tech Specs Changing Order of Channel Rotation During Outage for Scheduling Flexibility,While Still Requiring Rotation Schedule to Be Established for Operating Cycle ML20217P8141998-04-0101 April 1998 Proposed Tech Specs Re Upper Tubesheet Volumetric Indications to Remain in Svc for Cycle 15 ML20216J7841998-03-17017 March 1998 Proposed Tech Specs Bases Change Concerning Plant Protection Sys Matrix Logic Testing ML20203D1061998-02-18018 February 1998 Proposed Tech Specs Revising Surveillance Testing Requirements for Emergency Feedwater Sys ML20202G9771998-02-0909 February 1998 Proposed Tech Specs Pages,Allowing Use of Repair Roll Technology (Reroll) for Upper Tubesheet Region of SGs ML20197A8421997-12-12012 December 1997 Proposed Tech Specs Re Establishment of Alternate Repair Criteria for Outer Diameter Intergranular Attack in Upper Tubesheet of Unit 1 SGs ML20211C6441997-09-23023 September 1997 Proposed Tech Specs,Modifying RPS & ESFAS Trip Setpoint & Allowable Values for SG Low Pressure ML20211C8911997-09-23023 September 1997 Proposed Tech Specs Reducing Min Required Reactor Coolant Sys Flow Rate Requirements Until ANO-2 SGs Are Replaced ML20151J3371997-07-28028 July 1997 Proposed Tech Specs,Modifying Actions Associated W/Ts Table 3.3-1 for Reactor Protective Instrumentation & Table 3.3-3 for Esfa Sys Instrumentation ML20149K0551997-07-21021 July 1997 Proposed Tech Specs,Revising Surveillance Testing Requirements for Facility EFW Sys as Specified in Specification 4.7.1.2 ML20141C5641997-06-18018 June 1997 Proposed Tech Specs Changes Restoring Table 2 to Table II & Revision to One of Offsite Dose Calculation Manual, Pages Previously Submitted.Also Includes Amended Pages Modified to Amends Issued Since Change Request Submitted ML20141A8001997-05-0808 May 1997 Proposed Tech Specs 3/4.3.1 & 3/4.3.2 Requesting Removal of Reference to CE NPSD-576 ML20138H8521997-05-0202 May 1997 Proposed Tech Specs,Submitting Rev to Original TS Change Request to Reduce Limit Specified in Section 3.1.6.3.b for Leakage Through SG Tubes of Any One Sg,Per SG Tube Insp Surveillance Requirements ML20138D6411997-04-24024 April 1997 Proposed Tech Specs Revising Requirements for Sample Scope Initial Size & Expansion for Inservice Insp of Steam Generator Tube Sleeves ML20141H2621997-04-18018 April 1997 Proposed Tech Specs,Permitting Delay of Scheduled three-yr Inspections of Flywheels on All Four RCPs Until Completion of 2R13 Refueling Outage,Scheduled for Winter of 1998-99 1999-09-07
[Table view] Category:TECHNICAL SPECIFICATIONS & TEST REPORTS
MONTHYEARML20217N3171999-10-19019 October 1999 Rev 1,change 024-01-0 to OP-1903.011, Emergency Response Notifications ML20217J7641999-10-0505 October 1999 Rev 1 to Unit 1 Technical Requirement Manual, Replacing Index Page ML20216G0881999-09-19019 September 1999 Proposed Tech Specs Pages,Changing TS 4.18.5.a.9 & Associated Bases for One Cycle of Operation Through End of Cycle 16 for Suppl Use of OTSG Repair Roll Technology ML20212F5851999-09-17017 September 1999 Proposed Tech Specs Pages,Changing TS by Revising Curie Limits for Radioactive Gas Storage Tanks ML20216G0721999-09-17017 September 1999 Proposed Tech Specs,Revising Once Through SG Tubing Surveillance Requirements to Provide Alternate Repair Criteria for Volumetric Integranular Attack ML20211P0061999-09-0707 September 1999 Proposed TS in Support of SG Outer Diameter Intergranular Attack Alternate Repair Criteria ML20211B3291999-08-19019 August 1999 Proposed TS 4.18.3.a.4 Clarification Supporting Tube End Cracking Alternative Repair Criteria ML20211C4101999-08-18018 August 1999 Proposed Tech Specs Removing Requiremets for Tube Repair (Sleeving) & Clarifying Requirements for Preservice & ISI of Tubes to Facilitate Replacement of Original SGs ML20211C1701999-08-18018 August 1999 Proposed Tech Specs Revising ESAS Low RCS Pressure Setpoint to Ensure That TS Adequately Bounds Safety Analysis ML20210N5541999-08-0404 August 1999 Rev 28,Permanent Change 4 to OP-1903.061, Communication Equipment Test ML20210N5571999-08-0404 August 1999 Rev 23,Permanent Change 5 to OP-1903.011, Emergency Response/Notifications ML20210K5121999-07-29029 July 1999 Proposed Tech Specs,Revising Requirements Associated with Plant Station Batteries & DC Sources to 125 Vdc Switchyard Distribution Sys ML20210K3571999-07-29029 July 1999 Proposed Tech Specs Revising SRs Pertaining to ISI Requirements for SG Tube Circumferential Cracking at top-of-tubesheet During 2P99 Planned mid-cycle Outage ML20209H5811999-07-14014 July 1999 Proposed Tech Specs Revising RB Structural Integrity Requirements Re ISI Reporting for Containment Structures, Tendons & Anchorages ML20209H8701999-07-14014 July 1999 Proposed Tech Specs 6.2.2 & 6.2.2.h,replacing Functional Description of Operations Staff Middle Manager with Ref to Functional Description Assistant Operations Manager & Revising TS Table 6.2-1 Item 5 & TS 6.2.2.f ML20209H9721999-07-14014 July 1999 Proposed Tech Specs Changes for Elimination of Programmatic Requirements Associated with PASS & Regulatory Relief from PASS Requirements of NUREG-0737 & RG 1.97 ML20195D2371999-06-0101 June 1999 Proposed Tech Specs Re Surveillance Requirements & Applicable Bases Relevant to ISI Requirements for Portions of once-through SG (OTSG) Tubes Adjacent to Primary Cladding Region of tube-to Tubesheet Roll ML20206T2651999-05-14014 May 1999 Proposed Tech Specs Revising SG Tubing SRs ML20206Q1281999-05-10010 May 1999 Proposed Tech Specs Bases,Page B 2-2,discussing Guidance to Be Used When Applying Later Editions & Addendas of ASME Code to RCS Components ML20206J8021999-05-0404 May 1999 PC-03 to Procedure/Work Plan 1904-002, Offsite Dose Projections Rdacs Computer Method ML20205P6931999-04-0909 April 1999 Proposed Tech Specs Change,Adding Specification 3.0.6 & Associated Bases to ANO-2 ML20205P3731999-04-0909 April 1999 Revised Proposed TS Page 5-1 Re Design Features Conversion ML20205P6431999-04-0909 April 1999 Revised Proposed Technical Requirement Manual Pages ML20205P4081999-04-0909 April 1999 Proposed Tech Specs Changes,Revising Reactor Bldg Structural Integrity Requirements ML20205P6291999-04-0909 April 1999 Proposed Tech Specs Changes,Revising Battery Requirements ML20207C0631999-02-25025 February 1999 Proposed Tech Specs Change Revising Action 2 Associated with Table 3.3-1, Reactor Protective Instrumentation. Change Adds Footnote to Action 2 Allowing Startup with Functional Units Associated with Channel D Excore Inoperable ML20207M7561999-02-24024 February 1999 Proposed Tech Specs,Allowing Startup & Continued Operation of Plant with Channel D Detector Until New Detector Is Installed During mid-cycle Outage Scheduled for Nov 1999 ML20198K1341998-12-17017 December 1998 Corrected Tech Specs Pages to 980629 Application for Amend to License NPF-6 ML20198A3661998-12-0808 December 1998 Proposed Tech Specs B3/4 6-3 & B3/4 6-4,deleting All Requirements Associated with Sodium H Addition Sys & Adding New Requirements for Trisodium Phosphate to Be Stored in Containers Located on Floor of Cb ML20196B4381998-11-24024 November 1998 Proposed Tech Specs Pages,Changing Administrative Controls Section to Implement Consolidated QA Plan Manual & Clarifying Responsibilities on STA Position on Shift ML20196C9761998-11-24024 November 1998 Rev 1 to Unit 2 Technical Requirements Manual ML20154D6681998-10-0101 October 1998 Rev 28 to Procedure/Work Plan 1904.002, Offsite Dose Projections Rdacs Computer Method ML20153D8491998-09-17017 September 1998 Proposed Tech Specs 2.2.1,3.3.1.1 & 3.3.2.1 Re Operating Bypass Setpoint ML20153H1651998-08-12012 August 1998 Rev 0 to ANO Units 1 & 2 Technical Requirements Manual ML20236Y5251998-08-0606 August 1998 Proposed Tech Specs Section 3.1.3.2,revising Action Requirements for CEA Position Indicator Channels ML20236Y5081998-08-0606 August 1998 Proposed Tech Specs Section 3.3.4.B Re Sodium Hydroxide Tank Limits ML20236Y5951998-08-0606 August 1998 Proposed Tech Specs,Revising Requirements Associated W/Units 1 & 2 Control Room Emergency Ventilation Sys ML20236Q2781998-07-13013 July 1998 Proposed Tech Specs Re Safety Limits & Limiting Safety Settings ML20236G6921998-06-29029 June 1998 Proposed Tech Specs,Revising TS 3.4.2 & TS 3.4.12 Re Reactor Coolant Sys Safety Valves & Low Temp Overpressure Protection ML20236G5421998-06-29029 June 1998 Proposed Tech Specs,Revising Surveillance Testing Requirements for Unit 2 Direct Current Electrical Distribution Sys ML20236G5631998-06-29029 June 1998 Proposed Tech Specs,Revising Table 3.3-4 to Provide Range of Acceptable Values for 4160 Volt Bus Loss of Voltage Values ML20236G4911998-06-29029 June 1998 Proposed Tech Specs Re MSSVs & Pressurizer Safety Valves ML20199F7211998-05-22022 May 1998 Rev 8 to Simulator Mod Control,Training Desk Guide 6.3 ML20217N6141998-04-30030 April 1998 Proposed Tech Specs 1.6.1,revising Definition of Quadrant Power Tilt ML20217M2621998-04-30030 April 1998 Proposed Tech Specs Re DG Load Rejection Testing ML20217M4871998-04-28028 April 1998 Proposed Tech Specs Changing Order of Channel Rotation During Outage for Scheduling Flexibility,While Still Requiring Rotation Schedule to Be Established for Operating Cycle ML20217P8141998-04-0101 April 1998 Proposed Tech Specs Re Upper Tubesheet Volumetric Indications to Remain in Svc for Cycle 15 ML20216J7841998-03-17017 March 1998 Proposed Tech Specs Bases Change Concerning Plant Protection Sys Matrix Logic Testing ML20203D1061998-02-18018 February 1998 Proposed Tech Specs Revising Surveillance Testing Requirements for Emergency Feedwater Sys ML20202G9771998-02-0909 February 1998 Proposed Tech Specs Pages,Allowing Use of Repair Roll Technology (Reroll) for Upper Tubesheet Region of SGs 1999-09-07
[Table view] |
Text
-,,
i' t i
- s u, ' '
7 1
l ATTACHMENT PROPOSED TECHNICAL SPECIFICATION CHANGE LICENSE AMENDMENT REQUEST s IN THE MATTER OF AMENDING LICENSE NO NPF-6'--
' ARKANSAS POWER & LIGHT COMPANY ~
ARKANSAS NUCLEAR ONE., UNIT 2 o-DOCKET NO. 50-368=
DECEMBER 15,-1989 h-t
_ t
'\ b- ' ' '
7 ' g nom icewgp' 3
- .y
}
i f
Proposed Change No. 1 l
)
This change maket certain administrative corrections to Table 3.6-1. First, i the physical location of valve 2CV-5255-1 for penetration 2P60 as noted in Table 3.6-1 is incorrect. The existing functional description is "CCW from RCP Coolers Isolation (inside)." The correct function should be "CCW from RCP Coolers Isolation (outside)." Second, for penetration 2P46 valves j 2IA-14 and 2IA-15 were renumbered as 2BA-217 and 2SA-216, respectively, as t result of a design change which also redesignated the piping from l "instrumerit air supply" to " breathing air supply." The design change involved disconnecting the instrument air line to the reactor building, reconnecting the reactor building instrument air line to the breathing air i system, and redesignating the affected valve and piping as a part of the
- breathing air system. The NRC.was advised of the relabelling of these valves in our letter of September 30, 1985 (2CAN998597).
Proposed Change No. 2 This change corrects an apparent typographical error in Specification 4.6.1.5.2, where reference to " Specification 4.6.1.6.1 "is incorrect since there is no such specification. The correct reference is
" Specification 4.6.1.5.1."
h
. i 1
DETERM1WATION OF SIGNIFICANT HAZARDS l
-i Arkansas Power & Light Company has performed an analysis of the proposed change in accordance with 10CFR90.91(a)(1) regarding no significant hazards consideration, using the standards in 10CFR90.92(c): l l
- 1) The proposed changes would not increase the probability or consequences of any accident previously evaluated since these editorial changes do not provide any relief from the requirements of the Technical Specifications, or change the intended operation or administrative requirements of the plant. .
- 2) The proposed changes would not create the possibility of a'new or different kind of accident from any previously analyzed since these editorial changes do not adversely-affect any coEponents or systems-which contribute to the safety of the plant or the' ability to properly handle potential offsite releases.
- 3) The proposed changes would not involve a significant reduction in the margin of safety since these editorial changes provide the correct valve designations and correct a typographical error but have no effect on any plant safety parameters or accident mitigation capabilities.
4
The~ Commission has provided guidance concerning the application of these standards by providing examples. The proposed amendment is most closely encompassed by example (1): purely administrative 1y changes to-the Technical Specifications.
Therefore, based on the reasoning presented above and the previous discussion of the amendment request, AP&L has determined that the requested changes do not involve a sig- 1.; ant hazards consideration.-
h CONTAINMENT SYSTEMS SURVEILLANCE REOUIREMENTS (Continued) 4.6.1.5.2 End Anchorages and Adjacent Concrete Surfaces The structural integrity of the end anchorages of all tendons inspected pursuant to Specification 4.6.1.5.1 and the adjacent concrete surfaces shall be l demonstrated by determining through inspection that no apparent changes have occurred in the visual appearance of the end anchorage or the concrete crack patterns adjacent to the end anchorages. Inspections of the concrete shall be performed during the Type A containment leakage rate tests (reference Specification 4.6.1.2) while the containment is at its maximum test pressure.
4.6.1.5.3 Containment Surfaces The structural integrity of the exposed accessible interior and exterior surf aces of the containment, including the liner plate, shall be determined during the shutdown for each Type A containment leakage rate test (reference Specification 4.6.1.2) by a visual inspection of these surf aces and verifying r.o apparent changes in appearance or other abnormal degradation.
4.6.1.5.4 Deleted ARKANSAS - UNIT 2 3/4 6-9 Amendment No. 91
TABLE 3.6-1 2 .
CONTAINMENT ISOLATION VALVES E
PENETRATION ISOLATION El . NUMBER VALVE NUMBER FUNCTION TIME (SEC) w m A. CONTAINMENT ISOLATION 2P7 2CV-5852-2# "A" S/G Sample Isolation (outside) 5 20 2CV-5859-2# "B" S/G Sample Isolation (outside) 5 20 2P8 2SV-5833-1 RCS & Pressurizer Sample Isolation (inside) 5 20 2SV-5843-2 RCS & Pressurizer Sample Isolation (outside) 5 20 2P9 2CV-6207-2 H.P. Nitrogen to SI Tanks (outside) 5 20 2P14 2CV-4821-1 CVCS L/D Isolation (inside) 5 35 2CV-4823-2 CVCS L/D Isolation (outside) $ 20 2P18 2CV-4846-1 RCP Seal Return Isolation (inside) 5 25 R:
2CV-4847-2 RCP Seal Return Isolation (outside) 5 20 2P31 2CV-2401-1 Containment Vent Header (inside) $ 20 3' 2CV-2400-2 Containment Vent Header (outside) 5 20 as 2P37 2SV-5878-1 Quench Tank Liquid Sample (inside) 5 20 2SV-5871-2 Quench Tann Liquid Sample (outside) 5 20 2SV-5876-2 SI Tanks Sample Isolation (outside) 5 20 2P39 2CV-4690-2 Quench Tank Makeup & Demin Water Supply Isolation (outside) 5 20 2P40 2CV-3200-2 Fire Water Isolation (outside) 5 20 2P41 2CV-6213-2 L.P. Nitrogen Supply Isolation (outside) 5 20 E 2P51 2CV-3852-1 Chilled Water Supply Isolation (outside) 5 20
.@ 2P52 2CV-5236-1 CCW to RCP Coolers Isolation (outside) 5 20
' S- 2P59 2CV-3850-2 Chilled Water Return Isolation (inside) 5 20
@' -2CV-3851-1 Chilled Water Return Isolation (outside) 5 20 2P60 2CV-5254-2 CCW from RCP Coolers Isolation (inside) 5 20 jf 2CV-5255-1 CCW from RCP Coolers Isolation (outside) 5 20 l
'S
~
TABLE 3.6-1 (Cont.) .
CONTAINMENT ISOLATION VALVES
$l PENETRATION ISOLATION NUMBER VALVE NUMBER FUNCTION TIME (SEC)
SE C. MANUAL
.-4 no 2P7 2CV-5850#* "A" S/G Sample Isolation (inside)r operated from 2C17 N.A.
2CV-5858#* "B" S/G Sample Isolation (inside), operated from 2C17 N.A.
2P19 2FP-35# Refueling Canal Recirculation Line (inside) N.A.
2FP-34 Refueling Canal Recirculation Line (outside) N.A.
2P32 2CV-1015#* "A" S/G Blowdown Isolation (inside),
operated from 2C33 N.A.
2P37 2SV-5872#* SI Tank 2T2A Sample (inside) N.A.
2SV-5873#* SJ Tank 2T2B Sample (inside) N.A.
Ri 2SV-5874#* SI Tank 2T2C Sample (inside) N.A.
S' 2P42 2PH-44# Plant Heating Return Isolation (inside) N.A.
E! 2PH-45 Plant Heating Return Isolation (outside) N.A.
2P43 25A-68 Service Air Supply Isolation (outside) 2P46 28A-217 Breathing Air Supply Isolation (outside). l 2P48 2PH-22 Plant Heating Supply Isolation (outside) N.A.
2PH-23# Plant Heating Supply Isolation (inside) N.A.
2P64 2CV-1065#* "B" S/G Blowdown Isolation (inside),
operated from 2C33 N.A.
2-k a
2 a
F
__ - m>- -__s- < _ . . _ _ _ _ -e a -w v - ,-- - , -+ . ---% -. .--, e - --. - _ . - - -_--- __ ,--.-w-. e
e k
TABLE 3.6-1 (Cont.) .
+
3>
CONTAINMENT ISOLATION VALVES
-$ PENETRATION ISOLATION 7 NUMBER VALVE NUMBER FUNCTION TIME (SEC)
E C. MANUAL (Cont.)
to 2C3 2CV-5432# Fuel Transfer Tube-Isolation (outside) N.A.
O. OTHER (Check Valves) 2P9 2N2 -18# H.P. Nitrogen to SI Tanks (inside) N.A.
2P39 2CVC-78# Quench Tank Makeup & Demin Water Supply (inside) N.A.
2P40 2FS-37# Fire Water Isolation (inside) N.A.
2P41 2N 2 -l# L.P. Nitrogen Supply Isolation (inside) N.A.
2P43 2SA-69 Service Air Supply Isolation (inside) N.A.
T 2P46 2BA-216 Breathing Air Supply Isolation (inside) N.A. l 2 PSI . 2AC-49# Chilled Water Supply Isolation (inside) N.A.
T 2PS2 2CCW-38# CCW to RCP Coolers Isolation (inside) N.A.
U
- Not subject to Type C leakage tests.
- May be opened on an intermittent basis under administrative control.
?