MONTHYEARML20217B4471999-10-0707 October 1999 Safety Evaluation Supporting Amends 159 & 150 to Licenses NPF-10 & NPF-15,respectively ML20217E3381999-09-30030 September 1999 Monthly Operating Repts for Sept 1999 for Songs,Units 2 & 3 05000361/LER-1999-005-01, :on 990831,loss of Physical Separation in Control Room,Occurred.Caused by Personnel Error.Creacus Train a Was Returned to Standby on 9908311999-09-23023 September 1999
- on 990831,loss of Physical Separation in Control Room,Occurred.Caused by Personnel Error.Creacus Train a Was Returned to Standby on 990831
ML20212A1471999-09-13013 September 1999 Special Rept:On 990904,condenser Monitor Was Declared Inoperable.Difficulties Encountered During Component Replacement Precluded SCE from Restoring Monitor to Service within 72 H.Alternate Method of Monitoring Was Established ML20211R0571999-09-0909 September 1999 Safety Evaluation Supporting Amends 158 & 149 to Licenses NPF-10 & NPF-15,respectively ML20212A2391999-09-0707 September 1999 Safety Evaluation Supporting Amends 157 & 148 to Licenses NPF-10 & NPF-15,respectively ML20211N0511999-09-0303 September 1999 SER Approving Exemption from Certain Requirements of 10CFR50.44 & 10CFR50 App A,General Design Criterion 41 to Remove Requirements from Hydrogen Control Systems from SONGS Units 2 & 3 Design Basis ML20211Q8201999-08-31031 August 1999 Monthly Operating Repts for Aug 1999 for Songs,Units 2 & 3. with ML13316A3631999-08-31031 August 1999 Change Notice 47,Amend 19 to Topical Rept SCE 1-A, QA Program Approvals 05000206/LER-1999-001-02, :on 990808,unattended Security Weapon Was Discovered Inside Pa.Caused by Posted Security Officer Falling Asleep.Officer Was Relieved of Duties,Pa Access Was Removed & Officer Was Placed on Investigatory Suspension1999-08-31031 August 1999
- on 990808,unattended Security Weapon Was Discovered Inside Pa.Caused by Posted Security Officer Falling Asleep.Officer Was Relieved of Duties,Pa Access Was Removed & Officer Was Placed on Investigatory Suspension
ML20211H8621999-08-23023 August 1999 Safety Evaluation Accepting Licensee Requests for Relief RR-E-2-03 - RR-E-2-08 from Exam Requirements of Applicable ASME Code,Section Xi,For First Containment ISI Interval ML20211F2211999-08-19019 August 1999 Safety Evaluation Supporting Amends 155 & 146 to Licenses NPF-10 & NPF-15,respectively ML20211E9441999-08-19019 August 1999 Safety Evaluation Supporting Amends 156 & 147 to Licenses NPF-10 & NPF-15,respectively ML20210P4731999-08-11011 August 1999 COLR Cycle 10 Songs,Unit 2 ML20210P4791999-08-11011 August 1999 COLR Cycle 10 Songs,Unit 3 05000361/LER-1999-004-01, :on 990708,automatic Tgis Actuation Occurred. Caused by Small Leak in Suction Side of Tgis Train a Sample Pump.Small Leak Repaired1999-08-0606 August 1999
- on 990708,automatic Tgis Actuation Occurred. Caused by Small Leak in Suction Side of Tgis Train a Sample Pump.Small Leak Repaired
ML20210Q6521999-07-31031 July 1999 Monthly Operating Repts for July 1999 for Songs,Units 2 & 3 ML20210L2771999-07-30030 July 1999 SONGS Unit 3 ISI Summary Rept 2nd Interval,2nd Period Cycle 10 Refueling Outage U3C10 Site Technical Services 05000362/LER-1999-005, :on 990630,discovered LTOP Sys Relief Valve Setpoint Was Higher than Allowed by Ts.Cause Indeterminate. Subject Valve Will Be Disassembled & Inspected to Determine Caused of High Setpoint.With1999-07-28028 July 1999
- on 990630,discovered LTOP Sys Relief Valve Setpoint Was Higher than Allowed by Ts.Cause Indeterminate. Subject Valve Will Be Disassembled & Inspected to Determine Caused of High Setpoint.With
05000362/LER-1999-006, :on 990623,EDG 3G003 Was Inadvertently Made Inoperable.Caused by Operators Aligning EDG to Inoperable Automatic Voltage Regulator.Licensee Will Revise Process of Locating Tags.With1999-07-26026 July 1999
- on 990623,EDG 3G003 Was Inadvertently Made Inoperable.Caused by Operators Aligning EDG to Inoperable Automatic Voltage Regulator.Licensee Will Revise Process of Locating Tags.With
ML20209G8991999-07-12012 July 1999 Safety Evaluation Supporting Amends 154 & 145 to Licenses NPF-10 & NPF-15,respectively ML20209C9281999-06-30030 June 1999 Monthly Operating Repts for June 1999 for Songs,Units 2 & 3. with 05000362/LER-1999-003-01, :on 990513,reactor Manually Tripped Due to Loss of Main Feedwater.Caused by Open Relay Contact in Output of Feedwater Regulation Control Sys.Faulty Relay Was Replaced1999-06-11011 June 1999
- on 990513,reactor Manually Tripped Due to Loss of Main Feedwater.Caused by Open Relay Contact in Output of Feedwater Regulation Control Sys.Faulty Relay Was Replaced
05000362/LER-1999-004, :on 990515,reactor Manually Tripped Due to Feedwater Control Valve Opening.Caused by Faulty Valve Positioner.Faulty Positioner Was Replaced1999-06-11011 June 1999
- on 990515,reactor Manually Tripped Due to Feedwater Control Valve Opening.Caused by Faulty Valve Positioner.Faulty Positioner Was Replaced
ML20195D3061999-06-0202 June 1999 Safety Evaluation of TR SCE-9801-P, Reload Analysis Methodology for San Onofre Nuclear Generating Station,Units 2 & 3. Rept Acceptable ML20195H5491999-05-31031 May 1999 Monthly Operating Rept for May 1999 for Songs,Units 2 & 3 05000362/LER-1999-002-01, :on 990328,RWST Outlet Isolation Valve Failed to Open After Being Closed for Testing.Caused by Degradation of Valve.Rwst Oulet Valve Was Repaired.With1999-05-20020 May 1999
- on 990328,RWST Outlet Isolation Valve Failed to Open After Being Closed for Testing.Caused by Degradation of Valve.Rwst Oulet Valve Was Repaired.With
ML20207A0211999-05-13013 May 1999 Safety Evaluation Supporting Amends 153 & 144 to Licenses NPF-10 & NPF-15,respectively ML20196L3221999-05-11011 May 1999 SONGS Unit 2 ISI Summary Rept 2nd Interval,2nd Period Cycle-10 Refueling Outage ML20206H2611999-05-0505 May 1999 Part 21 Rept Re Defect Found in Potter & Brumfield Relays. Sixteen Relays Supplied in Lot 913501 by Vendor as Commercial Grade Items.Caused by Insufficient Contact Pad Welding.Relays Replaced with New Relays ML20206S7281999-04-30030 April 1999 Monthly Operating Repts for Apr 1999 for Songs,Units 2 & 3 ML20206G6561999-04-27027 April 1999 SER Accepting Proposed Exemption from 10CFR50.71(e)(4) for SONGS Units 2 & 3 ML20206D1461999-04-26026 April 1999 Safety Evaluation Supporting Amend 152 to License NPF-10 ML20205Q6221999-04-19019 April 1999 Safety Evaluation Authorizing Proposed Alternative to Use Wire Penetrameters for ISI Radiography in Place of ASME Code Requirement ML20205R0371999-04-16016 April 1999 SER Approving Proposed Deviation from Approved Fire Protection Program Incorporating Technical Requirements of 10CFR50,App R,Section III.0 That Applies to RCP Oil Fill Piping ML20205N2691999-04-0909 April 1999 Safety Evaluation Supporting Amends 151 & 143 to Licenses NPF-10 & NPF-15,respectively ML20205G2611999-04-0101 April 1999 Special Rept:On 990328,3RT-7865 Was Removed from Service. Monitor Is Scheduled to Be Returned to Service Prior to Mode 4 Entry (Early May 1999) Which Will Exceed 72 H Allowed by LCS 3.3.102.Alternate Method of Monitoring Will Be Used ML20205Q0981999-03-31031 March 1999 Monthly Operating Repts for Mar 1999 for Songs,Units 2 & 3 05000362/LER-1999-001-01, :on 990211,TS 3.0.3 Entered Due to Both Chilled Water Trains Being Inoperable.Warm Main Condenser Discharged Water Diverted in Salt Water Cooling (Swc)(Bs) Intake.With1999-03-12012 March 1999
- on 990211,TS 3.0.3 Entered Due to Both Chilled Water Trains Being Inoperable.Warm Main Condenser Discharged Water Diverted in Salt Water Cooling (Swc)(Bs) Intake.With
05000361/LER-1999-002, :on 990208,pressurizer Safety Valves Were Above TS Limit.Caused by Setpoint Drift.Sce Submitted License Amend Application on 980904 Requesting Tolerence Be Changed to +3/-2%.With1999-03-10010 March 1999
- on 990208,pressurizer Safety Valves Were Above TS Limit.Caused by Setpoint Drift.Sce Submitted License Amend Application on 980904 Requesting Tolerence Be Changed to +3/-2%.With
05000361/LER-1999-001, :on 990201,automatic Start of EDG Was Noted. Caused by Workers Closing Breaker 2A0418 by Discharging Closing Springs.Operators Restored SDC in Approx 26 Minutes. with1999-03-0303 March 1999
- on 990201,automatic Start of EDG Was Noted. Caused by Workers Closing Breaker 2A0418 by Discharging Closing Springs.Operators Restored SDC in Approx 26 Minutes. with
ML20204F8101999-02-28028 February 1999 Monthly Operating Repts for Songs,Units 2 & 3.With ML20203J1131999-02-12012 February 1999 Safety Evaluation Supporting Amends 150 & 142 to Licenses NPF-10 & NPF-15,respectively ML20203J1981999-02-12012 February 1999 Safety Evaluation Supporting Amends 149 & 141 to Licenses NPF-10 & NPF-15,respectively ML20202F7041999-01-21021 January 1999 Special Rept:On 990106,SCE Began to Modify 2RT-7865.2RT-7865 to Allow Monitor to Provide Input to New Radiation Monitoring Data Acquisition Sys.Monitor Found to Exceeds 72 H Allowed Bt LCS 3.3.102.Alternate Monitoring Established 05000206/LER-1998-006-01, :on 981207,unattended Security Weapon Was Noted Inside Pa.Cause of Event Is Under Investigation.Officer Was Relieved of All Duties,Removed PA Access & Was Placed on Investigatory Suspension1999-01-0606 January 1999
- on 981207,unattended Security Weapon Was Noted Inside Pa.Cause of Event Is Under Investigation.Officer Was Relieved of All Duties,Removed PA Access & Was Placed on Investigatory Suspension
ML13309A4481998-12-31031 December 1998 Riverside Public Utilities 1997-1998 Annual Rept ML20199F0771998-12-31031 December 1998 Monthly Operating Repts for Dec 1998 for Songs,Units 2 & 3 ML13309A4441998-12-31031 December 1998 Sempra Energy 1998 Annual Rept ML20206H2101998-12-31031 December 1998 SCE 1998 Annual Rept 1999-09-09
[Table view] |
Text
.* .
- Mic FSKM 344 U.S. NUCL3 Aft RMULAT@RY CSMMGBEN APP 7s@VED CY CM3 LICENSEE EVENT REPORT siso ssu O*/r4so (PLEASE PRINT OR TYPE ALL REQUIRED INFORMATION)
CONTROL B LOCK: l l l l l l l@
I o Ii .l .lC l LIC 7
A EN.E I SE IC 0oD lE S I 2l@l0 l 01 - l LIC le ..
0l EN.E 01NU01 010 l -l 01 Ol@[4_Ll_l MB E R .S ..
11 1l ll@l57 C.Tl l@
LIC E N.E T Y PE .. S.
CON'T Lo l' ]
p
"::""' L..LJ@l0 l5
.t DOCK l0ET NUMBER l 0 l 0 l 3l 6l 1l@l.. .. 0 l 7 l1 l4 ]8 l 3W EPoRT EVENTO.TE 74 75 l@l017 D.TE I2 l 9 l 8 l3 l@
EVENT DESCRIPTION AND PROBABLE CONSEQUENCES io l o !2 l lWith the Unit in Mode 1 and followin completion of a channel functional test on l la la l l Core Protection Calculator (CPC) Channel A, a routine channel comparison was l o 4 l conducted. During this comparison it was discovered that certain CPC addressablq lo is liconstants in Channels B_ and D did not comply with the most recent values contained lo ls l Lin the CPC Addressable Constant Loa. The incorrect values were assumed to be l lo l7 lInonconservative and CPC Channels B and D were declared inoperable ir) accordance l lo ls l lwith Technical Specification 2.2.2 at 1630. Public health and safety were not l 1
.*attected by ,t,his event. ..
a.E "
c '.",': .mL e....NEN,e..E .1":.E .: m :E lol91 l Il Al@ lA l@ l X l@ l ZlZ lZ lZ lZl Zl@ lZ l@ lZ l@
- " " " " " " " "'; "' " ' !.'J.' "
E, E N, , u .
@ 'dd.""E,, l813I 10 17 I 3 I I/I 1-1
... .. L..] .. M ., L. 91_1.J. L.T._1 ,, L..OJ n*" '";""" :::1', '"1;* ;" N.... @ *:M",'3"' , ";"*;:.. '".' .Lc
- V .
- , *
," : ",%.8 IX l@l XI@ L.5Z_j@ L.LJ O I o f olo l o I L,y_J @ 'dLJ @ L.ZJ@ I z 19 I 9191
- 9. 94 3 .7 4. 4 4. 4 44 47 CAUSE DESCRIPTION AND CORRECTIVE ACTIONS h lilo llInoperability of CPC Channels B and D was due to addressable constants from the__j lili llchannel functional test data base (i.e., " default" constants) being left in the l li l 2 i lchannels following comoletion of the 18-month channel calibration and function,al_]
l i l a l l test. The correct constant values were entered into CPC Channels B and D within I lil 4 l lone hour and the channels were declared operable. (See attachment). l
'.",*M'l "".'e"#," ; o,.co. u v
,...E, o,N o . .ro. .E.c.,,,,o-liIsILB_]@lOlSl0l@l NA @I (A_j@l CPC Channel Comparison ]
.'Ehi['lE#k"El.E
.-o Mr , .crivir. Loc....N o,,, ELE..E l iI eI [Zj @ l Zl@l
, .. i. i.
NA @l 4.
l 4.
NA l
NuumER 7V85 D E.C R.PfloN Nr i I il 71. .l0 l 0l 0 l@L..Zjgt PE R .oNN EL INJURIE.
Iil81l0 l0 l 0 l@l NA l
..,Eo to vv r o.oE.c
. .','.i . . E ,v io No .c'u@
8308080386 830729 PDR ADOCK 05000361 11 l 9. .l W@l NA s PDR l
...uRI"*'ii ll..., .N @
NRC USE ONLY 12l o l l N l@l NA [ lllllllllllll 7 . . i. .. .. ..
H. B. RAY N N / M l W k Psone (714) 492-7700 NAME OF PPEPARER 7 _
4 .
ATTACHMENT TO LER 83-073 SOUTHERN CALIFORNIA EDISON COMPANY SAN ONOFRE NUCLEAR GENERATING STATION UNIT NO. 2, DOCKET NO. 50-361 SUPPLEMENTAL INFORMATION FOR CAUSE DESCRIPTION AND CORRECTIVE ACTION
A preliminary evaluation by Combustion Engineering, Inc. (CE)
concluded that the use of default values for the addressable constants did not violate safety margins for 50% power operation.
A final evaluation will be performed and if results to the contrary are obtained, a revision to this LER will be submitted.
As corrective action to prevent recurrence of this event, Computer Engineering is developing a program requiring a second verification of CPC constants on a periodic basis.
4 l
1318u
O.
e .
.=
0t Southern California Edison Company S AN ONOFRE NUCLE AR GENER A TING ST A TION l'83 gr3 f
$5 ,-
P .O. B O X 12 8 S AN C LEMENTE C ALIFORNI A 92672 /
H. B. R AY d vetspHONE S v A,10 N . A N A. . . July 29, 1983 i,.l..,.,,.
t U.S. Nuclear Regulatory Commission Office of Inspection and Enforcement Region V 1450 Maria Lane, Suite 210 Walnut Creek, California 94596-5368
?
Attention: Mr. J.B. Martin, Regional Administrator
Dear Sir:
Subject:
Docket No. 50-361 14-Day Follow-Up Report Licensee Event Report No.83-073 San Onofre Nuclear Gen'erating Station, Unit 2
Reference:
Letter, H B. Ray, (SCE) to J. B. Martin (NRC),
dated July 15, 1982 The referenced letter provided you with confirmation of our prompt notification of a reportable occurrence involving the Core Protection Calculators (CPC).
3 Pursuant to Section 6.9.1.12.b of Appendix A, Technical Specifications to Facility Operating License NPP-10 for San Onofre Unit 2, this submittal provides the required 14-day follow-up report and a copy of Licensee Event Report (LER)
No.83-073 to address this event.
If there are any guestions regarding the above, please contact me.
Sincerely, i H6 lncurris
Enclosure:
LER No.83-073 l
l
e ,
. Mr. J.B. M2rtin cc: A.E. Chaffee (USNRC Resident Inspector, Units 2 and 3)
J.P. Stewart (USNRC Resident Inspector, Units 2 and 3)
U.S. Nuclear Regulatory Commission Office of Inspection and Enforcement U.S. Nuclear Regulatory Commission Division of Technical Information and Document Control ,
Institute of Nuclear Power Operations (INPO)
- v. =-
I 1318u
. , . . . - , . _ - - - . _- . .. . . .- . . - , . . = - . , :. : :.