Category:TECHNICAL SPECIFICATIONS
MONTHYEARML20217C6321999-09-30030 September 1999 Proposed Tech Specs 3/4.17.B, Control Room Emergency Filtration Sys, Eliminating Unnecessary in-place Testing of HEPA & Activated Charcoal Filters Based on Sys Operating Time ML20203B3191999-01-28028 January 1999 Proposed Tech Specs Page 60d,incorporating Approved Amend 103 Changes for Use by NRC in Issuing SER ML20206P1331998-12-31031 December 1998 Proposed Tech Specs,Revising pressure-temp Limit Curves Contained in Figures 3.6.1,3.6.2,3.6.3 & 3.6.4,deleting Completed RPV Sample SRs & Requirement to Withdraw Specimen at Next Refueling Outage & Removing Redundant SR for SLCS ML20154L9551998-10-12012 October 1998 Proposed Tech Specs Re Rev of Statement on Normal Shift Length & Other Misc Changes ML20154L9041998-10-0909 October 1998 Proposed Tech Specs,Incorporating Proposed Changes Re Surveillance Test Interval/Aot Extension Program ML20153F0191998-09-25025 September 1998 Proposed Tech Specs Pages Re Condensate Storage Tank Low Level Hpci/Rcic Suction Transfer ML20236P5421998-07-0101 July 1998 Proposed Tech Specs Pages 30,50 & 53 Containing Administrative Changes Re Power Rerate Program ML20249C5121998-06-19019 June 1998 Proposed Tech Specs Pages Re Rev 2 to 960726 LAR to License DPR-22,to Establish TS Requirements That Are Consistent W/Analysis Inputs Used for Evaluation of Radiological Consequences of MSLB Accident ML20247K6341998-05-12012 May 1998 Proposed Reprinted Tech Specs Bases Pages,Containing Spelling & Grammatical Corrections ML20216D0021998-03-19019 March 1998 Proposed Tech Specs,Providing Consistent Wording Throughout TS & Providing Sound Basis for Frequency of Actions Required Each Shift ML20248L2001998-03-13013 March 1998 Proposed Tech Specs Revising SLMCPR ML20248L4101998-03-0606 March 1998 Revised Page 39 to Proposed TS Change ML20202H7061997-12-0404 December 1997 Proposed Tech Specs Increasing Plant Max Power Level from 1670 Mwt to 1775 Mwt ML20203A9771997-11-25025 November 1997 Proposed Tech Specs Re Condensate Storage Tank Low Level Hpci/Rcic Suction Transfer ML20211J9801997-09-29029 September 1997 Proposed Tech Specs Page 249b & Cleaned Typed Page 249b, Adding Footnote to Topical Rept NEDE-24011-P-A Stating That Topical Rept Is Approved for Cycle 18 Only ML20210Q2971997-08-21021 August 1997 Proposed Tech Specs Re Safety Limit Min Critical Power Ratio ML20141B9181997-06-19019 June 1997 Proposed Tech Specs Re Update of Design Basis Accident Containment Temp & Pressure Response ML20137W2201997-04-11011 April 1997 Proposed Tech Specs 3.6.C Re Coolant Chemistry & TS 3/4.17B Re Control Room Emergency Filtration Sys ML20149M7281997-01-23023 January 1997 Proposed Tech Specs 3.5/4.5.C of TS Bases Describing Min RHR & RHRSW Pump Requirements for Post Accident Containment Heat Removal & Submit Update to Design Basis Accident Containment Temp & Pressure Response ML20132C6531996-11-25025 November 1996 Proposed Tech Specs,Sections 2.1.A Re SLMCPR & 3.11.C Re Olmcpr.Changes Revise SLMCPR Values & Deletes Sentence Re OLMCPR Limit Penalty for Single Recirculation Loop Operation ML20117A1551996-08-15015 August 1996 Proposed Tech Specs Re Revision to TS Administrative Controls Section 6.1.F.1 Stating That Either 8 or 12 H Shifts Will Be Considered Normal & 40 H Will Be Considered Nominal ML20116G8951996-07-26026 July 1996 Proposed Tech Specs Increasing Max Power Level by 6.3% to 1,775 from 1,670 Mwt.Summary of Plant Mods for Power Rerate Implementation & Power Rerate Environ Evaluation Encl ML20116D8361996-07-26026 July 1996 Proposed TS Sections 3.6.C & 3/4.17.B Re Reactor Coolant Equivalent Radioiodine Concentration & CR Habitability ML20100Q3861996-03-0101 March 1996 Proposed Tech Specs Re Periodic Replacement of Containment Purge & Vent Valve Seat Seal ML20095J4341995-12-20020 December 1995 Proposed Tech Specs Re Main Steam Isolation & App J Leak Rate Test Requirements ML20095E7121995-12-11011 December 1995 Proposed Tech Specs,Removing TS SR 4.7.D.4 & Replaces Seat Seals for Drywell & Suppression Chamber Purge & Vent Valves Every Five Yrs ML20094M1981995-11-14014 November 1995 Proposed Tech Specs,Incorporating Requirements of Option B, Section Iii.A for Type a Testing (Primary Containment ILRT) ML20091K6821995-08-18018 August 1995 Proposed Tech Specs Section 3.7/4.7 SGTS ML20087J4251995-08-15015 August 1995 Proposed Tech Specs,Revising Max Individual MSIV Leak Rate Acceptance Criteria of 11.5 Scfh to Overall Criteria That Encompasses Four Main Steam Lines Into One Limit of 46 Scfh ML20086D8011995-07-0505 July 1995 Proposed Tech Specs Extending Surveillance Test Intervals & Allowable out-of-svc Times for Selected Instrumentation ML20085N0991995-06-22022 June 1995 Proposed Tech Specs Supporting Implementation of BWR Thermal Hydraulic Stability Solution ML20082N8711995-04-20020 April 1995 Proposed Tech Specs Re SBGTS & Secondary Containment ML20069J1061994-06-0808 June 1994 Proposed TS Re SGTS & Secondary Containment ML20065B6691994-03-28028 March 1994 Proposed Tech Specs Re Approved Analytical Methods for Developing Core Operating Limits Rept ML20065B6991994-03-28028 March 1994 Proposed Tech Specs Re Standby Gas Treatment Sys Initiation Instumentation ML20063C9941994-01-26026 January 1994 Proposed Tech Specs,Requiring Valves to Be Tested at Pressure Greater than or Equal to Calculated Peak Containment Internal Pressure Re Design Basis LOCA ML20062N8731994-01-0404 January 1994 Proposed Tech Specs 3.11, Reactor Fuel Assemblies & Bases Re Methodology for MCPR ML20059E6041994-01-0303 January 1994 Proposed Tech Specs,Revising Surveillance Requirement 4.6.E.1.a to Require Valves to Be Tested Per Section XI Inservice Testing Requirements of ASME Boiler & Pressure Vessel Code ML1132102881993-11-30030 November 1993 Proposed Tech Specs Re Removal of Chlorine Detection Requirements & Changes to Control Room Ventilation Sys Requirements ML20056E1081993-08-10010 August 1993 Proposed Tech Specs Providing Clarification of Sampling & Analysis Requirements,Updating Liquid Effluent Sampling & Requirements & Correcting Typographical Errors in TS Section ML20045G6091993-07-0707 July 1993 Proposed TS 4.0.d Re Recording Unidentified & Identified Leakage Rates & 3/6/4.6 Re Analyzing Grad Samples of Primary Containment Atmosphere Once Per 12 H ML20128M7191993-02-12012 February 1993 Proposed TS Increasing Minimum Core Spray Pump Flow to More Conservatively Account for ECCS Bypass Leakage Paths ML20237G2081987-08-14014 August 1987 Proposed Tech Specs,Eliminating Certain Requirements for Plant Mgt & Support Staff to Hold Current Senior Reactor Operator Licenses ML20065E2121982-09-24024 September 1982 Proposed Tech Specs Re Surveillance,Reactor Protection Monitoring Sys,Jet Pump Surveillance,Organization & Steam Line Area Temp Switch Deviation ML1129708531982-07-0202 July 1982 Proposed Tech Spec Changes Allowing Plant to Remain at Substantial Power Level W/One Recirculation Pump in Operation & Equalizer Valve Closed ML1129708181981-03-19019 March 1981 Proposed Revisions to Tech Specs,App A,Pages 26,89-90 & 213-14 for Reactor Protection Sys ML20024G6491978-08-16016 August 1978 Proposed Tech Specs Raising Permissible Setpoint of Eight Safety/Relief Valves Installed at Plant to 1,108 Psig ML20127H2171978-08-10010 August 1978 Proposed Tech Specs to Authorize Use of Partial Drilled Model of Fuel Type for Plant Future Use ML20024G7051978-03-21021 March 1978 Proposed Tech Specs Re Application of Partial Drilled Model for Analyzing Retrofit Fuel Design Scheduled to Be Installed in Plant Reactor in Fall 1978 Refueling Outage ML20024G7031978-03-20020 March 1978 Proposed Tech Specs Clarifying Certain Sections of Interim Radioactive Effluent Tech Specs 1999-09-30
[Table view] Category:TECHNICAL SPECIFICATIONS & TEST REPORTS
MONTHYEARML20217C6321999-09-30030 September 1999 Proposed Tech Specs 3/4.17.B, Control Room Emergency Filtration Sys, Eliminating Unnecessary in-place Testing of HEPA & Activated Charcoal Filters Based on Sys Operating Time ML20211G0391999-02-10010 February 1999 Revised ODCM, Including Revs to Revised ODCM Index,Odcm 01.01 Page 2 Paragraph 1,ODCM 02.01 Page 2 Section 1.0,ODCM 05.01 Page 2 Sections 1.0,2.0 & 3.0 & ODCM 13.05 Page 2 ML20203B3191999-01-28028 January 1999 Proposed Tech Specs Page 60d,incorporating Approved Amend 103 Changes for Use by NRC in Issuing SER ML20206P1331998-12-31031 December 1998 Proposed Tech Specs,Revising pressure-temp Limit Curves Contained in Figures 3.6.1,3.6.2,3.6.3 & 3.6.4,deleting Completed RPV Sample SRs & Requirement to Withdraw Specimen at Next Refueling Outage & Removing Redundant SR for SLCS ML20154L9551998-10-12012 October 1998 Proposed Tech Specs Re Rev of Statement on Normal Shift Length & Other Misc Changes ML20154L9041998-10-0909 October 1998 Proposed Tech Specs,Incorporating Proposed Changes Re Surveillance Test Interval/Aot Extension Program ML20153F0191998-09-25025 September 1998 Proposed Tech Specs Pages Re Condensate Storage Tank Low Level Hpci/Rcic Suction Transfer ML20237E9771998-08-20020 August 1998 Rev 4 to EWI-09.04.01, Inservice Testing Program ML20236P5421998-07-0101 July 1998 Proposed Tech Specs Pages 30,50 & 53 Containing Administrative Changes Re Power Rerate Program ML20249C5121998-06-19019 June 1998 Proposed Tech Specs Pages Re Rev 2 to 960726 LAR to License DPR-22,to Establish TS Requirements That Are Consistent W/Analysis Inputs Used for Evaluation of Radiological Consequences of MSLB Accident ML20247K6341998-05-12012 May 1998 Proposed Reprinted Tech Specs Bases Pages,Containing Spelling & Grammatical Corrections ML20216D0021998-03-19019 March 1998 Proposed Tech Specs,Providing Consistent Wording Throughout TS & Providing Sound Basis for Frequency of Actions Required Each Shift ML20248L2001998-03-13013 March 1998 Proposed Tech Specs Revising SLMCPR B210059, Rev 1 to GE-NE-B2100594-1, Radiological Analyses of Design Basis Accidents1998-03-0909 March 1998 Rev 1 to GE-NE-B2100594-1, Radiological Analyses of Design Basis Accidents ML20248L4101998-03-0606 March 1998 Revised Page 39 to Proposed TS Change ML20202H7061997-12-0404 December 1997 Proposed Tech Specs Increasing Plant Max Power Level from 1670 Mwt to 1775 Mwt ML20203A9771997-11-25025 November 1997 Proposed Tech Specs Re Condensate Storage Tank Low Level Hpci/Rcic Suction Transfer ML20199H5281997-11-0606 November 1997 Software Requirement Specification (SRS) ERDS-SRS-1-3, Process Computer Sys - Emergency Response Data Sys (ERDS) - Data Point Library ML20211J9801997-09-29029 September 1997 Proposed Tech Specs Page 249b & Cleaned Typed Page 249b, Adding Footnote to Topical Rept NEDE-24011-P-A Stating That Topical Rept Is Approved for Cycle 18 Only ML20210Q2971997-08-21021 August 1997 Proposed Tech Specs Re Safety Limit Min Critical Power Ratio ML20141B9181997-06-19019 June 1997 Proposed Tech Specs Re Update of Design Basis Accident Containment Temp & Pressure Response ML20137W2201997-04-11011 April 1997 Proposed Tech Specs 3.6.C Re Coolant Chemistry & TS 3/4.17B Re Control Room Emergency Filtration Sys ML20137B5081997-03-12012 March 1997 Rev 2 to Inservice Insp Exam Plan ML20149M7281997-01-23023 January 1997 Proposed Tech Specs 3.5/4.5.C of TS Bases Describing Min RHR & RHRSW Pump Requirements for Post Accident Containment Heat Removal & Submit Update to Design Basis Accident Containment Temp & Pressure Response ML20132C6531996-11-25025 November 1996 Proposed Tech Specs,Sections 2.1.A Re SLMCPR & 3.11.C Re Olmcpr.Changes Revise SLMCPR Values & Deletes Sentence Re OLMCPR Limit Penalty for Single Recirculation Loop Operation ML20117A1551996-08-15015 August 1996 Proposed Tech Specs Re Revision to TS Administrative Controls Section 6.1.F.1 Stating That Either 8 or 12 H Shifts Will Be Considered Normal & 40 H Will Be Considered Nominal ML20116G8951996-07-26026 July 1996 Proposed Tech Specs Increasing Max Power Level by 6.3% to 1,775 from 1,670 Mwt.Summary of Plant Mods for Power Rerate Implementation & Power Rerate Environ Evaluation Encl ML20116D8361996-07-26026 July 1996 Proposed TS Sections 3.6.C & 3/4.17.B Re Reactor Coolant Equivalent Radioiodine Concentration & CR Habitability ML20115D8621996-06-28028 June 1996 Rev 3 to Engineering Work Instruction (Ewi) EWI-09.04.01, Inservice Testing Program ML20100Q3861996-03-0101 March 1996 Proposed Tech Specs Re Periodic Replacement of Containment Purge & Vent Valve Seat Seal ML20095J4341995-12-20020 December 1995 Proposed Tech Specs Re Main Steam Isolation & App J Leak Rate Test Requirements ML20095E7121995-12-11011 December 1995 Proposed Tech Specs,Removing TS SR 4.7.D.4 & Replaces Seat Seals for Drywell & Suppression Chamber Purge & Vent Valves Every Five Yrs ML20094M1981995-11-14014 November 1995 Proposed Tech Specs,Incorporating Requirements of Option B, Section Iii.A for Type a Testing (Primary Containment ILRT) ML20100M4821995-08-29029 August 1995 Revised Sections to Odcm,Including Rev 1 to ODCM-03.01,Rev 1 to ODCM-12.05 & Rev 1 to ODCM-13.05.5 ML20091K6821995-08-18018 August 1995 Proposed Tech Specs Section 3.7/4.7 SGTS ML20087J4251995-08-15015 August 1995 Proposed Tech Specs,Revising Max Individual MSIV Leak Rate Acceptance Criteria of 11.5 Scfh to Overall Criteria That Encompasses Four Main Steam Lines Into One Limit of 46 Scfh ML20086D8011995-07-0505 July 1995 Proposed Tech Specs Extending Surveillance Test Intervals & Allowable out-of-svc Times for Selected Instrumentation ML20085N0991995-06-22022 June 1995 Proposed Tech Specs Supporting Implementation of BWR Thermal Hydraulic Stability Solution ML20083Q8411995-05-18018 May 1995 Rewrite of Rev 2 to Engineering Work Instruction (Ewi) EWI-09.04.01, Inservice Testing Program ML20082N8711995-04-20020 April 1995 Proposed Tech Specs Re SBGTS & Secondary Containment ML20077S4551995-01-0909 January 1995 Startup Physics Testing Rept,Cycle 17 ML20069J1061994-06-0808 June 1994 Proposed TS Re SGTS & Secondary Containment ML20072P8011994-05-17017 May 1994 Rev 8 to Process Control Program, Installed Atcor Solidification Sys ML20065B6691994-03-28028 March 1994 Proposed Tech Specs Re Approved Analytical Methods for Developing Core Operating Limits Rept ML20065B6991994-03-28028 March 1994 Proposed Tech Specs Re Standby Gas Treatment Sys Initiation Instumentation ML20072P8101994-02-22022 February 1994 Offsite Dose Calculation Manual, Rev 0 ML20063C9941994-01-26026 January 1994 Proposed Tech Specs,Requiring Valves to Be Tested at Pressure Greater than or Equal to Calculated Peak Containment Internal Pressure Re Design Basis LOCA ML20062N8731994-01-0404 January 1994 Proposed Tech Specs 3.11, Reactor Fuel Assemblies & Bases Re Methodology for MCPR ML20059E6041994-01-0303 January 1994 Proposed Tech Specs,Revising Surveillance Requirement 4.6.E.1.a to Require Valves to Be Tested Per Section XI Inservice Testing Requirements of ASME Boiler & Pressure Vessel Code ML1132102881993-11-30030 November 1993 Proposed Tech Specs Re Removal of Chlorine Detection Requirements & Changes to Control Room Ventilation Sys Requirements 1999-09-30
[Table view] |
Text
- -- -
y : y ~
4 .
t -
9 3.0 I,IMITING CONDITIONS FOR OPERATION 4.0 SURVERLANCE REOUIRDENTS .
y n, (iv) The rod block function of the O- rod worth minimizer shall be
- O r; verified by attempt! ut to with-draw an out-of-sequence control
>@ rod beyond the block point.
co Os 04 7 tJ (b) Whenever the reactor is in the (b) If the rod worth minimizer is inoperable ou startup or run mode below 107 while the reactor is in the startup or y rated thermal power, no centrol run mode below 10I rated thermal power g og rods shall be moved unless the and the second independent operator or engineer is being used, he shall c ra a rod worth minimizer is operable
"$ or a accond independent operator or egineer verifies that the verify that all rod positions are correct prior to commencing withdrmaal operator at the reactor console or insertion of each rod group.
is following the control rod program. The second operator may be used as a substitute for an inoperable rod worth minimizer during a startup only if the rod i vorth minimizer fails af ter with-drawal of at least twelve control '
rods. i
- 4. Control rods shall not be withdrawn 4 Prior to control rod withdrawal for for startup or refueling unless at startup or during refueling verify i least two source range channels have an observed ccunt rate equal to or that at least two source range channels have an observed count rate h
greater than three counts per second, of at least three counts per second.
- 5. Whenever the Engir.eer, Nuclear, deter- 5. Whenever the Engineer, Nuclear, deter-mines that a limiting control rod mines that a limiting control rod pattern pattern exists, withdrawal of desig- exists, an instrtment functional test nated control rods shall be permitted I of the RBM shall be performed prior to l only when the REM system is operable. withdrawal of the designated rod (s) and daily thereafter.
I i
3,3/4.3 7g REV i
.n - - - - _ -_ -_ -- .__-- -- - . - - - -w- . - - -- -- r 3.0 LIMITING CONDITIONS FOR OPERATI(N 4.0 SuRVEILIANCE REQUIRBENTS C. Minimum Critical Power Ratio (MCPR) C. Ministan Critf cal Power Ratio (MCPR)
~
During power operation, MCPR shall be determined daily dur-the Operating EPR Limit shall be ing reactor power operation at 2t257.
l ,
> 1.46 for 8x8 fuel and 21.37 for rated thermal powse and following 7x7 fuel at rated power and flow. any change in power level or distri-If at any time during operation it is detemined that the limiting bution which has the potential cf bringing the core to its operating h
value for EPR is being exceeded, E PR limit.
action shall be initiated within 15 minutes to restore operation to with-in the prescribed limits. Surveil-lance and corresponding tetion shall continue until reactor operation is within the prescribed limits. If the steady state EPR is not returned to within the prescribed limita with-in two (2) hours, the reactor shall ha brought to the Cold Shutdown con-dition within 36 hours4.166667e-4 days <br />0.01 hours <br />5.952381e-5 weeks <br />1.3698e-5 months <br />. For core flows other than rated the Operating EPR Limit shall be the above applicable MCPR value times Kr where Kr is as shown in Figure 3.11.3.
189D 3.11/4.11 RW
_ _ __ _ o_ ----
.. ;
- g a Bases 3.11 (continued) .I.,
C. Minimum Critical Power Ratio ('.fCPR) ., .
The ECCS evaluation presented in Reference 4 assumed the steady state MCPR prior to the postulated loss-of-coolant accident to be 1.18 for all fuel types. In addition, the ECCS analysis presented in Reference 6 assumed an initial MCPR of 1.24 for reduced flow con-I ditions. The Operating MCPR Limit of 1.46 for 8x8 fuel and 1.37 for 7x7 fuel is determined from the analysis of transients discussed in Bases Sections 2.1 and 2.3. By maintaining an operating MCPR above these limits, the Safety Limit of.1.06 (T.S.2.1.A) applicable to all fuel types is maintained in the event of the most limiting abnormal operational transient.
For operation with less than rated core flow the Operating MCPR_ Limit is adjusted by multiplying the above limit by Kg. Reference 5 discusses how the transient analysis h done at rated conditions encompasses the reduced flow situation when the proper Kg factor ,
is applied.
Those abnormal operational transients, analyzed in FSAR Section 14.5, which result in an automatic reactor scram are not considered a violation of the LCO. Exceeding MCPR limits in such cases need not be reported.
Keferences
- 1. " Fuel Densification Ef fects in General Electric Boiling Water Reactor Fuel," Supplements 6, 7, and 8, NEDM-10735, August, 1973.
- 2. Supplement 1 to Technical Report on Densification of General Electric Reactor Fuels, December 14,1974 (USAEC Regulatory Staff)
- 3. Communication: VANbore to IS Mitchell, " Modified CE Model for Fuel Densification,"
Docket 50-321, March 27, 1974.
- 4. "Monticello Nuclear Generating Plant Loss-Of-Coolant Accident Analysis Conformance with 10 CFR 50 Appendix K, August 1974," L 0 Mayer (NSP) to J F O' Leary. August 20. 1974
- 5. " General Electric BWR Generic Reload Application for 8 x 8 Fuel." NEDO-20360, Revision
- 1. November 1974 l
l 6. " Additional Effects of Core Flow on ECCS LOCA Analysis," A. Levine (CE) to Z. Rosztoczy j (NRC) August 24, 1976.
t 3.11 BASES 189F P1V '
- 7. T O u.s. Nucle An maovcAtony c'okwesioN n stNu : a NRC DISTRIBUTION Pon PART 50 DOCKET MATERIAL TO: F ROM: DAte oP pocuusNr Mr. Victor Stello N rthern States Power company 7/29/77 Minneapolis, Mn oats m6ceivso f..O. Mnver R /1/77 NTTs m TNotomi2:0 P R oP INPUT PomW NVWssM OP COPiss meCalvso o o*NAL QuNc LAssiPis o 4y Q .
oescairTsow sNcLosvan License No. DPR-22 Application for Amendt' Tech specs proposed change concerning correction of an editorial error E seeks d(# t a more restrictive MCPR limit.
w;f:~ ;-nn q, Hun..LaLLu n u.
j .
JO 10~ REM 0E
,, PLANT NAME:
i Monticello Nuclear Plant Generating Plant enclosures: 13p, 13p, 13p.
VT 8/P/77 (1-P)
. RAFETy FOR ACTION /INFORMATION ENVIPENMENTAL
, ASSICNED ADt ASSIGNED ADt V. HOORE (LTR)
/ RRANCH CHIEF: (7/ Dd V/5 '
BRANCH CHIEFt PROJECT MANAGERt PROJECT MANAGER:
, LICENSING ASSISTANTt LICENSING ASSISTANT:
B. MAELESS
, INTERNAL DISTRIBUTION JMme FTt ?9 3 SYS72NS SAFETY PLANT SYSTEMS SITE SAFETY &
C Muc rux HEINt: MAN TEDESCO ENVIRON ANALYSIS
/
/ T AF nFt fi
/1) SCHROEDER BENAROYA fATNAM DEN'IVN - & MULLER c?f fTCHFT Ft.n
/ COSSICK & STAFF ENGINEERING IPPOLITO
/ MAMiffED MNTCMT F. ROSA ENVIRO TECH.
vTpc BOSNAM ERNST J cA<F . -W SIHWELL OPERATING REACTORS BALLARD RtWn PAWLICMT / STEtLO YOUNGPLOOD 1- / FT9ENMtfT
! 990 TFCT WANACUTNT REACTOR SAFEIY / S~r8.A0 o*Svnnt.T ROSS / EAER P. COf.1TN9 NOVAK / BUTLER GAMMILL (2)
MottsmN RO S Z'IUCZY # CRIES
. Mrt T2 / CHECK SITE ANALYSIS E- MrtTEMES VOLLMER tr AT&I / BUNCH .
SALTZMAN J. COLLINS RUTBERG _
KREGER
- EXTE RN AL DISTT.180 TION CONTROL NUMBE R j '
LPDRs_ Elinnea' DO!Ji' .Hf)I ,
[
/ TIC NSIC ,
'~
l NAT MB ~
f REC TV (J. HANCHETT) 77215c>222 ./
[ / 16 CYS ACRS SENT CATEGORY 5
, N AC P QaM 196 f2 73) w-y'I- pm- 1-y4 -g,e-.- .s-.-i 9 ry- goy 7 y- - "- **Mf' w 41p"-vf"-'-~-W----'**w ' =*- *- ' - - ++ F**