Semantic search
Jump to navigation
Jump to search
Issue date | Title | Topic | |
---|---|---|---|
ML20217C632 | 30 September 1999 | Proposed Tech Specs 3/4.17.B, Control Room Emergency Filtration Sys, Eliminating Unnecessary in-place Testing of HEPA & Activated Charcoal Filters Based on Sys Operating Time | |
ML20211G039 | 10 February 1999 | Revised ODCM, Including Revs to Revised ODCM Index,Odcm 01.01 Page 2 Paragraph 1,ODCM 02.01 Page 2 Section 1.0,ODCM 05.01 Page 2 Sections 1.0,2.0 & 3.0 & ODCM 13.05 Page 2 | Offsite Dose Calculation Manual |
ML20203B319 | 28 January 1999 | Proposed Tech Specs Page 60d,incorporating Approved Amend 103 Changes for Use by NRC in Issuing SER | |
ML20206P133 | 31 December 1998 | Proposed Tech Specs,Revising pressure-temp Limit Curves Contained in Figures 3.6.1,3.6.2,3.6.3 & 3.6.4,deleting Completed RPV Sample SRs & Requirement to Withdraw Specimen at Next Refueling Outage & Removing Redundant SR for SLCS | Hydrostatic |
ML20154L955 | 12 October 1998 | Proposed Tech Specs Re Rev of Statement on Normal Shift Length & Other Misc Changes | Safe Shutdown High Radiation Area Grab sample Offsite Dose Calculation Manual Fire Barrier Scram Discharge Volume Process Control Program Fuel cladding Pressure Boundary Leakage Continuous fire watch Fire Protection Program Fire Watch Hourly Fire Watch |
ML20154L904 | 9 October 1998 | Proposed Tech Specs,Incorporating Proposed Changes Re Surveillance Test Interval/Aot Extension Program | |
ML20153F019 | 25 September 1998 | Proposed Tech Specs Pages Re Condensate Storage Tank Low Level Hpci/Rcic Suction Transfer | |
ML20237E977 | 20 August 1998 | Rev 4 to EWI-09.04.01, Inservice Testing Program | High Radiation Area Stroke time Squib Scram Discharge Volume Power-Operated Valves Power Operated Valves |
ML20236P542 | 1 July 1998 | Proposed Tech Specs Pages 30,50 & 53 Containing Administrative Changes Re Power Rerate Program | |
ML20249C512 | 19 June 1998 | Proposed Tech Specs Pages Re Rev 2 to 960726 LAR to License DPR-22,to Establish TS Requirements That Are Consistent W/Analysis Inputs Used for Evaluation of Radiological Consequences of MSLB Accident | |
ML20247K634 | 12 May 1998 | Proposed Reprinted Tech Specs Bases Pages,Containing Spelling & Grammatical Corrections | Fire Barrier Scram Discharge Volume Fuel cladding |
ML20216D002 | 19 March 1998 | Proposed Tech Specs,Providing Consistent Wording Throughout TS & Providing Sound Basis for Frequency of Actions Required Each Shift | |
ML20248L200 | 13 March 1998 | Proposed Tech Specs Revising SLMCPR | |
B210059, Rev 1 to GE-NE-B2100594-1, Radiological Analyses of Design Basis Accidents | 9 March 1998 | Rev 1 to GE-NE-B2100594-1, Radiological Analyses of Design Basis Accidents | |
ML20248L410 | 6 March 1998 | Revised Page 39 to Proposed TS Change | |
ML20202H706 | 4 December 1997 | Proposed Tech Specs Increasing Plant Max Power Level from 1670 Mwt to 1775 Mwt | Abnormal operational transient Scram Discharge Volume MELLLA Fuel cladding Pressure Boundary Leakage |
ML20203A977 | 25 November 1997 | Proposed Tech Specs Re Condensate Storage Tank Low Level Hpci/Rcic Suction Transfer | |
ML20199H528 | 6 November 1997 | Software Requirement Specification (SRS) ERDS-SRS-1-3, Process Computer Sys - Emergency Response Data Sys (ERDS) - Data Point Library | Reactor Vessel Water Level Met Tower |
ML20211J980 | 29 September 1997 | Proposed Tech Specs Page 249b & Cleaned Typed Page 249b, Adding Footnote to Topical Rept NEDE-24011-P-A Stating That Topical Rept Is Approved for Cycle 18 Only | Shutdown Margin |
ML20210Q297 | 21 August 1997 | Proposed Tech Specs Re Safety Limit Min Critical Power Ratio | Fuel cladding |
ML20141B918 | 19 June 1997 | Proposed Tech Specs Re Update of Design Basis Accident Containment Temp & Pressure Response | |
ML20137W220 | 11 April 1997 | Proposed Tech Specs 3.6.C Re Coolant Chemistry & TS 3/4.17B Re Control Room Emergency Filtration Sys | Power change |
ML20137B508 | 12 March 1997 | Rev 2 to Inservice Insp Exam Plan | |
ML20149M728 | 23 January 1997 | Proposed Tech Specs 3.5/4.5.C of TS Bases Describing Min RHR & RHRSW Pump Requirements for Post Accident Containment Heat Removal & Submit Update to Design Basis Accident Containment Temp & Pressure Response | |
ML20132C653 | 25 November 1996 | Proposed Tech Specs,Sections 2.1.A Re SLMCPR & 3.11.C Re Olmcpr.Changes Revise SLMCPR Values & Deletes Sentence Re OLMCPR Limit Penalty for Single Recirculation Loop Operation | Abnormal operational transient Fuel cladding |
ML20117A155 | 15 August 1996 | Proposed Tech Specs Re Revision to TS Administrative Controls Section 6.1.F.1 Stating That Either 8 or 12 H Shifts Will Be Considered Normal & 40 H Will Be Considered Nominal | Safe Shutdown High Radiation Area Grab sample Fire Barrier Continuous fire watch Fire Protection Program Hourly Fire Watch |
ML20116G895 | 26 July 1996 | Proposed Tech Specs Increasing Max Power Level by 6.3% to 1,775 from 1,670 Mwt.Summary of Plant Mods for Power Rerate Implementation & Power Rerate Environ Evaluation Encl | Ultimate heat sink Hydrostatic Abnormal operational transient Scram Discharge Volume MELLLA Safeguards Contingency Plan License Renewal Control of Heavy Loads Fuel cladding Pressure Boundary Leakage Unidentified leakage |
ML20116D836 | 26 July 1996 | Proposed TS Sections 3.6.C & 3/4.17.B Re Reactor Coolant Equivalent Radioiodine Concentration & CR Habitability | Power change |
ML20115D862 | 28 June 1996 | Rev 3 to Engineering Work Instruction (Ewi) EWI-09.04.01, Inservice Testing Program | High Radiation Area Stroke time Squib Scram Discharge Volume Power-Operated Valves Power Operated Valves |
ML20100Q386 | 1 March 1996 | Proposed Tech Specs Re Periodic Replacement of Containment Purge & Vent Valve Seat Seal | |
ML20095J434 | 20 December 1995 | Proposed Tech Specs Re Main Steam Isolation & App J Leak Rate Test Requirements | |
ML20095E712 | 11 December 1995 | Proposed Tech Specs,Removing TS SR 4.7.D.4 & Replaces Seat Seals for Drywell & Suppression Chamber Purge & Vent Valves Every Five Yrs | |
ML20094M198 | 14 November 1995 | Proposed Tech Specs,Incorporating Requirements of Option B, Section Iii.A for Type a Testing (Primary Containment ILRT) | Exemption Request |
ML20100M482 | 29 August 1995 | Revised Sections to Odcm,Including Rev 1 to ODCM-03.01,Rev 1 to ODCM-12.05 & Rev 1 to ODCM-13.05.5 | Grab sample |
ML20091K682 | 18 August 1995 | Proposed Tech Specs Section 3.7/4.7 SGTS | |
ML20087J425 | 15 August 1995 | Proposed Tech Specs,Revising Max Individual MSIV Leak Rate Acceptance Criteria of 11.5 Scfh to Overall Criteria That Encompasses Four Main Steam Lines Into One Limit of 46 Scfh | |
ML20086D801 | 5 July 1995 | Proposed Tech Specs Extending Surveillance Test Intervals & Allowable out-of-svc Times for Selected Instrumentation | Scram Discharge Volume |
ML20085N099 | 22 June 1995 | Proposed Tech Specs Supporting Implementation of BWR Thermal Hydraulic Stability Solution | Shutdown Margin Abnormal operational transient |
ML20083Q841 | 18 May 1995 | Rewrite of Rev 2 to Engineering Work Instruction (Ewi) EWI-09.04.01, Inservice Testing Program | High Radiation Area Stroke time Squib Scram Discharge Volume Power-Operated Valves Power Operated Valves |
ML20082N871 | 20 April 1995 | Proposed Tech Specs Re SBGTS & Secondary Containment | Shutdown Margin |
ML20077S455 | 9 January 1995 | Startup Physics Testing Rept,Cycle 17 | Shutdown Margin |
ML20069J106 | 8 June 1994 | Proposed TS Re SGTS & Secondary Containment | Shutdown Margin |
ML20072P801 | 17 May 1994 | Rev 8 to Process Control Program, Installed Atcor Solidification Sys | Process Control Program |
ML20065B669 | 28 March 1994 | Proposed Tech Specs Re Approved Analytical Methods for Developing Core Operating Limits Rept | Shutdown Margin |
ML20065B699 | 28 March 1994 | Proposed Tech Specs Re Standby Gas Treatment Sys Initiation Instumentation | |
ML20072P810 | 22 February 1994 | Offsite Dose Calculation Manual, Rev 0 | Offsite Dose Calculation Manual |
ML20063C994 | 26 January 1994 | Proposed Tech Specs,Requiring Valves to Be Tested at Pressure Greater than or Equal to Calculated Peak Containment Internal Pressure Re Design Basis LOCA | Exemption Request |
ML20062N873 | 4 January 1994 | Proposed Tech Specs 3.11, Reactor Fuel Assemblies & Bases Re Methodology for MCPR | Shutdown Margin Abnormal operational transient |
ML20059E604 | 3 January 1994 | Proposed Tech Specs,Revising Surveillance Requirement 4.6.E.1.a to Require Valves to Be Tested Per Section XI Inservice Testing Requirements of ASME Boiler & Pressure Vessel Code | |
ML113210288 | 30 November 1993 | Proposed Tech Specs Re Removal of Chlorine Detection Requirements & Changes to Control Room Ventilation Sys Requirements |