Semantic search
Jump to navigation
Jump to search
Issue date | Title | Topic | |
---|---|---|---|
ML20217C632 | 30 September 1999 | Proposed Tech Specs 3/4.17.B, Control Room Emergency Filtration Sys, Eliminating Unnecessary in-place Testing of HEPA & Activated Charcoal Filters Based on Sys Operating Time | |
ML20203B319 | 28 January 1999 | Proposed Tech Specs Page 60d,incorporating Approved Amend 103 Changes for Use by NRC in Issuing SER | |
ML20206P133 | 31 December 1998 | Proposed Tech Specs,Revising pressure-temp Limit Curves Contained in Figures 3.6.1,3.6.2,3.6.3 & 3.6.4,deleting Completed RPV Sample SRs & Requirement to Withdraw Specimen at Next Refueling Outage & Removing Redundant SR for SLCS | Hydrostatic |
ML20154L955 | 12 October 1998 | Proposed Tech Specs Re Rev of Statement on Normal Shift Length & Other Misc Changes | Safe Shutdown High Radiation Area Grab sample Offsite Dose Calculation Manual Fire Barrier Scram Discharge Volume Process Control Program Fuel cladding Pressure Boundary Leakage Continuous fire watch Fire Protection Program Fire Watch Hourly Fire Watch |
ML20154L904 | 9 October 1998 | Proposed Tech Specs,Incorporating Proposed Changes Re Surveillance Test Interval/Aot Extension Program | |
ML20153F019 | 25 September 1998 | Proposed Tech Specs Pages Re Condensate Storage Tank Low Level Hpci/Rcic Suction Transfer | |
ML20236P542 | 1 July 1998 | Proposed Tech Specs Pages 30,50 & 53 Containing Administrative Changes Re Power Rerate Program | |
ML20249C512 | 19 June 1998 | Proposed Tech Specs Pages Re Rev 2 to 960726 LAR to License DPR-22,to Establish TS Requirements That Are Consistent W/Analysis Inputs Used for Evaluation of Radiological Consequences of MSLB Accident | |
ML20247K634 | 12 May 1998 | Proposed Reprinted Tech Specs Bases Pages,Containing Spelling & Grammatical Corrections | Fire Barrier Scram Discharge Volume Fuel cladding |
ML20216D002 | 19 March 1998 | Proposed Tech Specs,Providing Consistent Wording Throughout TS & Providing Sound Basis for Frequency of Actions Required Each Shift | |
ML20248L200 | 13 March 1998 | Proposed Tech Specs Revising SLMCPR | |
ML20248L410 | 6 March 1998 | Revised Page 39 to Proposed TS Change | |
ML20202H706 | 4 December 1997 | Proposed Tech Specs Increasing Plant Max Power Level from 1670 Mwt to 1775 Mwt | Abnormal operational transient Scram Discharge Volume MELLLA Fuel cladding Pressure Boundary Leakage |
ML20203A977 | 25 November 1997 | Proposed Tech Specs Re Condensate Storage Tank Low Level Hpci/Rcic Suction Transfer | |
ML20211J980 | 29 September 1997 | Proposed Tech Specs Page 249b & Cleaned Typed Page 249b, Adding Footnote to Topical Rept NEDE-24011-P-A Stating That Topical Rept Is Approved for Cycle 18 Only | Shutdown Margin |
ML20210Q297 | 21 August 1997 | Proposed Tech Specs Re Safety Limit Min Critical Power Ratio | Fuel cladding |
ML20141B918 | 19 June 1997 | Proposed Tech Specs Re Update of Design Basis Accident Containment Temp & Pressure Response | |
ML20137W220 | 11 April 1997 | Proposed Tech Specs 3.6.C Re Coolant Chemistry & TS 3/4.17B Re Control Room Emergency Filtration Sys | Power change |
ML20149M728 | 23 January 1997 | Proposed Tech Specs 3.5/4.5.C of TS Bases Describing Min RHR & RHRSW Pump Requirements for Post Accident Containment Heat Removal & Submit Update to Design Basis Accident Containment Temp & Pressure Response | |
ML20132C653 | 25 November 1996 | Proposed Tech Specs,Sections 2.1.A Re SLMCPR & 3.11.C Re Olmcpr.Changes Revise SLMCPR Values & Deletes Sentence Re OLMCPR Limit Penalty for Single Recirculation Loop Operation | Abnormal operational transient Fuel cladding |
ML20117A155 | 15 August 1996 | Proposed Tech Specs Re Revision to TS Administrative Controls Section 6.1.F.1 Stating That Either 8 or 12 H Shifts Will Be Considered Normal & 40 H Will Be Considered Nominal | Safe Shutdown High Radiation Area Grab sample Fire Barrier Continuous fire watch Fire Protection Program Hourly Fire Watch |
ML20116G895 | 26 July 1996 | Proposed Tech Specs Increasing Max Power Level by 6.3% to 1,775 from 1,670 Mwt.Summary of Plant Mods for Power Rerate Implementation & Power Rerate Environ Evaluation Encl | Ultimate heat sink Hydrostatic Abnormal operational transient Scram Discharge Volume MELLLA Safeguards Contingency Plan License Renewal Control of Heavy Loads Fuel cladding Pressure Boundary Leakage Unidentified leakage |
ML20116D836 | 26 July 1996 | Proposed TS Sections 3.6.C & 3/4.17.B Re Reactor Coolant Equivalent Radioiodine Concentration & CR Habitability | Power change |
ML20100Q386 | 1 March 1996 | Proposed Tech Specs Re Periodic Replacement of Containment Purge & Vent Valve Seat Seal | |
ML20095J434 | 20 December 1995 | Proposed Tech Specs Re Main Steam Isolation & App J Leak Rate Test Requirements | |
ML20095E712 | 11 December 1995 | Proposed Tech Specs,Removing TS SR 4.7.D.4 & Replaces Seat Seals for Drywell & Suppression Chamber Purge & Vent Valves Every Five Yrs | |
ML20094M198 | 14 November 1995 | Proposed Tech Specs,Incorporating Requirements of Option B, Section Iii.A for Type a Testing (Primary Containment ILRT) | Exemption Request |
ML20091K682 | 18 August 1995 | Proposed Tech Specs Section 3.7/4.7 SGTS | |
ML20087J425 | 15 August 1995 | Proposed Tech Specs,Revising Max Individual MSIV Leak Rate Acceptance Criteria of 11.5 Scfh to Overall Criteria That Encompasses Four Main Steam Lines Into One Limit of 46 Scfh | |
ML20086D801 | 5 July 1995 | Proposed Tech Specs Extending Surveillance Test Intervals & Allowable out-of-svc Times for Selected Instrumentation | Scram Discharge Volume |
ML20085N099 | 22 June 1995 | Proposed Tech Specs Supporting Implementation of BWR Thermal Hydraulic Stability Solution | Shutdown Margin Abnormal operational transient |
ML20082N871 | 20 April 1995 | Proposed Tech Specs Re SBGTS & Secondary Containment | Shutdown Margin |
ML20069J106 | 8 June 1994 | Proposed TS Re SGTS & Secondary Containment | Shutdown Margin |
ML20065B669 | 28 March 1994 | Proposed Tech Specs Re Approved Analytical Methods for Developing Core Operating Limits Rept | Shutdown Margin |
ML20065B699 | 28 March 1994 | Proposed Tech Specs Re Standby Gas Treatment Sys Initiation Instumentation | |
ML20063C994 | 26 January 1994 | Proposed Tech Specs,Requiring Valves to Be Tested at Pressure Greater than or Equal to Calculated Peak Containment Internal Pressure Re Design Basis LOCA | Exemption Request |
ML20062N873 | 4 January 1994 | Proposed Tech Specs 3.11, Reactor Fuel Assemblies & Bases Re Methodology for MCPR | Shutdown Margin Abnormal operational transient |
ML20059E604 | 3 January 1994 | Proposed Tech Specs,Revising Surveillance Requirement 4.6.E.1.a to Require Valves to Be Tested Per Section XI Inservice Testing Requirements of ASME Boiler & Pressure Vessel Code | |
ML113210288 | 30 November 1993 | Proposed Tech Specs Re Removal of Chlorine Detection Requirements & Changes to Control Room Ventilation Sys Requirements | |
ML20056E108 | 10 August 1993 | Proposed Tech Specs Providing Clarification of Sampling & Analysis Requirements,Updating Liquid Effluent Sampling & Requirements & Correcting Typographical Errors in TS Section | Grab sample Offsite Dose Calculation Manual |
ML20045G609 | 7 July 1993 | Proposed TS 4.0.d Re Recording Unidentified & Identified Leakage Rates & 3/6/4.6 Re Analyzing Grad Samples of Primary Containment Atmosphere Once Per 12 H | Grab sample Pressure Boundary Leakage |
ML20128M719 | 12 February 1993 | Proposed TS Increasing Minimum Core Spray Pump Flow to More Conservatively Account for ECCS Bypass Leakage Paths | Hydrostatic |
ML20237G208 | 14 August 1987 | Proposed Tech Specs,Eliminating Certain Requirements for Plant Mgt & Support Staff to Hold Current Senior Reactor Operator Licenses | |
ML20065E212 | 24 September 1982 | Proposed Tech Specs Re Surveillance,Reactor Protection Monitoring Sys,Jet Pump Surveillance,Organization & Steam Line Area Temp Switch Deviation | Safe Shutdown High Radiation Area Fire Protection Program |
ML112970853 | 2 July 1982 | Proposed Tech Spec Changes Allowing Plant to Remain at Substantial Power Level W/One Recirculation Pump in Operation & Equalizer Valve Closed | Abnormal operational transient Scram Discharge Volume Fuel cladding |
ML112970818 | 19 March 1981 | Proposed Revisions to Tech Specs,App A,Pages 26,89-90 & 213-14 for Reactor Protection Sys | |
ML20024G649 | 16 August 1978 | Proposed Tech Specs Raising Permissible Setpoint of Eight Safety/Relief Valves Installed at Plant to 1,108 Psig | Abnormal operational transient |
ML20127H217 | 10 August 1978 | Proposed Tech Specs to Authorize Use of Partial Drilled Model of Fuel Type for Plant Future Use | Abnormal operational transient Fuel cladding |
ML20024G705 | 21 March 1978 | Proposed Tech Specs Re Application of Partial Drilled Model for Analyzing Retrofit Fuel Design Scheduled to Be Installed in Plant Reactor in Fall 1978 Refueling Outage | |
ML20024G703 | 20 March 1978 | Proposed Tech Specs Clarifying Certain Sections of Interim Radioactive Effluent Tech Specs | Power change |