Category:E-Mail
MONTHYEARML23128A1612023-05-0808 May 2023 NRR E-mail Capture - Comanche Peak Nuclear Power Plant, Units 1 and 2, Beaver Valley Power Station, Unit Nos. 1 and 2, Davis-Besse Nuclear Power Station, Unit 1, and Perry Nuclear Power Plant, Unit No. 1 - Acceptance of Requested Licensing ML23086B9862023-03-27027 March 2023 NRR E-mail Capture - Davis-Besse, Unit No. 1 - Acceptance Review Results for Davis-Besse, Unit No. 1 - Proposed Alternative Request RP-5 ML23033A0322023-02-0101 February 2023 NRR E-mail Capture - Request for Additional Information for Davis-Besse's 2022 Steam Generator Inspection Report (L-2022-LRO-0115) ML22266A1102022-09-23023 September 2022 NRR E-mail Capture - Davis-Besse Nuclear Power Station, Unit No. 1 - Request for Additional Information Regarding July 21, 2022, Request for Withholding Information from Public Disclosure ML22164A8572022-06-13013 June 2022 NRR E-mail Capture - Davis-Besse Nuclear Power Station, Unit No. 1 - Request for Additional Information Regarding License Amendment Request to Revise the Emergency Plan ML22118A6862022-04-28028 April 2022 NRR E-mail Capture - Davis-Besse Nuclear Power Station, Unit No. 1 - Request for Additional Information Regarding Alternative to Extend the Steam Generator Weld Inspection Interval ML22112A1092022-04-22022 April 2022 NRR E-mail Capture - Davis-Besse Nuclear Power Station, Unit No. 1 - Request for Additional Information Regarding License Amendment Request to Revise the Design Basis for the Shield Building ML22090A1692022-03-30030 March 2022 Re_ Action Tracking Item 2022 SST - 335 - Tom Gurdziel, E-mail Re_ Event Number 55734 at Davis Besse, a Matter of Interpretation ML22080A2512022-03-18018 March 2022 NRR E-mail Capture - (External_Sender) ASME OM Code Case OMN-27, Alternative Requirements for Testing Category a Valves (Non- Piv/Civ) ML22055B0382022-02-24024 February 2022 NRR E-mail Capture - Davis-Besse Nuclear Power Station, Unit No. 1 - Upcoming Steam Generator Tube Inservice Inspection ML22055A0872022-02-23023 February 2022 NRR E-mail Capture - Davis-Besse Nuclear Power Station, Unit No. 1 - Request for Additional Information Regarding Relief Request RP-3 ML22045A4962022-02-14014 February 2022 NRR E-mail Capture - Davis-Besse Nuclear Power Station, Unit No. 1 - Acceptance of License Amendment Request to Revise the Emergency Plan ML22040A1832022-02-0707 February 2022 LTR-22-0033 Tom Gurdziel, E-mail Event Number 55734 at Davis Besse, a Matter of Interpretation ML22034A9472022-02-0303 February 2022 NRR E-mail Capture - Davis-Besse Nuclear Power Station, Unit No. 1 - Revised Review Estimates for Proposed Alternative to Extend the Steam Generator Weld Inspection Interval ML22033A0632022-02-0101 February 2022 NRR E-mail Capture - Davis-Besse Nuclear Power Station, Unit No. 1 - Acceptance of License Amendment Request to Revise the Design Basis for the Shield Building Containment Structure ML21321A3782021-11-16016 November 2021 NRR E-mail Capture - Energy Harbor Fleet, Beaver Valley Units 1 and 2 and DAVIS-BESSEL Unit 1 - Acceptance of License Amendment Request Adoption of TSTF-554 EPID-L-2021-LLA-0193 ML21321A3792021-11-16016 November 2021 NRR E-mail Capture - Davis-Besse Nuclear Power Station, Unit No. 1 - Request for Additional Information Regarding Alternative to Extend the Steam Generator Weld Inspection Interval ML21287A0382021-10-14014 October 2021 NRR E-mail Capture - Davis-Besse Nuclear Power Station, Unit No. 1 - Acceptance of Requests for Relief from Certain Inservice Testing Requirements ML21271A1332021-09-28028 September 2021 NRR E-mail Capture - Davis-Besse Nuclear Power Station, Unit No. 1 - Acceptance of Proposed Alternative RR-A2 for Certain Steam Generator Weld Inspections ML21119A2152021-04-28028 April 2021 NRR E-mail Capture - Energy Harbor Fleet, Beaver Valley Units 1 and 2 and DAVIS-BESSE Unit 1 - Acceptance of Relief Request Proposed Alternative to Use ASME OM Code Case OMN-27 ML21041A5452021-02-10010 February 2021 NRR E-mail Capture - Davis-Besse Nuclear Power Station, Unit No. 1 - Request for Additional Information Regarding Steam Generator Tube Inspection Reports ML21007A3732021-01-0707 January 2021 NRR E-mail Capture - (External_Sender) (External) Request for Additional Information Regarding License Amendment Request to Incorporate the Applicable Standard Technical Specification 5.2.2, Unit Staff, ML21004A1442020-12-30030 December 2020 NRR E-mail Capture - Request for Additional Information Regarding License Amendment Request to Incorporate the Applicable Standard Technical Specification 5.2.2, Unit Staff ML20329A3832020-11-24024 November 2020 NRR E-mail Capture - Davis Besse Nuclear Power Station, Unit No. 1 - Request for an Exemption from the 2020 Force-on-Force Exercises ML20304A2842020-10-29029 October 2020 50.59 Inspection 2nd Request for Information ML20289A0992020-10-0505 October 2020 NRR E-mail Capture - Energy Harbor Fleet, Results of Acceptance Review Request to Use Provision in Later Edition of the ASME Boiler and Pressure Vessel Code, Section XI, EPID-l-2020-LLR-0132 ML20281A3692020-10-0505 October 2020 Energy Harbor Fleet, Results of Acceptance Review Request to Use Provision in Later Edition of the ASME Boiler and Pressure Vessel Code, Section XI, EPID-l-2020-LLR-0132 ML20239A7942020-08-25025 August 2020 NRR E-mail Capture - Energy Harbor Fleet, Beaver Valley Units 1 and 2 and DAVIS-BESSEL Unit 1 - Acceptance of License Amendment Request Incorporation of Applicable Standard in TS 5.2.2.e ML20203M3712020-07-21021 July 2020 Ultimate Heat Sink Request for Information Part 1 ML20203M3722020-07-21021 July 2020 Ultimate Heat Sink Request for Information Part 1 and Part 2 L-20-183, Response to Request for Additional Information Regarding License Amendment Request for Adoption of TSTF-425, Revision 3, Relocate Surveillance Frequencies to Licensee Control - Risk Informed Technical Specification Task Force2020-06-23023 June 2020 Response to Request for Additional Information Regarding License Amendment Request for Adoption of TSTF-425, Revision 3, Relocate Surveillance Frequencies to Licensee Control - Risk Informed Technical Specification Task Force ML20154K7642020-06-0202 June 2020 NRR E-mail Capture - Davis-Besse Nuclear Power Station, Unit No. 1 - Request for Additional Information Regarding License Amendment Request to Adopt TSTF-425 ML20127H8672020-05-0606 May 2020 NRR E-mail Capture - Beaver Valley, Davis-Besse, and Perry - Request for Additional Information Regarding Request for Exemptions from Part 73 Security Requalification Requirements ML20058D3152020-02-27027 February 2020 Completion of License Transfer for the Beaver Valley, Davis-Besse and Perry Nuclear Units ML20024E0092020-01-23023 January 2020 NRR E-mail Capture - FENOC License Transfer - January 23, 2020 Call Summary ML20021A3162020-01-21021 January 2020 NRR E-mail Capture - Davis-Besse Nuclear Power Station - Request for Additional Information Regarding License Amendment Request to Revise Containment Leakage Rate Testing ML19346B3972019-12-11011 December 2019 NRR E-mail Capture - Davis-Besse Nuclear Power Station, Unit No. 1 - Acceptance of License Amendment Request to Adopt TSTF-425 ML19273A1132019-09-27027 September 2019 NRR E-mail Capture - Davis-Besse Nuclear Power Station - Acceptance of License Amendment Request to Extend Containment Leakage Rate Test Interval ML19179A1382019-06-28028 June 2019 NRR E-mail Capture - Davis-Besse - Request for Additional Information Regarding the Decommissioning Quality Assurance Program ML19164A1532019-06-13013 June 2019 NRR E-mail Capture - Davis-Besse Nuclear Power Station - Request for Additional Information Regarding License Amendment Request for Post-Shutdown Emergency Plan ML19162A3922019-06-11011 June 2019 NRR E-mail Capture - Davis-Besse Nuclear Power Station - Request for Additional Information Regarding License Amendment Request for Permanently Defueled Technical Specifications ML19161A2132019-06-0606 June 2019 NRR E-mail Capture - Results of Acceptance Review - FENOC Fleet - Request for Approval of Request for Approval of Lrradiated Fuel Management Plans, EPID L-2019-LRO-0016 ML19149A6202019-05-29029 May 2019 NRR E-mail Capture - Davis-Besse Nuclear Power Station, Unit No. 1 - Request for Approval of the Decommissioning Quality Assurance Program ML19130A2082019-05-0808 May 2019 Email - NRC Email to FEMA Dated May 8, 2019: NRC Response to Comment on FEMA Review of Proposed Changes to DBNPS Emergency Plan for Permanently Defueled Condition ML19106A2512019-04-16016 April 2019 NRR E-mail Capture - Davis-Besse - Proposed License Condition and Draft Safety Evaluation for the License Amendment Request to Adopt NFPA 805 ML19073A1112019-03-14014 March 2019 NRR E-mail Capture - Davis-Besse - Acceptance of License Amendment Request for Permanently Defueled License and Technical Specifications ML19043A6962019-02-0808 February 2019 NRR E-mail Capture - Davis-Besse License Amendment Request for the Post-Shutdown Emergency Plan ML18320A1272018-11-16016 November 2018 NRR E-mail Capture - Davis-Besse LAR to Change TS Definitions and Administrative Controls for Permanently Defueled Conditions ML18282A1482018-10-0909 October 2018 NRR E-mail Capture - Results of Acceptance Review - FENOC Fleet - Request for Exemption Related to the Suspension of Security Measures in an Emergency or During Severe Weather, EPID L-2018-LLL-0016 ML18282A2422018-10-0808 October 2018 OEDO-18-00160, FENOC Fleet, 2.206 Petition, Submission of Supplement Dated October 8, 2018, from the Petitioners - PRB and Petitioners (Elpc), Includes Email, Cover Letter from Elpc, and the Attachments to the Email 2023-05-08
[Table view] |
Text
Davis-BesseNPEm Resource From: dorts@firstenergycorp.com Sent: Thursday, December 20, 2012 10:55 AM To: CuadradoDeJesus, Samuel Cc: custerc@firstenergycorp.com
Subject:
NRC-FENOC Telecon Notes re: Shield Building Draft RAIs -- 2012-12-18 Attachments: NRC telecon 20121218 DRAIs Shield Bldg.pdf Sam, attached are the FENOC notes from the telephone conference call held on December 18, 2012, related to the draft requests for additional information on the Shield Building.
Please contact me with questions regarding the attached notes.
Thank you, Steve Dort Davis-Besse License Renewal
The information contained in this message is intended only for the personal and confidential use of the recipient(s) named above. If the reader of this message is not the intended recipient or an agent responsible for delivering it to the intended recipient, you are hereby notified that you have received this document in error and that any review, dissemination, distribution, or copying of this message is strictly prohibited. If you have received this communication in error, please notify us immediately, and delete the original message.
1
Hearing Identifier: Davis_BesseLicenseRenewal_Saf_NonPublic Email Number: 3996 Mail Envelope Properties (OF13F07833.9A3A2669-ON85257ADA.0056EEE2-85257ADA.00576958)
Subject:
NRC-FENOC Telecon Notes re: Shield Building Draft RAIs -- 2012-12-18 Sent Date: 12/20/2012 10:54:45 AM Received Date: 12/20/2012 10:55:18 AM From: dorts@firstenergycorp.com Created By: dorts@firstenergycorp.com Recipients:
"custerc@firstenergycorp.com" <custerc@firstenergycorp.com>
Tracking Status: None "CuadradoDeJesus, Samuel" <Samuel.CuadradoDeJesus@nrc.gov>
Tracking Status: None Post Office: FirstEnergyCorp.com Files Size Date & Time MESSAGE 895 12/20/2012 10:55:18 AM NRC telecon 20121218 DRAIs Shield Bldg.pdf 25449 Options Priority: Standard Return Notification: No Reply Requested: No Sensitivity: Normal Expiration Date:
Recipients Received:
Doc No. 121812 TO: File DATE: December 18, 2012 FROM: Steven Dort
SUBJECT:
NRC Telecon Regarding Davis-Besse License Renewal -
Shield Building Draft Requests for Additional Information NRC Attendees: Sam Cuadrado de Jesús, Bryce Lehman, Abdul Sheikh FENOC Attendees: Cliff Custer, Steven Dort, Allen McAllister, Jon Hook, Thomas Henry, Gerald Wolf This telephone conference call (telecon) was initiated by Sam Cuadrado de Jesús, NRC Project Manager for Davis-Besse License Renewal. The telecon took place at 1230 hours0.0142 days <br />0.342 hours <br />0.00203 weeks <br />4.68015e-4 months <br /> on December 18, 2012. The purpose of the call was to discuss NRC draft follow-up requests for additional information (RAIs) B.2.43-2 and B.2.43-3 regarding the Davis-Besse Shield Building Monitoring Program, as follows:
Follow-up DRAI B.2.43-2 This draft RAI questions the sample size for future inspections of Shield Building core bores, and the technical basis for the adequacy of the sample size. Specifically, NRC Staff requests a summary of the testing performed and the results of the testing. The use of impulse response testing methods instead of inspections of core bores was discussed, and it was stated that inspection of core bores is more accurate than the results from continued impulse response testing. NRC Staff questioned why inspection of 20 core bores is acceptable going forward. FENOC stated that the Shield Building Root Cause Evaluation is clear, that the cause was a discrete event that required specific environmental and design conditions to be present for the event to have occurred, and that there is no aging effect associated with the cracking in the Shield Building. Based on this conclusion, the number of samples is not important. Rather, the inspections are being performed by FENOC to confirm the Root Cause conclusion by showing that there are no changes in the nature of the internal cracks over time.
FENOC and NRC Staff also discussed the [in-progress] evaluation of the Shield Building licensing basis. FENOC stated that the licensing basis evaluation should be complete in July 2013.
Follow-up DRAI B.2.43-3 This draft RAI questions why testing for internal cracking using core bores was not performed on the other structures within the scope of license renewal, and whether structural coatings for the other structures are included in the scope of license renewal. FENOC reiterated that four specific environmental and design conditions must be present to generate the forces necessary to cause internal cracking in concrete structures as was observed in the Shield Building; none of the other structures within the scope of license
2 renewal meet the structural design conditions (i.e., the design associated with the flute shoulders on the Shield Building) necessary for internal laminar cracking to have occurred during the blizzard of 1978. However, based on a recommendation from NRC Region III Inspector Mel Holmberg that examining a core bore from another site structure would bolster the Shield Building Root Cause Evaluation, FENOC examined a core bore in the Auxiliary Building.
The Auxiliary Building and resulting core bore location were chosen based on similarities of reinforcing bar density, wall thickness, and a southwest location (the direction from which the blizzard approached in 1978). The core bore inspection performed in the Auxiliary Building showed that cracking did not occur in a building without the flute shoulder configuration of the Shield Building.
NRC Staff asked why cracking occurred in the main steam line area of the Shield Building, since it isnt close to the flute shoulders. FENOC responded that the reinforcing bar density (i.e., high density) in the area of the main steam lines is the same as that in the top of the Shield Building, and the steam line reinforcing bar is connected to adjacent flute shoulders, so the cracking propagated into the main steam line area from cracking that initiated in the flute shoulders.
NRC Staff stated that FENOC should consider performing a core bore inspection on another uncoated structure to further support the conclusions of the Root Cause. FENOC responded that the conclusions are already confirmed by core bore inspections of the uncoated barrel sections of the Shield Building between the flute shoulders. No internal laminar cracking initiated in the barrel sections of the Shield Building; cracking initiated in the flute shoulder regions and propagated from there to other sections of the Shield Building.
NRC stated that they will issue the RAIs. There was no further discussion, and the call was concluded.