Notification of Inspection and Request for Information
ML13024A395
Person / Time
Site: Brunswick Duke Energy icon.png
Issue date: 01/24/2013
From: Vias S
NRC/RGN-II/DRS/EB3
To: Annacone M
Carolina Power & Light Co
References
Download: ML13024A395 (10)


Text

UNITED STATES NUCLEAR REGULATORY COMMISSION REGION II 245 PEACHTREE CENTER AVENUE NE, SUITE 1200 ATLANTA, GEORGIA 30303-1257 January 24, 2013 Mr. Michael J. Annacone Vice President Brunswick Steam Electric Plant P.O. Box 10429 Southport, NC 28461-0429

SUBJECT:

BRUNSWICK STEAM ELECTRIC PLANT UNIT 2 - NOTIFICATION OF INSPECTION AND REQUEST FOR INFORMATION

Dear Annacone:

From March 11 - March 15, 2013, the Nuclear Regulatory Commission (NRC) will perform the baseline inservice inspection (ISI) at the Brunswick Electric Generating Plant , Unit 2, in accordance with NRC Inspection Procedure 71111.08. Experience has shown that this inspection is resource intensive both for the NRC inspectors and your staff. In order to minimize the impact to your on-site resources and to ensure a productive inspection, we have enclosed a request for documents needed for this inspection. These documents have been divided into two groups. The first group (Section A of the enclosure) identifies information to be provided prior to the inspection to ensure that the inspectors are adequately prepared. The second group (Section B of the enclosure) identifies the information the inspectors will need upon arrival at the site. It is important that all of these documents are up to date and complete in order to minimize the number of additional documents requested during the preparation and/or the on-site portions of the inspection.

We have discussed the schedule for these inspection activities with your staff and understand that our regulatory contact for this inspection will be Mr. Bill Murray of your organization. Our inspection dates are subject to change based on your updated schedule of outage activities. If there are any questions about this inspection or the material requested, please contact the lead inspector, Abhijit Sengupta at (404) 997-4430 (Abhijit.Sengupta@nrc.gov).

In accordance with 10 CFR 2.390 of the NRCs Rules of Practice, a copy of this letter, and its Enclosure, will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system,

M. Annacone 2 ADAMS. ADAMS is accessible from the NRC Web site at http://www.nrc.gov/ reading-rm/adams.html (the Public Electronic Reading Room).

Sincerely,

/RA/

Steven J. Vias, Chief Engineering Branch 3 Division of Reactor Safety Docket No.: 50-324 License No.: DPR-52

Enclosure:

Inservice Inspection Document Request cc: (See page 3)

_________________________ xG SUNSI REVIEW COMPLETE G FORM 665 ATTACHED OFFICE RII:DRS RII:DRS RII:DRS RII:DRS SIGNATURE RA RA RA NAME SENGUPTA LAKE VIAS DATE 1/ 24/2013 1/ 24 /2013 1/24/2013 1/ /2013 1/ /2013 1/ /2013 E-MAIL COPY? YES NO YES NO YES NO YES NO YES NO YES NO YES NO M. Annacone 3 cc: Randy C. Ivey Plant General Manager Manager, Nuclear Oversight Brunswick Steam Electric Plant Brunswick Steam Electric Plant Progress Energy Progress Energy Carolinas, Inc.

Electronic Mail Distribution Electronic Mail Distribution Edward L. Wills, Jr. Paul E. Dubrouillet Director Site Operations Manager, Training Brunswick Steam Electric Plant Brunswick Steam Electric Plant Electronic Mail Distribution Electronic Mail Distribution J. W. (Bill) Pitesa Joseph W. Donahue Senior Vice President Vice President Nuclear Operations Nuclear Oversight Duke Energy Corporation Progress Energy Electronic Mail Distribution Electronic Mail Distribution John A. Krakuszeski Senior Resident Inspector Plant Manager U.S. Nuclear Regulatory Commission Brunswick Steam Electric Plant Brunswick Steam Electric Plant Electronic Mail Distribution 8470 River Road, SE Southport, NC 28461 Lara S. Nichols Deputy General Counsel John H. O'Neill, Jr.

Duke Energy Corporation Shaw, Pittman, Potts & Trowbridge Electronic Mail Distribution 2300 N. Street, NW Washington, DC 20037-1128 M. Christopher Nolan Director - Regulatory Affairs Peggy Force General Office Assistant Attorney General Duke Energy Corporation State of North Carolina Electronic Mail Distribution P.O. Box 629 Raleigh, NC 27602 Michael J. Annacone Vice President Chairman Brunswick Steam Electric Plant North Carolina Utilities Commission Electronic Mail Distribution Electronic Mail Distribution Annette H. Pope Robert P. Gruber Manager-Organizational Effectiveness Executive Director Brunswick Steam Electric Plant Public Staff - NCUC Electronic Mail Distribution 4326 Mail Service Center Raleigh, NC 27699-4326 Lee Grzeck Regulatory Affairs Manager Anthony Marzano Brunswick Steam Electric Plant Director Progress Energy Carolinas, Inc. Brunswick County Emergency Services Electronic Mail Distribution Electronic Mail Distribution (cc contd - See page 4)

M. Annacone 4 (cc contd)

Public Service Commission State of South Carolina P.O. Box 11649 Columbia, SC 29211 W. Lee Cox, III Section Chief Radiation Protection Section N.C. Department of Environmental Commerce & Natural Resources Electronic Mail Distribution Warren Lee Emergency Management Director New Hanover County Department of Emergency Management 230 Government Center Drive Suite 115 Wilmington, NC 28403

Letter to Michael J. Annacone from Steven J. Vias dated January 24, 2013

SUBJECT:

BRUNSWICK STEAM ELECTRIC PLANT UNIT 2 - NOTIFICATION OF INSPECTION AND REQUEST FOR INFORMATION Distribution:

RIDSNRRDIRS PUBLIC RidsNrrPMBrunswick Resource

INSERVICE INSPECTION DOCUMENT REQUEST Inspection Dates: March 11 - March 15, 2013 Inspection Procedures: IP 71111.08, Inservice Inspection (ISI) Activities Inspectors: Abhijit Sengupta, Reactor Inspector (ISI, Lead Inspector)

A. Information Requested for the In-Office Preparation Week The following information should be sent to the Region II office in hard copy or electronic format (CD or SharePoint preferred), in care of Abhijit Sengupta by February 22, 2013, to facilitate the selection of specific items that will be reviewed during the on-site inspection weeks. The inspector will select specific items from the information requested below and then request, from your staff, additional documents needed during the on-site inspection week (Section B of this Enclosure). We ask that the specific items selected from the lists be available, and ready for review, on the first day of inspection. *Please provide requested documentation electronically if possible. If requested documents are large and only hard copy formats are available, please inform the inspectors, and provide subject documentation during the first day of the on-site inspection. If you have any questions regarding this information request, please call the inspector as soon as possible.

A.1 ISI / Welding Programs and Schedule Information a) A detailed schedule (including preliminary dates) of:

i) Nondestructive examinations (NDEs) planned for Class 1 and 2 systems and containment, performed as part of your ASME Section XI, Risk-Informed (if applicable), and augmented ISI Programs during the upcoming outage.

Please include a status summary of the NDE inspection activities versus the required inspection period percentages for this Interval by category per American Society for Mechanical Engineers (ASME)Section XI, IWX-2400. (Do not provide separately if other documentation requested contains this information.)

ii) Reactor pressure vessel head (RPVH) examinations planned for the upcoming outage.

iii) Examinations planned for BWR VIP program.

iv) Welding activities to be completed during the upcoming outage for ASME Class 1, 2, or 3 structures, systems, or components (SSCs).

Enclosure

2 b) A copy of ASME Section XI Code Relief Requests and associated NRC Safety Evaluations applicable to the examinations identified above.

c) A list of NDE reports, (ultrasonic, radiography, magnetic particle, and dye penetrant) that have identified surface or volumetric indications, which were analytically evaluated and accepted for continued service on Code Class 1, 2, and 3 systems since the beginning of the last refueling outage. This should include the previousSection XI pressure test(s) conducted during start up, and any evaluations associated with the results of the pressure tests.

d) A list, with a brief description (e.g., system, material, pipe size, weld number, and NDE performed), of the welds in Code Class 1, 2, and 3 systems that have been fabricated due to component repair/replacement activities since the beginning of the last refueling outage, or are planned to be fabricated during this refueling outage. Also, please indicate which of those welds are risk-significant.

e) If reactor vessel shell weld examinations required by the ASME Code are scheduled to occur during the upcoming outage, provide a detailed description of the welds to be examined, and the extent of the planned examination. Please also provide reference numbers for applicable procedures that will be used to conduct these examinations.

f) A copy of any 10 CFR Part 21 reports applicable to your SSCs, within the scope of Section XI of the ASME Code, that have been identified since the beginning of the last refueling outage.

g) A list of any temporary non-code repairs in service (e.g., pinhole leaks).

h) Copies of the most recent self assessments for the ISI, Welding, and Alloy 600 Programs.

A.5 Additional information related to all ISI activities a) Please provide a list with a brief description of ISI- related issues (e.g., condition reports) entered into your corrective action program since the beginning of the last refueling outage (for Unit 2). For example, a list based upon data base searches using key words related to piping degradation such as: ISI, ASME Code,Section XI, NDE, cracks, wear, thinning, leakage, rust, corrosion, boric acid, or errors in piping examinations.

b) Please provide names and phone numbers for the following program leads:

ISI (Examination, planning)

Containment Exams BWR VIP RPVH Exams Snubbers and Supports Repair and Replacement Program Licensing Site Welding Enclosure

3 B. Information to be provided on-site to the inspector at the entrance meeting (March 11, 2013):

B.1 ISI / Welding Programs and Schedule Information a) Updated schedules for ISI/NDE activities, planned welding activities, and schedule showing contingency repair plans, if available.

b) For ASME Class 1, 2, and 3 welds selected by the inspector from the lists provided from Section A of this Enclosure, please provide copies of the following documentation for each subject weld:

i) Weld data sheet (traveler) ii) Weld configuration and system location iii) Applicable Code Edition and Addenda for weldment iv) Applicable Code Edition and Addenda for Welding Procedures v) Applicable Weld Procedures (WPS) used to fabricate the welds vi) Copies of procedure qualification records (PQRs) supporting the WPS from B.1.b.v vii) Copies of mechanical test reports identified in the PQRs above viii) Copies of the nonconformance reports for the selected welds (If Applicable) ix) Radiographs of the selected welds and access to equipment to allow viewing radiographs (If RT was performed) x) Copies of the preservice examination records for the selected welds xi) Copies of welder performance qualifications records applicable to WPS, including documentation that welder maintained proficiency in the applicable welding processes specified in the WPS (At least six months prior to date subject work) xii) Copies of NDE personnel qualifications (VT, PT, UT, RT) (As applicable) c) For the ISI related corrective action issues selected by the inspector from Section A of this Enclosure, please provide a copy of the corrective actions and supporting documentation.

d) For the NDE reports with relevant indications on Code Class 1, 2, and 3 systems selected by the inspector from Section A above, please provide a copy of the examination records, examiner qualification records, and associated corrective action documents.

e) Please provide a copy of (or ready access to) most current revision of the ISI Program Manual and Plan for the current Interval.

f) For the NDEs selected by the inspector from section A of this Enclosure, please provide a copy of the NDE procedures used to perform the examinations (including calibration and flaw characterization/sizing procedures). For ultrasonic examination procedures qualified in accordance with ASME Code,Section XI, Enclosure

4 Appendix VIII, please provide documentation supporting the procedure qualification (e.g., the EPRI performance demonstration qualification summary sheets). Also, please include documentation of the specific equipment to be used (e.g., ultrasonic unit, cables, and transducers including serial numbers) and NDE personnel qualification records.

B.5 Codes and Standards a) Please provide ready access to: (i.e., copies provided to the inspector to use for the duration of the inspection at the on-site inspection location, or room number and location where available) i) Applicable editions of the ASME Code (Sections V, IX, and XI) for the inservice inspection program and the repair/replacement program.

Inspector Contact Information:

Mailing Address:

US NRC Region 2 ATTN: Abhijit Sengupta 245 Peachtree Center Avenue, Suite 1200 Atlanta, GA 30303 Abhijit.Sengupta@nrc.gov Enclosure