MONTHYEARNMP1L3570, Supplemental Information Letter - Revision to the Technical Specifications Design Features Sections to Remove the Nine Mile 3 Nuclear Project, LLC, Designation2024-02-0101 February 2024 Supplemental Information Letter - Revision to the Technical Specifications Design Features Sections to Remove the Nine Mile 3 Nuclear Project, LLC, Designation NMP1L3569, CFR 50.46 Annual Report2024-01-26026 January 2024 CFR 50.46 Annual Report NMP1L3566, Radiological Emergency Plan Document Revision. Includes EP-AA-1013, Revision 10, Radiological Emergency Plan Annex for Nine Mile Point Station2023-12-14014 December 2023 Radiological Emergency Plan Document Revision. Includes EP-AA-1013, Revision 10, Radiological Emergency Plan Annex for Nine Mile Point Station NMP1L3564, Supplemental Response to Part 73 Exemption Request - Withdrawal of Request for Exemption from 10 CFR 73, Subpart B, Preemption Authority Requirements2023-12-0707 December 2023 Supplemental Response to Part 73 Exemption Request - Withdrawal of Request for Exemption from 10 CFR 73, Subpart B, Preemption Authority Requirements NMP1L3563, Submittal of Relief Request I5R-12, Revision 0, Concerning the Installation of a Full Structural Weld Overlay on Reactor Pressure Vessel Recirculation Inlet Nozzle N2E Safe End-to-Nozzle Dissimilar Metal Weld (32-WD-208)2023-12-0404 December 2023 Submittal of Relief Request I5R-12, Revision 0, Concerning the Installation of a Full Structural Weld Overlay on Reactor Pressure Vessel Recirculation Inlet Nozzle N2E Safe End-to-Nozzle Dissimilar Metal Weld (32-WD-208) NMP1L3557, Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation2023-11-22022 November 2023 Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation NMP1L3554, Submittal of Revision 28 to the Final Safety Analysis Report (Updated), Fire Protection Design Criteria Document, 10CFR50.59 Evaluation Summary Report, 10CFR54.37(b) Aging Management Review, and Technical Specifications with Revised Bases2023-10-0606 October 2023 Submittal of Revision 28 to the Final Safety Analysis Report (Updated), Fire Protection Design Criteria Document, 10CFR50.59 Evaluation Summary Report, 10CFR54.37(b) Aging Management Review, and Technical Specifications with Revised Bases C NMP2L2851, Relief Request Associated with Successive Inspections for Generic Letter 88-01 / BWRVIP-75-A Augmented Examinations2023-08-25025 August 2023 Relief Request Associated with Successive Inspections for Generic Letter 88-01 / BWRVIP-75-A Augmented Examinations NMP1L3534, License Amendment Request - Revision to the Technical Specifications Design Features Sections to Remove the Nine Mile 3 Nuclear Project, LLC, Designation2023-08-18018 August 2023 License Amendment Request - Revision to the Technical Specifications Design Features Sections to Remove the Nine Mile 3 Nuclear Project, LLC, Designation NMP1L3545, Supplemental Information Letter to Adopt TSTF-505, Provide Risk- Informed Extended Completion Times - RITSTF Initiative 4b, Revision 2 and 10 CFR 50.69, Risk-informed Categorization and Treatment of Structures, Systems .2023-08-0404 August 2023 Supplemental Information Letter to Adopt TSTF-505, Provide Risk- Informed Extended Completion Times - RITSTF Initiative 4b, Revision 2 and 10 CFR 50.69, Risk-informed Categorization and Treatment of Structures, Systems . NMP1L3544, Fifth Inservice Inspection Interval, First Inservice Inspection Period 2023 Owner'S Activity Report for RFO-27 Inservice Examinations2023-07-14014 July 2023 Fifth Inservice Inspection Interval, First Inservice Inspection Period 2023 Owner'S Activity Report for RFO-27 Inservice Examinations NMP2L2846, Nine Mire Point Nuclear Station, Units 1 and 2, General License 30-day Cask Registration Notifications2023-07-0505 July 2023 Nine Mire Point Nuclear Station, Units 1 and 2, General License 30-day Cask Registration Notifications NMP1L3539, Day Commitment Response - Relief Request I5R-11 Concerning the Installation of a Weld Overlay on Reactor Pressure Vessel Recirculation Inlet Nozzle N2E Safe End-to-Nozzle Dissimilar Metal Weld (32-WD-208)2023-06-0909 June 2023 Day Commitment Response - Relief Request I5R-11 Concerning the Installation of a Weld Overlay on Reactor Pressure Vessel Recirculation Inlet Nozzle N2E Safe End-to-Nozzle Dissimilar Metal Weld (32-WD-208) NMP1L3523, Annual Radioactive Environmental Operating Report2023-05-12012 May 2023 Annual Radioactive Environmental Operating Report NMP1L3522, Independent Spent Fuel Storage Installation (ISFSI) - 2022 Radioactive Effluent Release Report2023-04-30030 April 2023 Independent Spent Fuel Storage Installation (ISFSI) - 2022 Radioactive Effluent Release Report NMP1L3525, Core Operating Limits Report2023-04-19019 April 2023 Core Operating Limits Report NMP1L3526, Submittal of Emergency Relief Request I5R-14 Concerning a Proposed Alternative Associated with N2E Safe End-to-Nozzle Dissimilar Metal Weld Repair with Laminar Indication2023-04-13013 April 2023 Submittal of Emergency Relief Request I5R-14 Concerning a Proposed Alternative Associated with N2E Safe End-to-Nozzle Dissimilar Metal Weld Repair with Laminar Indication NMP1L3520, Supplemental Information for License Amendment Request Application to Partially Adopt Technical Specification Task Force (TSTF) Traveler TSTF-568, Revision 22023-04-0404 April 2023 Supplemental Information for License Amendment Request Application to Partially Adopt Technical Specification Task Force (TSTF) Traveler TSTF-568, Revision 2 NMP1L3519, Submittal of Emergency Relief Request I5R-11 Concerning the Installation of a Weld Overlay on Reactor Pressure Vessel Recirculation Inlet Nozzle N2E Safe End-to-Nozzle Dissimilar Metal Weld (32-WD-208)2023-03-30030 March 2023 Submittal of Emergency Relief Request I5R-11 Concerning the Installation of a Weld Overlay on Reactor Pressure Vessel Recirculation Inlet Nozzle N2E Safe End-to-Nozzle Dissimilar Metal Weld (32-WD-208) NMP1L3516, Submittal of Emergency Relief Request I5R-11 Concerning the Installation of a Weld Overlay on Reactor Pressure Vessel Recirculation Inlet Nozzle N2E Safe End-to-Nozzle Dissimilar Metal Weld (32-WD-208)2023-03-29029 March 2023 Submittal of Emergency Relief Request I5R-11 Concerning the Installation of a Weld Overlay on Reactor Pressure Vessel Recirculation Inlet Nozzle N2E Safe End-to-Nozzle Dissimilar Metal Weld (32-WD-208) NMP1L3517, Proposed Alternative Associated with a Weld Overlay Repair to the Torus2023-03-29029 March 2023 Proposed Alternative Associated with a Weld Overlay Repair to the Torus NMP1L3518, Proposed Alternative to Utilize Specific Provisions of Code Case N-716-3, Alternative Classification and Examination Requirements Section XI, Division 12023-03-29029 March 2023 Proposed Alternative to Utilize Specific Provisions of Code Case N-716-3, Alternative Classification and Examination Requirements Section XI, Division 1 NMP1L3515, Submittal of Emergency Relief Request I5R-11 Concerning the Installation of a Weld Overlay on Reactor Pressure Vessel Recirculation Inlet Nozzle N2E Safe End-to-Nozzle Dissimilar Metal Weld (32-WD-208)2023-03-27027 March 2023 Submittal of Emergency Relief Request I5R-11 Concerning the Installation of a Weld Overlay on Reactor Pressure Vessel Recirculation Inlet Nozzle N2E Safe End-to-Nozzle Dissimilar Metal Weld (32-WD-208) NMP1L3513, Submittal of Emergency Relief Request I5R-11 Concerning the Installation of a Weld Overlay on Reactor Pressure Vessel Recirculation Inlet Nozzle N2E Safe End-to-Nozzle Dissimilar Metal Weld (32-WD-208)2023-03-24024 March 2023 Submittal of Emergency Relief Request I5R-11 Concerning the Installation of a Weld Overlay on Reactor Pressure Vessel Recirculation Inlet Nozzle N2E Safe End-to-Nozzle Dissimilar Metal Weld (32-WD-208) NMP1L3499, CFR 50.46 Annual Report2023-01-27027 January 2023 CFR 50.46 Annual Report NMP1L3482, License Amendment Request to Revise Technical Specifications to Adopt Risk Informed Completion Times TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 4b2022-12-15015 December 2022 License Amendment Request to Revise Technical Specifications to Adopt Risk Informed Completion Times TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 4b NMP1L3486, Radiological Emergency Plan Document Revision2022-12-15015 December 2022 Radiological Emergency Plan Document Revision NMP1L3484, Application to Adopt 10 CFR 50.69, Risk-Informed Categorization and Reatment of Structures, Systems and Components for Nuclear Power Reactors2022-12-15015 December 2022 Application to Adopt 10 CFR 50.69, Risk-Informed Categorization and Reatment of Structures, Systems and Components for Nuclear Power Reactors NMP1L3485, Proposed Alternative Associated with a Weld Overlay Repair to the Torus2022-12-0808 December 2022 Proposed Alternative Associated with a Weld Overlay Repair to the Torus NMP2L2823, Supplemental Information for License Amendment Request Revise Surveillance Requirements to Reduce Excessive Fast Starting of Emergency Diesel Generators2022-10-28028 October 2022 Supplemental Information for License Amendment Request Revise Surveillance Requirements to Reduce Excessive Fast Starting of Emergency Diesel Generators NMP1L3481, Constellation Energy Generation, LLC, 10 CFR 50, Appendix E - Development of Evacuation Time Estimates2022-09-15015 September 2022 Constellation Energy Generation, LLC, 10 CFR 50, Appendix E - Development of Evacuation Time Estimates NMP1L3477, License Amendment Request - Application to Partially Adopt Technical Specification Task Force (TSTF) Traveler TSTF-568, Revision 2, Revise Applicability of BWR/4 TS 3.6.2.5 and TS 3.6.3.2, to Revise.2022-08-12012 August 2022 License Amendment Request - Application to Partially Adopt Technical Specification Task Force (TSTF) Traveler TSTF-568, Revision 2, Revise Applicability of BWR/4 TS 3.6.2.5 and TS 3.6.3.2, to Revise. NMP1L3478, Response to Request for Additional Information - Relief Request Associated with Pump Periodic Verification Tests of Core Spray System Pumps2022-08-0505 August 2022 Response to Request for Additional Information - Relief Request Associated with Pump Periodic Verification Tests of Core Spray System Pumps NMP1L3469, Constellation Energy Company, LLC, Request for Use of Honeywell Mururoa V4F1 R Supplied Air Suits2022-06-30030 June 2022 Constellation Energy Company, LLC, Request for Use of Honeywell Mururoa V4F1 R Supplied Air Suits NMP1L3467, License Amendment Request - Revision to Alternative Source Term Calculation for Main Steam Isolation Valve (MSIV) Leakage and Non-MSIV Leakage2022-06-29029 June 2022 License Amendment Request - Revision to Alternative Source Term Calculation for Main Steam Isolation Valve (MSIV) Leakage and Non-MSIV Leakage NMP1L3465, Independent Spent Fuel Storage Installation - General License 30-day Cask Registration Notifications2022-06-17017 June 2022 Independent Spent Fuel Storage Installation - General License 30-day Cask Registration Notifications NMP1L3462, Independent Spent Fuel Storage Installation, General License 30-day Cask Registration Notifications2022-06-0909 June 2022 Independent Spent Fuel Storage Installation, General License 30-day Cask Registration Notifications NMP2L2799, License Amendment Request - Revise Surveillance Requirements to Reduce Excessive Fast Starting of Emergency Diesel Generators2022-05-24024 May 2022 License Amendment Request - Revise Surveillance Requirements to Reduce Excessive Fast Starting of Emergency Diesel Generators NMP2L2811, Fourth Inservice Inspection Interval, Second Inservice Inspection Period 2022 Owner'S Activity Report for RFO-18 Inservice Examinations2022-05-13013 May 2022 Fourth Inservice Inspection Interval, Second Inservice Inspection Period 2022 Owner'S Activity Report for RFO-18 Inservice Examinations NMP1L3459, 2021 Annual Radiological Environmental Operating Report2022-05-0808 May 2022 2021 Annual Radiological Environmental Operating Report NMP1L3457, 2021 Radioactive Effluent Release Report for Nine Mile Point Units 1 and 22022-04-30030 April 2022 2021 Radioactive Effluent Release Report for Nine Mile Point Units 1 and 2 NMP2L2805, Annual Environmental Operating Report2022-04-23023 April 2022 Annual Environmental Operating Report NMP2L2807, Core Operating Limits Report2022-04-0707 April 2022 Core Operating Limits Report NMP1L3458, Constellation Energy Generation, LLC, Annual Property Insurance Status Report2022-04-0101 April 2022 Constellation Energy Generation, LLC, Annual Property Insurance Status Report NMP1L3454, Relief Request Associated with Pump Periodic Verification Tests of Core Spray System Pumps2022-03-0202 March 2022 Relief Request Associated with Pump Periodic Verification Tests of Core Spray System Pumps NMP1L3447, Constellation Energy Generation, LLC - Response to Request for Additional Information - Proposed Relief Request Associated with Reactor Pressure Vessel Water Level Instrumentation Partial Penetration Nozzle Repairs2022-02-0202 February 2022 Constellation Energy Generation, LLC - Response to Request for Additional Information - Proposed Relief Request Associated with Reactor Pressure Vessel Water Level Instrumentation Partial Penetration Nozzle Repairs NMP1L3444, CFR 50.46 Annual Report2022-01-27027 January 2022 CFR 50.46 Annual Report NMP2L2794, Supplemental Information to Support Review of Nine Mile Point Nuclear Station, Unit 2, License Amendment Request to Adopt TSTF-582, Revision 02022-01-11011 January 2022 Supplemental Information to Support Review of Nine Mile Point Nuclear Station, Unit 2, License Amendment Request to Adopt TSTF-582, Revision 0 NMP2L2793, Supplemental Information - Relief Request Associated with Excess Flow Check Valves2021-12-17017 December 2021 Supplemental Information - Relief Request Associated with Excess Flow Check Valves NMP2L2789, Response to Request for Additional Information by the Office of Reactor Regulation to Support Review of License Amendment Request to Adopt TSTF-582, Revision 02021-12-16016 December 2021 Response to Request for Additional Information by the Office of Reactor Regulation to Support Review of License Amendment Request to Adopt TSTF-582, Revision 0 2024-02-01
[Table view] Category:Response to Request for Additional Information (RAI)
MONTHYEARNMP1L3545, Supplemental Information Letter to Adopt TSTF-505, Provide Risk- Informed Extended Completion Times - RITSTF Initiative 4b, Revision 2 and 10 CFR 50.69, Risk-informed Categorization and Treatment of Structures, Systems .2023-08-0404 August 2023 Supplemental Information Letter to Adopt TSTF-505, Provide Risk- Informed Extended Completion Times - RITSTF Initiative 4b, Revision 2 and 10 CFR 50.69, Risk-informed Categorization and Treatment of Structures, Systems . NMP1L3519, Submittal of Emergency Relief Request I5R-11 Concerning the Installation of a Weld Overlay on Reactor Pressure Vessel Recirculation Inlet Nozzle N2E Safe End-to-Nozzle Dissimilar Metal Weld (32-WD-208)2023-03-30030 March 2023 Submittal of Emergency Relief Request I5R-11 Concerning the Installation of a Weld Overlay on Reactor Pressure Vessel Recirculation Inlet Nozzle N2E Safe End-to-Nozzle Dissimilar Metal Weld (32-WD-208) NMP1L3516, Submittal of Emergency Relief Request I5R-11 Concerning the Installation of a Weld Overlay on Reactor Pressure Vessel Recirculation Inlet Nozzle N2E Safe End-to-Nozzle Dissimilar Metal Weld (32-WD-208)2023-03-29029 March 2023 Submittal of Emergency Relief Request I5R-11 Concerning the Installation of a Weld Overlay on Reactor Pressure Vessel Recirculation Inlet Nozzle N2E Safe End-to-Nozzle Dissimilar Metal Weld (32-WD-208) NMP1L3478, Response to Request for Additional Information - Relief Request Associated with Pump Periodic Verification Tests of Core Spray System Pumps2022-08-0505 August 2022 Response to Request for Additional Information - Relief Request Associated with Pump Periodic Verification Tests of Core Spray System Pumps RS-22-027, Constellation, Response to Request for Additional Information Regarding Application to Revise Technical Specifications to Adopt TSTF-541 Revision 2, Add Exceptions to Surveillance Requirements for Valves and Dampers Locked in the Actuated2022-02-23023 February 2022 Constellation, Response to Request for Additional Information Regarding Application to Revise Technical Specifications to Adopt TSTF-541 Revision 2, Add Exceptions to Surveillance Requirements for Valves and Dampers Locked in the Actuated P NMP1L3447, Constellation Energy Generation, LLC - Response to Request for Additional Information - Proposed Relief Request Associated with Reactor Pressure Vessel Water Level Instrumentation Partial Penetration Nozzle Repairs2022-02-0202 February 2022 Constellation Energy Generation, LLC - Response to Request for Additional Information - Proposed Relief Request Associated with Reactor Pressure Vessel Water Level Instrumentation Partial Penetration Nozzle Repairs NMP2L2794, Supplemental Information to Support Review of Nine Mile Point Nuclear Station, Unit 2, License Amendment Request to Adopt TSTF-582, Revision 02022-01-11011 January 2022 Supplemental Information to Support Review of Nine Mile Point Nuclear Station, Unit 2, License Amendment Request to Adopt TSTF-582, Revision 0 NMP2L2789, Response to Request for Additional Information by the Office of Reactor Regulation to Support Review of License Amendment Request to Adopt TSTF-582, Revision 02021-12-16016 December 2021 Response to Request for Additional Information by the Office of Reactor Regulation to Support Review of License Amendment Request to Adopt TSTF-582, Revision 0 NMP2L2787, Response to Request for Additional Information - Relief Request Associated with Excess Flow Check Valves2021-11-15015 November 2021 Response to Request for Additional Information - Relief Request Associated with Excess Flow Check Valves JAFP-21-0087, Response to Request for Additional Information Regarding Request for Approval of Transfer of Licenses and Conforming Amendments2021-09-16016 September 2021 Response to Request for Additional Information Regarding Request for Approval of Transfer of Licenses and Conforming Amendments NMP2L2773, Company - Response to Request for Additional Information2021-06-30030 June 2021 Company - Response to Request for Additional Information JAFP-21-0044, Response to Request for Additional Information Regarding Request for Approval of Transfer of Licenses and Conforming Amendments2021-06-11011 June 2021 Response to Request for Additional Information Regarding Request for Approval of Transfer of Licenses and Conforming Amendments NMP1L3402, Response to Request for Additional Information by the Office of Nuclear Reactor Regulation to Support Review of License Amendment Request to Adopt TSTF-582, Revision 02021-06-0404 June 2021 Response to Request for Additional Information by the Office of Nuclear Reactor Regulation to Support Review of License Amendment Request to Adopt TSTF-582, Revision 0 JAFP-21-0032, Response to Request for Additional Information - Proposed Alternative Concerning ASME Section XI Repair/Replacement Documentation for Replacement of Pressure Retaining Bolting2021-04-20020 April 2021 Response to Request for Additional Information - Proposed Alternative Concerning ASME Section XI Repair/Replacement Documentation for Replacement of Pressure Retaining Bolting NMP1L3376, Supplemental Information to Support Review of Nine Mile Point Nuclear Station, Unit 1, License Amendment Request to Adopt TSTF-334, Revision 22021-01-27027 January 2021 Supplemental Information to Support Review of Nine Mile Point Nuclear Station, Unit 1, License Amendment Request to Adopt TSTF-334, Revision 2 NMP1L3373, Response to Request for Additional Information by the Office of Nuclear Reactor Regulation to Support Review of License Amendment Request to Adopt TSTF-334, Revision 22021-01-22022 January 2021 Response to Request for Additional Information by the Office of Nuclear Reactor Regulation to Support Review of License Amendment Request to Adopt TSTF-334, Revision 2 NMP2L2754, Responses to Request for Additional Information Questions 27 and 28 to Adopt TSTF-505, Provide Risk- Informed Extended Completion Times - RITSTF Initiative 4b, Revision 22021-01-0707 January 2021 Responses to Request for Additional Information Questions 27 and 28 to Adopt TSTF-505, Provide Risk- Informed Extended Completion Times - RITSTF Initiative 4b, Revision 2 NMP2L2749, Responses to Request for Additional Information Questions 17 and 26 for Nine Mile Point Nuclear Station, Unit 2, to Adopt TSTF-505, Provide Risk- Informed Extended Completion Times - RITSTF Initiative 4b, Rev. 22020-10-22022 October 2020 Responses to Request for Additional Information Questions 17 and 26 for Nine Mile Point Nuclear Station, Unit 2, to Adopt TSTF-505, Provide Risk- Informed Extended Completion Times - RITSTF Initiative 4b, Rev. 2 NMP2L2745, Request for Additional Information for Nine Mile Point Nuclear Station, Unit 2, to Adopt TSTF-505, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 4b, Revision 22020-10-0202 October 2020 Request for Additional Information for Nine Mile Point Nuclear Station, Unit 2, to Adopt TSTF-505, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 4b, Revision 2 RS-20-112, Response to Request for Additional Information Related to License Amendment Request to Adopt TSTF-5682020-09-0303 September 2020 Response to Request for Additional Information Related to License Amendment Request to Adopt TSTF-568 NMP2L2742, Response to Request for Additional Information by NRR to Support Review of Nine Mile Point Nuclear Station, Unit 2, License Amendment Request Re Risk Informed Categorization & Structures, Systems and Components2020-08-28028 August 2020 Response to Request for Additional Information by NRR to Support Review of Nine Mile Point Nuclear Station, Unit 2, License Amendment Request Re Risk Informed Categorization & Structures, Systems and Components ML20188A2642020-07-0606 July 2020 Clinton Power Station, R.E. Ginna Station, Limerick Station, Nine Mile Point Station & Peach Bottom Station - Proposed Alternative to Utilize Code Case OMN-26 - Response to Request for Additional Information NMP2L2713, Response to Request for Additional Information by the Office of Nuclear Reactor Regulation to Support Review of Nine Mile Point Nuclear Station, Unit 2, License Amendment Request to Increase Allowable MSIV Leakage Rates2019-11-21021 November 2019 Response to Request for Additional Information by the Office of Nuclear Reactor Regulation to Support Review of Nine Mile Point Nuclear Station, Unit 2, License Amendment Request to Increase Allowable MSIV Leakage Rates NMP2L2711, Byron Station; Calvert Cliffs; Clinton Power Station; LaSalle County Station; Limerick Generating Station; and Nine Mile Point Nuclear Station - Proposed Alternative to Utilize Code Case N-8792019-10-16016 October 2019 Byron Station; Calvert Cliffs; Clinton Power Station; LaSalle County Station; Limerick Generating Station; and Nine Mile Point Nuclear Station - Proposed Alternative to Utilize Code Case N-879 JAFP-19-0057, Response to Request for Additional Information - Proposed Alternative to Utilize Code Cases N-878 and N-8802019-06-0404 June 2019 Response to Request for Additional Information - Proposed Alternative to Utilize Code Cases N-878 and N-880 NMP1L3279, Response to Request for Additional Information - Proposed Alternatives to Utilize Code Cases N-878 and N-880 for Plants2019-05-0101 May 2019 Response to Request for Additional Information - Proposed Alternatives to Utilize Code Cases N-878 and N-880 for Plants NMP1L3264, Response to Request for Additional Information by the Office of Nuclear Reactor Regulation to Support Review of Nine Mile Point Nuclear Station, Unit 1, License Amendment Request to Revise Technical Specifications 3.3.1 for Primary Contain2019-02-25025 February 2019 Response to Request for Additional Information by the Office of Nuclear Reactor Regulation to Support Review of Nine Mile Point Nuclear Station, Unit 1, License Amendment Request to Revise Technical Specifications 3.3.1 for Primary Containm JAFP-19-0006, Response to Request for Additional Information - Proposed Alternative to Utilize Code Cases N-878 and N-8802019-01-0808 January 2019 Response to Request for Additional Information - Proposed Alternative to Utilize Code Cases N-878 and N-880 NMP2L2695, Supplement Information and Response to Request for Additional Information by the Office of Nuclear Reactor Regulation to Support Review of an Emergency License Amendment Request for One Time Extension to The.2018-12-0707 December 2018 Supplement Information and Response to Request for Additional Information by the Office of Nuclear Reactor Regulation to Support Review of an Emergency License Amendment Request for One Time Extension to The. NMP1L3248, Supplement to the Response to Request for Additional Information by the Office of Nuclear Reactor Regulation to Support Review of Nine Mile Point Nuclear Station, Unit 1, License Amendment Request to Apply TSTF-542, Revision 2, Reactor Pre2018-11-0202 November 2018 Supplement to the Response to Request for Additional Information by the Office of Nuclear Reactor Regulation to Support Review of Nine Mile Point Nuclear Station, Unit 1, License Amendment Request to Apply TSTF-542, Revision 2, Reactor Pres NMP1L3238, Response to Request for Additional Information by the Office of Nuclear Reactor Regulation to Support Review of Nine Mile Point Nuclear Station, Unit 1, License Amendment Request to Apply TSTF-542, ...2018-10-0101 October 2018 Response to Request for Additional Information by the Office of Nuclear Reactor Regulation to Support Review of Nine Mile Point Nuclear Station, Unit 1, License Amendment Request to Apply TSTF-542, ... NMP1L3233, Response to Request for Additional Information by the Office of Nuclear Reactor Regulation to Support Review of Nine Mile Point Nuclear Station, Unit 1, Removal of Boraflex Credit License Amendment Request (L-2018-LLA-0039)2018-08-17017 August 2018 Response to Request for Additional Information by the Office of Nuclear Reactor Regulation to Support Review of Nine Mile Point Nuclear Station, Unit 1, Removal of Boraflex Credit License Amendment Request (L-2018-LLA-0039) NMP1L3221, Independent Spent Fuel Storage Installation, Nine Mile Point, Units 1 & 2, R. E. Ginna - Response to Request for Additional Information License Amendment Request to Adopt Emergency Action Level Schemes.2018-05-10010 May 2018 Independent Spent Fuel Storage Installation, Nine Mile Point, Units 1 & 2, R. E. Ginna - Response to Request for Additional Information License Amendment Request to Adopt Emergency Action Level Schemes. RS-18-061, Response to Request for Additional Information Regarding Decommissioning Funding Plans for Independent Spent Fuel Storage Installations (Isfsis)2018-05-0202 May 2018 Response to Request for Additional Information Regarding Decommissioning Funding Plans for Independent Spent Fuel Storage Installations (Isfsis) ML18025A7992018-01-25025 January 2018 Response to Request for Additional Information Regarding Generic Letter 2016-01 NMP2L2662, Supplemental Information for Nine Mile Point Nuclear Station, Unit 2, to Adopt TSTF-542, Reactor Pressure Vessel Water Inventory Control, Revision 22017-12-27027 December 2017 Supplemental Information for Nine Mile Point Nuclear Station, Unit 2, to Adopt TSTF-542, Reactor Pressure Vessel Water Inventory Control, Revision 2 NMP2L2658, Response to Request for Additional Information by the Office of Nuclear Reactor Regulation to Support Review of Nine Mile Point Nuclear Station, Unit 2, License Amendment Request to Adopt TSTF-542, Revision 2, Reactor Pressure Vessel Water2017-11-0303 November 2017 Response to Request for Additional Information by the Office of Nuclear Reactor Regulation to Support Review of Nine Mile Point Nuclear Station, Unit 2, License Amendment Request to Adopt TSTF-542, Revision 2, Reactor Pressure Vessel Water NMP1L3180, Submittal of Relief Request NMP-RR-001 Concerning Nozzle-to-Vessel Weld and Inner Radii Examinations (Use of Code Case N-702)2017-09-18018 September 2017 Submittal of Relief Request NMP-RR-001 Concerning Nozzle-to-Vessel Weld and Inner Radii Examinations (Use of Code Case N-702) RS-17-053, Response to Request for Additional Information Regarding Generic Letter 2016-012017-04-27027 April 2017 Response to Request for Additional Information Regarding Generic Letter 2016-01 NMP1L3146, Response to Request for Additional Information to Relief to Perform Pressure Isolation Valve Leakage Testing at Frequencies Consistent with 10 CFR 50, Appendix J2017-04-0606 April 2017 Response to Request for Additional Information to Relief to Perform Pressure Isolation Valve Leakage Testing at Frequencies Consistent with 10 CFR 50, Appendix J RS-17-044, Response to Request for Additional Information Regarding Proposed Alternative for the Use of Encoded Phased Array Ultrasonic Examination Techniques in Lieu of Radiography2017-03-13013 March 2017 Response to Request for Additional Information Regarding Proposed Alternative for the Use of Encoded Phased Array Ultrasonic Examination Techniques in Lieu of Radiography RS-17-027, Response to March 12, 2012, Request for Information Enclosure 2, Recommendation 2.1, Flooding, Required Response 3, Flooding Focused Evaluation Summary Submittal2017-03-10010 March 2017 Response to March 12, 2012, Request for Information Enclosure 2, Recommendation 2.1, Flooding, Required Response 3, Flooding Focused Evaluation Summary Submittal ML17037A2652017-02-0606 February 2017 Response to Request for Information Concerning Regional Meteorological Conditions Characterizing Atmospheric Transport Processes within 50 Miles of the Plant RA-16-049, Response to Request for Additional Information Regarding Requests to Withhold Emergency Preparedness Documents from Public Disclosure2016-05-26026 May 2016 Response to Request for Additional Information Regarding Requests to Withhold Emergency Preparedness Documents from Public Disclosure ML16131A6542016-05-0404 May 2016 Response to a Question Raised During the Audit ML16131A6552016-05-0404 May 2016 White Paper Prepared in Response to a Question Raised During the Audit NMP2L2616, Supplemental Response to Request for Additional Information by NRR to Support Review of Relocation of Secondary Containment Bypass Leakage Paths Table from Technical Specifications to the Technical Requirements Manual2016-03-21021 March 2016 Supplemental Response to Request for Additional Information by NRR to Support Review of Relocation of Secondary Containment Bypass Leakage Paths Table from Technical Specifications to the Technical Requirements Manual NMP1L3068, Supplemental Information to Request for Additional Information - Application for Technical Specification Change Regarding Risk-Informed Justification for the Relocation of Specific Surveillance Frequency Requirements to A....2016-01-25025 January 2016 Supplemental Information to Request for Additional Information - Application for Technical Specification Change Regarding Risk-Informed Justification for the Relocation of Specific Surveillance Frequency Requirements to A.... NMP2L2611, Response to Request for Additional Information by NRR to Support Review of Relocation of Secondary Containment Bypass Leakage Paths Table from Technical Specifications to the Technical Requirements Manual2016-01-0808 January 2016 Response to Request for Additional Information by NRR to Support Review of Relocation of Secondary Containment Bypass Leakage Paths Table from Technical Specifications to the Technical Requirements Manual NMP1L3064, Supplemental Response to Request for Additional Information - Application for Technical Specification Change Regarding Risk-Informed Justification for the Relocation of Specific Surveillance Frequency Requirements....2015-12-22022 December 2015 Supplemental Response to Request for Additional Information - Application for Technical Specification Change Regarding Risk-Informed Justification for the Relocation of Specific Surveillance Frequency Requirements.... 2023-08-04
[Table view] Category:Technical Specifications
MONTHYEARML23289A0122023-12-0606 December 2023 Issuance of Amendment No. 250 Regarding the Revision to Technical Specifications to Adopt TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 4b RS-23-080, Constellation Energy Generation, LLC, Application to Revise Technical Specifications to Adopt TSTF-264-A, Revision 0, 3.3.9 and 3.3.10 - Delete Flux Monitors Specific Overlap Requirement SRs2023-08-30030 August 2023 Constellation Energy Generation, LLC, Application to Revise Technical Specifications to Adopt TSTF-264-A, Revision 0, 3.3.9 and 3.3.10 - Delete Flux Monitors Specific Overlap Requirement SRs ML23131A4242023-06-23023 June 2023 Issuance of Amendment No. 249 Regarding the Revision to Technical Specification 3.3.1 to Adopt Technical Specifications Task Force Traveler TSTF-568 ML22090A0862022-04-29029 April 2022 Amendments to Adopt TSTF-541,Rev.2,Add Exceptions to Surveillance Requirements for Valves,Dampers Locked in Actuated Position RS-22-049, Constellation Energy Generation, LLC, Supplemental Information to Correct Typographical Errors in Constellation'S Application to Revise Technical Specifications to Adopt TSTF-541 Revision 2, Add Exceptions to Surveillance Requirements for2022-04-0404 April 2022 Constellation Energy Generation, LLC, Supplemental Information to Correct Typographical Errors in Constellation'S Application to Revise Technical Specifications to Adopt TSTF-541 Revision 2, Add Exceptions to Surveillance Requirements for V ML22033A3102022-03-0404 March 2022 Issuance of Amendment No. 190, Changes to Reactor Pressure Vessel Water Inventory Control Technical Specification Requirements ML21347A0382022-01-13013 January 2022 Issuance of Amendments to Revise Reactor Coolant Leakage Requirements NMP2L2794, Supplemental Information to Support Review of Nine Mile Point Nuclear Station, Unit 2, License Amendment Request to Adopt TSTF-582, Revision 02022-01-11011 January 2022 Supplemental Information to Support Review of Nine Mile Point Nuclear Station, Unit 2, License Amendment Request to Adopt TSTF-582, Revision 0 ML21295A7342021-11-15015 November 2021 Issuance of Amendment No. 187 Adoption of Technical Specification Task Force (TSTF) Traveler TSTF-501, Revision 1, Relocate Stored Fuel Oil and Lube Oil Volume Values to Licensee Control JAFP-21-0089, Application to Revise Technical Specifications to Adopt TSTF-541 Revision 2, Add Exceptions to Surveillance Requirements for Valves and Dampers Locked in the Actuated Position2021-09-27027 September 2021 Application to Revise Technical Specifications to Adopt TSTF-541 Revision 2, Add Exceptions to Surveillance Requirements for Valves and Dampers Locked in the Actuated Position ML21033A5302021-04-0101 April 2021 Issuance of Amendments to Adopt Technical Specifications Task Force TSTF-566, Revise Actions for Inoperable RHR Shutdown Cooling Subsystems ML21049A0062021-03-16016 March 2021 Issuance of Amendment No. 245 for Relaxation of Surveillance Frequency for Instrument-Line Flow Check Valve ML21077A0142021-03-16016 March 2021 License and Technical Specification Pages for Amendment No. 245, Relaxation of Surveillance Frequency for Instrument-Line Flow Check Valve ML21013A0052021-02-0404 February 2021 Issuance of Amendments to Adopt Technical Specifications Task Traveler TSTF-568, Revise Applicability of BWR/4 TS 3.6.2.5 and TS 3.6.3.2 ML20332A1152021-01-29029 January 2021 Issuance of Amendment No. 183 Regarding Risk-Informed Categorization and Treatment of Structures, Systems, and Components RS-20-016, County, Nine Mile Point, Peach Bottom Atomic and Quad Cities - Application to Revise Technical Specifications to Adopt TSTF-566, Revise Actions for Inoperable RHR Shutdown Cooling Systems2020-04-13013 April 2020 County, Nine Mile Point, Peach Bottom Atomic and Quad Cities - Application to Revise Technical Specifications to Adopt TSTF-566, Revise Actions for Inoperable RHR Shutdown Cooling Systems ML19176A0862019-07-30030 July 2019 Issuance of Amendment No. 237 Changes to Containment Oxygen Concentration Requirements ML18344A4522019-01-11011 January 2019 Issuance of Amendment No. 234 Change to Remove Boraflex Credit from Spent Fuel Racks NMP2L2695, Supplement Information and Response to Request for Additional Information by the Office of Nuclear Reactor Regulation to Support Review of an Emergency License Amendment Request for One Time Extension to The.2018-12-0707 December 2018 Supplement Information and Response to Request for Additional Information by the Office of Nuclear Reactor Regulation to Support Review of an Emergency License Amendment Request for One Time Extension to The. ML18330A0952018-11-30030 November 2018 Correction Duplicate Subparagraph (N) on Technical Specification Page 204 That Occurred in Amendment No. 186 Issued January 25, 2005 RS-18-020, Application to Revise Technical Specifications to Modify the APRM Channel Adjustment Surveillance Requirement2018-06-15015 June 2018 Application to Revise Technical Specifications to Modify the APRM Channel Adjustment Surveillance Requirement ML18032A1772018-03-0606 March 2018 Issuance of Amendment No. 166 to Adopt Technical Specifications Task Force (TSTF) Traveler TSTF-522 (CAC No. MF9804; EPID L-2017-LLA-0232) NMP2L2662, Supplemental Information for Nine Mile Point Nuclear Station, Unit 2, to Adopt TSTF-542, Reactor Pressure Vessel Water Inventory Control, Revision 22017-12-27027 December 2017 Supplemental Information for Nine Mile Point Nuclear Station, Unit 2, to Adopt TSTF-542, Reactor Pressure Vessel Water Inventory Control, Revision 2 ML17324B1782017-12-21021 December 2017 Issuance of Amendment to Allow Greater Flexibility in Performing Surveillance Testing in Modes 1, 2, or 3 of Emergency Diesel Generators(Cac No. MF9579; EPID L-2017-LLA-0203) ML17152A3202017-06-30030 June 2017 Issuance of Amendments Emergency Plans Emergency Action Level HU1.5 ML17055A4512017-03-0909 March 2017 Issuance of Amendment Partial Length Fuel Rod Burnup ML16088A0532016-04-19019 April 2016 Issuance of Amendment License Amendment Request for Relocation of Secondary Containment Bypass Leakage Paths Table from Technical Specifications to the Technical Requirements Manual ML15352A1642016-03-17017 March 2016 Calvert Cliffs, Units 1 & 2 and Independent Spent Fuel Storage Installation; Nine Mile, Units 1 & 2 and R. E. Ginna - Issuance of Amendments Regarding the Emergency Plan Requalification Training Frequency for Emergency Response Organization Personnel NMP2L2611, Response to Request for Additional Information by NRR to Support Review of Relocation of Secondary Containment Bypass Leakage Paths Table from Technical Specifications to the Technical Requirements Manual2016-01-0808 January 2016 Response to Request for Additional Information by NRR to Support Review of Relocation of Secondary Containment Bypass Leakage Paths Table from Technical Specifications to the Technical Requirements Manual ML15341A3362016-01-0505 January 2016 Issuance of Amendment Technical Specifications for Safety Limit Minimum Critical Power Ratio NMP1L3064, Supplemental Response to Request for Additional Information - Application for Technical Specification Change Regarding Risk-Informed Justification for the Relocation of Specific Surveillance Frequency Requirements....2015-12-22022 December 2015 Supplemental Response to Request for Additional Information - Application for Technical Specification Change Regarding Risk-Informed Justification for the Relocation of Specific Surveillance Frequency Requirements.... ML15317A3072015-11-30030 November 2015 Issuance of Amendment Adoption of Technical Specification Task Force Traveler 425 ML15096A0762015-09-0202 September 2015 Issuance of Amendment Maximum Extended Load Line Limit Analysis Plus ML15223B2502015-08-14014 August 2015 and Nine Mile Point Nuclear Station, Unit No. 2- Copy of License Amendment Nos. 313, 291, 118, and 150 ML15161A3802015-07-30030 July 2015 R. E. Ginna and Nine Mile Point, Unit 2 - Issuance of Amendments Regarding Implementation of Technical Specification Task Force Traveler 523, Generic Letter 2008-01, Managing Gas Accumulation (TAC Nos. MF4405 - MF4409) ML15167A3152015-07-0808 July 2015 Issuance of Amendments Change to TS Requirements Regarding Education and Experience Eligibility Requirements for Licensed Operators ML15110A0082015-05-26026 May 2015 Issuance of Amendment Primary Containment Isolation Instrumentation Technical Specification Allowable Value Change ML15075A1592015-03-17017 March 2015 Correction Letter to Amendment No. 217 Diesel Generator Initiation - Degraded Voltage Time Delay Setting Change (Tac No. MF1022) ML15043A2702015-03-12012 March 2015 Issuance of Amendment Diesel Generator Initiation - Degraded Voltage Time Delay Setting Change ML14126A0032014-06-30030 June 2014 Issuance of Amendment Regarding Transition to a Risk-Informed, Performance-Based Fire Protection Program in Accordance with 10 CFR 50.48(c) ML14057A5542014-05-29029 May 2014 Issuance of Amendment Regarding Relocation of Pressure and Temperature Limit Curves to the Pressure and Temperature Limits Report ML1233803362012-11-21021 November 2012 License Amendment Request Pursuant to 10 CFR 50.90: Relocation of Pressure and Temperature Limit Curves to the Pressure and Temperature Limits Report ML1133000472011-12-22022 December 2011 NMP2 EPU - Operating License and Technical Specification Pages ML1133000412011-12-22022 December 2011 Cover Letter - Nine Mile Point Nuclear Station, Unit No. 2 - Issuance of Amendment Extended Power Uprate ML11208C3952011-07-20020 July 2011 License Amendment Requests Pursuant to 10 CFR 50.90: Revisions to the Technical Specifications Design Features Sections to Reflect Transfer of a Portion of Nine Mile Point Nuclear Station Site Real Property ML1018803332010-07-26026 July 2010 Issuance of Amendment No. 206 Modification of TS Section 3.2.7.1 and 4.2.7.1 ML1008904222010-03-22022 March 2010 License Amendment Request Pursuant to 10 CFR 50.90: Revision to Containment Spray System Nozzle Surveillance Frequency ML0926406812009-09-18018 September 2009 License Amendment Request Pursuant to 10 CFR 50.90: Revisions to Primary Coolant System Pressure Isolation Valve Requirements Consistent with Standard Technical Specifications - Tech. Spec. Sections 3.2.7.1 and 4.2.7.1 ML0919504152009-07-0202 July 2009 License Amendment Request to Remove Position Indication for Relief Valves and Safety Valves from Technical Specifications ML0905605222009-02-11011 February 2009 Units, 1 & 2, License Amendment Request for Adoption of TSTF-511-A Rev. 0 Eliminate Working Hour Restrictions from TS 5.2.2 to Support Compliance with 10 CFR Part 26. 2023-08-30
[Table view] |
Text
200 Exelon Way Kennett Square. PA 19348 Exelon Generation www.exeloncorp.com 10 CFR 50.90 NMP2L2611 January 8, 2016 U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, DC 20555-0001 Nine Mile Point Nuclear Station, Unit 2 Renewed Facility Operating License No. NPF-69 NRC Docket No. 50-410
Subject:
Response to Request for Additional Information by the Office of Nuclear Reactor Regulation to Support Review of Nine Mile Point Nuclear Station, Unit 2, Relocation of Secondary Containment Bypass Leakage Paths Table from Technical Specifications to the Technical Requirements Manual
References:
- 1. Letter from J. Barstow (Exelon Generation Company, LLC) to U.S. Nuclear Regulatory Commission, "Relocation of Secondary Containment Bypass Leakage Paths Table from Technical Specifications to the Technical Requirements Manual," dated March 23, 2015.
- 2. Letter from Brenda Mozafari (Senior Project Manager, U.S Nuclear Regulatory Commission) to Mr. Bryan Hanson (Exelon), "Nine Mile Point Nuclear Station, Unit 2 - Request for Additional Information Regarding (CAC MF5900)," dated December 17, 2015.
By letter dated March 23, 2015, (Reference 1) Exelon Generation Company, LLC (Exelon) requested to change the Nine Mile Point Unit 2 (NMP2) Technical Specifications (TS). The proposed amendment request would modify NMP2 TS by relocating the secondary containment bypass leakage paths table from Technical Specifications to the Technical Requirements Manual.
On December 8, 2015, the U.S. Nuclear Regulatory Commission (NRC) emailed a draft Request for Additional Information (RAI). On December 11, 2015, a clarification teleconference was held between NRC and Exelon personnel. The formal RAI (Reference 2) was provided on December 17, 2015.
Attachment 1 to this letter contains the NRC's request for additional information immediately followed by Exelon's response.
Exelon has reviewed the information supporting a finding of no significant hazards consideration and the environmental consideration provided to the NRC in Reference 1. The additional
U.S. Nuclear Regulatory Commission Response to Request for Additional Information Relocation of Secondary Containment Bypass Leakage Paths January 8, 2016 Page 2 information provided in this response does not affect the bases for concluding that the proposed license amendment does not involve a significant hazards consideration. Furthermore, the additional information provided in this response does not affect the bases for concluding that neither an environmental impact statement nor an environmental assessment needs to be prepared in connection with the proposed amendment.
There are no commitments contained in this response.
If you should have any questions regarding this submittal, please contact Ron Reynolds at 610-765-5247.
I declare under penalty of perjury that the foregoing is true and correct. Executed on the 81h day of January 2016.
Respectfully, J~. J t- 4. J y.-
David T. Gudger Manager - Licensing & Regulatory Affairs Exelon Generation Company, LLC : Response to Request for Additional Information : Mark-Up of Proposed Technical Specification and Bases Pages w/attachments cc: USNRC Region I Regional Administrator USNRC Senior Resident Inspector - NMP USNRC Project Manager, NRR - NMP A. L. Peterson, NYSERDA
ATTACHMENT 1 Response to Request for Additional Information
Response to Request for Additional Information Attachment 1 Relocation of Secondary Containment Bypass Leakage Paths Page 1of2 RAI STSB-1:
In the existing NMP2 TS, Table 3.6.1.3-1 specifies a numerical value tor allowable leakage tor each leakage path in standard cubic feet per hour. Surveillance Requirement (SR) 3.6.1.3.11 states:
Verify the leakage rate tor the secondary containment bypass leakage paths is within the limits of Table 3.6.1.3-1 when pressurized to~ 40 psig.
The proposed change is deletion of Table 3.6.1.3-1 and revision of SR 3.6.1.3.11 to state:
Verify the leakage rate tor the secondary containment bypass leakage paths is within the limits when pressurized to ~ 40 psig.
The staff requests additional information to explain why a numerical value limit on the secondary containment bypass leakage is not retained within the proposed SR 3.6.1.3.11 itself. Typically, the safety analysis tor a facility assumes a specific amount of bypass leakage when calculating dose consequences. This leakage limit is reflected in the TS to ensure operation within the bounds of the safety analysis.
The regulation at 10 CFR 50.36(c)(3) requires TSs to include items in the category of surveillance requirements, which are requirements relating to test, calibration, or inspection to assure that the necessary quality of systems and components is maintained, that facility operation will be within safety limits, and that the Limiting Conditions tor Operations will be met. The leakage limit for the pathways to be considered operable must be specified in the TS.
The staff compared the proposed revision of SR 3.6.1.3.11 with the guidance provided in Generic Letter 91-08. The Generic Letter recommended that the limitation on containment leakage rate be revised to state:
A combined leakage rate of less than or equal to [0.1 O La] for all penetrations that are secondary containment bypass leakage paths when pressurized to Pa.
This requirement has also been retained in the Standard TS.
Provide a technical justification tor not retaining a numerical limit on allowable leakage on the secondary containment bypass pathways or propose a change to SR 3.6.1.3.11 to reflect the appropriate limit. If it is proposed to specify the leakage limit in terms of a combined leakage rate, please review LCO 3.6.1.3 Condition D and its associated Required Actions to ensure consistency with the proposed change to SR 3.6.1.3.11 .
Response to Request for Additional Information Attachment 1 Relocation of Secondary Containment Bypass Leakage Paths Page 2 of 2 Exelon Response to RAI STSB-1 The secondary bypass leakage paths and limits specified in the current TS Table 3.6.1.3-1 are incorporated into the approved Alternative Source Term (AST) licensing basis for Nine Mile Point Unit 2 (NMP2) for the Loss of Coolant Accident (LOCA) evaluation as submitted in to License Amendment Request dated May 31, 2007 (Reference 1) and approved by Amendment 125 (Reference 2). These pathways release activity across four different release points; each release point having unique atmospheric dispersion coefficients.
Additionally, each pathway has unique flow and fission product removal characteristics. As a result of these varying release pathway characteristics, the current approved LOCA AST licensing basis is not configured to transform the multiple leakage limits into a single value for use in the proposed Surveillance Requirement (SR) 3.6.1.3.11.
The revision to SR 3.6.1.3.11 as shown in Attachment 2 reflects that the AST analyzed bypass leakage paths limits are within 10 CFR 50 Appendix J Testing Program Plan leakage criteria.
Reference to the TS Section 5.5.12 10 CFR 50 Appendix J Testing Program Plan refers directly to the NMP2 AST calculation, which demonstrates that the allowable leak rates found in the current TS Table 3.6.1.3-1 are acceptable. The TS Table 3.6.1.3-1 will be relocated to the Technical Requirements Manual (TAM) and acceptable leakage values will be maintained by the 10 CFR 50 Appendix J Testing Program Plan. Changes to the allowed leak rates and TAM are performed under the 10 CFR 50.59 process. to this submittal includes the revised TS and Bases marked-up pages and supersedes the previously submitted Attachment 2 in its entirety.
References:
- 1. Letter from Kevin J. Nietmann (Nine Mile Point Nuclear Station) to Document Control Desk (U.S. NRC), "License Amendment Request Pursuant to 10 CFR 50.90: Application of Alternate Source Term," dated May 31, 2007 (ML071580314).
- 2. Letter from Richard V. Guzman (Senior Project Manager, U.S Nuclear Regulatory Commission) to Mr. Keith J. Polson (Nine Mile Point Nuclear Station), "Nine Mile Point Nuclear Station, Unit 2 - Issuance of Amendment RE: Implementation of Alternative Radiological Source Term (TAC NO. MD5758)," dated May 29, 2008 (ML081230439).
ATTACHMENT 2 Mark-Up of Proposed Technical Specification and Bases Pages TS Pages 3.6.1.3-1, -12, -14 and -15 Bases Pages B3.6.1.3-1 through -3 TRM Pages 3.6-23a and -23b
PCIVs Secondary Containment Bypass 3.6.1.3 Leakage Valve 3.6 CONTAINMENT SYSTEMS DELETE 3.6.1.3 Primary Containment Isolation Valves Va (PCIVs)
LCO 3.6.1.3 Each PCIV and each non-PCIV llisted in Table 3.6.1.3-1 3 6 1 3-1 shall be OPERABLE.
APPLICABILITY: MODES 1, 2, and 3, When associated instrumentation is required to be OPERABLE per LCO 3.3.6.1, "Primary Containment Isolation Instrumentation."
ACTIONS
NOTES-----------------------------------------------------------
- 1. Penetration flow paths may be unisolated intermittently under administrative controls.
- 2. Separate Condition entry is allowed for each penetration flow path.
- 3. Enter applicable Conditions and Required Actions for systems made inoperable by PCIVs.
- 4. Enter applicable Conditions and Required Actions of LCO 3.6.1.1, "Primary Containment," when PCIV leakage results in exceeding overall containment leakage rate acceptance criteria.
CONDITION REQUIRED ACTION COMPLETION TIME A. -------------NOTE-------------- A.1 Isolate the affected 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br /> except Only applicable to penetration flow path for main steam penetration flow paths by use of at least line with two or more one closed and PCIVs. de-activated AND
automatic valve, closed manual valve, 8 hours9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br /> for main One or more blind flange, or steam line penetration flow paths check valve with flow with one PCIV through the valve inoperable except due secured.
to leakage not within limit. AND (continued)
NMP2 3.6.1.3-1 Amendment 91
PCIVs 3.6.1.3 SURVEILLANCE REQUIREMENTS (continued)
SURVEILLANCE FREQUENCY SR 3.6.1.3.6 Perform leakage rate testing for each 184 days primary containment purge valve with resilient seals. AND Once within 92 days after opening the valve SR 3.6.1.3.7 Verify the isolation time of each MSIV is In accordance t 3 seconds and d 5 seconds. with the Inservice Testing Program SR 3.6.1.3.8 Verify each automatic PCIV actuates to 24 months the isolation position on an actual or simulated isolation signal.
SR 3.6.1.3.9 Verify a representative sample of reactor 24 months instrumentation line EFCVs actuates to the isolation position on an actual or simulated instrument line break signal.
SR 3.6.1.3.10 Remove and test the explosive squib from 24 months on a each shear isolation valve of the TIP STAGGERED TEST System. BASIS SR 3.6.1.3.11 Verify the leakage rate for the secondary In accordance containment bypass leakage paths is with 10 CFR 50 within the limits of Table 3 3.6.1.3-1 6 1 3-1 when Appendix J pressurized to t 40 psig. Testing Program Plan (continued) the 10 CFR 50 Appendix J Testing Program Plan NMP2 3.6.1.3-12 Amendment 91, 96
PCIVs DELETE 3.6.1.3 Table 3.6.1.3-1 (page 1 of 2)
Secondary Containment Bypass Leakage Paths Leakage Rate Limits VALVE NUMBER PER VALVE LEAK RATE (SCFH) 2MSS*MOV111 1.875 2MSS*MOV112 2MSS*MOV208 0.625 2CMS*SOV74A, B (d) 0.2344 2CMS*SOV75A, B (d) 2CMS*SOV76A, B (d) 2CMS*SOV77A, B (d) 2DER*MOV119 (a) 2DER*RV344 2DER*MOV120 1.25 2DER*MOV130 0.625 2DER*MOV131 2DFR*MOV120 1.875 2DFR*MOV121 (b) 2DFR*RV228 2DFR*MOV139 0.9375 2DFR*MOV140 2WCS*MOV102 2.5 2WCS*MOV112 2FWS*V23A, B 12.0 2FWS*V12A, B 2CPS*AOV104 4.38 2CPS*AOV106 2CPS*AOV105 3.75 2CPS*AOV107 (continued)
(a) The combined leakage rate for these two valves shall be d 1.25 SCFH.
(b) The combined leakage rate for these two valves shall be d 1.875 SCFH.
The information from this Technical Specification section has been relocated to the TRM and maintained in accordance with the 10 CFR 50 Appendix J Testing Program Plan.
NMP2 3.6.1.3-14 Amendment 91, 104, 106
DELETE PCIVs 3.6.1.3 Table 3.6.1.3-1 (page 2 of 2)
Secondary Containment Bypass Leakage Paths Leakage Rate Limits VALVE NUMBER PER VALVE LEAK RATE (SCFH) 2CPS*SOV119 0.625 2CPS*SOV120 2CPS*SOV121 2CPS*SOV122 2IAS*SOV164 0.9375 2IAS*V448 2IAS*SOV165 0.9375 2IAS*V449 2GSN*SOV166 (c) 2GSN*V170 2IAS*SOV166 (c) 2IAS*SOV184 2IAS*SOV167 (c) 2IAS*SOV185 2IAS*SOV168 (c) 2IAS*SOV180 2CPS*SOV132 (c) 2CPS*V50 2CPS*SOV133 (c) 2CPS*V51 (c) The combined leak rate for these penetrations shall be d 3.6 SCFH. The assigned leakage rate through a penetration shall be that of the valve with the highest leakage rate in that penetration. However, if a penetration is isolated by one closed and de-activated automatic valve, closed manual valve, or blind flange, the leakage through the penetration shall be the actual pathway leakage.
(d) The LCO requirements and leakage rate limit shall apply until such time as a modification eliminates the potential secondary containment bypass leakage path.
The information from this Technical Specification section has been relocated to the TRM and maintained in accordance with the 10 CFR 50 Appendix J Testing Program Plan.
NMP2 3.6.1.3-15 Amendment 91, 106
PCIVs B 3.6.1.3 B 3.6 CONTAINMENT SYSTEMS Secondary Containment Bypass B 3.6.1.3 Primary Containment Isolation Valves (PCIVs)
Leakage Valves DELETE BASES BACKGROUND The function of the PCIVs and the non-PCIVs llisted in Table 3.6.1.3-1 T 3 6 1 3-1 (2CMS*SOV74A, (2CMS SOV74A 74B, 74B 75A, 75A 75B, 75B 76A, 76A 76B, 77A, 76B 77A 77B), in combination with other accident mitigation and 77B) systems, is to limit fission product release during and following postulated Design Basis Accidents (DBAs) to within DELETE limits. Primary containment isolation within the time limits specified for those PCIVs designed to close automatically ensures that the release of radioactive material to the environment will be consistent with the assumptions used in the analyses for a DBA.
The OPERABILITY requirements for PCIVs help ensure that an adequate primary containment boundary is maintained during and after an accident by minimizing potential paths to the environment. Therefore, the OPERABILITY requirements provide assurance that the primary containment function assumed in the safety analysis will be maintained. These isolation devices consist of either passive devices or active (automatic) devices. Manual valves, de-activated automatic valves secured in their closed position (including check valves with flow through the valve secured), blind flanges (which include plugs and caps as listed in Reference 1), and closed systems are considered passive devices. Check valves, or other automatic valves designed to close without operator action following an accident, are considered active devices. Two barriers in series are provided for each penetration, except for penetrations isolated by excess flow check valves, so that no single credible failure or malfunction of an active component can result in a loss of isolation or leakage that exceeds limits assumed in the safety analysis. One of these barriers may be a closed system.
The 12 and 14 inch primary containment purge valves are PCIVs that are qualified for use during all operational conditions. The 12 and 14 inch primary containment purge valves are normally maintained closed in MODES 1, 2, and 3 to ensure the primary containment boundary is maintained.
However, the purge valves may be open when being used for pressure control, inerting, de-inerting, ALARA, or air quality considerations since they are fully qualified.
(continued)
NMP2 B 3.6.1.3-1 Revision 0
PCIVs B 3.6.1.3 BASES BACKGROUND A two inch bypass line is provided when the primary (continued) containment full flow line to the Standby Gas Treatment (SGT) System is isolated.
Secondary Containment Bypass ss Leakage Valves APPLICABLE The PCIVs P LCO was derived from the assumptions related SAFETY ANALYSES to minimizing nim the loss of reactor coolant inventory, and establishing sh the primary containment boundary during major accidents.s. As part of the primary containment boundary, PCIV (and d non-PCIVs listed in Table 3 3.6.1.3-1) 6 1 3-1) OPERABILITY supports leak tightness of primary containment. tt. Therefore, The the safety analysis of any event requiring isolation of DELETE primary containment is applicable to this LCO.
The DBAs that result in a release of radioactive material for which the consequences are mitigated by PCIVs are a loss of coolant accident (LOCA) and a main steam line break Secondary (MSLB) (Refs. 2 and 3). In the analysis for each of these Containment Bypass a accidents, it is assumed that PCIVs are either closed or Leakage Valves un function to close within the required isolation time following low event initiation. This ensures that potential pathss to the environment through PCIVs (including primary containment nm purge valves) are minimized. Of the events DELETE analyzed d in References 2 and 3, the LOCA is the most st The Secondary Containment limiting event ven due to radiological consequences. In Bypass Leakage paths addition, the hee non-PCIVs listed in Table 3 3.6.1.3-1 6 1 3-1 are also leakage rate limits are assumed to be closed during the LOCA. The closure time of relocated to the Technical the main steam isolation valves (MSIVs) is a significant Requirements Manual (TRM) variable from a radiological standpoint. The MSIVs are Table 3.6.1-3 and the Alternate required to close within 3 to 5 seconds since the 3 second Source Term (AST) closure clos time is assumed in the MSIV closure (the most severe established leak rate values overpressurization press transient) analysis (Ref. 4) and 5 second are maintained in accordance closure time me is assumed in the MSLB analysis (Ref. 3).
with the 10 CFR 50 Appendix J Likewise, it is assumed assum that the primary containment Testing Program Plan. isolates such that release eleas of fission products to the environment is controlled. d.
The DBA analysis assumes that isolation of the primary containment is complete and leakage terminated, except for the maximum allowable leakage, La, prior to fuel damage.
The single failure criterion required to be imposed in the conduct of unit safety analyses was considered in the original design of the primary containment purge valves.
Two valves in series on each purge line provide assurance that both the supply and exhaust lines could be isolated even if a single failure occurred.
(continued)
NMP2 B 3.6.1.3-2 Revision 0
PCIVs B 3.6.1.3 BASES APPLICABLE PCIVs satisfy Criterion 3 of Reference 5.
SAFETY ANALYSES (continued)
LCO PCIVs form a part of the primary containment boundary. The PCIV safety function is related to minimizing the loss of reactor coolant inventory and establishing the primary containment boundary during a DBA.
The power operated, automatic isolation valves are required to have isolation times within limits and actuate on an automatic isolation signal. The valves covered by this LCO are listed with their associated stroke times in Ref. 1.
The normally closed manual PCIVs are considered OPERABLE when the valves are closed and blind flanges in place, or open under administrative controls. Normally closed automatic PCIVs, which are required by design (e.g., to meet 10 CFR 50 Appendix R requirements) to be de-activated and closed, are considered OPERABLE when the valve is closed and de-activated. These passive isolation valves and devices are those listed in Reference 1. Purge valves with resilient seals, secondary containment bypass valves, MSIVs, and hydrostatically tested valves must meet additional Secondary leakage rate requirements. Other PCIV leakage rates are Containment Bypass addressed add by LCO 3.6.1.1, "Primary Containment," as Type B Leakage Valves or C te testing.
This LCO provi provides assurance that the PCIVs will perform their designed safety safe functions to minimize the loss of reactor coolant inventory entor and establish the primary containment boundary durin duringg accidents. In addition, the LCO ensures leakage through the ennon-PCIVs listed in Table 3.6.1.3-1 3 6 1 3-1 are within the limits assumed in the accident analysis.
APPLICABILITY In MODES 1, 2, and 3, a DBA could cause a release of radioactive material to primary containment. In MODES 4 and 5, the probability and consequences of these events are reduced due to the pressure and temperature limitations of these MODES. Therefore, most PCIVs are not required to be OPERABLE and the primary containment purge valves are not required to be normally closed in MODES 4 and 5. Certain valves are required to be OPERABLE, however, to prevent inadvertent reactor vessel draindown. These valves are (continued)
NMP2 B 3.6.1.3-3 Revision 0
INSERT Primary Containment Isolation Valves TRM 3.6.1 TRM Table 3.6.1-3 (page 1 of 2)
Secondary Containment Bypass Leakage Paths Leakage Rate Limits VALVE NUMBER VALVE DESCRIPTION PER VALVE LEAK RATE (SCFH)
Main steam drain line 2MSS*MOV111 (inboard) 1.875 2MSS*MOV112 Main steam drain line 2MSS*MOV208 (outboard) 0.625 2CMS*SOV74A, B (d) 0.2344 2CMS*SOV75A, B (d) 4 Post-accident sampling 2CMS*SOV76A, B (d) lines 2CMS*SOV77A, B (d) 2DER*MOV119 Drywell equipment drain (a) 2DER*RV344 lines 2DER*MOV120 1.25 2DER*MOV130 Drywell equipment vent line 0.625 2DER*MOV131 2DFR*MOV120 1.875 Drywell floor drain line 2DFR*MOV121 (b) 2DFR*RV228 2DFR*MOV139 Drywell floor vent line 0.9375 2DFR*MOV140 2WCS*MOV102 RWCU line 2.5 2WCS*MOV112 2FWS*V23A, B Feedwater line 12.0 2FWS*V12A, B 2CPS*AOV104 CPS supply line to drywell 4.38 2CPS*AOV106 2CPS*AOV105 CPS supply line to supp. 3.75 2CPS*AOV107 chamber (continued)
(a) The combined leakage rate for these two valves shall be 1.25 SCFH.
(b) The combined leakage rate for these two valves shall be 1.875 SCFH.
NMP2 TRM 3.6-23a TRM Markup provided for information only.
INSERT Primary Containment Isolation Valves TRM 3.6.1 TRM Table 3.6.1.3-1 (page 2 of 2)
Secondary Containment Bypass Leakage Paths Leakage Rate Limits VALVE NUMBER VALVE DESCRIPTION PER VALVE LEAK RATE (SCFH) 2CPS*SOV119 CPS supply line to supp. chamber 0.625 2CPS*SOV120 2CPS*SOV121 2CPS*SOV122 Inst. air to ADS accumulators 2IAS*SOV164 0.9375 2IAS*V448 Inst. air to ADS accumulators 2IAS*SOV165 0.9375 2IAS*V449 N2 purge to TIP index mechanism 2GSN*SOV166 (c) 2GSN*V170 Inst. air to SRV accumulators 2IAS*SOV166 (c) 2IAS*SOV184 Inst. air to drywell 2IAS*SOV167 (c) 2IAS*SOV185 Inst. air to CPS valve in supp.
2IAS*SOV168 chamber (c) 2IAS*SOV180 Inst. air to CPS valve in supp.
2CPS*SOV132 chamber (c) 2CPS*V50 Inst. air to CPS valve in supp.
2CPS*SOV133 chamber (c) 2CPS*V51 (c) The combined leak rate for these penetrations shall be 3.6 SCFH. The assigned leakage rate through a penetration shall be that of the valve with the highest leakage rate in that penetration. However, if a penetration is isolated by one closed and de-activated automatic valve, closed manual valve, or blind flange, the leakage through the penetration shall be the actual pathway leakage.
(d) The LCO requirements and leakage rate limit shall apply until such time as a modification eliminates the potential secondary containment bypass leakage path.