RS-16-175, High Frequency Supplement to Seismic Hazard Screening Report,Response to NRC Request for Information Pursuant to 10 CFR 50.54(f) Regarding Recommendation 2.1 the Near Term-Task Force Review of Insights from the Fukushima Dai-ichi Accident

From kanterella
Revision as of 23:25, 4 February 2020 by StriderTol (talk | contribs) (Created page by program invented by StriderTol)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
High Frequency Supplement to Seismic Hazard Screening Report,Response to NRC Request for Information Pursuant to 10 CFR 50.54(f) Regarding Recommendation 2.1 the Near Term-Task Force Review of Insights from the Fukushima Dai-ichi Accident
ML16307A447
Person / Time
Site: Byron  Constellation icon.png
Issue date: 11/02/2016
From: Kaegi G
Exelon Generation Co
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
RS-16-175
Download: ML16307A447 (79)


Text

ExeLon Generation, RS-16-175 10 CFR 50.54(f)

November 2, 2016 U.S. Nuclear Regulatory Commission ATTN: Document Control Desk 11555 Rockville Pike Rockville, MD 20852 Byron Station, Units 1 and 2 Renewed Facility Operating License Nos. NPF-37 and NPF-66 NRC Docket Nos. STN 50-454 and STN 50-455

Subject:

High Frequency Supplement to Seismic Hazard Screening Report, Response to NRC Request for Information Pursuant to 10 CFR 50.54(f) Regarding Recommendation 2.1 of the Near-Term Task Force Review of Insights from the Fukushima Dai-ichi Accident

References:

1. NRC Letter, Request for Information Pursuant to Title 10 of the Code of Federal Regulations 50.54(f) Regarding Recommendations 2.1, 2.3, and 9.3, of the Near-Term Task Force Review of Insights from the Fukushima Dai-ichi Accident, dated March 12, 2012 (ML12053A340)
2. NRC Letter, Electric Power Research Institute Report 3002000704, "Seismic Evaluation Guidance: Augmented Approach for the Resolution of Fukushima Near-Term Task Force Recommendation 2.1: Seismic," As An Acceptable Alternative to the March 12, 2012, Information Request for Seismic Reevaluations, dated May 7, 2013 (ML13106A331)
3. NEI Letter, Final Draft of Industry Seismic Evaluation Guidance, Screening, Prioritization and Implementation Details (SPID) for the Resolution of Fukushima Near-Term Task Force Recommendation 2.1: Seismic (EPRI 1025287), dated November 27, 2012 (ML12333A168 and ML12333A170)
4. NRC Letter, Endorsement of Electric Power Research Institute Final Draft Report 1025287, Seismic Evaluation Guidance, Screening, Prioritization and Implementation Details (SPID) for the Resolution of Fukushima Near-Term Task Force Recommendation 2.1: Seismic, dated February 15, 2013 (ML12319A074)
5. Exelon Generation Company, LLC letter to NRC, Byron Station, Units 1 and 2 - Seismic Hazard and Screening Report (CEUS Sites), Response to NRC Request for Information Pursuant to 10CFR50.54(f) Regarding Recommendation 2.1 of Near-Term Task Force Review of Insights from the Fukushima Dai-ichi Accident, dated March 31, 2014 (RS-14-065) (ML14091A010)

U.S. Nuclear Regulatory Commission Seismic Hazard 2.1 High Frequency Supplement November 2, 2016 Page 2

6. NRC Letter, Screening and Prioritization Results Regarding Information Pursuant to Title 10 of the Code of Federal Regulations 50.54(f) Regarding Seismic Hazard Re-evaluations for Recommendation 2.1 of the Near Term Task Force Review of Insights from the Fukushima Dai-ichi Accident, dated May 9, 2014 (ML14111A147)
7. NRC Memorandum, Support Document for Screening and Prioritization Results Regarding Seismic Hazard Re-Evaluation for Operating Reactors in the Central and Eastern United States, dated May 21, 2014 (ML14136A126)
8. NEI Letter, Request for NRC Endorsement of High Frequency Program: Application Guidance for Functional Confirmation and Fragility Evaluation (EPRI 3002004396),

dated July 30, 2015 (M L 1 5223A 1 OO/M L 1 5223A 102)

9. NRC Letter to NEI: Endorsement of Electric Power Research Institute Final Draft Report 3002004396: "High Frequency Program: Application Guidance for Functional Confirmation and Fragility', dated September 17, 2015 (ML15218A569) 10.NRC Letter, Final Determination of Licensee Seismic Probabilistic Risk Assessments Under the Request for Information Pursuant to Title 10 of the Code of Federal Regulations 50.54(f) Regarding Recommendation 2.1 "Seismic" of the Near-Term Task Force Review of Insights from the Fukushima Dai-Ichi Accident, dated October 27, 2015 (ML15194A015)

On March 12, 2012, the Nuclear Regulatory Commission (NRC) issued a Request for Information per 10 CFR 50.54(f) (Reference 1) to all power reactor licensees. The required response section of Enclosure 1 of Reference 1 indicated that licensees should provide a Seismic Hazard Evaluation and Screening Report within 1.5 years from the date of the letter for Central and Eastern United States (CEUS) nuclear power plants. By NRC letter dated May 7, 2013 (Reference 2), the date to submit the report was extended to March 31, 2014.

By letter dated May 9, 2014 (Reference 6), the NRC transmitted the results of the screening and prioritization review of the seismic hazards reevaluation report for Byron Station, Units 1 and 2 submitted on March 31, 2014 (Reference 5). In accordance with the screening, prioritization, and implementation details report (SPID) (References 3 and 4), and Augmented Approach guidance (Reference 2), the reevaluated seismic hazard is used to determine if additional seismic risk evaluations are warranted for a plant. Specifically, the reevaluated horizontal ground motion response spectrum (GIVIRS) at the control point elevation is compared to the existing safe shutdown earthquake (SSE) or Individual Plant Examination for External Events (IPEEE) High Confidence of Low Probability of Failure (HCLPF) Spectrum (IHS) to determine if a plant is required to perform a high frequency confirmation evaluation. As noted in the May 9, 2014 letter from the NRC (Reference 6) on page 4 of Enclosure 2, Byron Station, Units 1 and 2 is to conduct a limited scope High Frequency Evaluation (Confirmation).

Within the May 9, 2014 letter (Reference 6), the NRC acknowledged that these limited scope evaluations will require additional development of the assessment process. By Reference 8, the Nuclear Energy Institute (NEI) submitted an Electric Power Research Institute (EPRI) report entitled, High Frequency Program: Application Guidance for Functional Confirmation and Fragility Evaluation (EPRI 3002004396) for NRC review and endorsement. NRC endorsement was provided by Reference 9. Reference 10 provided the NRC final seismic hazard evaluation

U.S. Nuclear Regulatory Commission Seismic Hazard 2.1 High Frequency Supplement November 2, 2016 Page 3 screening determination results and the associated schedules for submittal of the remaining seismic hazard evaluation activities.

The High Frequency Evaluation Confirmation Report for Byron Station, Units 1 and 2, provided in the enclosure to this letter, shows that all high frequency susceptible equipment evaluated within the scoping requirements and using evaluation criteria of Reference 8 for seismic demands and capacities, are acceptable. Therefore, no additional modifications or evaluations are necessary.

This letter closes Commitment No. 1 in Reference 5.

This letter contains no new regulatory commitments.

If you have any questions regarding this report, please contact Ronald Gaston at 630-657-3359.

I declare under penalty of perjury that the foregoing is true and correct. Executed on the 2nd day of November 2016.

Respectfully submitted, Glen T. Kaegi Director - Licensing & Regulatory Affairs Exelon Generation Company, LLC

Enclosure:

Byron Station, Units 1 and 2 - Seismic High Frequency Evaluation Confirmation Report cc: NRC Regional Administrator - Region III NRC Project Manager, NRR Byron Station NRC Senior Resident Inspector Byron Station Mr. Brett A. Titus, NRR/JLD/JCBB, NRC Mr. Stephen M. Wyman, NRR/JLD/JHMB, NRC Mr. Frankie G. Vega, NRR/JLD/JHMB, NRC Illinois Emergency Management Agency Division of Nuclear Safety

Enclosure Byron Station, Units 1 and 2 Seismic High Frequency Evaluation Confirmation Report (75 pages)

HIGH FREQUENCY CONFIRMATION REPORT IN RESPONSE TO NEAR TERM TASK FORCE (NTTF) 2.1 RECOMMENDATION for the Byron Generating Station, Units 1 and 2 4450 North German Church Road Byron, Illinois 61010-9794 Facility Operating License Nos. NPF-37 and NPF-66 NRC Docket Nos. STN 50-454 and STN 50-455 Correspondence No.: RS-16-175 r

~.r Exeton .,

Exeion Generation Company, LLC (Exelon)

PO Box 805398 Chicago, IL 60680-5398 Prepared by:

Stevenson & Associates 1661Feehanville Drive, Suite 150 Mount Prospect, IL 60056 Report Number.1SC0346-RPT-002, Rev. 0 Printed Name Sian Date Preparer: A. Broda ~ 1%6/2016 Reviewer. M. Delaney 10/06/2016 l

Approver. M. Delaney 10/10/2016 Lead Responsible Engineer. itb kt,Iq V---~~ ,u 1 Branch Manager. x C~ ~L lJ~t -U/GV Senior Manager Design Engineering: 44" ~1~ /v 28-l6 Corporate Acceptance: -T~LVV $C iu" ~Z

Document ID: 15CO346-RPT-002

Title:

High Frequency Confirmation Report for Byron Nuclear Power Station in Response to Near Term Task Force NTTF 2.1 Recommendation Document Type:

Criteria Interface Report Specification Other Drawing Project Name:

Byron High Frequency Confirmation Job No.: 15CO346 ANOW Client: Omlm '

This document has been prepared in accordance with the S&A Quality Assurance Program Manual, Revision 18 and project requirements:

Initial Issue (Rev. 0)

Originated by: A. Broda Date: 10/06/2016 L:

Checked by: M. Delaney Date: 10/06/2016 Approved by: M. Delaney Date: 10/10/2016 W

Revision Record:

Revision Originated by/ Checked by/ Approved by/ Description of Revision No. Date Date Date

!E;A Stevenson & Associates DOCUMENT APPROVAL SHEET Figure 2.8 PROJECT NO.

15CO346

l5CO345-RPT-OO2, Rev. O Correspondence No.: RS-16-175 Executive Summary The purpose of this report is to provide information asrequested by the Nuclear Regulatory Commission (NRC)ln its March 12 2O12 letter issued to all power reactor licensees and holders of construction permits in active or deferred status [I]. In particular, this report provides information requested to address the High Frequency Confirmation requirements of Item (4), Enclosure 1, Recommendation 2.1: Seiarnlo,of the March 12,2O12 letter [l].

Following the accident atthe FukushlnmaDal-lchl nuclear power plant resulting from the March Il, 2011, Great Tohoku Earthquake and subsequent tsunami, the Nuclear Regulatory Commission (NRC) established a Near Term Task Force (NTTF) to conduct a systematic review of NRC processes and regulations and to determine if the agency should make additional improvements to its regulatory system. The NTTF developed a set of recommendations [15] intended to clarify and strengthen the regulatory framework for protection against natural phenomena. Subsequently, the NRC issued a 50.54(f) letter on March 12, 2012 [1], requesting information to assure that these recommendations are addressed by all U.S. nuclear power plants. The 50.54(f) letter requests that licensees and holders of construction permits under 10 CFR Part 50 reevaluate the seismic hazards at their sites against present-day NRC requirements and guidance. Included in the 50.54(f) letter was a request that licensees' perform a "confirmation, if necessary, that SSCs, which may be affected by high-frequency ground motion, will maintain their functions important to safety."

EPRl IO25287, "Seismic Evaluation Guidance: Screening, Prioritization and Implementation Details (SPID) for the resolution of Fukushima Near-Term Task Force Recommendation 2.1: Seismic" [6]

provided screening, prioritization, and implementation details tothe U.S. nuclear utility industry for responding to the NRC 50.54(f) letter. This report was developed with NRC participation and was subsequently endorsed by the NRC. The SPID included guidance for determining which plants should perform a High Frequency Confirmation and identified the types of components that should be evaluated ln the evaluation.

Subsequent guidance for performing a High Frequency Confirmation was provided in EPRI 3002004396.1 "High Frequency Program, Application Guidance for Functional Confirmation and Fragility Evaluotlon,"[8] and was endorsed by the NRClne letter dated September I7,2O15[3].

Final screening identifying plants needing to perform a High Frequency Confirmation was provided byNRClno letter dated October 27,2OI5[2].

This report describes the High Frequency Confirmation evaluation performed for Byron Nuclear Power Station, Units 1and 2(BYR). The objective of this report lsto provide summary information describing the High Frequency Confirmation evaluations and results. The level of detail provided in the report is intended to enable NRC to understand the inputs used, the evaluations performed, and the decisions made aso result ofthe evaluations.

EPRI 3002004396 [8] is used for the BYR evaluations described in this report. In accordance with Reference [8], the following topics are addressed in the subsequent sections of this report:

w Process of selecting components and a list of specific components for high-frequency confirmation w Estimation of vertical ground motion response spectrum (GMRS) w Estimation of in-cabinet seismic demand for subject components w Estimation of in-cabinet seismic capacity for subject components w Summary of subject components' high-frequency evaluations Page 3 of 75

15C0346-RPT-002, Rev. 0 Correspondence No.: RS-16-175 1 Introduction The purpose of this report is to provide information as requested by the NRC in its March 12, 2012 50.54(f) letter issued to all power reactor licensees and holders of construction permits in active or deferred status [1]. In particular, this report provides requested information to address the High Frequency Confirmation requirements of Item (4), Enclosure 1, Recommendation 2.1:

Seismic, of the March 12, 2012 letter [1].

Following the accident at the Fukushima Dai-ichi nuclear power plant resulting from the March 11, 2011, Great Tohoku Earthquake and subsequent tsunami, the Nuclear Regulatory Commission (NRC) established a Near Term Task Force (NTTF) to conduct a systematic review of NRC processes and regulations and to determine if the agency should make additional improvements to its regulatory system. The NTTF developed a set of recommendations intended to clarify and strengthen the regulatory framework for protection against natural phenomena. Subsequently, the NRC issued a 50.54(f) letter on March 12, 2012 [1], requesting information to assure that these recommendations are addressed by all U.S. nuclear power plants. The 50.54(f) letter requests that licensees and holders of construction permits under 10 CFR Part 50 reevaluate the seismic hazards at their sites against present-day NRC requirements and guidance. Included in the 50.54(f) letter was a request that licensees perform a "confirmation, if necessary, that SSCs, which may be affected by high-frequency ground motion, will maintain their functions important to safety."

EPRI 1025287, "Seismic Evaluation Guidance: Screening, Prioritization and Implementation Details (SPID) for the resolution of Fukushima Near-Term Task Force Recommendation 2.1:

Seismic" [6] provided screening, prioritization, and implementation details to the U.S. nuclear utility industry for responding to the NRC 50.54(f) letter. This report was developed with NRC participation and is endorsed by the NRC. The SPID included guidance for determining which plants should perform a High Frequency Confirmation and identified the types of components that should be evaluated in the evaluation.

Subsequent guidance for performing a High Frequency Confirmation was provided in EPRI 3002004396, "High Frequency Program, Application Guidance for Functional Confirmation and Fragility Evaluation," [8] and was endorsed by the NRC in a letter dated September 17, 2015 [3].

Final screening identifying plants needing to perform a High Frequency Confirmation was provided by NRC in a letter dated October 27, 2015 [2].

On March 31, 2014, BYR submitted a reevaluated seismic hazard to the NRC as a part of the Seismic Hazard and Screening Report [4]. By letter dated October 27, 2015 [2], the NRC transmitted the results of the screening and prioritization review of the seismic hazards reevaluation.

This report describes the High Frequency Confirmation evaluation undertaken for BYR using the methodologies in EPRI 3002004396, "High Frequency Program, Application Guidance for Page 4 of 75

15C0346-RPT-002, Rev. 0 Correspondence No.: RS-16-175 Functional Confirmation and Fragility Evaluation," as endorsed by the NRC in a letter dated September 17, 2015 [3].

The objective of this report is to provide summary information describing the High Frequency Confirmation evaluations and results. The level of detail provided in the report is intended to enable NRC to understand the inputs used, the evaluations performed, and the conclusions made as a result of the evaluations.

1.3 APPROACH EPRI 3002004396 [8] is used for the BYR evaluations described in this report. Section 4.1 of Reference [8] provided general steps to follow for the high frequency confirmation component evaluation. Accordingly, the following topics are addressed in the subsequent sections of this report:

  • Selection of components and a list of specific components for high-frequency confirmation
  • Estimation of seismic demand for subject components
  • Estimation of seismic capacity for subject components
  • Summary of subject components' high-frequency evaluations
  • Summary of Results 1.4 PLANT SCREENING BYR submitted reevaluated seismic hazard information including GMRS and seismic hazard information to the NRC on March 31, 2014 [4]. In a letter dated February 17, 2016, the NRC staff concluded that the submitted GMRS adequately characterizes the reevaluated seismic hazard for the BYR site for 2.1 Seismic [14].

The NRC final screening determination letter concluded [2] that the BYR GMRS to SSE comparison resulted in a need to perform a High Frequency Confirmation in accordance with the screening criteria in the SPID [6].

1.5 REPORT DOCUMENTATION Section 2 describes the selection of devices. The identified devices are evaluated in Reference

[190] for the seismic demand specified in Section 3 using the evaluation criteria discussed in Section 4. The overall conclusion is discussed in Section 5.

Table B-1 lists the devices identified in Section 2 and provides the results of the evaluations performed in accordance with Section 3 and Section 4.

Page 5 of 75

15C0346-RPT-002, Rev. 0 Correspondence No.: RS-16-175 Selection Screening The fundamental objective of the high frequency confirmation review is to determine whether the occurrence of a seismic event could cause credited FLEX/mitigating strategies equipment to fail to perform as necessary. An optimized evaluation process is applied that focuses on achieving a safe and stable plant state following a seismic event. As described in Reference [8], this state is achieved by confirming that key plant safety functions critical to immediate plant safety are preserved (reactor trip, reactor vessel inventory and pressure control, and core cooling) and that the plant operators have the necessary power available to achieve and maintain this state immediately following the seismic event (AC/DC power support systems).

Within the applicable functions, the components that would need a high frequency confirmation are contact control devices subject to intermittent states in seal-in or lockout circuits. Accordingly, the objective of the review as stated in Section 4.2.1 of Reference [8] is to determine if seismic induced high frequency relay chatter would prevent the completion of the following key functions.

2.1 REACTOR TRIP/SCRAM The reactor trip/SCRAM function is identified as a key function in Reference [8] to be considered in the High Frequency Confirmation. The same report also states that "the design requirements preclude the application of seal-in or lockout circuits that prevent reactor trip/SCRAM functions" and that "No high-frequency review of the reactor trip/SCRAM systems is necessary."

2.2 REACTOR VESSEL INVENTORY CONTROL The reactor coolant system/reactor vessel inventory control systems were reviewed for contact control devices in seal-in and lockout (SILO) circuits that would create a Loss of Coolant Accident (LOCA). The focus of the review was contact control devices that could lead to a significant leak path. Check valves in series with active valves would prevent significant leaks due to misoperation of the active valve; therefore, SILO circuit reviews were not required for those active valves.

The process/criteria for assessing potential reactor coolant leak path valves is to review all P&ID's attached to the Reactor Coolant System (RCS) and include all active isolation valves and any active second valve upstream or downstream that is assumed to be required to be closed during normal operation or close upon an initiating event (LOCA or Seismic). A table with the valves and associated P&ID is included in Table B-2 of this report.

Manual valves that are normally closed are assumed to remain closed and a second simple check valve is assumed to function and not be a Multiple Spurious Failure.

Active Function: A function that requires mechanical motion or a change of state (e.g., the closing of a valve or relay or the change in state of a transistor)

Simple Check Valve: A valve which closes upon reverse fluid flow only.

Page 6 of 75

15C0346-RPT-002, Rev. 0 Correspondence No.: RS-16-175 The Letdown and Purification System on PWRs is a normally in service system with the flowpath open and in operation. If an event isolated a downstream valve, there are pressure relief valves that would flow water out of the RC System. Letdown has auto isolation and abnormal operating procedure which isolate the flow. There are no auto open valves in this flowpath.

Table B-2 contains a list of valves analyzed and the resultant devices selected which are also identified in the section below. Based on the analysis detailed below, there are no moving contact control devices which could create a LOCA due to chatter-induced sustained valve misalignment, and thus no devices were selected for this category.

Reactor Coolant Loop Valves Drain Line Valves 1RC8037A/B/C/D, 2RC8037A/B/C/D, Reactor Head Vent Valves 1RC014A/B/C/D, 2RC014A/B/C/D Electrical control for the solenoid-operated pilot valves is via a rugged hand control switch.

There are no chatter sensitive contact devices involved in the control of these valves [21, 22, 23, 24].

Pressurizer Power Operated Relief Valves 1RY455A, 1RY456, 2RY455A, 2RY456, Blocking Valves 1RY8000A/B,2RY8000A/B Electrical control for the solenoid-operated pilot valves is via relays which are energized from process control signals. There are no devices which could seal-in and cause a sustained undesirable opening of the Pressurizer Power Operated Relief Valves [25, 26, 27, 28, 29, 30].

For this reason, these valve controls can be credited in a high frequency event, and analysis of the Blocking Valve controls is unnecessary.

Residual Heat Removal Valves Reactor Coolant Loop to Residual Heat Removal Pump Isolation Valves 1RH8701A-1/1B-2/2A-1/213-2, 2RH8701A-1/113-2/2A-1/213-2 Both the MID and control schematic diagrams indicate 1RH8701B-2, 1RH8702A-1, 2RH870113-2, and 2RH8702A-1 are closed and depowered during normal operation [31, 32, 33, 34, 35, 36].

Lacking electrical power, any SILO devices in the control for these valves would have no effect on valve position. Since these valves can be credited for remaining closed following a seismic event, analysis of the valve controls for 1RH8701A-1, 1RH8702B-2, 2RH8701A-1, and 2RH8702B-2 is unnecessary.

Process Sampling Valves Hot Leg Loop M Sample Line Selector Valves 1PS9351A/B, 2PS9351A/B, Pressurizer Steam Sample Selector Valves 1PS9350A, 2PS9350A, Pressurizer Liquid Sample Selector Valves 1PS9350B, 2PS9350B, Cold Leg Loop 1/2/3/4 Sample Line Selector Valves 1PS9358A/B/C/D, 2PS9351A/B/C/D Electrical control for the solenoid-operated pilot valves is via a rugged hand control switch and permissive relay. The MID indicates these valves are normally closed [37, 38, 39], and in this position the (rugged) hand control switch is normally open and blocks the effect of chatter in the series permissive relay. There are no other chatter sensitive contact devices involved in the control of these valves [40, 41, 42, 43].

Page 7 of 75

15C0346-RPT-002, Rev. 0 Correspondence No.: RS-16-175 Loop Sample Line Isolation Valves 1PS9356A, 2PS9356A, Pressurizer Steam Sample Isolation Valves 1PS9354A, 2PS9354A, Pressurizer Liquid Sample Isolation Valves 1PS9355A, 2PS9355A Electrical control for the solenoid-operated pilot valves is via a rugged hand control switch and permissive relay. These valves are shown normally closed on the MID [37, 38, 39]. The only chatter sensitive device in the control circuit is the containment isolation permissive relay.

When the valve is closed the valve position switch contacts are open and block the effect of chatter in the relay. There are no other chatter sensitive contact devices involved in the control of these valves [44, 45, 46, 47].

2.3 REACTOR VESSEL PRESSURE CONTROL The reactor vessel pressure control function is identified as a key function in Reference [8] to be considered in the High Frequency Confirmation. The same report also states that "required post event pressure control is typically provided by passive devices" and that "no specific high frequency component chatter review is required for this function."

2.4 CORE COOLING The core cooling systems were reviewed for contact control devices in seal-in and lockout circuits that would prevent at least a single train of non-AC power driven decay heat removal from functioning. For BYR, the credited decay heat removal system is the Diesel Driven Auxiliary Feedwater (DDAFW) Pump.

The selection of contact devices for the Diesel Driven Auxiliary Feedwater (DDAF) Pump was based on the premise that DDAF operation is desired, thus any SILO which would lead to DDAF operation is beneficial and thus does not meet the criteria for selection [17, 18]. Only contact devices which could render the DDAF system inoperable were considered.

Any chatter which could de-energize the normally-energized Engine Failure Lockout Relay K12 would prevent engine start [19, 20]. The lockout relay itself does not seal in, however the relays with contacts in K12`s coil circuit do. The Overcrank Relay K7, High Water Temperature Relay K8, Overspeed Relay K9, and Low Lube Oil Pressure Relay K10 are normally energized and sealed-in. Chatter in the seal-in contacts of K7, K8, K9, K10, or in the contacts of the Overcrank Timer Relay K4 (input to K7), High Water Temperature Switch 1TSH-AF147 (input to K8), Speed Switch lSS-AF8002 (input to K9), Low Oil Pressure Time Delay Relay K11 (input to K10), could trip the lockout relay and prevent engine start. The time delay associated with K4 and K11 prevents chatter in their coil circuits from affecting engine start. It is presumed that pump suction pressure is above the reset pressure setting of 1PSL-AF055 and therefore chatter in this pressure switch and the Low Suction Pressure Timer Relay K6 have only a temporary effect on engine start and thus do not meet selection criteria.

2.5 AC/DC POWER SUPPORT SYSTEMS The AC and DC power support systems were reviewed for contact control devices in seal-in and lockout circuits that prevent the availability of DC and AC power sources. The following AC and DC power support systems were reviewed:

  • Battery Chargers and Inverters, Page 8 of 75

15C0346-RPT-002, Rev. 0 Correspondence No.: RS-16-175

  • EDG Ancillary Systems, and
  • Switchgear, Load Centers, and MCCs.

Electrical power, especially DC, is necessary to support achieving and maintaining a stable plant condition following a seismic event. DC power relies on the availability of AC power to recharge the batteries. The availability of AC power is dependent upon the Emergency Diesel Generators and their ancillary support systems. EPRI 3002004396 [8] requires confirmation that the supply of emergency power is not challenged by a SILO device. The tripping of lockout devices or ,

circuit breakers is expected to require some level of diagnosis to determine if the trip was spurious due to contact chatter or in response to an actual system fault. The actions taken to diagnose the fault condition could substantially delay the restoration of emergency power.

In order to ensure contact chatter cannot compromise the emergency power system, control circuits were analyzed for the Emergency Diesel Generators (EDG), Battery Chargers, Vital AC Inverters, and Switchgear/Load Centers/MCCs as necessary to distribute power from the EDGs to the Battery Chargers and EDG Ancillary Systems. General information on the arrangement of safety-related AC and DC systems, as well as operation of the EDGs, was obtained from the BYR UFSAR [48]. BYR has four (4) EDGs which provide emergency power for their two units. Each unit has two (2) divisions of Class 1E loads with one EDG for each division [48, pp. 8.3-8]. The overall power distribution, both AC and DC, is shown on the Station One-Line Diagram [49].

The analysis considers the reactor is operating at power with no equipment failures or LOCA prior to the seismic event. The Emergency Diesel Generators are not operating but are available. The seismic event is presumed to cause a Loss of Offsite Power (LOOP) and a normal reactor SCRAM.

In response to bus under voltage relaying detecting the LOOP, the Class 1E control systems must automatically shed loads, start the EDGs, and sequentially load the diesel generators as designed. Ancillary systems required for EDG operation as well as Class 1E battery chargers and inverters must function as necessary. The goal of this analysis is to identify any vulnerable contact devices which could chatter during the seismic event, seal-in or lock-out, and prevent these systems from performing their intended safety-related function of supplying electrical power during the LOOP.

The following sections contain a description of the analysis for each element of the AC/DC Support Systems. Contact devices are identified by description in this narrative and apply to all divisions.

Emergency Diesel Generators The analysis of the Emergency Diesel Generators, DG1A, DG113, DG2A, DG213, is divided into two sections, generator protective relaying and diesel engine control. General descriptions of these systems and controls appear in the UFSAR [48, pp. 8.3-8].

Generator Protective Relaying The control circuits for the DG1A circuit breaker [50] include ESF Bus Lockout Relays 486-1412 (Normal Feed), 486-1413 (EDG Feed), and 486-1414X (Reserve Feed). If any of these lockout relays are tripped the EDG breaker will not close automatically during the LOOP. Bus Lockout Relay 486-1412 may be tripped by chatter in Phase Overcurrent Relays PR30A-451 and PR30C-451 and Ground Overcurrent Protective Relay PR31-451N [51]. Bus Lockout Relay 486-1413 is tripped by a solid-state differential relay (non-vulnerable) on the EDG breaker[50]. Bus Lockout Page 9 of 75

15C0346-RPT-002, Rev. 0 Correspondence No.: RS-16-175 Relay 486-1414X may be tripped by chatter in Phase Overcurrent Relays PR27A-451 and PR27C-451 and Ground Overcurrent Protective Relay PR28-451N [52].

The control circuits for the other three EDG circuit breakers are identical in design and sensitive to chatter in their equivalent devices: DG1B: 486-1422, 486-1423, 486-1424X, PR33A-451, PR33C-451, PR34-451N, PR30A-451 PR30C-451 and PR31-451N [53, 54, 55]; DG2A: 486-2412, 486-2413,486-2414, PR9A-451, PR9C-451, PR10-451N, PR13A-451 PR13C-451 and PR14-451N

[56, 57, 58]; DG213: 486-2422, 486-2423, 486-2424, PR7A-451, PR7C-451, PR8-451N, PR3A-451 PR3C-451 and PR4-451N [59, 60, 61].

Diesel Engine Control Chatter analysis for the diesel engine control was performed on the start and shutdown circuits of each EDG [62, 63, 64, 65, 66, 67] (DG1A), [68, 69, 70, 71, 72, 73] (DG1B), [74, 75, 76, 77, 78, 79] (DG2A), [80, 81, 82, 83, 84, 85] (DG2B) using the description of operation [86, 87, 88, 89],

legends [90, 91, 92, 93], and switch development documents [94, 95, 96, 97] as necessary. Two conditions were considered for EDG Start, Emergency Start in response to a true LOOP, and Manual Start as a defense-in-depth response to situations where a bus undervoltage trip has not occurred but offsite power may be considered unreliable after a seismic event (e.g. brownout).

SILO devices that only affect Manual Start availability are being considered based on the discussion below.

It is conservatively assumed that manual start of the EDGs may be desired in the absence of a LOOP-induced emergency start. SILO devices which may block manual start have been identified herein.

The SILO devices which may block EDG Emergency Start in response to a LOOP are the Generator Differential Shutdown Repeater Relays 87G1X and 87G2X, and Engine Overspeed Relays 12X1 and 12X2. 87G1X and 87G2X are both controlled by 486-1413 (already covered).

12X1 and 12X2 are controlled by 1PS-DG251A, 1PS-DG252A, and 1PS-DG108A. Chatter in any of these devices could prevent EDG Emergency Start.

In addition to the devices which could prevent Emergency Start, Manual Start may be blocked by the normally-energized Unit Shutdown Relay 86521. Chatter of the seal-in contact of 8652, or of the contacts of relays within the coil circuits of this relay, may prevent EDG manual start.

Chatter in any other device in the start control circuit would only have a transient effect, delaying start by, at most, the period of strong shaking.

The Unit Shutdown Relay is normally energized and sealed-in. This relay is controlled by the Engine Shutdown Relay 86E, Generator Shutdown Relay 86G, Generator Differential Shutdown Repeater Relays 87G1X and 87G2X, Engine Overspeed Shutdown Relays 12X1 and 12X2, and Incomplete Starting Sequence Relay 48. Chatter in the contacts of these auxiliary relays may cause tripping of the engine shutdown relay. Once tripped this relay would need to be manually reset.

The Engine Shutdown Relay 86E is controlled by the Engine Lube Oil Low Pressure Shutdown Repeater Relay 63QELX, Turbo Low Lube Oil Pressure Shutdown Repeater Relay 63QTLX, Main and Connecting Rod High Bearing Temperature Shutdown Repeater Relay 26MBHTX, Turbo Thrust Bearing Failure Shutdown Repeater Relay 38TBFX, Jacket Water High Temperature Shutdown Repeater Relay 26JWSX, and Crankcase High Pressure Repeater Relay 63CX. Engine 1 Note that the repeater (slave) relay 8651 does not seal-in on its own; it merely mimics the state of 86S2.

Page 10 of 75

I5CO346-RPT-OO2, Rev. O Correspondence No.:RS-IG-175 trips (other than ) are blocked when the diesel engine is not running bv powering the associated auxiliary relay coil circuits via steering diodes. This design feature acts on the coils of these auxiliary relays, however the contacts of these relays are active in the engine fault circuits; and thus chatter ln these auxiliary relays could prevent EOG manual start.

Generator Shutdown Relay 86G is controlled by Generator Overcurrent Relay 51X, Generator Neutral Ground Voltage Auxiliary Relay59GX, Loss of Field Auxiliary Relay 40X, Reverse Power Auxiliary Relay 32X, and Under Frequency Auxiliary Relay 81UX. Generator faults are blocked when the EDG circuit breaker is open (the normal condition at the time of the seismic event) by depovverlng the coil circuits of these auxiliary relays. For this reason, chatter of the protection relays ln these coil circuits would have no effect.

The Incomplete Starting Sequence Relay 4Mia normally energized and sealed-ln. Chatter lnthe Cranking Limit Time Delay Relay 62CL could break the seal-in and prevent EDG manual start.

Other devices in the coil circuit of relay 48 are closed and arranged in parallel. This arrangement blocks the effect of chatter ln any one of these other devices.

Note the device identifiers mentioned here are identical on all EDGs with the exception of the EOG Bus Lockout Relay: 408-14l3 for OGI/;488-1423 for DG18;4B6-2413 for OG2A; and 488-242S for DG2B; and ovenspeed switches: IP3-OG25lA,1PS-OG252A^ and 1PS-OGlO8A for DG1/<<

IPS-DG25IB,IPS-DG2528, and 1PS-DG1O8B for DG18;2PS-DG251A^2PS-OG252A^ and 2PS-OG1O8A for DG2A; and 2PS-OG25lQ,2PS-OG252B, and 29S-OGIO8B for DG2B.

Battery Charaers Chatter analysis on the battery chargers was performed using information from the UFSAR [48]

as well es plant schematic diagrams [9@,99,1OO,2Ol,lO2,1O3]. Each battery charger has ahigh voltage shutdown circuit [48, pp. 8.3-46] which is intended to protect the batteries and DC loads from output overuoltage due to charger failure. The high voltage shutdown circuit has an output relay IDCO3E-DSH-K1orIDCO4E'OSH-K1(2DCO3E'DDH-Nlor2DCD4E'DSH-K1),which shunt-trips the AC input circuit breaker, shutting the charger down. Chatter ln the contacts of these output relays may disable the battery chargers, and for this reason meet the selection criteria.

The battery chargers for the Diesel Driven Auxiliary Feedvvater Pump also have an ovcrvo/tage relay, IAF0IEA-1-D3H-KI or 1AFOlE8-I-D5H-KI (2AF01EA-1-OSH-K1 or 2AFOlEB-1-D5H-KI), that may shutdown these chargers [17, 29, 104, 18, 20, 105].

Page 11nr7n

15C0346-RPT-002, Rev. 0 Correspondence No.: RS-16-175 inverters Analysis of schematics for the Instrument Bus 111, 112, 113, and 114 (211, 212, 213, and 214) and Static Inverters as noted in the table below revealed no vulnerable contact devices in the control circuits and thus chatter analysis is unnecessary.

Static Inverters Bus Reference 111 106 112 107,108.109,110 113 111 114 112,113,114,115 211 116 212 117 213 118 214 119 EDG Ancillary Systems In order to start and operate the Emergency Diesel Generators require a number of components and systems. For the purpose of identifying electrical contact devices, only systems and components which are electrically controlled are analyzed. Information in the UFSAR [48] was used as appropriate for this analysis.

Starting Air Based on Diesel Generator availability as an initial condition the passive air reservoirs are presumed pressurized and the only active components in this system required to operate are the air start solenoids [48, pp. 9.5-21], which are covered under the EDG engine control analysis above.

Combustion Air Intake and Exhaust The combustion air intake and exhaust for the Diesel Generators are passive systems [48, pp.

9.5-29, 120, 121, 122, 123] which do not rely on electrical control.

Lube Oil The Diesel Generators utilize engine-driven mechanical lubrication oil pumps [48, pp. 9.5-231 which do not rely on electrical control.

Fuel Oil The Diesel Generators utilize engine-driven mechanical pumps to supply fuel oil to the engines from the day tanks [48, pp. 9.5-6]. The day tanks are re-supplied using AC-powered Diesel Oil Transfer Pumps [124, 125, 120, 121, 122, 123]. Chatter analysis of the control circuits for the electrically-powered transfer pumps [126,127, 128, 129] concluded they do not include SILO devices. The mechanical pumps do not rely on electrical control.

Page 12 of 75

Correspondence No.: RS-16-175 Cooling Wate The Diesel Generator Cooling Water System is described ln the UFSAR[48, pp. 9.5-l5]. This system consists of two cooling loops, jacket water and Essential Service Water (E8VV). Engine driven pumps are credited for jacket water when the engine lsoperating. These mechanical pumps do not nsly on electrical control. The electric jacket water pump is only used during shutdown periods and ls thus not included ln this analysis.

Four ESW pumps, 1A, 113, 2A, and 213, provide cooling water to the heat exchangers associated with the four EDGs[I3[,l31,232,188,134,l35]. ln automatic mode these pumps are started via a sequencing signal following EDG start. Chatter analysis of the EDG start signal lsincluded ln the Emergency Diesel Generator section above. A chatter analysis of the E3W pump circuit breaker control circuits [136,l37,I38,139] indicates the Low Suction Pressure Relays S%2AXor SX1B%; the Phase Overcurnant Relays PR3A-45[/451,PR3C-45O/45I,PA4/-45O/451,orPR4C-4SO/4S1(U2:PA3GA-450/451,PRS6C-450/45I,PRl8A-45O/451,orPRl3C-45O/45]); and the Ground Fault Relays PR4-45ONorPR5-45ON/U2:PR37-45DNorPR14-45ON\ all could prevent automatic (sequendal) breaker closure following the seismic event.

ESW valves necessary for EDG cooling are either locked out, depowered, or, in the case of valves 1S%IG9A and lSXI8BB(3S%I69A and 2S%1698),do not contain SILO devices [14O,141].

Ventilation The Diesel Generator Enclosure Ventilation System is described in Section 9.4.5.2 of the UF3AR

[48, pp. 9.4-25]. Ventilation for each Diesel Generator Enclosure is provided via intake and exhaust fans [242,l48]. ln automatic mode the intake fans are started via the EDG Start Signal or high room temperature. Chatter analysis ofthe EOG start signal la included lnthe Emergency Diesel Generator section above. Apart from SILO devices identified for the EDG start signal, chatter analysis of the control circuits for the intake fans [I44,145,l46,I47,I48,149,15O,151]

concluded they do not include SILO devices. Contact chatter on pressure switch 2PO5-VOO44 (2PDS-VD044) may set the latching relay VD01CAX and interrupt fan operation, however a timing circuit would eutornotloal{y reset this relay after 58seconds. Since this effect is transient only, lt does not meet the selection criteria.

Contact chatter on pressure switches 1PDS-VD103 or 1PDS-VD105 (2PDS-VD103 or 2PDS-VD105) may set latching relays VD03CAX or VD03CBX, respectively, which would lock out the exhaust fans and require a manual reset [152,153].

Switchaear, Load Centers, and MM Power distribution from the EDGs to the necessary electrical loads (Battery Chargers, Inverters, Fuel Oll Pumps, and EOG Ventilation Fans) was traced to identify any SILO devices which could lead to a circuit breaker trip and interruption in power. This effort excluded control circuits for the EDG circuit breakers, which are covered in the Emergency Diesel Generator section above, and the ESW Pump breakers which are covered in the EDG Ancillary Systems section above, as well as component-specific contactors and their control devices, which are covered in the analysis of each component above. Those medium- and low-voltage circuit breakers ln4I6OV ESF Busses and 48OVAC Load Centers [154,155,15G,157] supplying power to loads identified ln this section (battery chargers, EDG ancillary systems, etc.) have been identified for evaluation:

52@2AP05EF/ACB1418,52@1AP05EU/ACB1415X, 52@IAP05E8,52@1AP10EF,52@

1API0E],52@1AP10EL52@1AP10E[,, 52@IAP06EF/ACBI423,52@1AP05EP/AC8I425X, 52@1AP06EB,52 @IAP12EC,52@1AP12EF,52@1APl2EG,52@1AP12EJ, and S2@

Page 13 of 75

15C0346-RPT-002, Rev. 0 Correspondence No.: RS-16-175 1AP12EL (U2: 52 @ 2AP05ES/ACB 2413, 52 @ 2AP05ED/ACB 2415X, 52 @ 2AP05EW, 52 @

2AP10EF, 52 @ 2AP10EJ, 52 @ 2AP10EL, 52 @ 2AP10EQ, 52 @ 2AP06ER/ACB 2423, 52 @

2AP06EH/ACB 2425X, 52 @ 2AP06EJ, 52 @ 2AP12EC, 52 @ 2AP12EF, 52 @ 2AP12EG, 52 @

2AP12EJ, and 52 @ 2AP12EL). Per the UFSAR [48, pp. 8.3-44], DC Distribution [170, 171, 172, 173, 174, 175, 176, 177] uses Molded-Case Circuit Breakers (MCCBs) which are seismically rugged [4, pp. 2-11]. MCCBs in the low voltage Motor Control Center Buckets [158, 159, 160, 161, 162, 163] (U1), [164, 165, 166, 167, 168, 169] (U2), as well as the 120VAC Vital Instrument Buses [178, 179, 180, 181, 182, 183, 184, 185] were considered rugged as well. The only circuit breakers affected by external contact devices not already mentioned were those that distribute power from the 4160V ESF Busses to the 4160/480V step-down transformers. A chatter analysis of the control circuits for these circuit breakers [186, 187, 188, 189] indicates the transformer primary phase overcurrent relays PR37A-450/451, PR37B-450/451, PR37C-450/451, PR28A-450/451, PR28B-450/451, or PR28C-450/451(U2: PR3A-450/451, PR3B-450/451, PR3C-450/451, PR11A-450/451, PR1113-450/451, or PR11C-450/451); primary and secondary ground fault relays PR38-450N, PR29-450N, or PR1-351N (U2: PR4-450N, PR12-450N, or PR1-351N); and lockout relays 486-1415X or 486-1425X (U2: 486-2415X or 486-2425X) all could trip the transformer primary circuit breaker following the seismic event.

2.6

SUMMARY

OF SELECTED COMPONENTS The investigation of high-frequency contact devices as described above was performed in Ref.

[191]. A list of the contact devices requiring a high frequency confirmation is provided in Appendix B, Table B-1. The identified devices are evaluated in Ref. [190] per the methodology/description of Section 3 and 4. Results are presented in Section 5 and Table B-1.

Page 14 of 75

15C0346-RPT-002, Rev. 0 Correspondence No.: RS-16-175 3 Seismic Evaluation 3.1 HORIZONTAL SEISMIC DEMAND Per Reference [8], Sect. 4.3, the basis for calculating high-frequency seismic demand on the subject components in the horizontal direction is the BYR horizontal ground motion response spectrum (GMRS), which was generated as part of the BYR Seismic Hazard and Screening Report

[4] submitted to the NRC on March 31, 2014, and accepted by the NRC on February 17, 2016

[14].

It is noted in Reference [8] that a Foundation Input Response Spectrum (FIRS) may be necessary to evaluate buildings whose foundations are supported at elevations different than the Control Point elevation. However, for sites founded on rock, per Ref. [8], "The Control Point GMRS developed for these rock sites are typically appropriate for all rock-founded structures and additional FIRS estimates are not deemed necessary for the high frequency confirmation effort."

The applicable buildings at BYR are founded on rock; therefore, the Control Point GMRS is representative of the input at the building foundation.

The horizontal GMRS values are provided in Table 3-2.

3.2 VERTICAL SEISMIC DEMAND As described in Section 3.2 of Reference. [8], the horizontal GMRS and site soil conditions are used to calculate the vertical GMRS (VGMRS), which is the basis for calculating high-frequency seismic demand on the subject components in the vertical direction.

The site's soil mean shear wave velocity vs. depth profile is provided in Reference. [4], Table 2.3.2-1 and reproduced below in Table 3-1.

Page 15 of 75

15C0346-RPT-002, Rev. 0 Correspondence No.: RS-16-175 Table 3-1: Soil Mean Shear Wave Velocity Vs. Depth Profile Depth Depth Thickness, Vsi Vs30 Layer (ft) (m) di (ft) (ft/sec) d, / Vsi Y- [ di / Vsi ] (ft/s) 1 10.0 3.048 10.0 3,197 0.0031 0.0031 2 20.0 6.096 10.0 3,197 0.0031 0.0063 3 30.0 9.144 10.0 3,197 0.0031 0.0094 4 40.0 12.192 10.0 3,197 0.0031 0.0125 5 50.0 15.24 10.0 3,197 0.0031 0.0156 6 60.0 18.288 10.0 3,197 0.0031 0.0188 3,145 7 70.0 21.336 10.0 3,197 0.0031 0.0219 8 80.1 24.41448 10.0 3,197 0.0031 0.0250 9 90.1 27.46248 10.0 3,197 0.0031 0.0282 10 97.0 29.5656 7.0 3,197 0.0022 0.0303 11 101.0 30.7848 4.0 4,242 0.0009 0.0313 Using the shear wave velocity vs. depth profile, the velocity of a shear wave traveling from a depth of 30m (98.43ft) to the surface of the site (Vs30) is calculated per the methodology of Reference [8], Section 3.5.

  • The time for a shear wave to travel through each soil layer is calculated by dividing the layer depth (di) by the shear wave velocity of the layer (Vs,).
  • The total time for a wave to travel from a depth of 30m to the surface is calculated by adding the travel time through each layer from depths of Om to 30m (F[d,/Vsi]).
  • The velocity of a shear wave traveling from a depth of 30m to the surface is therefore the total distance (30m) divided by the total time; i.e., Vs30 = (30m)/F[d,/Vsi].
  • Note: The shear wave velocity is calculated based on time it takes for the shear wave to travel 30.78m (101.0ft) instead of 30m (98.43ft). This small change in travel distance will have no impact on identifying soil class type.

The site's soil class is determined by using the site's shear wave velocity (Vs30) and the peak ground acceleration (PGA) of the GMRS and comparing them to the values within Reference [8],

Table 3-1. Based on the PGA of 0.270g and the shear wave velocity of 3145ft/s, the site soil class is C-Hard.

Once a site soil class is determined, the mean vertical vs. horizontal GMRS ratios (V/H) at each frequency are determined by using the site soil class and its associated V/H values in Reference

[8], Table 3-2.

The vertical GMRS is then calculated by multiplying the mean V/H ratio at each frequency by the horizontal GMRS acceleration at the corresponding frequency. It is noted that Reference [8],

Table 3-2 values are constant between 0.11-lz and 20Hz.

The V/H ratios and VGMRS values are provided in Table 3-2 of this report.

Figure 3-1 below provides a plot of the horizontal GMRS, V/H ratios, and vertical GMRS for BYR.

Page 16 of 75

15C0346-RPT-002, Rev. 0 Correspondence No.: RS-16-175 Table 3-2: Horizontal and Vertical Ground Motions Response Spectra Frequency ( ) HGMRS (g) WH Ratio VGMRS (g) 100 0.270 0.81 0.219 90 0.272 0.84 0.228 80 0.275 0.88 0.242 70 0.284 0.93 0.264 60 0.307 0.94 0.289 50 0.365 0.92 0.336 45 0.400 0.91 0.364 40 0.435 0.87 0.378 35 0.467 0.82 0.383 30 0.497 0.77 0.383 25 0.508 0.71 0.361 20 0.514 0.7 0.360 15 0.488 0.7 0.342 12.5 0.508 0.7 0.356 10 0.568 0.7 0.398 9 0.581 0.7 0.407 8 0.583 0.7 0.408 7 0.551 0.7 0.386 6 0.477 0.7 0.334 5 0.385 0.7 0.270 4 0.269 0.7 0.188 3.5 0.218 0.7 0.153 3 0.172 0.7 0.120 2.5 0.129 0.7 0.090 2 0.113 0.7 0.079 1.5 0.090 0.7 0.063 1.25 0.081 0.7 0.057 1 0.070 0.7 0.049 0.9 0.066 0.7 0.046 0.8 0.062 0.7 0.043 0.7 0.058 0.7 0.040 0.6 0.054 0.7 0.038 0.5 0.051 0.7 0.035 0.4 0.040 0.7 0.028 0.35 0.035 0.7 0.025 0.3 0.030 0.7 0.021 0.25 0.025 0.7 0.018 0.2 0.020 0.7 0.014 0.15 0.015 0.7 0.011 0.125 0.013 0.7 0.009 0.1 0.010 0.7 0.007 Page 17 of 75

15C0346-RPT-002, Rev. 0 Correspondence No.: RS-16-175 0.70 1.00 VGMRS I

0.60 HGMRS

---V/H Ratio (C-Hardy 0.90 0.50 I ~

bb 0.80 r 0.40 I 0 L cc 0.30 v 0.70 Q

i I r I 0.20 0.60 0.10 001-0.00 0.50 0.1 1 10 100 Frequency [Hz]

Figure 3-1 Plot of the Horizontal and Vertical Ground Motions Response Spectra and V/H Ratios Page 18 of 75

15C0346-RPT-002, Rev. 0 Correspondence No.: RS-16-175 3.3 COMPONENT HORIZONTAL SEISMIC DEMAND Per Reference [8] the peak horizontal acceleration is amplified using the following two factors to determine the horizontal in-cabinet response spectrum:

  • Horizontal in-structure amplification factor AFsH to account for seismic amplification at floor elevations above the host building's foundation
  • Horizontal in-cabinet amplification factor AFB to account for seismic amplification within the host equipment (cabinet, switchgear, motor control center, etc.)

The in-structure amplification factor AFsH is derived from Figure 4-3 in Reference [8]. The in-cabinet horizontal amplification factor, AFB is associated with a given type of cabinet construction. The three general cabinet types are identified in Reference [8] and Appendix I of EPRI NP-7148 [13] assuming 5% in-cabinet response spectrum damping. EPRI NP-7148 [13]

classified the cabinet types as high amplification structures such as switchgear panels and other similar large flexible panels, medium amplification structures such as control panels and control room benchboard panels and low amplification structures such as motor control centers.

All of the electrical cabinets containing the components subject to high frequency confirmation (see Table B-1 in Appendix B) can be categorized into one of the in-cabinet amplification categories in Reference [8] as follows:

  • BYR Motor Control Centers are typical motor control center cabinets consisting of a lineup of several interconnected sections. Each section is a relatively narrow cabinet structure with height-to-depth ratios of about 4.5 that allow the cabinet framing to be efficiently used in flexure for the dynamic response loading, primarily in the front-to-back direction. This results in higher frame stresses and hence more damping which lowers the cabinet response. In addition, the subject components are not located on large unstiffened panels that could exhibit high local amplifications. These cabinets qualify as low amplification cabinets.
  • BYR Switchgear cabinets are large cabinets consisting of a lineup of several interconnected sections typical of the high amplification cabinet category. Each section is a wide box-type structure with height-to-depth ratios of about 1.5 and may include wide stiffened panels. This results in lower stresses and hence less damping which increases the enclosure response. Components can be mounted on the wide panels, which results in the higher in-cabinet amplification factors.
  • BYR Control cabinets are in a lineup of several interconnected sections with moderate width. Each section consists of structures with height-to-depth ratios of about 3 which results in moderate frame stresses and damping. The response levels are mid-range between MCCs and switchgear and therefore these cabinets can be considered in the medium amplification category.

Page 19 of 75

15C0346-RPT-002, Rev. 0 Correspondence No.: RS-16-175 3.4 COMPONENT VERTICAL SEISMIC DEMAND The component vertical demand is determined using the peak acceleration of the VGMRS between 15 Hz and 40 Hz and amplifying it using the following two factors:

  • Vertical in-structure amplification factor AFsv to account for seismic amplification at floor elevations above the host building's foundation
  • Vertical in-cabinet amplification factor AFB to account for seismic amplification within the host equipment (cabinet, switchgear, motor control center, etc.)

The in-structure amplification factor AFsv is derived from Figure 4-4 in Reference [8]. The in-cabinet vertical amplification factor, AFB is derived in Reference [8] and is 4.7 for all cabinet types.

Page 20 of 75

Correspondence No.: RS-16-175 MT711: ffm I

. Ito0" Per Reference [8], seismic capacities (the highest seismic test level reached by the contact device without chatter or other malfunction) for each subject contact device are determined by the following procedures:

(I)Ka contact device was tested as part of the EP0High Frequency Testing program [7],

then the component seismic capacity from this program is used.

(2) Ifa contact device was not tested os part of[7], then one or more of the following means to determine the component capacity were used:

(a) Device-specific seismic test reports (either from the station or from the SQURTS testing program.

(b) Generic Equipment Ruggedness Spectra (GERS) capacities per [9], [10], [11], and kj Assembly (e.g. electrical cabinet) tests where the component functional performance was monitored.

The high-frequency capacityofeachdevicevvosexaluatedvviththecompongn1moundnApolnt demand from Section 3 using the criteria in Section 4.5 of Reference [8]

A summary of the high-frequency evaluatkzncondusionslsprovdedlnTable8-1lnAppendixB of this report.

Page o1oy7o

15C0346-RPT-002, Rev. 0 Correspondence No.: RS-16-175 Conclusions 5.1 GENERAL CONCLUSIONS BYR has performed a High Frequency Confirmation evaluation in response to the NRC's 50.54(f) letter [1] using the methods in EPRI report 3002004396 [8].

The evaluation identified a total of 226 components that required seismic high frequency evaluation. As summarized in Table B-1 in Appendix B, all of the devices have adequate seismic capacity for the reevaluated seismic hazard [4].

5.2 IDENTIFICATION OF FOLLOW-Up ACTIONS No follow-up actions were identified.

Page 22 of 75

I5CO346-RPT-OO2, Rev. O Correspondence N RS-16-175 1 NRC (E. Leeds and M. Johnson) Letter to All Power Reactor Licensees etal,"Request for Information Pursuant to Title 10 of the Code of Federal Regulations 50.54(f) Regarding Recommendations 2.1, 2.3 and 9.3 of the Near-Term Task Force Review of Insights from the FukushlnnoDal-lchlAcdden¢" March 12,3Ol2, ADAMS Accession Number MLI2053A340 2 NRC(VV. Dean) Letter to the Power Reactor Licensees onthe Enclosed List. "Final Determination of Licensee 3elsnnlo Probabilistic Risk Assessments Under the Request for Information Pursuant to Title 10 of the Code of Federal Regulations 50.54(f) Regarding Recommendation 2.l"5elarnlc"of the Near-Term Task Force Review of Insights from the FukushlnnaOal-lchlAcddent." October 27,2O15, ADAMS Accession Number ML15194AO15 3 NRC (J. Davis) Letter to Nuclear Energy Institute (A. Mauer). "Endorsement of Electric Power Research Institute Final Draft Report 3002004396, "High Frequency Program:

Application Guidance for Functional Confirmation and Froglllty.'" September 17,2O15, ADAMS Accession Number ML152I8A569 4 Seismic Hazard and Screening Report in Response to the 50.54(f) Information Request Regarding Fukushlnme Near-Term Task Force Recommendation 2.l: Seismic for BYR dated March 31,2O14` ADAMS Accession Number ML14O91AO]O 5 EPRI 1015109. "Program on Technology Innovation: Seismic Screening of Components Sensitive to High-Frequency Vibratory Motlons." October 2OO7 6 EPR1 1025287. "Seismic Evaluation Guidance: Screening, Prioritization and Implementation Details (5PlD) for the Resolution ofFukuah/nna Near-Term Task Force Recommendation 2.l:Selsmnlo." February 2Ol3 7 EPRl3OO2OO2997. "High Frequency Program: High Frequency Testing Summary."

September 2014 8 EPRI 3002004396. "High Frequency Program: Application Guidance for Functional Confirmation and Fragility Eveluatlon." July 2OI5 9 E9RlNP-7147-SL."Selamnlu Ruggedness ofRe/eys." August 1991 10 EPRlNP-7l47-SLV2, Addendum 1,"Selsnnlc Ruggedness ofRelays", September 1993 11 EPR1NP-7147-S[V2, Addendum 2, "Seismic Ruggedness ofRelaya", April l995 12 EPR/NP-71475[lUG Advisory 20O4-O2."RelayGERSCorrectlons." September lO,2OO4 13 EPRI NP-71481 "'Procedure for Evaluating Nuclear Power Plant Relay Seismic Functionality", 1990 14 NRC (F. Vega) Letter to Exelon Generation Company, LLC (B. Hanson). ""Byron Station, Units 1 and 2 Staff Assessment of Information Provided Pursuant to Title 10 of the Code of Federal Regulations Part 50, Section 50.54(f), Seismic Hazard Reevaluations for Recommendation 2.1 of the Near-Term Task Force Review of Insights from the Fukushima Page 000Ym

15C0346'RPT-002 Rev.O Correspondence No.: RS-16-175 Dai-bhl Accident (CAC NOS. MF3884 and MF3@Q5\." February I7,2Ol6 ADAMS Accession Number ML18D27AO45 15 Recommendations For Enhancing Reactor Safety in the 21st Century, "The Near-Term Task Force Review of Insights from the Fukushlrna Dal-lchl Accident" July 12, 201I, ADAMS Accession Number ML11286I807 16 NE} 13-06, Rev. 2. "'Diverse and Flexible Coping Strategies (FLEX) Implementation Guide" 17 Byron Drawing 6E-1-4030AF02 Rev. AE, Schematic Diagram Auxiliary Feedwater Pump 1B -

Diesel Driven 1AF01PB 18 Byron Drawing 6E-2-4030AF02 Rev. Z, Schematic Diagram Auxiliary Feedwater Pump 2B Diesel Driven 2AFOIPB 19 Byron Drawing 6E-1-4030AF12 Rev. AH, Schematic Diagram Auxiliary Feedwater Pump 113 (Dlesel-Drlven) Engine Startup Panel 1AFO1J 20 Byron Drawing 6E-2-4O3UAF12 Rev. AH, Schematic Diagram Auxiliary Building Pump 28 (Dlesel'Drlven)Englne Startup Panel 2AFO1J 21 Byron Drawing 8E-1-4O3ORCl4 Rev. E, Schematic Diagram Loop 1A^1B,IC and 1DDrain Line Valves 1RC8O37/, B,C and D(AOV) 22 Byron Drawing 6E-1-403ORC32 Rev. C, Schematic Diagram Reactor Head Vent Valves IRCOI4A^ B,C and D 23 Byron Drawing GE-2-4O9ORC14 Rev. B, Schematic Diagram Loop 2A^2B,2C and 2DDrain Valves 2RC8O37A^B,C and D/A(JV\

24 Byron Drawing 6E-2-403ORC32 Rev. C, Schematic Diagram Reactor Head Vent Valves 2RCOI4A,B,[ and D 25 Byron Drawing 6E-1-403ORY17 Rev. V, Schematic Diagram Nitrogen Supply Isolation Valves IRY079A and B Pressurizer Power Relief Valves 1RY455A and 456, Pressurizer Relief Tank Primary Water Supply Isolation Valve IRY8O3O 26 Byron Drawing 6E-1-403ORY13 Rev. G, Schematic Diagram Pressurizer Pressure and Level Control Non-Safety Related (Division 1I).

27 Byron Drawing 6E-1-403ORY14 Rev. F, Schematic Diagram Pressurizer Pressure and Level Control Non-Safety Related (Division 22) 28 Byron Drawing 6E-2-403ORY17 Rev. L, Schematic Diagram Pressurizer Power Relief Valves 2RY455A and 2RY456, Pressurizer Relief Tank Primary Water Supply Isolation Valve2RY8O3O 29 Byron Drawing 6E-2-403ORY13 Rev. E, Schematic Diagram Pressurizer Pressure and Level Control Non-Safety Related (Division 21) 30 Byron Drawing 6E-2-403ORY14 Rev. D, Schematic Diagram Pressurizer Pressure and Level Control Non-Safety Related (Division 22) 31 Byron Drawing M-62 Rev. BF, Diagram C)f Residual Heat Removal Unit 1 32 Byron Drawing 6E-1-4030RHO4 Rev. 0, Schematic Diagram RC Loop 1A to RHR Pump Isolation Valves 1RH87O1A and lRH87O18 Page 24 or7o

15CO346-RPT-002 Nev.O Correspondence No.: RS-16-175 33 Byron Drawing 6E-l-4O3ORHOS Rev. C, Schematic Diagram RC Loop lCtoRHRPump Isolation Valves 2RH87O2A and 1RH87O28 34 Byron Drawing 01-I37 Rev. 8H, Diagram CU Residual Heat Removal 35 Byron Drawing 6E-2-4030RHO4 Rev. M, Schematic Diagram RC Loop 2A to RHR Pump Isolation Valves 2RH87D1A and 2RH87OI8 36 Byron Drawing 6E-2-4030RHO5 Rev. P, Schematic Diagram Reactor Coolant Loop 2C to RHR Pump Isolation Valves -2RH87O2A2RH87O2B 37 Byron Drawing M-68 Sheet 1A Rev. D, Diagram of Process Sampling (Primary and Secondary) Unit 1 38 Byron Drawing M-68 Sheet 18 Rev. G, Diagram of Process Sampling Primary and Secondary 39 Byron Drawing M-14O Sheet 1 Rev. AO, Diagram of Process Sampling Primary and Secondary 40 Byron Drawing 6E-1-403OPS03 Rev. J, Schematic Diagram Press Steam and Liquid Sample Isolation Valve 1PS935DA and lP3935OB Hot Leg Loops 2 and 3 Sample Line Isolation Valves lP3985lA and 1P598518 41 Byron Drawing 6E-1-4O3O9OOG Rev. K, Schematic Diagram Cold Legs Loop 1,2,3 and 4 Sample Line Isolation Valves 1P3935@A,8,C and O(AOV) 42 Byron Drawing 6E-2'4O3OP3O3 Rev. F, Schematic Diagram Pressurizer Steam and Liquid Sample Isolation Valves 2P3935OA2P3935OB; Hot Leg Loops 2 and 3 Sample Line Isolation Valves 43 Byron Drawing 6E-2-4O3OPSO6 Rev. F, Schematic Diagram Cold Leg Loops I,2,3 and 4 Sample Line Isolation Valves -ZP59358A2PS93S8B29S9358C2P39358D 44 Byron Drawing 6E-l-4O3OP3O1 Rev. E, Schematic Diagram Pressurizer Steam and Liquid Sample Isolation Valves lPS9354A and B,1PS9355A and B 45 Byron Drawing 6E-1-403OPS02 Rev. E, Schematic Diagram Loop Sample Line Isolation Valves -lP59358A and 8 Accumulator Sample Line Isolation Valves lP39357A and B 40 Byron Drawing 6E-2-403OPS01 Rev. C, Schematic Diagram Pressurizer Steam and Liquid Sample Isolation Valves 2P39354A and B,2PS93S5A and B 47 Byron Drawing 6E-2-403OPS02 Rev. C, Schematic Diagram Loop Sample Line Isolation Valves 2PS935GA and B Accumulator Sample Line Isolation Valves 2PS9357A and B 48 Byron Report, "Updated Final Safety Analysis Report (UFSAR)," Revision 16, December 2015 49 Byron Drawing BE'O'4OOl Rev. N, Station One Line Diagram.

50 Byron Drawing 6E-1-403ODG01 Rev. AA, Schematic Diagram Diesel Generator 1A Feed to 4.I6KVESF3xvltchgear Bus 141-ACBl413 51 Byron Drawing 6E-I-4080AP23 Rev. ), 3ohernotlc Diagram System Auxiliary Transformer l42-1 Feed to4.16KVE3FDvvltohgnar Bus 141-ACBI4l2 Page 25orm

15CO346'RPT-OO2, Rev. O Correspondence N RS-I6-175 52 Byron Drawing 6E-1-4030AP25 Rev. AF, Schematic Diagram Reserve Feed from 4.16KV ESF 3xvltchgear Bus 241to4.l6KVESFSvvltohgear Bus 14I-ACB14I4 53 Byron Drawing 6E-1-403ODG02 Rev. X, Schematic Diagram Diesel Generator 1B Feed TO 4.16KVESFSvvltchgear Bus I42-ACB142g 54 Byron Drawing 5E-1-4030AP32 Rev. VV, Schematic Diagram System Auxiliary Transformer I42-2 Feed to4.16KVE3F3vvltuhgaar Bus 142-/\C8l422 55 Byron Drawing 6E-1-4030AP34 Rev. Z, Schematic Diagram Reserved Feed from 4.16KV ESF 3vvltchgear Bus 242to4.16KVE6FSvvltchgear Bus l42-ACB1424 50 Byron Drawing 6E-2-403ODGOI Rev. T, Schematic Diagram Diesel Generator 2A Feed to 4.16KV ESFSvvltuhgear Bus 241-AC824I3 57 Byron Drawing 8E-2-4030AP23 Rev. X, Schematic Diagram System Auxiliary Transformer 242-1 Feed to4.IGKVESFSvvltohgear Bus 24]-ACB24I2 58 Byron Drawing 6E-2-4030AP25 Rev. X, Schematic Diagram Reserve Feed from 4.16KV ESF Svvltchgear Bus 141to4.IGKVEOFDxvltohgear Bus 24I-AC8Z4I4 59 Byron Drawing 6E-2-4O3ODGO2 Rev. T, Schematic Diagram Diesel Generator 2B Feed to 4.16KVESF3vvltchgear Bus 242-ACB2423 60 Byron Drawing 6E-2-4030AP32 Rev. \\ Schematic Diagram System Auxiliary Transformer 242-2 Feed to4.l6KV[8F3vvltchgear Bus 242-ACB2422 61 Byron Drawing 6E-2-4O3OA934 Rev. \, Schematic Diagram Reserve Feed from 4.1GKV Svvltchgear Bus 142to4.1GKVE3FSxvltohgear Bus 242-ACB2424 62 Byron Drawing 6E-1-403ODG31 Rev. AO, Schematic Diagram Diesel Generator 1A Starting Sequence Control 1DGO2KA Part 1 63 Byron DravvlngGE-l-4O3OOG32 Rev. AH, Schematic Diagram Diesel Generator 1A Starting Sequence Control 1DGO1KA Part 2 84 Byron Drawing 6E-1-403ODG33 Rev. T, Schematic Diagram Diesel Generator 1A Starting Sequence Control 1DGOIK4 (Part 3) 65 Byron Drawing 6E-1-403ODG35 Rev. L, Schematic Diagram Diesel Generator 1A Generator Control1OGOIK4 68 Byron Drawing 6E-1-4O9OOG35 Rev. O, Schematic Diagram Diesel Generator IAGenerator and Engine Governor Control 1DGOIKA 67 Byron Oravvlng8E-l-4O3OOG4O Rev. U, Schematic Diagram Diesel Generator 1A Shutdown and Alarm System IOGOIKA 68 Byron Dravvlng6E-I-4O3OOG5I Rev. AO, 3ohennatlo Diagram Diesel Generator IBStarting Sequence Control 1OGOIKB Part l G@ Byron Dravvlng8E-l-4O3ODGS2 Rev. AG, Schematic Diagram Diesel Generator 1B Starting Sequence Control 1DGOIK8 Part 2 70 Byron Drawing 6E-1-403ODG53 Rev. X, Schematic Diagram Diesel Generator IB Starting Sequence Control lOGO1KB (Part 3)

Page 26ur7n

Correspondence No.: RS-16-175 71 Byron Drawi ng 6E-I-403ODG55Rev L Schematic Diagram Diesel Generator l8Generator Control 1DG01KB 72 Byron Drawing 6E-I-4OgODG56 Rev. [~ Schematic Diagram Diesel Generator 1BGenerator and Engine Governor Control IOGOlK8 73 Byron Drawing 6E-1-403ODG60 Rev. S, Schematic Diagram Diesel Generator 1B Shutdown and Alarm System IDGOlKB 74 Byron Drawing 6E-2-403ODG31 Rev. AO, Schematic Diagram Diesel Generator 2A Starting Sequence Control 2DGOIKA Part 1 75 Byron Dravvlng6E-2-4O3ODG32 Rev. AG, Schematic Diagram Diesel Generator 2AStarting Sequence Control 2DGOIKA Part 2 76 Byron Drawing 6E-2-403ODG33 Rev. T, Schematic Diagram Diesel Generator 2A Starting Sequence Control 2DGOIKA (Part 3) 77 Byron Drawing 6E-2-403ODG3S Rev. J, Schematic Diagram Diesel Generator 2A Generator Control 2OGOlNA Unit 2 78 Byron Oravving6E-2-4O3OOG36 Rev. L Schematic Diagram Diesel Generator 2A Generator and Engine Governor Control 2DGO2KA Unit Z 79 Byron Drawing 6E-2-403OOG40 Rev. 9, Schematic Diagram Diesel Generator 2AShutdown and Alarm System 2OG01K4 80 Byron Drawing 6E-2-403OOG51 Rev. AJ, Schematic Diagram Diesel Generator 2B Starting Sequence Control 2DGU1KB Part l 81 Byron Dravvlng5E-2-4O3OOB52 Rev. AG, Schematic Diagram Diesel Generator 2BStarting Sequence Control 2DGOlK8 Part 2 82 Byron Oravving6E-2-4O3OOG53 Rev. 3, Schematic Diagram Diesel Generator 2BStarting Sequence Control 2DGO1K8 (Part g>

83 Byron Drawing 6E-2-403ODG55 Rev. L, Schematic Diagram Diesel Generator 2B Generator Control2DGOIK8 84 Byron Drawing 6E-2-403ODG56 Rev. N, Schematic Diagram Diesel Generator 2B Generator and Engine Governor Control 2DGO1KB Unit 2 85 Byron Drawing 6E-2-403ODG60 Rev. N, Schematic Diagram Diesel Generator 2B Shutdown and Alarm System 2DGO1K8 (Part 2) 86 Byron Oravvlng8E-l-4O9ODG34 Rev. F, Schematic Diagram Diesel Generator IA Starting Sequence Control (Description of Operation) lDGO1KA Part 4 Unit 1 87 Byron Drevv/ng6E-l-4O3OOG54 Rev. F, Schematic Diagram Diesel Generator 1BStarting Sequence Control (Description of Operation) lDGO1KB Part 4 Unit l 88 Byron Oravv/ng6E-2-403ODG34 Rev. O, Schematic Diagram-Diesel Generator 2/\Starting Sequence Control (Description of Operation) 2OGO1K4 Part 4 Unit 2 89 Byron Drawing 6E-2-403ODG54 Rev. D, Schematic Diagram Diesel Generator 2B Start Sequence Control (Description Of Operation) 2DGO1KB Part 4 Unit 2 Page 27m/o

Correspondence No.: RS-16-175 90 Byron Drawing 6E-1-403ODG4IRev. L, Schematic Diagram Diesel Generator IALegends 1DGO1KA 91 Byron Drawing 6E-l-4O3ODGGI Rev. M, Schematic Diagram Diesel Generator I8Legends lDGO1KB 92 Byron Drawing 6E-2-403ODG41 Rev. J, Schematic Diagram Diesel Generator 2A Legends 2DGOlNA Unit 2 93 Byron Drawing 6E-2-403ODG61 Rev. H, Schematic Diagram Diesel Generator 2B Legends 2DGO1KB Unit 2 94 Byron Dnavving6E-I-4O3ODG44 Rev. V, Schematic Diagram Diesel Generator lAControl Cabinet Switches Development IOGOIKA 95 Byron Dravvlng6E-1-4O3OOG64 Rev. U, Sohcrnatlo Diagram Diesel Generator lDControl Cabinet Switches Development lDGO1KB 96 Byron Drawing 6E-2-403ODG44 Rev. N, Schematic Diagram Diesel Generator 2A Control Cab Switches Development 2DGOlKA Unit 2 97 Byron Drawing 6E-2-4O8ODB64Rev. N, Schematic Diagram Diesel Generator 2BControl Cab Switches Development 2DGO1K8 Unit Z 08 Byron Drawing 6E-1-403ODCOI Rev. N, Schematic Diagram 125V DC Battery Charger Ill 1OCO3E 99 Byron Drawing 6E-1-403ODCO2 Rev. N, Schematic Diagram 125V DC Battery Charger 112 IDCO4E 100 Byron Drawing 6E-1-403ODC04 Rev. B, Schematic Diagram Firing Amplifier and Miscellaneous Alarm Modules 125VDC and 25OVDC Battery Chargers 101 Byron Drawing 6E-2-4O3ODCD2 Rev. K, Schematic Diagram l25VDC Battery Charger 211 2OCO3E 102 Byron Drawing 6E-2-403ODCO2 Rev. M, Schematic Diagram 125V DC Battery Charger 212 2OCO4E 103 Byron Drawing GE-2-4O3ODCO4 Rev. B, Schematic Diagram Firing Amplifier and Miscellaneous Alarm Modules I25VOC and 25OVDC Battery Chargers 104 Byron Drawing 6E-1-4030AF19 Rev. C, Schematic Diagram 32V DC Battery Charger 1AFOlEA-1 and ]AFO1EB-1 105 Byron Drawing 6E-2-4030AF19 Rev. E, Schematic Diagram 32V DC Battery Charger 2AFO1EA-I and 2AFD1E8-1 106 Byron Drawing 6E-1-40301POI Rev. Q, Schematic Diagram 7.5KVA Fixed Frequency Inverter for Instrument Bus 1Il'IlPO5E 107 Byron Drawing 8E-1-4O3OlPO2 Sheet 1 Rev. A^ Schematic Diagram lOKVA Inverter for Instrument Bus 1121lPOGE Part 1 108 Byron Drawing 6E-1-4O8OlPO2 Sheet 2 Rev. /, Schematic Diagram 1OK\AA Inverter for Instrument Bus II31lPOGE Part 2 Page 28of75

Rev O Correspondence No.: RS-16-175 109 Byron Drawing 6E-I-40301PO2 Sheet 3 Rev. A^ Schematic Diagram 10 KVA Inverter Static Switch for Instrument Bus 1121lPO6E Part 3 110 Byron Drawing 6E-1-40301PO2 Sheet 4 Rev. A, Schematic Diagram 10 KVA Inverter for Instrument Bus 1121lPOGE Part 4 111 Byron Drawing 6E-I-4O3OlPO3 Rev. 3, Schematic Diagram 7.5KVA Fixed Frequency Inverter for Instrument Bus 113lPO7E 112 Byron Drawing 6E-1-40301PO4 Sheet 1 Rev. A, Schematic Diagram 10 KVA Inverter for Instrument Bus 114-llPO8E Part l 113 Byron Drawing 6E-l-4O3OlPO4 Sheet 2 Rev. A, Schematic Diagram lOKVA Inverter for Instrument Bus I14-2lPOBE Part 2 114 Byron Drawing 6E-1-40301PO4 Sheet 3 Rev. A, Schematic Diagram 10 KVA Inverter Static Switch for Instrument Bus I14-lIPOOE Part 3 115 Byron Drawing 6E-1-4O3OlPO4 Sheet 4 Rev. /\ Schematic Diagram lOKVA Inverter for Instrument Bus 114-1lPO8E Part 4 116 Byron Drawing 6E-2-403011301 Rev. K, Schematic Olognann 7.5K\AA Fixed Frequency Inverter for Instrument Bus 21l-2lPO5E 117 Byron Drawing 6E-2-403011302 Rev. K, Schematic Diagram 7.5KVA Fixed Frequency Inverter for Instrument Bus 212-2lPOOE 118 Byron Drawing 6E-2-403011303 Rev. L, Schematic Diagram 7.5K\A\Fiued Frequency Inverter for Instrument Bus 213-21PO7E 119 Byron Drawing GE-2-4O3OlPO4 Rev. L, Schematic Diagram 7.5KVA Fixed Frequency Inverter for Instrument Bus 2l4-2/PO8E 120 Byron Drawing M-SO Sheet 1C Rev. AN, Diagram of Diesel Fuel Oil Unit 1 121 Byron Drawing M-50 Sheet ID Rev. AP, Diagram of Diesel Fuel Oll Unit 1 122 Byron Drawing W1-l3O Sheet 1A Rev. BH, Diagram of Diesel Oil and Fuel Oil Supply 123 Byron Drawing M-l3O Sheet IB Rev. BE, Diagram of Diesel Oil and Fuel Oil Supply 124 Byron Onavvlng M-50 Sheet 1A Rev. AS, Diagram of Diesel Fuel [)il Unit 1 125 Byron Drawing M-5O Sheet 1B Rev. AP, Diagram of Diesel Fuel Oil 128 Byron DrovvlngGE-1-4O3OD[)O2 Rev. H, Schematic Diagram Diesel Generator 1AFuel Ol/

Transfer Pumps IO[)O1PA and lDOOIPC 127 Byron Drawing 6E-1-4O3OO003 Rev. ], Schematic Diagram Diesel Gen 18 Fuel Oil Transfer Pumps 1OC>O1PB and lOOO2PD Unit I 128 Byron Drawing 6E-2-4030DO02 Rev. G, Schematic Diagram Diesel Gen 2A Fuel Oil Transfer Pumps 2O[)OlPA and 2OOOlPC 129 Byron Drawing 6E-2-4030DO03 Rev. G, Schematic Diagram Diesel Gen 2B Fuel Oil Transfer Pumps 2OOOIPB and 2OOO1PO Unit 2 130 Byron Drawing M-42 Sheet 1A Rev. AQ, Diagram of Essential Service Water Critical Control Room Drawing Page 29m7o

l5CO346-RPT-OO2, Rev. O Correspondence No.: RS-16-175 131 Byron Drawing M-42 Sheet 2A Rev. BC, Diagram of Essential Service Water Units I and 2 132 Byron Drawing M-42 Sheet 2B Rev. BC, Diagram of Essential Service Water Units Iand 2 133 Byron Drawing M-42 Sheet 3 Rev. BD, Diagram of Essential Service Water Unit ICritical Control Room Drawing 134 Byron Drawing &4-42 Sheet 8 Rex. 8C, Diagram of Essential Service Water Critical Control Room Drawing 135 Byron Drawing M-12G Sheet l Rev. BG, Diagram Of Essential Service Water Unit 2 136 Byron Drawing 6E-1-4030SX01 Rev. W, Schematic Diagram Essential Service Water Pump 1AISXOIPA 137 Byron DravvlngGE-l-4O3OSXO2 Rev. X, Schematic O)ogrern Essential Service Water Pump 18lSXOlPB 138 Byron Drawing 6E-2-4030SX01 Rev. T, Schematic Diagram Essential Service Water Pump 2A23XOIPA 139 Byron Drawing 6E-2-4030SX02 Rev. 0, Schematic Diagram Essential Service Water Pump 2B25XOIPB 140 Byron Drawing 6E-2-4O3O0K17 Rev. K4, Schematic Diagram Diesel Gen 1A and 18ES3 Service Water Valves 2SXlG9A and 1SX1698 141 Byron Drawing GE-2-4O3O8Kl7 Rev. N4, Schematic Diagram Diesel Generator 2A and 2BE35 Service Water Valves 23XI59A and 23XI69B 142 Byron Drawing M-97 Rev. S, Diagram Of Diesel Generator Room lA And l8Ventilation System 143 Byron Drawing M-98 Rev. P, Diagram Of Diesel Generator Room 2A And 2B Ventilation System 144 Byron Drawing 6E-1-403OVD01 Rev. L, Schematic Diagram Diesel Generator Room IA HVAC System Ventilation Fan 1A1VDOl[A 145 Byron Drawing 6E-1-403OVD02 Rev. K, Schematic Diagram Diesel Generator Room 1B HVAC System Ventilation Fan 1B1VDO1CB 140 Byron Drawing 6E-1-403OVD03 Rev. S, Schematic Diagram Diesel Generator Room 1A HVAC System Ventilation and Exhaust Fans Auxiliary Relays Switches and Alarm - Part 1 147 Byron Drawing 6E-1-403OVD04 Rev. N, Schematic Diagram Diesel Generator Room 1A HVAC System Ventilation and Exhaust Fans Auxiliary Relays Switches and Alarms Part 11 148 Byron Drawing 6E-2-403OVD01 Rev. M, Schematic Diagram Diesel Generator Room 2A H\AC System Ventilation Fan 2A2VOOICA 149 Byron Drawing 6E-2-403OVD02 Rev. M, Schematic Diagram Diesel Generator Room 2B HVAC System Ventilation Fan 282VDO1C8 150 Byron Drawing 6E-2-403OVD03 Rev. S, Schematic Diagram Diesel Generator Room 2A HVAC System Ventilation and Exhaust Fans Auxiliary Relays, Switches and Alarms Part I Page oomm

15CO346-RPT-002 Rev.O Correspondence No.: RS-16-175 151 Byron Drawing GE-2-403OVD04Rev. M, Schematic Diagram Diesel Generator Room 2A H\AAC System Ventilation and Exhaust Fans Auxiliary Relays, Switches and Alarms Part U 152 Byron Drawing 6E-1-403OVD07 Rev. L, Schematic Diagram Diesel Generator Room 1A and 1BHVAC System Exhaust Fans 1A and lB-lVOO8C4 and IVDO3CB 153 Byron Drawing 6E-2-4O3OVDO7 Rev. L, Schematic Diagram Diesel Generator Room 2Aand 2BHVAC System Exhaust Fans 2A and 2B2VDO3CA and 2VDO3CB 154 Byron Drawing GE-l-4UO7A Rev. M, Key Diagram 48OVESF Substation Bus 181X(lAP1OE) 155 Byron Drawing 6E-1-4OO7D Rev. [), Key Diagram 48OVEDF Substation Bus 132X(lAP12E) 156 Byron Drawing 8E-2-4OO7A Rev. J, Key Diagram 48OVESF Substation Bus 23lX(2AP1OE)

Critical Control Room Drawing 157 Byron Drawing 8E-2-4OO7O Rev. L, Key Diagram 48OVESF Substation Bus 232X/2AP12E>

Critical Control Room Drawing 158 Byron Drawing 6E-l-4OO8A Rev. AE, Key Diagram 48OV Auxiliary Building E5F MCC 13lX1-1AP21E- Part 1 150 Byron Drawing GE-1-4OD8B Rev. Z, Key Diagram 48OV Auxiliary Building ESF MCC 131%I and I31%1A-IAP2IE and lAP2IEA- Part 2 160 Byron Drawing 6E-l-4OO8] Rev. A], Key Diagram 4QOV Auxiliary Building ESF MCC l32%1 (IAp23E) 181 Byron Drawing 6E-I-4OO8L Rev. AO, Key Diagram 48OV Auxiliary Building E3F MCC 132X2 and A(1AP27E and 1AP27A) 162 Byron Drawing 6E-1-4OO8CL Rev. S, Key Diagram 48OV Auxiliary Building E3F MCC I8lX3 (1AP22E) 163 Byron Drawing 5E-1-4OO8Y Rev. AG, Key Diagram 48OV Auxiliary Building ESF MCC 1328]

lAP24E 164 Byron Drawing 5E-2-4OO8A Rev. N, Key Diagram 4OOV Auxiliary Building EDF MCC 231X2 2AP2IE Part 1 165 Byron Drawing 6E-2-4OO8B Rev. O, Key Diagram 48OV Auxiliary Building ESF MCC23lXI-A 2AP2lE-A Part 2 168 Byron Drawing 6E-2-4000U Rev. Y, Key Diagram 48OV Auxiliary Building E5F MCC 232X1 (2AP23E) 167 Byron Drawing GE-2-4OO8L Rev. AE, Key Diagram 48OV Auxiliary Building ESF MCC 232X2 and A(2AP27E and 2AP27A) 168 Byron Drawing GE-2-4DO8Cl Rev. R, Key Diagram 48OV Auxiliary Building E5F MCC 231X3 2AP22E 189 Byron Drawing 6E-2-4000Y Rev. U, Key Diagram 48OV Auxiliary Building ESF MCC 232X3 2AP24E 170 Byron Drawing 6E-1-4010A Rev. M, Key Diagram 125V DC ESF Distribution Center Bus III (1DCO5E) Part I Page murre

I5CO346-RpT-002 Rev.O Correspondence No.: RS-16-175 171 Byron Drawing 6E-I-4O1OB Rev. G, Key Diagram 125V0C E3F Distribution Center Bus 112 (1DCO5E) Part 2 172 Byron Drawing 6E-1-4O1OO Rev. N, Key Diagram l2SVDCESFDistMbutlonCenter8usll2 (1OCO6E) Part I 173 Byron Drawing 6E-I-4O1OE Rev. Gi Key Diagram l25VDC E3F Distribution Center Bus 112 (IOCO6E) Part 2 174 Byron Drawing GE-2-4O1OA Rev. L Key Diagram 125VDCESF Distribution Center Bus 211 (2OCO5E) Part I 175 Byron Drawing GE-2-4OlOB Rev. F, Key Diagram l25VDCE8F Distribution Center Bus 21l (2DCO5E) Part 2 176 Byron Drawing GE-2-4OlOD Rev. L, Key Diagram l25VDCE3F Distribution Center Bus 212 (2OCO6E) Part I 177 Byron Drawing 6E-2-4010E Rev. E, Key Diagram 125V DC ESF Distribution Center Bus 212 (2O[O6E) Part 2 178 Byron Drawing GE-1-4O12A Rev. N, Key Diagram 12OVAC Instrument Bus lII-IlPO1JE3F Division 11 Channel l 179 Byron Drawing 6E-1-4Ol2B Rev. l[ Key Diagram 12OVAC Instrument Bus 1l2-llPO2JE5F Division 12 Channel 11 180 Byron Drawing 6E-I-4O22C Rev. \, Key Diagram 12OVAC Instrument Bus 118-llPO9JESF Division 1I Channel III 181 Byron Drawing GE-1-4Ol2D Rev. Z, Key Diagram l2OVA[ Instrument Bus 1l4-1lPO4JE5F Division l2 Channel /V 182 Byron Drawing GE-2-4Ul2A Rev. K, Key Diagram 12OVAC Instrument Bus 21l-2lPOIJE3F Division 2I Channel /

183 Byron Drawing 6E-2-4O12D Rev. ], Key Diagram 12OVAC Instrument Bus 212-2lPO2]EBF Division 22 Channel /l 184 Byron Drawing 6E-2-4O12C Rev. K, Key Diagram 12OVAC Instrument Bus 2I3-2lPO3]E5F Division 21 Channel III 185 Byron Drawing GE-2-4D12D Rev. M, Key Diagram l2OVAC Instrument Bus 2I4-2lPO4]ESF Division 22 Channel /V 188 Byron Drawing 6E-I-4O3OAP27 Rev. ], Schematic Diagram 4.16KVESF3vvltohgeor Bus 14l Feed to48OV Auxiliary Transformer 13I%-ACBI415X 187 Byron Drawing 6E-2-4D3Q4P9G Rev. H, Schematic Diagram 4.16KVESFSvvltchgear Bus 142 Feed to48OV Auxiliary Transformer 2S2X-AC81425X 188 Byron Drawing 6E-2-4O3OAP27 Rev. ], Schematic Diagram 4.1GKVESFSvvltchgeer Bus 242 Feed to4@OV Auxiliary Transformer 231X-ACB2415X 189 Byron Drawing 6E-2-4030AP36 Rev. G, Schematic Diagram 4.16KV ESF Switchgear Bus 242 Feed to48OVAuxiliary Page 000rm

15C0346-RPT-002, Rev. 0 Correspondence No.: RS-16-175 190 15C0346-CAL-001, Rev. 1, High Frequency Functional Confirmation and Fragility Evaluation of Relays 191 15C0346-RPT-001, Rev. 1, Selection of Relays and Switches for High Frequency Seismic Evaluation Page 33 of 75

I5CO346-R9T-002 Rev.O Correspondence No.: RS-16-175 Representative Sample Component Evaluations The following sannole calculation is extracted from Reference [190].

Notes/

l. Reference citations within the sample calculation are per Ref. [190] reference section shown on the following page.
2. This sample calculation contains evaluations of sample high-frequency sensitive components per the methodologies of both the EPRI high-frequency guidance [8] and the flexible coping strategies guidance document NB12-O6[l6].

Page o4ur,o

15C0346-RPT-002, Rev. 0 Correspondence No.: RS-16-175 S&A Calc. No.: 15CO346-CAL-001, Rev. 1 Sheet 32 of 44

Title:

High Frequency Functional Confirmation and Fragility Evaluation of Relays By: FG 10/5/2016 stevemw&Assoaa~s Check: MD 10/5/2016 6 REFERENCES

1. Codes, Guidance, and Standards 1.1. EPRI 3002004396, "High Frequency Program: Application Guidance for Functional Confirmation and Fragility Evaluation." July 2015.

1.2. EPRI 3002002997, "High Frequency Program: High Frequency Testing Summary."

September 2014.

1.3. EPRI NP-7147-SL, "Seismic Ruggedness of Relays", August 1991.

1.4. NEI 12-06, Appendix H, Rev. 2, "Diverse and Flexible Coping Strategies (FLEX) Implementation Guide."

1.5. EPRI NP-5223-SL, Rev. 1, "Generic Seismic Ruggedness of Power Plant Equipment."

Nuclear Regulatory Commission Documents 2.1. Byron Seismic Hazard and Screening Report, Rev. 0, NRC Docket No. STN 50-454 and STN 50-455, Correspondence No. RS-14-065.

3. Station Documents 3.1. BYRON-UFSAR, Rev. 14 3.2. Calculation BYR08-091, Rev. 0, "Review of Engine Systems, Inc. (ESI) Seismic Qualification Report No. ES-SR-08-106, Revision 0, For a Replacement Speed Circuit for the Auxiliary Feedwater Diesel Driven Pump at Byron Station."

3.3. DC-ST-04-BB, Rev. 2, "Development of Seismic Subsystem (or Equipment) Design Criteria (Horizontal and Vertical) and Response Spectra."

3.4. Calculation SM-AF143, Rev. C, "Calcs. For Aux Feed Pump (2)1B Diesel Engine Oil Pressure Switch."

3.5. Calculation CQD-200156, Rev. 0, "Seismic Qualification of Westinghouse 7300 Series Process Control and Protection System, Spec. No. F/L-2812."

3.6. Calculation EMD-020714, Rev. 0, "Review of Seismic Qualification Report for the Aux.

Feedwater Diesel Drive and Control Panel (Safety-Related)."

3.7. Calculation BRW-05-0094-E, Rev. 1, "Seismic Qualification of ABB Protective Relays for the 480V, 4.16 kV and 6.9 kV Switchgear at Byron and Braidwood Stations. (WCAP-16451-P, Revision 01)."

3.8. Calculation 018815(EMD) (Wyle Report 44369-2), Rev. 0, "Review of Seismic Qualification for Engine/Generator Panel of Cooper Energy Services."

3.9. Calculation 012617 (CQD), Rev. 0, "Review of Seismic Test Reports for various Control Components."

3.10. Calculation CQD-012527, Rev. 0, "Seismic Simulation Test Program on a 130-VDC Battery Charger."

3.11. Calculation CQD-200164 (Wyle Report 47993-1), "Seismic Qualification Test Report for Battery Chargers, 0SX02EA-1 thru OSX02ED-1, 1,2AF01EA-1, 1,2AF01EB-1 (Model #32-50)."

3.12. Calculation CQD-007041, Rev. 0 & 1, "Seismic Qualification Review for HVAC Control Instrumentation."

3.13. Not Used 3.14. Calculation CQD-007999, Rev. 1, "Seismic Qualification of Westinghouse 480 Volt Switchgear (1&2AP10E, 1&2AP12E, 1&2AP98E, 1&2AP99E)."

Page 35 of 75

15CO346-RPT-002, Rev. 0 1-U1 f C5(JUf1UCfIGe IVU.: na-10-1/J S&A Calc. No.: 15C0346-CAL-001, Rev. 1 Sheet 33 of 44

Title:

High Frequency Functional Confirmation and Fragility Evaluation of Relays By: FG 10/5/2016 scion&Assodeues Check: MD 10/5/2016

4. Station Drawing 4.1. Drawing 6E-1-4031AF14, Rev. D, "Loop Schematic Diagram Aux. Feedwater Pump Suction Pressure Cab.1PA34J."

4.2. Drawing 6E-2-4031AF14, Rev. E, "Loop Schematic Diagram Aux. Feedwater Pump Suction Pressure Cab. 2PA34J."

4.3. Drawing 6E-1-4468, Rev. Y, "Elevation Auxiliary Feedwater Pump 1B Startup Panel 1AF01J."

4.4. Drawing 6E-2-4468, Rev. W, "Elevation Auxiliary Feedwater Pump 2B Startup Panel 2AF01J."

4.5. Drawing 6E-1-4234B, Rev. H, "Bill of Material & Nameplate 125V DC Battery Chargers 111 &

112 (1DC03E, 1DC04E)."

4.6. Drawing 6E-2-42346, Rev. H, "Bill of Material & Nameplate 125V DC Battery Chargers 211 &

212 (2DC03E, 2DC04E)."

4.7. Drawing 6E-1-4030VD07, Rev. L, "Schematic Diagram Diesel Generator Room 1A & 1B HVAC System Exhaust Fans 1A & 1B 1VD03CA & B."

4.8. Drawing 6E-2-4030VD07, Rev. L, "Schematic Diagram Diesel Generator Room 2A & 2B HVAC System Exhaust Fans 2A & 2B 2VD03CA & B."

4.9. Drawing 6E-1-4468, Rev. Y, "Elevation Auxiliary Feedwater Pump 1B Startup Panel 1AF01J."

4.10. Drawing 6E-2-4468, Rev. W, "Elevation Auxiliary Feedwater Pump 2B Startup Panel 2AF01J."

5. S&A Documents 5.1. 15C0346-RPT-001, Rev. 1, "Selection of Relays and Switches for High Frequency Seismic Evaluation."
6. Miscellaneous Documents 6.1. Test Report ES-1000, "Nuclear Environmental Qualification Test Report On Agastat E7000 Series Timing Relays." (See Attachment E) 6.2. Report 60967, Rev. 0, "Nuclear Environmental Qualification Report for a Microswitch, P/N BZLN-LH." (See Attachment H) 6.3. Solon Manufacturing Company Catalog, "Model Series 7PS Pressure Switch Diaphragm Sensing Element." (See Attachment J) 6.4. Ashcroft Data Sheet, "B Series Switches Pressure, Differential Pressure & Hydraulics." (See Attachment K) 6.5. Report S9025.0, Rev. 2, "Seismic Test Report for Parker Regulator & Gauge, Durabla Check Valve and Square D Pressure Switch." (See Attachment M)

Page 36 of 75

15C0346-RPT-002, Rev. 0 ndence No.: K5-1b-1/5 S&A Calc. No.: 15C0346-CAL-001, Rev. 1 Sheet 34 of 44

Title:

High Frequency Functional Confirmation and Fragility Evaluation of Relays BY: FG 10/5/2016 Steven&Assodaoes rmo Check: MD 10/5/2016 7 INPUTS Inputs are provided as necessary within Section 8 of this calculation.

Page 37 of 75

15C0346-RPT-002, Rev. 0 I-UI I ebpuf luume IVU.: Ma-.Lo-.L/Z)

S&A Calc. No.: 15C0346-CAL-001, Rev. 1 Sheet 35 of 44

Title:

High Frequency Functional Confirmation and t

Fragility Evaluation of Relays By: FG 10/5/2016 sbevemn&Assodabes Check: MD 10/5/2016 8 ANALYSIS 8.1 Equipment Scope The list of essential relays at BYR is per Ref. 5.1 and can be found in Section 1, Table 1.1 of this calculation.

Page 38 of 75

15C0346-RPT-002, Rev. 0

~.urrespunuence ivu.: KJld-1 /J S&A Calc. No.: 15C0346-CAL-001, Rev. 1 Sheet 36 of 44

Title:

High Frequency Functional Confirmation and Fragility Evaluation of Relays BY: FG 10/5/2016 srewrwm&Asso<<a~s Check: MD 10/5/2016 8 ANALYSIS (cont'd) 8.2 High-Frequency Seismic Demand Calculate the high-frequency seismic demand on the relays per the methodology from Ref. 1.1.

Sample calculation for the high-frequency seismic demand of relay components 1AF011-K4 and 1AF01J-K10 is presented below. A table that calculates the high-frequency seismic demand fur all of the subject relays listed in Section 1, Table 1.1 of this calculation is provided in Attachment A of this calculation.

8.2.1 Horizontal Seismic Demand The horizontal site-specific GMRS for Byron Nuclear Generating Station (BYR) is per Ref. 2.1. GMRS data can be found in Attachment B of this calculation. A plot of GMRS can be found in Attachment C of this calculation.

Determine the peak acceleration of the horizontal GMRS between 15 Hz and 40 Hz.

Peak acceleration of horizontal GMRS 0.5148 (at 20 Hz)

SAGMRS between 15 Hz and 40 Hz (Ref. 2.1; see Attachment B of this calculation):

Calculate the horizontal in-structure amplification factor based on the distance between the plant foundation elevation and the subject floor elevation.

Grade Elevation (Ref. 3.1): 400ft ELgrade Per Ref. 3.1, Table 3.7-3, the embedment depth of the foundation varies between 0' to 70'. Conservatively use 70' as the Auxiliary Building embedment depth.

Auxiliary Building Embedment Depth embedab := 70ft (Ref. 3.1, Table 3.7-3)

El found.ab ELgrade' embed ab = 330.00-ft Foundation Elevation (Auxiliary Building):

Relay floor elevation (Table 1.1) 383ft ELrelay Relay components 1AF01J-K4 and 1AF01J-K10 are both located in the Auxiliary Building at elevation 383'-0".

Distance between relay floor and foundation: h relay ELrelay Elfound.ab = 53.00*ft Page 39 of 75

15C0346-RPT-002, Rev. 0 correspondence No.: K5-1b-175 S&A Calc. No.: 15CO346-CAL-001, Rev. 1 Sheet 37 of 44

Title:

High Frequency Functional Confirmation and Fragility Evaluation of Relays By: FG 10/5/2016 Stmrwn&Asoaates Check: MD 10/5/2016 8 ANALYSIS (cont'd) 8.2 High-Frequency Seismic Demand (cont'd) 8.2.1 Horizontal Seismic Demand (cont'd)

Work the distance between the relay floor and foundation with Ref. 1.1, Fig. 4-3 to calculate the horizontal in-structure amplification factor.

2.1-1.2 1 Slope of amplification factor line, mh :_ = 0.0225. 1 Oft < hrelay < 40ft 40ft Oft ft Intercept of amplification factor line: bh := 1.2 Horizontal in-structure amplification factor:

A FSH (hrelay) (mh - hrelay + bh) if hrelay < 40ft 2.1 otherwise AFSH(hrelay) = 2.10 Calculate the horizontal in-cabinet amplification factor based on the type of cabinet that contains the subject relay.

Type of cabinet (per Table 1.1) cab := "Control Cabinet" (enter "MCC", "Switchgear", "Control Cabinet", or "Rigid"):

Horizontal in-cabinet amplification factor AFc h (cab) := 3.6 if cab= "MCC" (Ref. 1.1, p. 4-13):

7.2 if cab = "Switchgear" 4.5 if cab = "Control Cabinet" 1.0 if cab= "Rigid" AFc h (cab) = 4.5 Multiplythe peak horizontal GMRS acceleration bythe horizontal in-structure and in-cabinet amplification factors to determine the in-cabinet response spectrum demand on the relays.

Horizontal in-cabinet response spectrum (Ref. 1.1, p. 4-12, Eq. 4-1a and p. 4-15, Eq. 4-4):

ICRSc.h AFSH(hrelay)-AFc.h (cab) -SAGMRS = 4.857-g Note that the horizontal seismic demand is same for both relay components 1AF01J-K4 and 1AF01J-K10.

Page 40 of 75

15CO346-RPT-002, Rev. 0

%_U1 I t-:)PUI lut-1 mu IVU.: na-J.U-JL / J S&A Calc. No.: 15C0346-CAL-001, Rev. 1 Sheet 38 of 44

Title:

High Frequency Functional Confirmation and FFragility Evaluation of Relays By: FG 10/5/2016 stewnw~&A%oc m Check: MD 10/5/2016 8 ANALYSIS (cont'd) 8.2 High-Frequency Seismic Demand (cont'd) 8.2.2 Vertical Seismic Demand Determine the peak acceleration of the horizontal GMRS between 15 Hz and 40 Hz.

Peak acceleration of horizontal GMRS SAGMRS = 0.514*g (at 20 Hz) between 15 Hz and 40 Hz (see Sect. 8.2.1 of this calculation)

Obtain the peak ground acceleration (PGA) of the horizontal GMRS from Ref. 2.1 (see Attachment B of this calculation).

PGAGMRS 0.270g Calculate the shear wave velocity traveling from a depth of 30m to the surface of the site (Vs30) from Ref. 1.1, p. 3-5 and Attachment D.

(30m)

Shear Wave Velocity: Vs30 di E

Vsi where, di: Thickness of the layer (ft)

Vsi: Shear wave velocity of the layer (ft/s)

Per Attachment D, the sum of thickness of the layer over shear wave velocity of the layer is 0.0313 sec.

30m ft Shear Wave Velocity: Vs30 := 0.0313sec = 3145-sec Page 41 of 75

15C0346-RPT-002, Rev. 0 wrrespunuence ivo.: KJ-lt~-1 /J S&A Calc. No.: 15C0346-CAL-001, Rev. 1 Sheet 39 of 44

Title:

High Frequency Functional Confirmation and Fragility Evaluation of Relays By: FG 10/5/2016 Stevenson&tsaocbtPs Check: MD 10/5/2016 8 ANALYSIS (cont'd) 8.2 High-Frequency Seismic Demand (cont'd) 8.2.2 Vertical Seismic Demand (cont'd)

Work the PGA and shear wave velocity with Ref. 1.1, Table 3-1 to determine the soil class of the site. Based on the PGA of 0.2708 and shear wave velocity of 3145ft/sec at BYR, the site soil class is conservatively taken as C-Hard.

Work the site soil class with Ref. 1.1, Table 3-2 to determine the mean vertical vs. horizontal GMRS ratios (V/H) at each spectral frequency. Multiplythe V/H ratio at each frequency between 15Hz and 40Hz by the corresponding horizontal GMRS acceleration at each frequency between 15Hz and 40Hz to calculate the vertical GMRS.

See Attachment B for a table that calculates the vertical GMRS (equal to (V/H) x horizontal GMRS) between 15Hz and 40Hz.

Determine the peak acceleration of the vertical GMRS (SAvcMRs) between frequencies of 15Hz and 40Hz. (By inspection of Attachment B, the peak SAvGMRS occurs at 35Hz.)

V/H ratio at 35Hz VH := 0.82 (See Attachment B of this calculation):

Horizontal GMRS at frequency of peak HGMRS := 0.467g vertical GMRS (at 35Hz)

(See Attachment B of this calculation):

Peak acceleration of vertical GMRS between SAVGMRS VH-HGMRS = 0.383-g (at 35 Hz) 15 Hz and 40 Hz:

A plot of horizontal and vertical GMRS is provided in Attachment C of this calculation.

Page 42 of 75

15C0346-RPT-002, Rev. 0 k-vrrespunuence NO.: K")-.LD-1 /o S&A Calc. No.: 15CO346-CAL-001, Rev. 1 Sheet 40 of 44

Title:

High Frequency Functional Confirmation and Fragility Evaluation of Relays By: FG 10/5/2016 sbmnsw&assodaces Check: MD 10/5/2016 8 ANALYSIS (cont'd) 8.2 High-Frequency Seismic Demand (cont'd) 8.2.2 Vertical Seismic Demand (cont'd)

Calculate the vertical in-structure amplification factor based on the distance between the plant foundation elevation and the subject floor elevation.

Distance between relay floor and foundation h relay = 53.00-ft (see Sect. 8.2.1 of this calculation):

Work the distance between the relay floor a nd foundation with Ref. 1.1, Fig. 4-4 to calculate the vertical in-structure amplification factor.

2.7-1.0 1 Slope of amplification factor line: my 0.017 100ft Oft ft Intercept of amplification factor line by .= 1.0 Vertical in-structure amplification factor: AFSV mv' hrelay + by = 1.901 The sample relay components 1AF01J-K4 and 1AF01J-K10 are mounted within host 1AF01J. Therefore, the vertical in-cabinet amplification for sample relay components is 4.7 per Ref. 1.1, Eq. 4-3.

Vertical in-cabinet amplification factor: AFc v := 4.7 Multiplythe peakvertical GMRS acceleration bythe vertical in-structure and in-cabinet amplification factors to determine the in-cabinet response spectrum demand on the relay.

Vertical in-cabinet response spectrum (Ref. 1.1, p. 4-12, Eq. 4-1b and p. 4-15, Eq. 4-4):

ICRSc.v := AFSV' AFc.v.SAVGMRS = 3.421*g Note that the vertical seismic demand is same for both relay components 1AF01J-K4 a nd 1AF01J-K10.

Page 43 of 75

15C0346-RPT-002, Rev. 0 Correspondence No.: RS-16-175 S&A Calc. No.: 15C0346-CAL-001, Rev. 1 Sheet 41 of 44

Title:

High Frequency Functional Confirmation and Fragility Evaluation of Relays By: FG 10/5/2016 stmeru<<,&Assoaat~

Check: MD 10/5/2016 8 ANALYSIS (cont'd) 8.3 High-Frequency Seismic Capacity for Ref. 1.1 Relays A sample calculation for the high-frequency seismic capacity of 1AF01J-K4 and 1AF011-K10 relay components are presented here. A table that calculates the high-frequency seismic capacities for all of the Ref. 1.1 subject relays listed in Section 1, Table 1.1 of this ca Icu lation is provided in Attachment A of this calculation.

8.3.1 Seismic Test Capacity The high frequency seismic capacity of a relay can be determined from the Ref. 1.2 high-frequency testing program or other broad banded low frequency capacity data such as the Generic Equipment Ruggedness Spectra (GERS). Per Ref. 1.1, Sect. 4.5.2, a conservative estimate of the high-frequency (i.e., 20Hz to 40Hz) capacity can be made by extending the low frequency GERS capacity into the high frequency range to a roll off frequency of about 40Hz. Therefore, if the high frequency capacity was not available for a component, a SAT value equal to the GERS spectral acceleration from 4 to 16 Hz could be used.

For the relay component 1AF01J-K4 (Model #: E70120EL) and 1AF01J-K10 (Model #: KHS17D11), the GERS spectral acceleration from Ref. 1.3 is used as the seismic test capacity.

12.5 1AF01J-K4 (Ref. 1.3, Page B-8)

Seismic test capacity (SA*): SA' := g 10 ( 1AFO1J-K1O (Ref. 1.3, Page B-29) 8.3.2 Effective Spectral Test Capacity GERS spectral acceleration for the relay components 1AF01J-K4 and 1AF01J-K10 is used as the seismic test capacity.

Therefore for the relay components 1AF01J-K4 and 1AF01J-K10 there is no spectral acceleration increase.

SA'1(12.50) 1AF01J-K4 Effective spectral test capacity SAT SA' .

(Ref. 1.1, p. 4-16): 2 10.00 g ( IAFOIJ-KIO Page 44 of 75

15C0346-RPT-002, Rev. 0 Dui r cSNunuence ivu.: r<a-lo-1i:)

S&A Calc. No.: 15C0346-CAL-001, Rev. 1 Sheet 42 of 44

Title:

High Frequency Functional Confirmation and Fragility Evaluation of Relays By: FG 10/5/2016 stmem,&Assodates Check: MD 10/5/2016 8 ANALYSIS (cont'd) 8.3 High-Frequency Seismic Capacity for Ref. 1.1 Relays (cont'd) 8.3.3 Seismic Capacity Knockdown Factor Determine the seismic capacity knockdown factor for the subject relay based on the type of testing used to determine the seismic capacity of the relay.

The knockdown factor for relay components 1AF01J-K4 and 1AF01J-K10 is obtained per Ref. 1.1, Table 4-2.

1AF01J-K4 (Ref. 1.1, Table 4-2)

Seismic capacity knockdown factor: Fk :_ 1.50 (1.50 1AF01J-K10 (Ref. 1.1, Table 4-2) 8.3.4 Seismic Testing Single-Axis Correction Factor Determine the seismic testing single-axis correction factor of the subject relay, which is based on whether the equipment housing to which the relay is mounted has well-separated horizontal and vertical motion or not.

Per Ref. 1.1, pp. 4-17 to 4-18, relays mounted within cabinets that are bra ced, bolted together in a row, mounted to both floor and wall, etc. will have a correction factor of 1.00. Relays mounted within cabinets that are bolted only to the floor or otherwise not well-braced will have a correction factor of 1.2.

The sample relay components 1AF01J-K4 and 1AF01J-K10 are mounted within host 1AF01J. Per Ref. 1.1, pp. 4-18, conservatively take the FMS value as 1.0.

Single-axis correction factor FMS := 1.0 (Ref. 1. 1, pp. 4-17 to 4-18):

Page 45 of 75

15C0346-RPT-002, Rev. 0 wrrespunuence ivu.: KJ ld-1/J S&A Calc. No.: 15C0346-CAL-001, Rev. 1 Sheet 43 of 44

Title:

High Frequency Functional Confirmation and Fragility Evaluation of Relays By: FG 10/5/2016 scevenm&assodates Check: MD 10/5/2016 8 ANALYSIS (cont'd) 8.3 High-Frequency Seismic Capacity for Ref. 1.1 Relays (cont'd) 8.3.5 Effective Wide-Band Component Capacity Acceleration Calculate the effective wide-band component capacity acceleration of relay components 1AF01J-K4 and 1AF01J-K10 per Ref. 1.1, Eq. 4-5.

Effective wide-band component capacity SAT FMS(8.333).g 1AF01J-K4 TRS := Fk acceleration (Ref. 1.1, Eq. 4-5) 6.667 1AF01J-K10 8.4 High-Frequency Seismic Capacity for Ref. 1.4, Appendix H Relays 8.4.1 Effective Wide-Band Component CapacitvAcceleration Per a review of the capacity generation methodologies of Ref. 1.1 and Ref. 1.4, App. H, Section H.5, the capacity of a Ref. 1.4 relay is equal to the Ref. 1.1 effective wide-band component capacity multiplied by a factor accounting for the difference between a 1% probabilkyof failure (CI%, Ref. 1.1) and a 10% probability of failure (CIO%, Ref. 1.4).

Per Ref. 1.4, App. H, Table H.1, use the C1O% vs. C1% ratio from the Realistic Lower Bound Case for relays.

CIO% vs. C1% ratio C10 := 1.36 Effective wide-band component capacity 11.333 1AF01J-K4 TRS1 4 := TRS-C10 = g acceleration (Ref. 1.4, App. H, Sect. H.5) (9.067 (1AFO1J-K1O)

Page 46 of 75

1SC0346-RPT-002, Rev. 0

%_U1 1 CbpulluulILU INU.: Ra-10-J. /J S&A Calc. No.: 15C0346-CAL-001, Rev. 1 Sheet 44 of 44

Title:

High Frequency Functional Confirmation and Fragility Evaluation of Relays By: FG 10/5/2016 sbmnsw&Assoaaces Check: MD 10/5/2016 8 ANALYSIS (cont'd) 8.5 Relay (Ref. 11) High-Frequency Margin Calculate the high-frequency seismic margin for Ref. 1.1 relays per Ref. 1.1, Eq. 4-6.

A sample calculation for the high-frequency seismic demand of relay components 1AF01J-K4 and 1AF01J-K10 is presented here. A table that calculates the high-frequency seismic margin for all of the subject relays listed in Section 1, Table 1.1 of this calculation is provided in Attachment A of this calculation.

TRS (1.716) > 1.0, O.K. 1AF01J-K4 Horizontal seismic margin (Ref. 1.1, Eq. 4-6):

ICRSc h 1.373 > 1.0, O.K. 1AF01J-K10 TRS = (2.436) > 1.0, O.K. 1AF01J-K4 Vertical seismic margin (Ref. 1.1, Eq. 4-6):

ICRSc v 1.948 > 1. 0, O.K. 1AF01J-K10 Both the horizontal and vertical seismic margins for the relay components 1AF01J-K4 and 1AF01J-K10 are greater than 1.00. The sample relays are adequate for high frequency seismic spectral ground motion. The sample relays are adequate for high-frequency seismic spectral ground motion for their Ref. 1.1 functions.

8.6 Relay (Ref. 1.4)Hgh-Frequency Margin Calculate the high-frequency seismic margin for Ref. 1.4 relays per Ref. 1.1, Eq. 4-6.

A sample calculation for the high-frequency seismic demand of relay components 1AF01J-K4 and 1AF01J-K10 is presented here. A table that calculates the high-frequency seismic margin for all of the subject relays listed in Section 1, Table 1.1 of this calculation is provided in Attachment A of this calculation.

TRS1.4 2.333 > 1.0, O.K. 1AF01J-K4 Horizontal seismic margin (Ref. 1.1, Eq. 4-6):

ICRSc h 1.867 > 1.0, O.K. 1AF01J-K10 TRS1.4 r3.312 > 1. 0, O.K. 1AF01J-K4 Vertical seismic margin (Ref. 1. 1, Eq. 4-6):

ICRSc v 2.650 > 1. 0, O.K. 1AF01J-K10 Both the horizontal and vertical seismic margins for the relay components 1AF01J-K4 and 1AF01J-K10 are greater than 1.00. The sample relays are adequate for high frequency seismic spectral ground motion fur their Ref. 1.4 functions.

Page 47 of 75

15C0346-RPT-002, Rev. 0 Correspondence No.: RS-16-175 B Components Identified for High Frequency Confirmation Table B-1: Components Identified for High Frequency Confirmation Component Enclosure Floor Component Evaluation No. Unit Building Elev.

Basis for Evaluation ID Type System Function Manufacturer Model No. ID Type (ft) Capacity Result Core Low Lube Oil Potter Control Auxiliary 1 1 1AF01J-K10 Control Relay KHS-17D11 1AF01J 383 GERS Cap > Dem Cooling Pressure Relay Brumfield Cabinet Building Core Low Oil Pressure Control Auxiliary EPRI HF 2 1 1AF01J-K11 Control Relay Agastat 7022OC 1AF01J 383 Cap > Dem Cooling Time Delay Relay Cabinet Building Test Core OvercrankTimer Control Auxiliary 3 1 1AF01J-K4 Control Relay Agastat E7012OEL004 1AF01J 383 GERS Cap > Dem Cooling Relay Cabinet Building Core Potter KHS-17D11- Control Auxiliary 4 1 1AF01J-K7 Control Relay Overcrank relay 1AF01J 383 GERS Cap > Dem Cooling Brumfield 24VDC Cabinet Building Core High water Potter KHS-17D11- Control Auxiliary 5 1 1AFO1J-K8 Control Relay 1AF01J 383 GERS Cap > Dem Cooling temperature relay Brumfield 24VDC Cabinet Building Core Potter KHS-17D11- Control Auxiliary 6 1 1AF01J-K9 Control Relay Overspeed relay 1AF01J 383 GERS Cap> Dem Cooling Brumfield 24VDC Cabinet Building iSS-AF8002 Process Core Control Auxiliary BYR 7 1 Speed switch Dynalco SST-2400A 1AF01J 383 Cap> Dem "S1" Switch Cooling Cabinet Building Report United F400-6BS-High water Cap >Dem 1TSH-AF147 Process Core Electric 20S-20S Control Auxiliary BYR 8 1 temperature 1AFO1PB 383 "S10" Switch Cooling Cabinet Building Report switch Square D 9025-BCW-32 Cap > Dem AC/DC 486-1413 @ Power Circuit Breaker Type WL Auxiliary 9 Control Relay Westinghouse 1APOSE Switchgear 426 GERS Cap > Dem 1 1AP05EF Support Lockout Relay 656A830G01 Building System Page 48 of 75

15CO346-RPT-002, Rev. 0 Correspondence No.: RS-16-175 Table B-1: Components Identified for High Frequency Confirmation Component Enclosure Floor Component Evaluation No. Unit Building Elev.

Basis for Evaluation ID Type System Function Manufacturer Model No. ID Type {fij Capacity Result AC/DC Type WL Westinghouse Cap > Dem 486-1412 @ Power Circuit Breaker 5 1A81 GOl Auxiliary 10 1 Control Relay 1APOSE Switchgear 426 GERS 1AP05ER Support Lockout Relay Building Electroswitch 793A389G01F Cap > Dem System AC/DC PR30A-451 Protective Power Phase A CO-7 Auxiliary BYR 11 1 Westinghouse 1AP05E Switchgear 426 Cap > Dem

@ 1APO5ER Relay Support Overcurrent Relay 1456COSA09 Building Report System AC/DC PR30C-451 Protective Power Phase C CO-7 Auxiliary BYR 12 1 Westinghouse 1AP05E Switchgear 426 Cap > Dem

@ 1APOSER Relay Support Overcurrent Relay 1456COSA09 Building Report System AC/DC PR31-451N Protective Power Ground Fault CO-66 Auxiliary BYR 13 1 Westinghouse 1AP05E Switchgear 426 Cap > Dem

@ 1APO5ER Relay Support Relay 1456COSA16 Building Report System AC/DC Type WL Westinghouse Cap> Dem 486-1414X Power Circuit Breaker SO1A817GO1 Auxiliary 14 1 Control Relay 1AP05E Switchgear 426 GERS

@ 1AP05EP Support Lockout Relay Building Electroswitch 793A389G01F Cap > Dem System AC/DC PR27A-451 Protective Power Phase A CO-7 Auxiliary BYR 15 1 Westinghouse 1APOSE Switchgear 426 Cap > Dem

@ 1AP05EP Relay Support Overcurrent Relay 1456C05A09 Building Report System AC/DC PR27C-451 Protective Power Phase C CO-7 Auxiliary BYR 16 1 Westinghouse 1APOSE Switchgear 426 Cap > Dem

@ 1AP05EP Relay Support Overcurrent Relay 1456C05A09 Building Report System AC/DC PR28-451N Protective Power Ground Fault CO-6 Auxiliary BYR 17 1 Westinghouse 1APOSE Switchgear 426 Cap > Dem

@ 1AP05EP Relay Support Relay 1456C05A16 Building Report System AC/DC 62CL @ Power Cranking Limit Control Auxiliary BYR 18 1 Control Relay TWO E7012PDLO04 1PL07J 401 Cap > Dem 1PL07J Support Time Delay Relay Cabinet Building Report System AC/DC EGPDR-Incomplete Agastat Cap >Dem 48 @ Power C2017-004 Control Auxiliary BYR 19 1 Control Relay Starting Sequence 1PL07J 401 1PL07J Support Cabinet Building Report Relay Agastat GPDR-C740 Cap > Dem System Page 49 of 75

15C0346-RPT-002, Rev. 0 Correspondence No.: RS-16-175 Table 13-1: Components Identified for High Frequency Confirmation Component Enclosure Floor Component Evaluation No. Unit Building Elev.

Basis for Evaluation ID Type System Function Manufacturer Model No. ID Type (ft) Capacity Result AC/DC EGPDR-Agastat Cap > Dem 86E @ Power Engine Shutdown C2017-004 Control Auxiliary BYR 20 1 Control Relay - 1PL07J 401 1PL07J Support Relay Cabinet Building Report Agastat GPDR-C740 Cap> Dem System AC/DC Engine Lube Oil EGPDR-Agastat Cap> Dem 63QELX @ Power Low Pressure C2017-004 Control Auxiliary BYR 21 1 Control Relay 1PL07J 401 IPL07J Support Shutdown Cabinet Building Report Agastat GPDR-C740 Cap> Dem System Repeater Relay AC/DC Turbo Low Lube EGPDR-Agastat Cap > Dem 63QTLX @ Power Oil Pressure C2017-004 Control Auxiliary BYR 22 1 Control Relay 1PL07J 401 1PL07J Support Shutdown Cabinet Building Report Agastat GPDR-C740 Cap > Dem System Repeater Relay Main and EGPDR-Agastat Cap > Dem AC/DC Connecting Rod C2017-004 26MBHTX Power High Bearing Control Auxiliary BYR 23 1 Control Relay 1PL07J 401

@ 1PL07J Support Temperature Cabinet Building Report Agastat GPDR-C740 Cap > Dem System Shutdown Repeater Relay AC/DC Turbo Thrust EGPDR-Agastat Cap > Dem 38TBFX @ Power Bearing Failure C2017-004 Control Auxiliary BYR 24 1 Control Relay 1PL07J 401 IPL07J Support Shutdown Cabinet Building Report Agastat GPDR-C740 Cap > Dem System Repeater Relay AC/DC Jacket Water High EGPDR-Agastat Cap > Dem 26JWSX @ Power Temperature C2017-004 Control Auxiliary BYR 25 1 Control Relay 1PL071 401 1PL07J Support Shutdown Cabinet Building Report Agastat GPDR-C740 Cap > Dem System Repeater Relay AC/DC EGPDR-Crankcase High Agastat Cap > Dem 63CX @ Power C2017-004 Control Auxiliary BYR 26 1 Control Relay Pressure Repeater IPL07J 401 1PL07J Support Cabinet Building Report Relay Agastat GPDR-C740 Cap > Dem System AC/DC EGPDR-Agastat Cap > Dem 86G @ Power Generator C2017-004 Control Auxiliary BYR 27 1 Control Relay 1PL07J 401 IPL07J Support Shutdown Relay Cabinet Building Report Agastat GPDR-C740 Cap > Dem System AC/DC EGPDR-Agastat Cap > Dem 51X @ Protective Power Generator C2017-004 Control Auxiliary BYR 28 1 1PL07J 401 1PL07J Relay Support Overcurrent Relay Cabinet Building Report Agastat GPDR-C740 Cap > Dem System Page 50 of 75

15CO346-RPT-002, Rev. 0 Correspondence No.: RS-16-175 Table B-1: Components Identified for High Frequency Confirmation Component Enclosure Floor Component Evaluation No. Unit Building Elev.

{ft~ Basis for Evaluation ID Type System Function Manufacturer Model No. ID Type Capacity Result AC/DC EGPDR-GeneratorNeutral Agastat Cap > Dem 59GX @ Power C2017-004 Control Auxiliary BYR 29 1 Control Relay Ground Voltage 1PL07J 401 1PL07J Support Cabinet Building Report Auxiliary Relay Agastat GPDR-C740 Cap > Dem System AC/DC Loss of Field EGPDR-Agastat Cap > Dem 40X @ Power Auxiliary Relay C2017-004 Control Auxiliary BYR 30 1 Control Relay 1PL07J 401 1PL07J Support Loss of Field Cabinet Building Report Agastat GPDR-C740 Cap > Dem System Auxiliary Relay AC/DC EGPDR-Agastat Cap > Dem 32X @ Power Reverse Power C2017-004 Control Auxiliary BYR 31 1 Control Relay 1PL07J 401 IPL07J Support Auxiliary Relay Cabinet Building Report Agastat GPDR-C740 Cap> Dem System AC/DC EGPDR-Agastat Cap > Dem 81UX @ Power Under Frequency C2017-004 Control Auxiliary BYR 32 1 Control Relay 1PL07J 401 1PL07J Support Auxiliary Relay Cabinet Building Report Agastat GPDR-C740 Cap > Dem System AC/DC Generator EGPDR-Agastat Cap > Dem 87G1X @ Power Differential C2017-004 Control Auxiliary BYR 33 1 Control Relay 1PL071 401 1PL07J Support Shutdown Cabinet Building Report Agastat GPDR-C740 Cap > Dem System Repeater Relay AC/DC Generator EGPDR-Agastat Cap > Dem 87G2X @ Power Differential C2017-004 Control Auxiliary BYR 34 1 Control Relay 1PL07J 401 1PL07J Support Shutdown Cabinet Building Report Agastat GPDR-C740 Cap > Dem System Repeater Relay AC/DC EGPDR-Agastat Cap > Dem 12X1 @ Power Engine Overspeed C2017-004 Control Auxiliary BYR 35 1 Control Relay 1PL07J 401 1PL07J Support Shutdown Relay Cabinet Building Report Agastat GPDR-C740 Cap> Dem System AC/DC EGPDR-Agastat Cap> Dem 12X2 @ Power Engine Overspeed C2017-004 Control Auxiliary BYR 36 1 Control Relay 1PL07J 401 1PL07J Support Shutdown Relay Cabinet Building Report Agastat GPDR-C740 Cap > Dem System AC/DC EGPDR-Agastat Cap > Dem 8652 @ Power Unit Shutdown C2017-004 Control Auxiliary BYR 37 1 Control Relay 1PL07J 401 1PL07J Support Relay Cabinet Building Report Agastat GPDR-C740 Cap > Dem System Page 51 of 75

15CO346-RPT-002, Rev. 0 Correspondence No.: RS-16-175 Table B-1: Components Identified for High Frequency Confirmation Component Enclosure Floor Component Evaluation No. Unit Building Elev. Evaluation Basis for ID Type System Function Manufacturer Model No. ID Type (ft) Result Capacity AC/DC 1Ps- Process Power Engine Overspeed 9012-GAW- Diesel Auxiliary BYR 38 1 Square D 24 1DG01KA 401 Cap > Dem DG108A Switch Support Switch Generator Building Report System AC/DC 1PS- Process Power Engine Overspeed Control Auxiliary SQURTS 39 1 Honeywell BZLN-LH iPL07J 401 Cap > Dem DG251A Switch Support Switch Cabinet Building Report System AC/DC iPS- Process Power Engine Overspeed Control Auxiliary SQURTS 40 1 Honeywell BZLN-LH 1PL07J 401 Cap > Dem DG252-A Switch Support Switch Cabinet Building Report System AC/DC Medium DG1A Circuit EPRI HF 52 @ Power Auxiliary Cap> Dem 41 1 Circuit Breaker (ACB Westinghouse 50 DHP 350 1AP05E Switchgear 426 1APOSEF Support Building Test Breaker 1413)

System AC/DC Transformer 131X Medium Auxiliary EPRI HF 52 @ Power Primary Circuit 426 Cap > Dem 42 1 Circuit Westinghouse 50 DHP 350 1APOSE Switchgear lAPOSEU Support Breaker (ACB Building Test Breaker System 1415X)

AC/DC Medium EPRI HF Power ESW Pump 1A Auxiliary 43 1 52 @ Circuit Westinghouse 50 DHP 350 1AP06E Switchgear 426 Cap > Dem 1APOSEB Support Circuit Breaker Building Test Breaker System AC/DC MCC 131X1 52 @ Low Circuit Power Auxiliary BYR 44 1 Feeder Circuit Westinghouse DS 206 1AP10E Switchgear 426 Cap > Dem 1AP10EF Breaker Support Building Report Breaker System AC/DC DG Room Vent BYR 52 @ Low Circuit Power Auxiliary 45 1 Fan 1A Circuit Westinghouse DS 206 1AP10E Switchgear 426 Cap > Dem 1AP10EJ Breaker Support Building Report Breaker System AC/DC Battery Charger 52 @ Low Circuit Power Auxiliary BYR 46 1 111 Circuit Westinghouse DS 206 1AP10E Switchgear 426 Cap > Dem 1AP10EL Breaker Support Building Report Breaker System AC/DC MCC 131X3 52 @ Low Circuit Power Auxiliary BYR 47 1 Feeder Circuit Westinghouse DS 206 1AP10E Switchgear 426 Cap > Dem 1AP10EQ Breaker Support Building Report Breaker System Page 52 of 75

15CO346-RPT-002, Rev. 0 Correspondence No.: RS-16-175 Table B-1: Components Identified for High Frequency Confirmation Component Enclosure Floor Component Evaluation No. Unit Building Elev.

Basis for Evaluation ID Type System Function Manufacturer Model No. 1D Type (ft) Capacity Result AC/DC 486-1415X Power Circuit Breaker Type WL Auxiliary 48 1 Control Relay Westinghouse 1APOSE Switchgear 426 GERS Cap > Dem

@ 1AP05EU Support Lockout Relay 503A804G01 Building System AC/DC PR37A- Westinghouse CO-9A Cap >Dem Protective Power Phase A Auxiliary BYR 49 1 450/451 @ 1APOSE Switchgear 426 Relay Support Overcurrent Relay Building Report 1AP05EU Westinghouse 1456C0SA05 Cap > Dem System AC/DC PR37B- Westinghouse CO-9A Cap > Dem Protective Power Phase B Auxiliary BYR 50 1 450/451 @ -- 1APOSE Switchgear 426 Relay Support Overcurrent Relay Building Report 1APOSEU Westinghouse 1456C0SA0S Cap > Dem System AC/DC PR37C- Westinghouse CO-9A Cap > Dem Protective Power Phase C Auxiliary BYR 51 1 450/451 @ 1APOSE Switchgear 426 Relay Support Overcurrent Relay Building Report 1AP05EU Westinghouse 1456COSA05 Cap > Dem System AC/DC Westinghouse SSC-T Cap > Dem PR38-450N Protective Power Neutral Auxiliary BYR 52 1 1APOSE Switchgear 426

@ 1APOSEU Relay Support Overcurrent Relay Building Report Westinghouse 1321D79A03 Cap > Dem System AC/DC Cap > Dem Westinghouse CO-6 PR1-351N Protective Power Ground Fault Auxiliary BYR 53 1 1AP10E Switchgear 426

@ 1AP10EA Relay Support Relay Building Report Westinghouse 1456COSA08 Cap > Dem System AC/DC Cap > Dem PR3A- Westinghouse CO-5A Protective Power Phase A Auxiliary BYR 54 1 450/451 @ 1APO5E Switchgear 426 Relay Support Overcurrent Relay Building Report 1AP05EB Westinghouse 1456COSA04 Cap > Dem System AC/DC Cap > Dem PR3C- Westinghouse CO-5A Protective Power Phase C Auxiliary BYR 55 1 450/451 @ 1APOSE Switchgear 426 Relay Support Overcurrent Relay Building Report 1AP05EB Westinghouse 1456C0SA04 Cap > Dem System AC/DC Cap > Dem Westinghouse SSC-T PR4-450N Protective Power Ground Fault Auxiliary BYR 56 1 1APOSE Switchgear 426

@ 1Ap05E6 Relay Support Relay Building Report Westinghouse 1321D79A03 Cap > Dem System AC/DC Low Suction SX1AX @ Protective Power Auxiliary 57 1 Pressure Time Tyco E7012PD004 1AP05E Switchgear 426 GERS Cap > Dem 1AP05E6 Relay Support Building Delay Relay System Page 53 of 75

15C0346-RPT-002, Rev. 0 Correspondence No.: RS-16-175 Table B-1: Components Identified for High Frequency Confirmation Component Enclosure Floor Component Evaluation No. Unit Building Elev.

Basis for Evaluation ID Type System Function Manufacturer Model No. ID Type (ft)

Capacity Result AC/DC High DG 1A Diesel 1PDS- Process Power Auxiliary 58 1 Exhaust Fan 1A Solon 7PS/7P2A 1VD03CA Generator 401 GERS Cap > Dem VD103 Switch Support Budding Delta Pressure Vent Fan System AC/DC 1DC03E- Protective Power Battery Auxiliary BYR 59 1 Overvoltage Relay N/A N/A 1DC03E 451 Cap > Dem DSH-K1 Relay Support Charger Building Report System AC/DC 486-1423 @ Power Circuit Breaker Type WL Auxiliary 60 1 Control Relay Westinghouse 1AP06E Switchgear 426 GERS Cap > Dem 1AP06EF Support Lockout Relay 656A830G01 Building System AC/D Type WL Westinghouse Cap > Dem 486-1422 @ Power Circuit Breaker 501A817G01 Auxiliary 61 1 Control Relay 1AP06E Switchgear 426 GERS 1AP06ES Support Lockout Relay Building Electroswitch 793A389GO1F Cap > Dem System AC/DC PR33A-451 Protective Power Phase A CO-7 Auxiliary BYR 62 1 Westinghouse 1AP06E Switchgear 426 Cap > Dem

@ 1AP06ES Relay Support Overcurrent Relay 1456COSA09 Building Report System AC/DC PR33C-451 Protective Power Phase C CO-7 Auxiliary BYR 63 1 Westinghouse 1AP06E Switchgear 426 Cap> Dem

@ 1AP06ES Relay Support Overcurrent Relay 1456COSA09 Building Report System AC/DC PR34-451N Protective Power Ground Fault SSC-T Auxiliary BYR 64 1 Westinghouse 1AP06E Switchgear 426 Cap > Dem

@ 1AP06ES Relay Support Relay 1321D79A02 Building Report System AC/D Type WL Westinghouse Cap > Dem 486-1424X Power Circuit Breaker 501A817G01 Auxiliary 65 1 Control Relay 1AP06E Switchgear 426 GERS

@ 1AP06EQ Support Lockout Relay Building Electroswitch 793A389GO1F Cap > Dem System AC/DC PR30A-451 Protective Power Phase A CO-7 Auxiliary BYR 66 1 Westinghouse 1AP06E Switchgear 426 Cap > Dem

@ 1AP06EQ Relay Support Overcurrent Relay 1456C05A09 Building Report System AC/DC PR30C-451 Protective Power Phase C CO -7 Auxiliary BYR 67 1 Westinghouse 1AP06E Switchgear 426 Cap > Dem

@ 1AP06EQ Relay Support Overcurrent Relay 1456CO5AO9 Building Report System Page 54 of 75

15CO346-RPT-002, Rev. 0 Correspondence No.: RS-16-175 Table B-1: Components Identified for High Frequency Confirmation Component Enclosure Floor Component Evaluation No. Unit Building Elev.

Basis for Evaluation ID Type System function Manufacturer Model No. ID Type (ft) Capacity Result AC/DC PR31-451N Protective Power Ground Fault CO-6 Auxiliary BYR 68 1 Westinghouse 1AP06E Switchgear 426 Cap > Dem

@ 1AP06EQ Relay Support Relay 1456C05A08 Building Report System AC/DC 62CL @ Power Cranking Limit Control Auxiliary BYR 69 1 Control Relay Tyco E7012PDL004 1PL08J 401 Cap > Dem 1PL08J Support Time Delay Relay Cabinet Building Report System AC/DC EGPDR-Incomplete Agastat Cap > Dem 48 @ Power C2017-004 Control Auxiliary BYR 70 1 Control Relay Starting Sequence 1PL08J 401 1PL08J Support Cabinet Building Report Relay Agastat GPDR-C740 Cap> Dem System AC/DC EGPDR-Agastat Cap > Dem 86E @ Power Engine Shutdown C2017-004 Control Auxiliary BYR 71 1 Control Relay 1PL08J 401 1PL08J Support Relay Cabinet Building Report Agastat GPDR-C740 Cap > Dem System AC/DC Engine Lube Oil EGPDR-Agastat Cap > Dem 63QELX @ Power Low Pressure C2017-004 Control Auxiliary BYR 72 1 Control Relay 1PL08J 401 IPL081 Support Shutdown Cabinet Building Report Agastat GPDR-C740 Cap > Dem System Repeater Relay AC/DC Turbo Low Lube EGPDR-Agastat Cap > Dem 63QTLX @ Power Oil Pressure C2017-004 Control Auxiliary BYR 73 1 Control Relay 1PL081 401 1PL08J Support Shutdown Cabinet Building Report Agastat GPDR-C740 Cap > Dem System Repeater Relay Main and EGPDR-Agastat Cap > Dem AC/DC Connecting Rod C2017-004 26MBHTX Power High Bearing Control Auxiliary BYR 74 1 Control Relay 1PL08J 401

@ 1PL08J Support Temperature Cabinet Building Report Agastat GPDR-C740 Cap > Dem System Shutdown Repeater Relay AC/DC Turbo Thrust EGPDR-Agastat Cap > Dem 38TBFX @ Power Bearing Failure C2017-004 Control Auxiliary BYR 75 1 Control Relay 1PL08J 401 1PL08J Support Shutdown Cabinet Building Report Agastat GPDR-C740 Cap > Dem System Repeater Relay AC/DC Jacket Water High EGPDR-g Agastat Cap > Dem 26JWSX @ Power Temperature C2017_004 Control Auxiliary BYR 76 1 Control Relay 1PL08J 401 1PL08J Support Shutdown Cabinet Building Report Agastat GPDR-C740 Cap > Dem System Repeater Relay Page 55 of 75

15C0346-RPT-002, Rev. 0 Correspondence No.: RS-16-175 Table B-1: Components Identified for High Frequency Confirmation Component Enclosure Floor Component Evaluation No. Unit Building Elev.

Basis for Evaluation ID Type System Function Manufacturer Model No. ID Type (ft) Capacity Result AC/DC EGPDR-Crankcase High Agastat Cap > Dem 63CX @ Power C2017-004

_ Control Auxiliary BYR 77 1 Control Relay Pressure Repeater 1PL08J 401 iPL08J Support Cabinet Building Report Relay Agastat GPDR-C740 Cap > Dem System AC/DC EGPDR-Agastat Cap > Dem 86G @ Power Generator C2017-004 Control Auxiliary BYR 78 1 Control Relay 1PL08J 401 1PL081 Support Shutdown Relay Cabinet Building Report Agastat GPDR-C740 Cap > Dem System AC/DC EGPDR-Agastat Cap > Dem 51X @ Protective Power Generator C2017-004 Control Auxiliary BYR 79 1 1PL08J 401 1PL08J Relay Support Overcurrent Relay Cabinet Building Report Agastat GPDR-C740 Cap > Dem System AC/DC EGPDR-GeneratorNeutral Agastat Cap > Dem 59GX @ Power C2017-004 Control Auxiliary BYR 80 1 Control Relay Ground Voltage 1PL08J 401 1PL08J Support Cabinet Building Report Auxiliary Relay Agastat GPDR-C740 Cap > Dem System AC/DC EGPDR-Agastat Cap > Dem 40X @ Power Loss of Field C2017-004 Control Auxiliary BYR 81 1 Control Relay 1PL08J 401 1PL08J Support Auxiliary Relay Cabinet Building Report Agastat GPDR-C740 Cap > Dem System AC/DC EGPDR-Agastat Cap > Dem 32X @ Power Reverse Power C2017-004 Control Auxiliary BYR 82 1 Control Relay 1PL08J 401 1PL08J Support Auxiliary Relay Cabinet Building Report Agastat GPDR-C740 Cap > Dem System AC/DC EGPDR-Agastat Cap > Dem 81UX @ Power Under Frequency C2017-004 Control Auxiliary BYR 83 1 Control Relay 1PL08J 401 IPL08J Support Auxiliary Relay Cabinet Building Report Agastat GPDR-C740 Cap > Dem System AC/DC Generator EGPDR-Agastat Cap > Dem 87G1X @ Power Differential C2017-004 BYR 84 1 Control Auxiliary Control Relay 1PL08J 401 iPL08J Support Shutdown Cabinet Building Report Agastat GPDR-C740 Cap> Dem System Repeater Relay AC/DC Generator EGPDR-Agastat Cap > Dem 87G2X @ Power Differential C2017-004 Control Auxiliary BYR 85 1 Control Relay iPL08J 401 1PL08J Support Shutdown Cabinet Building Report Agastat GPDR-C740 Cap > Dem System Repeater Relay Page 56 of 75

15CO346-RPT-002, Rev. 0 Correspondence No.: RS-16-175 Table B-1: Components Identified for High Frequency Confirmation Component Enclosure Floor Component Evaluation No. Unit Building Elev.

Basis for Evaluation ID Type System Function Manufacturer Model No. ID Type (ft) Capacity Result AC/DC EGPDR-Agastat Cap > Dem 12X1 @ Power Engine Overspeed C2017-004 Control Auxiliary BYR 86 1 Control Relay 1PL08J 401 1PL08J Support Shutdown Relay Cabinet Building Report Agastat GPDR-C740 Cap > Dem System AC/DC EGPDR-Agastat Cap > Dem 12X2 @ Power Engine Overspeed C2017-004 Control Auxiliary BYR 87 1 Control Relay 1PL08J 401 1PL08J Support Shutdown Relay Cabinet Building Report Agastat GPDR-C740 Cap > Dem System AC/DC EGPDR-Agastat Cap > Dem 8652 @ Power Unit Shutdown C2017-004 Control Auxiliary BYR 88 1 Control Relay 1PL08J 401 1PL08J Support Relay Cabinet Building Report Agastat GPDR-C740 Cap > Dem System AC/DC 1PS- Process Power Engine Overspeed 9012-GAW- Diesel Auxiliary BYR 89 1 Square D 24 1DG01KB 401 Cap > Dem DG108B Switch Support Switch Generator Building Report System AC/DC 1PS- Process Power Engine Overspeed Control Auxiliary SQURTS 90 1 Honeywell BZLN-LH 1PL08J 401 Cap > Dem DG251B Switch Support Switch Cabinet Building Report System AC/DC iPS- Process Power Engine Overspeed Control Auxiliary SQURTS 91 1 Honeywell BZLN-LH 1PL08J 401 Cap > Dem DG252B Switch Support Switch Cabinet Building Report System Medium AC/DC DG 1B Circuit 52 @ Voltage Power Auxiliary EPRI HF 92 1 Breaker (ACB Westinghouse 50 DHP 350 1AP06E Switchgear 426 Cap > Dem 1AP06EF Circuit Support Building Test 1423)

Breaker System Medium AC/DC Transformer 132-X 52 @ Voltage Power Primary Circuit Auxiliary EPRI HF 93 1 Westinghouse 50 DHP 350 1AP06E Switchgear 426 Cap > Dem 1AP06EP Circuit Support Breaker (ACB Building Test Breaker System 1425X)

Medium AC/DC 52 @ Voltage Power ESW Pump 16 Auxiliary EPRI HF 94 1 Westinghouse SO DHP 350 1AP06E Switchgear 426 Cap > Dem 1AP06EB Circuit Support Circuit Breaker Building Test Breaker System AC/DC Low Voltage MCC 132X3 Power Auxiliary BYR 95 1 52 @ Circuit Feeder Circuit Westinghouse DS 206 1AP12E Switchgear 426 Cap > Dem 1AP12EC Support Building Report Breaker Breaker System Page 57 of 75

15C0346-RPT-002, Rev. 0 Correspondence No.: RS-16-175 Table B-1: Components Identified for High Frequency Confirmation Component Enclosure Floor Component Evaluation No. Unit Building Elev.

Basis for Evaluation ID Type System Function Manufacturer Model No. ID Type (ft)

Capacity Result AC/DC Low Voltage MCC 132X1 Power Auxiliary BYR 96 1 52 @ Circuit Feeder Circuit Westinghouse DS 206 1AP12E Switchgear 426 Cap > Dem 1AP12EF Support Building Report Breaker Breaker System AC/DC Low Voltage MCC 132X2 Power Auxiliary BYR 97 1 52 @ Circuit Feeder Circuit Westinghouse DS 206 1AP12E Switchgear 426 Cap > Dem 1AP12EG Support Building Report Breaker Breaker System AC/DC Low Voltage DG Room Vent Power Auxiliary BYR 98 1 52 @ Circuit Fan 1B Circuit Westinghouse DS 206 1AP12E Switchgear 426 Cap > Dem 1AP12EJ Support Building Report Breaker Breaker System AC/DC Low Voltage Battery Charger Power Auxiliary BYR 99 1 52 @ Circuit 112 Circuit Westinghouse DS 206 1AP12E Switchgear 426 Cap > Dem 1AP12EL Support Building Report Breaker Breaker System AC/DC 486-1425X Power Circuit Breaker Type WL Auxiliary 100 1 Control Relay Westinghouse 1APO6E Switchgear 426 GERS Cap > Dem

@ 1AP06EP Support Lockout Relay 503A804G01 Building System AC/DC Cap > Dem PR28A- Westinghouse CO-9 Protective Power Phase A Auxiliary BYR 101 1 450/451 @ 1AP06E Switchgear 426 Relay Support Overcurrent Relay Building Report 1AP06EP Westinghouse 1456C05A05 Cap > Dem System AC/DC Cap > Dem PR28B- Westinghouse CO-9 Protective Power Phase B Auxiliary BYR 102 1 450/451 @ 1AP06E Switchgear 426 Relay Support Overcurrent Relay Building Report 1AP06EP Westinghouse 1456COSA05 Cap > Dem System AC/DC Cap > Dem PR28C- Westinghouse CO-9 Protective Power Phase C Auxiliary BYR 103 1 450/451 @ 1AP06E Switchgear 426 Relay Support Overcurrent Relay Building Report 1AP06EP Westinghouse 1456C05A05 Cap > Dem System AC/DC Cap > Dem Westinghouse SSC-T PR29-450N Protective Power Neutral Auxiliary BYR 104 1 1AP06E Switchgear 426

@ 1AP06EP Relay Support Overcurrent Relay Building Report Westinghouse 1321D79A03 Cap > Dem System AC/DC Cap > Dem Westinghouse CO-6 PR1-351N Protective Power Ground Fault Auxiliary BYR 105 1 1AP1 2E Switchgear 426

@ 1AP12EA Relay Support Relay Building Report Westinghouse 1456COSA08 Cap > Dem System Page 58 of 75

15C0346-RPT-002, Rev. 0 Correspondence No.: RS-16-175 Table B-1: Components Identified for High Frequency Confirmation Component Enclosure Floor Component Evaluation No. Unit Building Elev.

Basis for Evaluation ID Type System Function Manufacturer Model No. ID Type (ft) Capacity Result AC/DC Cap >Dem PR4A- Westinghouse CO-5A Protective Power Phase A Auxiliary BYR 106 1 450/451 @ 1AP06E Switchgear 426 Relay Support Overcurrent Relay Building Report 1AP06EB Westinghouse 1456COSA04 Cap > Dem System AC/DC Cap > Dem PR4C- Westinghouse CO-5A Protective Power Phase C Auxiliary BYR 107 1 450/451 @ ' 1AP06E Switchgear 426 Relay Support Overcurrent Relay Building Report 1AP06EB Westinghouse 1456COSA04 Cap > Dem System AC/DC Cap > Dem PR5- Westinghouse SSC-T Protective Power Ground Fault Auxiliary BYR 108 1 450/451 @ 1AP06E Switchgear 426 Relay Support Relay Building Report 1AP06EB Westinghouse 1321D79A03 Cap> Dem System AC/DC Low Suction SXlBX @ Power Auxiliary 109 1 Control Relay Pressure Time Tyco E7012PDO04 1AP06E Switchgear 426 GERS Cap > Dem 1AP06EB Support Building Delay Relay System AC/DC High DG 16 Diesel 1PDS- Process Power Auxiliary 110 1 Exhaust Fan 1B Solon 7PS/7P2A 1VD03CB Generator 401 GERS Cap > Dem VD105 Switch Support Building Delta Pressure Vent Fan System AC/DC lDC04E- Protective Power Battery Auxiliary BYR 111 1 Overvoltage Relay N/A N/A 1DC04E 451 Cap> Dem DSH-Kl Relay Support Charger Building Report System AC/DC 1AF01EA Protective Power 1AF01EA- Battery Auxiliary BYR 112 1 Overvoltage Relay N/A N/A 386.17 Cap > Dem DSH-Kl Relay Support 1 Charger Building Report System AC/DC 1AF01EB Protective Power 1AF01EB- Battery Auxiliary BYR 113 1 Overvoltage Relay N/A N/A 389'42 Cap> Dem DSH-K1 Relay Support 1 Charger Building Report System Core Low Lube Oil Potter Control Auxiliary 114 2 2AF01J-K10 Control Relay KHS-17Dll 2AF01J 383 GERS Cap > Dem Cooling Pressure Relay Brumfield Cabinet Building Core Low Oil Pressure Control Auxiliary EPRI HF 115 2 2AF01J-Kll Control Relay Agastat 70220C 2AF01J 383 Cap > Dem Cooling Time Delay Relay Cabinet Building Test Core Overcrank Timer Control Auxiliary 116 2 2AF01J-K4 Control Relay Agastat 70120EL 2AF01J 383 GERS Cap > Dem Cooling Relay Cabinet Building Core Potter Control Auxiliary 117 2 2AF01J-K7 Control Relay Overcrank relay KHS-17Dll 2AF01J 383 GERS Cap > Dem Cooling Brumfield Cabinet Building Page 59 of 75

15C0346-RPT-002, Rev. 0 Correspondence No.: RS-16-175 Table 6-1: Components Identified for High Frequency Confirmation Component Enclosure Floor Component Evaluation Na. Unit Building Elev.

Basis for Evaluation ID Type System Function Manufacturer Model No. ID Type (ft) Capacity Result Core High water Potter Control Auxiliary 118 2 2AF01J-K8 Control Relay KHS-17D11 2AF01J 383 GERS Cap > Dem Cooling temperature relay Brumfield Cabinet Building Core Potter Control Auxiliary 119 2 2AF01J-K9 Control Relay Overspeed relay KHS-17D11 2AF01J 383 GERS Cap > Dem Cooling Brumfield Cabinet Building 2SS-AF8002 Process Core Control Auxiliary BYR 120 2 Speed switch Dynalco SST-2400A 2AF01J 383 Cap > Dem "S1" Switch Cooling Cabinet Building Report High water Square D 9025-BCW-32 Cap > Dem 2TSH-AF147 Process Core Control Auxiliary BYR 121 2 11 temperature 2AF01PB 383 S10" Switch Cooling United F400-6BS- Cabinet Building Report switch Cap > Dem Electric 20S-20S AC/DC 486-2413 @ Power Circuit Breaker Type WL Auxiliary 122 2 Control Relay Westinghouse 2APOSE Switchgear 426 GERS Cap> Dem 2AP05ES Support Lockout Relay 656A830G01 Building System AC/DC Type WL Westinghouse Cap > Dem 486-2412 @ Power Circuit Breaker 501A817G01 Auxiliary 123 2 Control Relay 2APOSE Switchgear 426 GERS 2AP05EG Support Lockout Relay Building Electroswitch 793A389G01F Cap > Dem System AC/DC PR9A-451 Protective Power Phase A CO -7 Auxiliary BYR 124 2 Westinghouse 2AP05E Switchgear 426 Cap > Dem

@ 2AP05EG Relay Support Overcurrent Relay 1456COSA09 Building Report System AC/DC PR9C-451 Protective Power Phase C CO -7 Auxiliary BYR 125 2 Westinghouse 2APOSE Switchgear 426 Cap > Dem

@ 2APOSEG Relay Support Overcurrent Relay 1456C05A09 Building Report System AC/DC PR10-451N Protective Power Ground Fault CO-6 Auxiliary BYR 126 2 Westinghouse 2APOSE Switchgear 426 Cap > Dem

@ 2AP05EG Relay Support Relay 1456COSA16 Building Report System AC/DC Type WL Westinghouse Cap > Dem 486-2414 @ Power Circuit Breaker 501A817G01 Auxiliary 127 2 Control Relay 2APOSE Switchgear 426 GERS 2AP05EJ Support Lockout Relay Building Electroswitch 793A3$9G01F Cap > Dem System AC/DC PR13A-451 Protective Power Phase A CO-7 Auxiliary BYR 128 2 Westinghouse 2AP05E Switchgear 426 Cap > Dem

@ 2AP05EJ Relay Support Overcurrent Relay 1456C0SA09 Building Report System Page 60 of 75

15C0346-RPT-002, Rev. 0 Correspondence No.: RS-16-175 Table B-1: Components Identified for High Frequency Confirmation Component Enclosure Floor Component Evaluation No. Unit Building Elev.

Basis for Evaluation ID Type System Function Manufacturer Model No. ID Type (ft)

Capacity Result AC/DC PR13C-451 Protective Power Phase C CO-7 Auxiliary BYR 129 2 Westinghouse 2APOSE Switchgear 426 Cap > Dem

@ 2AP05EJ Relay Support Overcurrent Relay 1456CO5AO9 Building Report System AC/DC PR14-451N Protective Power Ground Fault CO-6 Auxiliary BYR 130 2 Westinghouse 2APOSE Switchgear 426 Cap > Dem

@ 2AP05EJ Relay Support Relay 1456COSA08 Building Report System AC/DC 62CL @ Power Cranking Limit Control Auxiliary BYR 131 2 Control Relay Westinghouse E7012PDL004 2PL07J 401 Cap > Dem 2PL07J Support Time Delay Relay Cabinet Building Report System AC/DC EGPDR-Incomplete Agastat Cap >Dem Power C2017-004 Control Auxiliary BYR 132 2 48 @ Control Relay Starting Sequence 2PL07J 401 2PL07J Support Cabinet Building Report Relay Agastat GPDR-C740 Cap> Dem System AC/DC EGPDR-Agastat Cap > Dem 86E @ Power Engine Shutdown C2017-004 Control Auxiliary BYR 133 2 Control Relay 2PL07J 401 2PL07J Support Relay Cabinet Building Report Agastat GPDR-0740 Cap > Dem System AC/DC EGPDR-Engine Lube Oil Agastat Cap > Dem 63QELX @ Power Low Pressure C2017-004 Control Auxiliary BYR 134 2 Control Relay 2PL07J 401 2PL07J Support Shutdown Cabinet Building Report Agastat GPDR-C740 Cap > Dem System Repeater Relay AC/DC Turbo Low Lube EGPDR-Agastat Cap > Dem 63QTLX @ Power Oil Pressure C2017-004 Control Auxiliary BYR 135 2 Control Relay 2PL07J 401 2PL07J Support Shutdown Cabinet Building Report Agastat GPDR-C740 Cap> Dem System Repeater Relay Main and EGPDR-Agastat Cap > Dem AC/DC Connecting Rod C2017-004 26MBHTX Power High Bearing Control Auxiliary BYR 136 2 Control Relay 2PL07J 401

@ 2PL07J Support Temperature Cabinet Building Report Agastat GPDR-C740 Cap> Dem System Shutdown Repeater Relay AC/DC Turbo Thrust EGPDR-Agastat Cap > Dem 38TBFX @ Power Bearing Failure C2017-004 Control Auxiliary BYR 137 2 Control Relay 2PL07J 401 2PL07J Support Shutdown Cabinet Building Report Agastat GPDR-C740 Cap > Dem System Repeater Relay Page 61 of 75

15C0346-RPT-002, Rev. 0 Corresl,ondence No.: RS-16-175 Table B-1: Components Identified for High Frequency Confirmation Component Enclosure Floor Component Evaluation No. Unit Building Elev.

Basis for Evaluation ID Type System Function Manufacturer Model No. ID Type (ft)

Capacity Result AC/DC Jacket Water High EGPDR-Agastat Cap > Dem 26JWSX @ Power Temperature C2017-004 Control Auxiliary BYR 138 2 Control Relay 2PL07J 401 2PL07J Support Shutdown Cabinet Building Report Agastat GPDR-C740 Cap> Dem System Repeater Relay AC/DC EGPDR-Crankcase High Agastat Cap > Dem 63CX @ Power C2017-004 Control Auxiliary BYR 139 2 Control Relay Pressure Repeater 2PL07J 401 2PL07J Support Cabinet Building Report Relay Agastat GPDR-C740 Cap > Dem System AC/DC EGPDR-Agastat Cap > Dem 86G @ Power Generator C2017-004 Control Auxiliary BYR 140 2 Control Relay 2PL07J 401 2PL07J Support Shutdown Relay Cabinet Building Report Agastat GPDR-C740 Cap > Dem System AC/DC EGPDR-Agastat Cap > Dem 51X @ Protective Power Generator C2017-004 Control Auxiliary BYR 141 2 2PL07J 401 2PL07J Relay Support Overcurrent Relay Cabinet Building Report Agastat GPDR-C740 Cap> Dem System AC/DC EGPDR-Generator Neutral Agastat Cap > Dem 59GX @ Power C2017-004 Control Auxiliary BYR 142 2 Control Relay Ground Voltage 2PL07J 401 2PL07J Support Cabinet Building Report Auxiliary Relay Agastat GPDR-C740 Cap > Dem System AC/DC EGPDR-Agastat Cap > Dem 40X @ Power Loss of Field C2017-004 Control Auxiliary BYR 143 2 Control Relay 2PL07J 401 2PL07J Support Auxiliary Relay Cabinet Building Report Agastat GPDR-C740 Cap > Dem System AC/DC EGPDR-Agastat Cap > Dem 32X @ Power Reverse Power C2017-004 Control Auxiliary BYR 144 2 Control Relay 2PL07J 401 2PL07J Support Auxiliary Relay Cabinet Building Report Agastat GPDR-C740 Cap > Dem System AC/DC EGPDR-Agastat Cap > Dem 81UX @ Power Under Frequency C2017-004 Control Auxiliary BYR 145 2 Control Relay 2PL07J 401 2PL07J Support Auxiliary Relay Cabinet Building Report Agastat GPDR-C740 Cap > Dem System AC/DC Generator EGPDR-Agastat Cap > Dem 87G1X @ Power Differential C2017-004 Control Auxiliary BYR 146 2 Control Relay 2PL071 401 2PL07J Support Shutdown Cabinet Building Report Agastat GPDR-C740 Cap > Dem System Repeater Relay - T Page 62 of 75

15C0346-RPT-002, Rev. 0 Correspondence No.: RS-16-175 Table B-1: Components Identified for High Frequency Confirmation Component Enclosure Floor Component Evaluation No. Unit Building Elev.

Basis for Evaluation ID Type System Function Manufacturer Model No. ID Type (n) Capacity Result AC/DC Generator EGPDR-Agastat Cap > Dem 87G2X @ Power Differential C2017-004 Control Auxiliary BYR 147 2 Control Relay 2PL07J 401 2PL07J Support Shutdown Cabinet Building Report Agastat GPDR-C740 Cap > Dem System Repeater Relay AC/DC EGPDR-Agastat Cap > Dem 12X1 @ Power Engine Overspeed C2017-004 Control Auxiliary BYR 148 2 Control Relay 2PL071 401 2PL07J Support Shutdown Relay Cabinet Building Report Agastat GPDR-C740 Cap > Dem System AC/DC EGPDR-Agastat Cap > Dem 12X2 @ Power Engine Overspeed C2017-004 Control Auxiliary BYR 149 2 Control Relay 2PL07J 401 2PL07J Support Shutdown Relay Cabinet Building Report Agastat GPDR-C740 Cap> Dem System AC/DC EGPDR-Agastat Cap > Dem 8652 @ Power Unit Shutdown C2017-004 Control Auxiliary BYR 150 2 Control Relay 2PL071 401 2PL07J Support Relay Cabinet Building Report Agastat GPDR-C740 Cap > Dem System AC/DC 2PS- Process Power Engine Overspeed 9012-GAW- Diesel Auxiliary BYR 151 2 Square D 24 2DG01KA 401 Cap> Dem DG108A Switch Support Switch Generator Building Report System AC/DC 2PS- Process Power Engine Overspeed Control Auxiliary SQURTS 152 2 Honeywell BZLN-LH 2PL07J 401 Cap > Dem DG251A Switch Support Switch Cabinet Building Report System AC/DC 2PS- Process Power Engine Overspeed Control Auxiliary SQURTS 153 2 Honeywell BZLN-LH 2PL07J 401 Cap > Dem DG252A Switch Support Switch Cabinet Building Report System Medium AC/DC DG2A Circuit 52 @ Voltage Power Auxiliary EPRI HF 154 2 Breaker (ACB Westinghouse 50 DHP 350 2APOSE Switchgear 426 Cap > Dem 2AP05ES Circuit Support Building Test 2413)

Breaker System Medium AC/DC Transformer 231X 52 @ Voltage Power Primary Circuit Auxiliary EPRI HF 155 2 Westinghouse 50 DHP 350 2APO5E Switchgear 426 Cap > Dem 2APOSED Circuit Support Breaker (ACB Building Test Breaker System 2415X)

Medium AC/DC 52 @ Voltage Power ESW Pump 2A Auxiliary EPRI HF 156 2 Westinghouse 50 DHP 350 2AP05E Switchgear 426 Cap > Dem 2AP05EW Circuit Support Circuit Breaker Building Test Breaker System Page 63 of 75

15CO346-RPT-002, Rev. 0 Correspondence No.: RS-16-175 Table B-1: Components Identified for High Frequency Confirmation Component Enclosure floor Component Evaluation No. Unit Building Elev.

Basis for Evaluation ID Type System Function Manufacturer Model No. ID Type (ft) Capacity pa Result AC/DC Low Voltage MCC 231X1 Power Auxiliary BYR 157 2 52 @ Circuit Feeder Circuit Westinghouse DS 206 2AP10E Switchgear 426 Cap > Dem 2AP10EF Support Building Report Breaker Breaker System AC/DC Low Voltage DG Room Vent Power Auxiliary BYR 158 2 52 @ Circuit Fan 2A Circuit Westinghouse DS 206 2AP10E Switchgear 426 Cap > Dem 2AP10EJ Support Building Report Breaker Breaker System AC/DC Low Voltage Battery Charger Power Auxiliary BYR 159 2 52 @ Circuit 211 Circuit Westinghouse DS 206 2AP10E Switchgear 426 Cap > Dem 2AP10EL Support Building Report Breaker Breaker System AC/DC Low Voltage MCC 231X3 Power Auxiliary BYR 160 2 52 @ Circuit Feeder Circuit Westinghouse DS 206 2AP10E Switchgear 426 Cap > Dem 2AP10EQ Support Building Report Breaker Breaker System AC/DC 486-2415X Power Circuit Breaker Type WL Auxiliary 161 2 Control Relay Westinghouse 2APOSE Switchgear 426 GERS Cap > Dem

@ 2APOSED Support Lockout Relay 503A804G01 Building System AC/DC PR3A- Westinghouse CO-9A Cap > Dem Protective Power Phase A Auxiliary BYR 162 2 450/451 @ 2AP05E Switchgear 426 Relay Support Overcurrent Relay Building Report 2AP05ED Westinghouse 1456C0SA05 Cap > Dem System AC/DC PR3B- Westinghouse CO-9A Cap > Dem Protective Power Phase B Auxiliary BYR 163 2 450/451 @ 2AP05E Switchgear 426 Relay Support Overcurrent Relay Building Report 2APOSED Westinghouse 1456C0SA05 Cap > Dem System AC/DC PR3C- Westinghouse CO-9A Cap > Dem Protective Power Phase C Auxiliary BYR 164 2 450/451 @ 2APO5E Switchgear 426 Relay Support Overcurrent Relay Building Report 2APOSED Westinghouse 1456C0SA05 Cap > Dem System AC/DC Westinghouse SSC-T Cap > Dem PR4-450N Protective Power Neutral Auxiliary BYR 165 2 2AP05E Switchgear 426

@ 2APOSED Relay Support Overcurrent Relay Building Report Westinghouse 1321D79A03 Cap > Dem System AC/DC Westinghouse CO-6 Cap > Dem PR1-351N Protective Power Ground Fault Auxiliary BYR 166 2 - 2AP10E Switchgear 426

@ 2AP10EA Relay Support Relay Building Report Westinghouse 1456COSA08 Cap > Dem System Page 64 of 75

15CO346-RPT-002, Rev. 0 Correspondence No.: RS-16-175 Table B-1: Components Identified for High Frequency Confirmation Component Enclosure floor Component Evaluation No. Unit Building Elev.

Basis for Evaluation ID Type System Function Manufacturer Model No. ID Type (ft)

Capacity Result AC/DC Cap> Dem PR36A- Westinghouse CO-SA Protective Power Phase A Auxiliary BYR 167 2 450/451 @ 2AP05E Switchgear 426 Relay Support Overcurrent Relay Building Report 2APOSEW Westinghouse 1456C05A04 Cap > Dem System AC/DC Cap >Dem PR36C- Westinghouse CO-SA Protective Power Phase C Auxiliary BYR 168 2 450/451 @ 2AP05E Switchgear 426 Relay Support Overcurrent Relay Building Report 2AP05EW Westinghouse 1456C0SA04 Cap > Dem System AC/DC Cap > Dem PR37-450N Westinghouse SSC-T Protective Power Ground Fault Auxiliary BYR 169 2 @ 2APOSE Switchgear 426 Relay Support Relay Building Report 2APOSEW Westinghouse 1321D79A03 Cap > Dem System AC/DC Low Suction SX1AX @ Power Auxiliary 170 2 Control Relay Pressure Time Tyco E7012PD004 2AP05E Switchgear 426 GERS Cap > Dem 2APOSEW Support Building Delay Relay System AC/DC High DG 2A Diesel 2PDS- Process Power Auxiliary 171 2 Exhaust Fan 2A Solon 7PS/7P2A 2VD03CA Generator 401 GERS Cap > Dem VD103 Switch Support Building Delta Pressure Vent Fan System AC/DC 2DC03E- Protective Power Battery Auxiliary BYR 172 2 Overvoltage Relay N/A N/A 2DC03E 451 Cap > Dem DSH-K1 Relay Support Charger Building Report System AC/DC 486-2423 @ Power Circuit Breaker Type WL Auxiliary 173 2 Control Relay Westinghouse 2AP06E Switchgear 426 GERS Cap > Dem 2AP06ER Support Lockout Relay 656A830G01 Building System AC/DC Type WL Westinghouse Cap > Dem 486-2422 @ Power Circuit Breaker 501A817G01 Auxiliary 174 2 Control Relay 2AP06E Switchgear 426 GERS 2AP06EF Support Lockout Relay Building Electroswitch 793A389G01F Cap > Dem System AC/DC PR7A-451 Protective Power Phase A CO -7 Auxiliary BYR 175 2 Westinghouse 2AP06E Switchgear 426 Cap> Dem

@ 2AP06EF Relay Support Overcurrent Relay 1456CO5A09 Building Report System AC/DC PR7C-451 Protective Power Phase C CO-7 Auxiliary BYR 176 2 Westinghouse 2AP06E Switchgear 426 Cap> Dem

@ 2AP06EF Relay Support Overcurrent Relay 1456C05A09 Building Report System Page 65 of 75

15CO346-RPT-002, Rev. 0 Correspondence No.: RS-16-175 Table B-1: Components Identified for High Frequency Confirmation Component Enclosure Floor Component Evaluation No. Unit Building Elev.

Basis for Evaluation ID Type System Function Manufacturer Model No. ID Type (ft) Capacity Result AC/DC PR8-451N Protective Power Ground Fault CO-6 Auxiliary BYR 177 2 Westinghouse 2AP06E Switchgear 426 Cap > Dem

@ 2AP06EF Relay Support Relay 1456CO5A08 Building Report System AC/DC Type WL Westinghouse Cap > Dem 486-2424 @ Power Circuit Breaker 501A817G01 Auxiliary 178 2 Control Relay 2AP06E Switchgear 426 GERS 2AP06ED Support Lockout Relay Building Electroswitch 793A389GO1F Cap > Dem System AC/DC PR3A-451 Protective Power Phase A CO -7 Auxiliary BYR 179 2 Westinghouse 2AP06E Switchgear 426 Cap > Dem

@ 2AP06ED Relay Support Overcurrent Relay 1456C0SA09 Building Report System AC/DC PR3C-451 Protective Power Phase C CO-7 Auxiliary BYR 180 2 Westinghouse 2AP06E Switchgear 426 Cap> Dem

@ 2AP06ED Relay Support Overcurrent Relay 1456COSA09 Building Report System AC/DC PR4-451N Protective Power Ground Fault CO-6 Auxiliary BYR 181 2 Westinghouse 2AP06E Switchgear 426 Cap > Dem

@ 2AP06ED Relay Support Relay 1456COSA08 Building Report System AC/DC 62CL @ Power Cranking Limit Control Auxiliary BYR 182 2 Control Relay Westinghouse E7012PDL004 2PL08J 401 Cap > Dem 2PL08J Support Time Delay Relay Cabinet Building Report System AC/DC EGPDR-Incomplete Agastat Cap > Dem 48 @ Power C2017-004 Control Auxiliary BYR 183 2 Control Relay Starting Sequence 2PL08J 401 2PL08J Support Cabinet Building Report Relay Agastat GPDR-C740 Cap > Dem System AC/DC EGPDR-Agastat Cap > Dem 86E @ Power Engine Shutdown C2017-004 Control Auxiliary BYR 184 2 Control Relay 2PL08J 401 2PL08J Support Relay Cabinet Building Report Agastat GPDR-C740 Cap > Dem System AC/DC Engine Lube Oil EGPDR-Agastat Cap > Dem 63QELX @ Power Low Pressure C2017-004 Control Auxiliary BYR 185 2 Control Relay 2PL08J 401 2PL081 Support Shutdown Cabinet Building Report Agastat GPDR-C740 Cap > Dem System Repeater Relay AC/DC Turbo Low Lube EGPDR-Agastat Cap > Dem 63QTLX @ Power Oil Pressure C2017-004 Control Auxiliary BYR 186 2 Control Relay 2PL08J 401 2PL08J Support Shutdown Cabinet Building Report Agastat GPDR-C740 Cap> Dem System Repeater Relay Page 66 of 75

15CO346-RPT-002, Rev. 0 Correspondence No.: RS-16-175 Table B-1: Components Identified for High Frequency Confirmation Component Enclosure Floor Component Evaluation No. Unit Building Elev.

Basis for Evaluation ID Type System Function Manufacturer Model No. ID Type (ft)

Capacity Result Main and EGPDR-Agastat Cap > Dem AC/DC Connecting Rod C2017-004 26MBHTX Power High Bearing Control Auxiliary BYR 187 2 Control Relay 2PL08J 401

@ 2PL08J Support Temperature Cabinet Building Report Agastat GPDR-C740 Cap> Dem System Shutdown Repeater Relay AC/DC Turbo Thrust EGPDR-Agastat Cap > Dem 38TBFX @ Power Bearing Failure C2017-004 Control Auxiliary BYR 188 2 Control Relay 2PL08J 401 2PL08J Support Shutdown Cabinet Building Report Agastat GPDR-C740 Cap > Dem System Repeater Relay AC/DC Jacket Water High EGPDR-g Agastat Cap > Dem 26JWSX @ Power Temperature C2017-004 Control Auxiliary BYR 189 2 Control Relay 2PL08J 401 2PL08J Support Shutdown Cabinet Building Report Agastat GPDR-C740 Cap > Dem System Repeater Relay AC/DC EGPDR-Agastat Cap > Dem Crankcase High C2017-004 63CX @ Power Control Auxiliary BYR 190 2 Control Relay Pressure Repeater 2PL08J 401 2PL08J Support Cabinet Building Report Relay Agastat GPDR-C740 Cap > Dem System AC/DC EGPDR-Agastat Cap > Dem 86G @ Power Generator C2017-004 Control Auxiliary BYR 191 2 Control Relay 2PL08J 401 2PL08J Support Shutdown Relay Cabinet Building Report Agastat GPDR-C740 Cap >]

System AC/DC EGPDR-Agastat Cap > Dem 51X @ Protective Power Generator C2017-004 Control Auxiliary BYR 192 2 2PL08J 401 2PL08J Relay Support Overcurrent Relay Cabinet Building Report Agastat GPDR-C740 Cap> Dem System AC/DC EGPDR-Generator Neutral Agastat Cap > Dem 59GX @ Power C2017-004 Control Auxiliary BYR 193 2 Control Relay Ground Voltage -- 2PL08J 401 2PL08J Support Cabinet Building Report Auxiliary Relay Agastat GPDR-C740 Cap > Dem System AC/DC EGPDR-Agastat Cap > Dem 40X @ Power Loss of Field C2017-004 Control Auxiliary BYR 194 2 Control Relay 2PL08J 401 2PL08J Support Auxiliary Relay Cabinet Building Report Agastat GPDR-C740 Cap > Dem System AC/DC EGPDR-Agastat Cap > Dem 32X @ Power Reverse Power C2017-004 Control Auxiliary BYR 195 2 Control Relay 2PL08J 401 2PL08J Support Auxiliary Relay Cabinet Building Report Agastat GPDR-C740 Cap > Dem System Page 67 of 75

15CO346-RPT-002, Rev. 0 Correspondence No.: RS-16-175 Table B-1: Components Identified for High Frequency Confirmation Component Enclosure floor Component Evaluation No. Unit Building Elev.

Basis for Evaluation ID Type System function Manufacturer Model No. ID Type (ft}

Capacity Result AC/DC EGPDR-Agastat Cap > Dem 81UX @ Power Under Frequency C2017-004 Control Auxiliary BYR 196 2 Control Relay 2PL08J 401 2PL08J Support Auxiliary Relay Cabinet Building Report Agastat GPDR-C740 Cap> Dem System AC/DC Generator EGPDR-Agastat Cap > Dem 87G1X @ Power Differential C2017-004 Control Auxiliary BYR 197 2 Control Relay 2PL08J 401 2PL08J Support Shutdown Cabinet Building Report Agastat GPDR-C740 Cap > Dem System Repeater Relay AC/DC Generator EGPDR-Agastat Cap > Dem 87G2X @ Power Differential C2017-004 Control Auxiliary BYR 198 2 Control Relay 2PL08J 401 2PL08J Support Shutdown Cabinet Building Report Agastat GPDR-C740 Cap > Dem System Repeater Relay AC/DC EGPDR-Agastat Cap > Dem 12X1 @ Power Engine Overspeed C2017-004 Control Auxiliary BYR 199 2 Control Relay 2PL08J 401 2PL08J Support Shutdown Relay Cabinet Building Report Agastat GPDR-C740 Cap > Dem System AC/DC EGPDR-Agastat Cap > Dem 12X2 @ Power Engine Overspeed C2017-004 Control Auxiliary BYR 200 2 Control Relay 2PL08J 401 2PL08J Support Shutdown Relay Cabinet Building Report Agastat GPDR-C740 Cap > Dem System AC/DC EGPDR-Agastat Cap > Dem 8652 @ Power Unit Shutdown C2017-004 Control Auxiliary BYR 201 2 Control Relay 2PL08J 401 2PL08J Support Relay Cabinet Building Report Agastat GPDR-C740 Cap > Dem System AC/DC 2PS- Process Power Engine Overspeed 9012-GAW- Diesel Auxiliary BYR 202 2 Square D 24 2DGO1K6 401 Cap > Dem DG108B Switch Support Switch Generator Building Report System AC/DC 2PS- Process Power Engine Overspeed Control Auxiliary SQURTS 203 2 Honeywell BZLN-LH 2PL08J 401 Cap > Dem DG251B Switch Support Switch Cabinet Building Report System AC/DC 2PS- Process Power Engine Overspeed Control Auxiliary SQURTS 204 2 Honeywell BZLN-LH 2PL08J 401 Cap > Dem DG252B Switch Support Switch Cabinet Building Report System Medium AC/DC DG 2B Circuit 52 @ Voltage Power Auxiliary EPRI HF 205 2 Breaker (ACB Westinghouse SO DHP 350 2AP06E Switchgear 426 Cap > Dem 2AP06ER Circuit Support Building Test 2423)

Breaker System Page 68 of 75

15C0346-RPT-002, Rev. 0 Correspondence No.: RS-16-175 Table B-1: Components Identified for High Frequency Confirmation Component Enclosure Floor Component Evaluation No. Unit Building Elev.

Basis for Evaluation ID Type System Function Manufacturer Model No. ID Type (ft) Capacity Result Medium AC/DC Transformer 232X 52 @ Voltage Power Primary Circuit Auxiliary EPRI HF 206 2 Westinghouse 50 DHP 350 2AP06E Switchgear 426 Cap > Dem 2AP06EH Circuit Support Breaker (ACB Building Test Breaker System 2425X)

Medium AC/DC 52 @ Voltage Power ESW Pump 2B Auxiliary EPRI HF 207 2 Westinghouse 50 DHP 350 2AP06E Switchgear 426 Cap > Dem 2AP06EJ Circuit Support Circuit Breaker Building Test Breaker System AC/DC Low Voltage MCC 232X3 Power Auxiliary BYR 208 2 52 @ Circuit Feeder Circuit Westinghouse DS 206 2AP12E Switchgear 426 Cap > Dem 2AP12EC Support Building Report Breaker Breaker System AC/DC Low Voltage MCC 232X1 Power Auxiliary BYR 209 2 52 @ Circuit Feeder Circuit Westinghouse DS 206 2AP12E Switchgear 426 Cap > Dem 2AP12EF Support Building Report Breaker Breaker System AC/DC Low Voltage MCC 232X2 Power Auxiliary BYR 210 2 52 @ Circuit Feeder Circuit Westinghouse DS 206 2AP12E Switchgear 426 Cap > Dem 2AP12EG Support Building Report Breaker Breaker System AC/DC Low Voltage DG Room Vent Power Auxiliary BYR 211 2 52 @ Circuit Fan 2B Circuit Westinghouse DS 206 2AP12E Switchgear 426 Cap > Dem 2AP12EJ Support Building Report Breaker Breaker System AC/DC Low Voltage Battery Charger Power Auxiliary BYR 212 2 52 @ Circuit 212 Circuit Westinghouse DS 206 2AP12E Switchgear 426 Cap > Dem 2AP12EL Support Building Report Breaker Breaker System AC/DC 486-2425X Power Circuit Breaker Type WL Auxiliary 213 2 Control Relay Westinghouse 2AP06E Switchgear 426 GERS Cap > Dem

@ 2AP06EH Support Lockout Relay 503A804G01 Building System AC/DC Cap > Dem PR11A- Westinghouse CO-9A Protective Power Phase A Auxiliary BYR 214 2 450/451 @ 2AP06E Switchgear 426 Relay Support Overcurrent Relay Building Report 2AP06EH Westinghouse 1456C05A05 Cap > Dem System AC/DC Cap > Dem PR11B- Westinghouse CO-9A Protective Power Phase B Auxiliary BYR 215 2 450/451 @ 2AP06E Switchgear 426 Relay Support Overcurrent Relay Building Report 2AP06EH Westinghouse 1456COSA05 Cap > Dem System Page 69 of 75

15CO346-RPT-002, Rev. 0 Correspondence No.: RS-16-175 Table B-1: Components Identified for High Frequency Confirmation Component Enclosure Floor Component Evaluation No. Unit Building Elev.

Basis for Evaluation ID Type System Function Manufacturer Model No. ID Type (ft)

Capacity Result AC/DC PR11C- Westinghouse CO-9A Cap > Dem Protective Power Phase C Auxiliary BYR 216 2 450J451 @ -- 2AP06E Switchgear 426 Relay Support Overcurrent Relay Building Report 2AP06EH Westinghouse 1456C05A05 Cap > Dem System AC/DC Westinghouse SSC-T Cap > Dem PR12-450N Protective Power Neutral Auxiliary BYR 217 2 2AP06E Switchgear 426

@ 2AP06EH Relay Support Overcurrent Relay Building Report Westinghouse 1321D79A03 Cap > Dem System AC/DC Westinghouse CO-6 Cap > Dem PR1-351N Protective Power Ground Fault Auxiliary BYR 218 2 2AP12E Switchgear 426

@ 2AP12EA Relay Support Relay Building Report Westinghouse 1456COSA08 Cap > Dem System AC/DC PR13A- Westinghouse CO-SA Cap > Dem Protective Power Phase A Auxiliary BYR 219 2 450/451 @ 2AP06E Switchgear 426 Relay Support Overcurrent Relay Building Report 2AP06EJ Westinghouse 1456COSA04 Cap > Dem System AC/DC PR13C- Westinghouse CO-5A Cap > Dem Protective Power Phase C Auxiliary BYR 220 2 450/451 @ 2AP06E Switchgear 426 Relay Support Overcurrent Relay Building Report 2AP06EJ Westinghouse 1456C05A04 Cap > Dem System AC/DC Westinghouse SSC-T Cap > Dem PR14-450N Protective Power Ground Fault Auxiliary BYR 221 2 2AP06E Switchgear 426

@ 2AP06EJ Relay Support Relay Building Report Westinghouse 1321D79A03 Cap > Dem System AC/DC Low Suction SX1BX @ Power Auxiliary 222 2 Control Relay Pressure Time Tyco E7012PD004 2AP06E Switchgear 426 GERS Cap > Dem 2AP06EJ Support Budding Delay Relay System AC/DC High DG 1B Diesel 2PDS- Control Power Auxiliary 223 2 Exhaust Fan 1B Salon 7PS/7P2A 2VD03CB Generator 401 GERS Cap > Dem VD105 Switch Support Building Delta Pressure Vent Fan System AC/DC 2DC04E- Protective Power Battery Auxiliary BYR 224 2 Overvoltage Relay N/A N/A 2DC04E 451 Cap > Dem DSH-K1 Relay Support Charger Building Report System AC/DC 2AFOIEA Protective Power 2AFO1EA- Battery Auxiliary BYR 225 2 Overvoltage Relay N/A N/A 389'25 Cap> Dem DSH-K1 Relay Support 1 Charger Building Report System Page 70 of 75

15C0346-RPT-002, Rev. 0 Correspondence No.: RS-16-175 Table B-1: Components Identified for High Frequency Confirmation Component Enclosure Floor Component Evaluation No. Unit Building Elev.

Basis for Evaluation ID Type System Function Manufacturer Model No. ID Type (ft)

Capacity Result AC/DC 2AF01EB Protective Power 2AF01EB- Battery Auxiliary BYR 226 2 Overvoltage Relay N/A N/A 385.92 Cap > Dem DSH-K1 Relay Support 1 Charger Building Report System Page 71 of 75

15C0346-RPT-002, Rev. 0 Correspondence No.: RS-16-175 Table B-2: Reactor Coolant Leak Path Valve Identified for High Frequency Confirmation VALVE MID SHEET UNIT NOTE 1 RC8037A M-60 1A 1 1 RC8037B M-60 2 1 1 RC8037C M-60 3 1 1 RC8037D M-60 4 1 1 RC014A M-60 1B 1 1 RC014B M-60 1B 1 1 RC014C M-60 1B 1 1 RC014D M-60 1B 1 1 RY8000A M-60 5 1 May be excluded provided 1 RY455A is closed 1 RY455A M-60 5 1 1 RY8000B M-60 5 1 May be excluded provided 1 RY456 is closed 1 RY456 M-60 5 1 1 S18900A M-61 2 1 Simple Check Valve (no need to be included) 1 S18900B M-61 2 1 Simple Check Valve (no need to be included) 1S18900C M-61 2 1 Simple Check Valve (no need to be included) 1 S18900D M-61 2 1 Simple Check Valve (no need to be included) 1 S18949A M-61 3 1 Simple Check Valve (no need to be included) 1 S18949B M-61 3 1 Simple Check Valve (no need to be included) 1S18949C M-61 3 1 Simple Check Valve (no need to be included) 1 S18949D M-61 3 1 Simple Check Valve (no need to be included) 1 S18819A M-61 3 1 Simple Check Valve (no need to be included) 1 S18819B M-61 3 1 Simple Check Valve (no need to be included) 1 S18819C M-61 3 1 Simple Check Valve (no need to be included) 1 S18819D M-61 3 1 Simple Check Valve (no need to be included) 1 S18948A M-61 5 1 Simple Check Valve (no need to be included) 1 S18948B M-61 5 1 Simple Check Valve (no need to be included) 1 S18948C M-61 6 1 Simple Check Valve (no need to be included)

Page 72 of 75

15C0346-RPT-002, Rev. 0 Correspondence No.: RS-16-175 Table B-2: Reactor Coolant leak Path Valve Identified for High Freauencv Confirmation VALVE MID SHEET UNIT NOTE 1 S18948D M-61 6 1 Simple Check Valve (no need to be included) 1 RH8701 A-1 M-62 1 1 May be excluded provided 1 RH8701 B-2 is closed 1 RH8701 B-2 M-62 1 1 EC 384171 to isolate flowpath 1 RH8702A-1 M-62 1 1 EC 384171 to isolate flowpath 1 R1-1870213-2 M-62 1 1 May be excluded provided 1 RH8702A-1 is closed 1 CV8377 M-64 5 1 Simple Check Valve (no need to be included) 1 CV8378A M-64 5 1 Simple Check Valve (no need to be included) 1 CV8379A M-64 5 1 Simple Check Valve (no need to be included) 1 PS9351 A M-68 1A 1 1 PS9351 B M-68 1A 1 1 PS9358A M-68 1A 1 1 PS9358B M-68 1A 1 1 PS9358C M-68 1A 1 1 PS9358D M-68 1A 1 1 PS9356A M-68 1A 1 1 PS9350A M-68 113 1 1 PS9350B M-68 113 1 1 PS9354A M-68 113 1 May be excluded provided 1 PS9350A is closed 1 PS9355A M-68 113 1 May be excluded provided 1PS9350B is closed Unit 2 Byron RCS leakage valves 2RC8037A M-135 1A 2 2RC8037B M-135 2 2 2RC8037C M-135 3 2 2RC8037D M-135 4 2 2RC014A M-135 113 2 2RC014B M-135 113 2 2RC014C M-135 113 2 2RC014D M-135 113 2 Page 73 of 75

15C0346-RPT-002, Rev. 0 Correspondence No.: RS-16-175 Table B-2: Reactor Coolant leak Path Valve Identified for High Frequencv Confirmation VALVE P&ID SHEET UNIT NOTE 2RY8000A M-135 5 2 May be excluded provided 2RY455A is closed 2RY455A M-135 5 2 2RY8000B M-135 5 2 May be excluded provided 2RY456 has is closed 2RY456 M-135 5 2 2SI8900A M-136 2 2 Simple Check Valve (no need to be included) 2SI8900B M-136 2 2 Simple Check Valve (no need to be included) 2SI8900C M-136 2 2 Simple Check Valve (no need to be included) 2SI8900D M-136 2 2 Simple Check Valve (no need to be included) 2SI8949A M-136 3 2 Simple Check Valve (no need to be included) 2SI8949B M-136 3 2 Simple Check Valve (no need to be included) 2SI8949C M-136 3 2 Simple Check Valve (no need to be included) 2SI8949D M-136 3 2 Simple Check Valve (no need to be included) 2SI8819A M-136 3 2 Simple Check Valve (no need to be included) 2SI8819B M-136 3 2 Simple Check Valve (no need to be included) 2SI8819C M-136 3 2 Simple Check Valve (no need to be included) 2SI8819D M-136 3 2 Simple Check Valve (no need to be included) 2SI8948A M-136 5 2 Simple Check Valve (no need to be included) 2SI8948B M-136 5 2 Simple Check Valve (no need to be included) 2SI8948C M-136 6 2 Simple Check Valve (no need to be included) 2SI8948D M-136 6 2 Simple Check Valve (no need to be included) 2RH8701A-1 M-137 1 2 May be excluded provided 2RH8701 B-2 is closed 2RH8701 B-2 M-137 1 2 EC 385243 to isolate flowpath 2RH8702A-1 M-137 1 2 EC 385243 to isolate flowpath 2RH8702B-2 M-137 1 2 May be excluded provided 2RH8702A-1 is closed 2CV8377 M-138 5C 2 Simple Check Valve (no need to be included) 2CV8378A M-138 5C 2 Simple Check Valve (no need to be included) 2CV8379A M-138 5C 2 Simple Check Valve (no need to be included) 2PS9351A M-140 1A 2 Page 74 of 75

15C0346-RPT-002, Rev. 0 Correspondence No.: RS-16-175 Table B-2: Reactor Coolant Leak Path Valve Identified for High Freauencv Confirmation VALVE MID SHEET UNIT NOTE 2PS9351 B M-140 1A 2 2PS9358A M-140 1A 2 2PS9358B M-140 1A 2 2PS9358C M-140 1A 2 2PS9358D M-140 1A 2 2PS9356A M-140 1A 2 2PS9350A M-140 1B 2 2PS9350B M-140 1B 2 2PS9354A M-140 1B 2 May be excluded provided 2PS9350A is closed 2PS9355A M-140 1B 2 May be excluded provided 2PS9350B is closed Page 75 of 75