ML17137A316
ML17137A316 | |
Person / Time | |
---|---|
Site: | Farley |
Issue date: | 05/17/2017 |
From: | NRC/RGN-II |
To: | Southern Nuclear Operating Co |
References | |
Download: ML17137A316 (82) | |
Text
ES-401 Site-Specific RO Written Examination Form ES-401-7 Cover Sheet U. S. Nuclear Regulatory Commission Site-Specific RO Written Examination Applicant Information Name:
Date: 18 APRIL 2017 Facility I Unit FARLEY 1 & 2 Region: I El II [] Ill [1 IV C] Reactor Type: WIX]CEEBW El GE El Start Time: Finish Time:
Instructions Use the answer sheets provided to document your answers. Staple this cover sheet on top of the answer sheets. To pass the examination, you must achieve a final grade of at least 80.00 percent. Examination papers will be collected 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> after the examination begins Applicant Certification All work done on this examination is my own. I have neither given nor received aid.
Applicants Signature Results Examination Value 75 Points Applicants Score Points Applicants Grade Percent
- 1. Unit 1 is operating at 100% power when the following events occur:
- FK-122, CHG FLOW, demand indicates 100% in AUTO.
- LK-459F, PRZR LVL, demand indicates 0% in AUTO.
- EA2, CHG HDR FLOW HI-LO, is in ALARM.
- HA2, PRZR LVL DEV HI B/U HTRS ON, is in ALARM.
- VCT LVL is 38% and slowly lowering.
Which of the following completes the statements below?
(1) controller has failed.
VCT level will (2)
A. (1) FK-122 (2) lower until the operators realign Charging Pump suctions to the RWST B. (1) LK-459F (2) lower until the operators realign Charging Pump suctions to the RWST C. (1) FK-122 (2) cycle between 20% and 40%
D. (1) LK-459F (2) cycle between 20% and 40%
- 2. Unit 1 is at 45% power and the following conditions exist:
Preparation to recover dropped control rod P8 per AOP-19.O, Malfunction of Rod Control System, is in progress.
CON1R< .
4KD cor.l.TL BVKD -
F Using the Lift Coil Disconnect Panel figure above, which of the following completes the statements below to recover rod P8?
Reposition switch(es) (1) at the Lift Coil Disconnect Panel.
Per AOP-1 9, the ROD CONTROL BANK SELECTOR SWITCH will be placed in the (2) position to withdraw or insert the rod(s) and restore the bank.
A. (1)P8ONLY (2) MAN B. (1)P8ONLY (2) CB D C. (1) H2, B8, H14, F6, FlO, K1O and K6 (2) CB D D. (1) H2, B8, H14, F6, FlO, K1O and K6 (2) MAN
- 3. A Reactor trip has occurred on Unit 1 with the following conditions:
- 1A, lB and 1C 4160V busses are deenergized.
Subsequently, the crew is in ESP-0.1, Reactor Trip Response, evaluating RCP support conditions and the following is observed:
- 1A, lB and 1C 4160V busses are energized.
- RCS Pressure: 2160 psig
- RCS Tavg: 548°F
1ARCP 1BRCP 1CRCP Shaft Seal Flow 8gpm 8gprn 9gprn No I Seal Leakoff 2.5 gpm 3 gpm 2.5 gpm
- 1 Seal >400 pskf >400 psid >400 psid Per ESP-0.1, the operating crew will start Reference Provided A. No RCPs B. 1BRCP ONLY C. 1ARCPONLY D. 1A RCP and IC RCP ONLY
- 4. Unit 1 has just synched the Mn Generatortothe grid when the following occurs:
The 1C RCP trips.
Which one of the following completes the statement below?
Following the 1C RCP trip, the flow in the 1C RCS loop will lower to zero (1) and Tave in the 1C RCS loop will (2)
A. (1) then rise (2) rise B. (1) and remain at zero (2) rise C. (1) then rise (2) lower D. (1) and remain at zero (2) lower
- 5. Unit 1 is at 100% power when the following occurs:
TK-144, LTDN HX OUTLET TEMP controller, demand fails low (0%).
Which one of the following completes the statements below?
The temperature of the letdown water exiting the Letdown Heat Exchanger will (1)
This will result in a (2)
(1) (2)
A. lower dilution B. lower boration C. rise dilution D. rise boration
- 6. Which one of the following completes the statements below?
MOV-8701A, 1C RCS LOOP TO 1A RHR PUMP, is powered from (1)
MOV-8701B, 1C RCS LOOP TO 1A RHR PUMP, is powered from (2)
A. (1)600VMCC1U (2) 600V MCC IV B. f1)600VMCC1U (2) 600V MCC 1 U C. (1)600VMCC iF (2) 600V MCC 1 G D. (1)600VMCC iF (2)600VMCC iF
- 7. Unit 1 has experienced a large break LOCA with the following conditions:
- MLB-1 1-1 and 11-1, SAFETY INJECTION, are LIT.
- BYP & PERMISSIVE SAFETY INJECTION ACTUATED, status light is LIT.
- CH4, RWST LVL A TRN LO-LO, is in ALARM.
- CH5, RWST LVL B TRN LO-LO, is in ALARM.
Which one of the following would be the expected automatic response of the RHR system assuming no manual operator actions?
MOV-8701NB (1) automatically open.
MOV-8811N12A (2) automatically open.
Nomenclature: MOV-8701NB, 1C RCS LOOP TO 1A RHR PUMP MOV-8811N12A, CTMT SUMP TO IA RHR PUMP (1) (2)
A. will NOT WILL B. will NOT will NOT C. WILL WILL D. WILL will NOT
- 8. Unit 1 is operating at 100% power when the following occurs:
At 1000:
- AReactortrip.
At 1005:
- Operators are monitoring Intermediate Range Nuclear Instrumentation operation.
At 1020:
- The operators are at the step of ESP-0. 1, Reactor Trip Response, to Check Source Range Detectors Energized Which one of the following completes the statements below?
At 1005: Intermediate Range startup rate is (1)
At 1020: The Source Range Nuclear Instruments .J energized.
A. (1) -1/3DPM (2) ARE B. (1) -1/3DPM (2) are NOT C. (1) -1/2DPM (2) ARE D. (1) -1/2DPM (2) are NOT
- 9. Which of the following completes the statement below?
Alternate cooldown of the PRT is accomplished by (1) flow to the (2)
A. (1) Demin Water (2) bottom of the PRT via a sparger pipe B. (1) Demin Water (2) top of the PRT via spray nozzles C. (1) Reactor Makeup Water (2) top of the PRT via spray nozzles D. (1) Reactor Makeup Water (2) bottom of the PRT via a sparger pipe
EW Which of the following completes the statement below?
HV-3184,CCW FROM RCP THRM BARR, will automatically close on a (1) if the CCW return line from any RCP Thermal Barrier reaches (2)
A. (1)Tsignal (2) 160 gpm B. (1)Tsignal (2) 75 psig C. (1) P signal (2) 160 gpm D. (1) P signal (2) 75 psig
fli1. A Pressurizer Steam Space break has occurred on Unit 1 with the following conditions:
- EEP-1, Loss of Reactor or Secondary Coolant, is in progress.
- CTMT Press is 13.0 psig and rising.
Which of the following completes the statements below for the current plant conditions?
RHR injection flow (1) greater than 1500 gpm.
MOV-3185A, CCW TO 1A RHR HX, (2) required to be opened.
A. (1) is NOT (2) is NOT B. (1)isNOT (2)lS C. (1)lS (2)lS D. (1)IS (2) is NOT
- 12. Unit I is operating at 100% power with the following conditions:
At 1000:
- A Train is the On Service Train.
- M4 and AB4, CCW SRG TK LVL A (B) TRN HI-LO, are in ALARM.
At 1200:
- AA5, COW SRG TK LVL A TRN LO-LO, is in ALARM.
- L13027A, CCW SRG TK LVL, is 19 and falling.
- L13027B, CCW SRG TK LVL, is 30 and stable.
Which one of the following completes the statements below?
A leak has developed in the (1)
(2) is the backup source of make up water for the CCW Surge tank.
A. (1) Seal Water Hx (2) Reactor Makeup Water B. (1) Letdown Hx (2) Reactor Makeup Water C. (1) Seal Water Hx (2) Fire Water D. (1) Letdown Hx (2) Fire Water
- 13. Unit 1 is operating at 100% with the following conditions:
- Identified leakage: 9.5 gpm
- Unidentified leakage: 0.9 gpm Which one of the following completes the statements below?
Entry into a REQUIRED ACTION Statement of Technical Specification 3.4.13, RCS Operational leakage, (1) required.
If conditions degrade and Pressurizer Level cannot be maintained near program or stable, the operating crew is required to (2)
A. (1)IS (2) trip the Reactor and actuate SI B. (1)IS (2) align Charging pump suction to RWST and commence unit shutdown C. (1) is NOT (2) trip the Reactor and actuate SI D. (1) is NOT (2) align Charging pump suction to RWST and commence unit shutdown
FZj4 Which one of the following completes the statements below for Unit Pressurizer Heater Group 1A is powered from 600V (1)
Pressurizer Heater Group 1 B is powered from 600V JJ.
A. (1)LC1A (2) LC iN B. (i)LC1M (2) LC iN C. (1)LC1M (2)LC1C D. fi)LC1A (2) LC 1C
- 15. Unit I was operating at 100% power when the following occurred:
At 1000
- A Large break LOCA occurs.
At 1430
- The crew exits ESP-1 .3, Transfer to Cold Leg Recirculation, and transitions back to EEP-1, Loss of Reactor or Secondary Coolant.
- The control room staff is evaluating conditions for entry into ESP-1 .4, Transfer to Simultaneous Cold and Hot Leg Recirculation.
Which one of the following completes the statements below?
The earliest time the operating crew may transfer to Simultaneous Cold and Hot Leg Recirculation is at (1)
The reason to transfer to Simultaneous Cold and Hot Leg Recirculation is to (2)
A. (1) 1730 (2) ensure refill of the reactor vessel and downcomer region B. (1)2200 (2) ensure refill of the reactor vessel and downcomer region C. (1) 1730 (2) prevent boron precipitation that could adversely affect core cooling D. (1)2200 (2) prevent boron precipitation that could adversely affect core cooling
- 16. Unit 1 is at 90% power with the following conditions:
- Pressurizer pressure is 2220 psig.
- RCS Tavg is 570°F.
- AFDis+4%.
Which one of the following will cause an OTzT trip setpoint to lower?
A. An RCS boration occurs.
B. PT-456, PRZR PRESS, fails low.
C. Pressurizer Backup Heaters are energized.
D. N44, POWER RANGE, upper detector current, fails high.
- 17. A Reactor shutdown is being performed with the following conditions:
- At 50% power, N135, Intermediate Range, fails high.
Which one of the following completes the statements below?
If the shutdown continues and no action is taken, an automatic Reactor trip will occur when the (1) light on the Bypass and Permissive Panel extinguishes.
Per AOP-100, Instrumentation Malfunction, the operators are required to (2)
A. (1)P-10 (2) remove the N135 control power fuses B. (1)P-6 (2) remove the N135 control power fuses C. (1)P-10 (2) Place the N135 LEVEL TRIP switch in BYPASS D. (1)P-6 (2) Place the N135 LEVEL TRIP switch in BYPASS
- 18. Which one of the following completes the statement below?
The Unit I Solid State Protection System B Train Output Cabinet Slave Relays are powered from A. 120V Vital Panel 1C B. 120V Vital Panel ID C. 1 25V DC Panel 1 B D. 125VDCPaneI1E
- 19. Unit 1 is at 100% power with the following conditions:
- PT-951, CTMT Pressure, (Channel II), has been declared INOPERABLE.
- PT-951, CTMT Pressure, bistables have been placed in the position required by Technical Specification, 3.3.2, Engineered Safety Feature Actuation System Instrumentation Which one of the following completes the statements below?
A Safety Injection will occur when a minimum of (1) additional Containment pressure bistable(s) reach(es) the appropriate setpoint.
Containment Spray will actuate when a minimum of (2) additional Containment pressure bistable(s) reach(es) the appropriate setpoint.
(1) (2)
A. 1 2 B. 1 1 C. 2 2 D. 2 1
- 20. Which one of the following completes the statements below?
The signals that drive the group step counters (1) come from the Rod Control Logic Cabinet.
C-I I, Bank D Rod Stop, (2) stop auto outward rod motion on bank D rods at 220 steps.
A. (1)DO (2) WILL B. (1)do NOT (2) WILL C. (1)DO (2) will NOT D. (1)do NOT (2) will NOT
- 21. A Unit 1 Reactor trip has just occurred with the following conditions:
- FB2, Nl-35 LOSS OF COMPENSATING VOLTAGE, is in ALARM.
- N135B, IRI CURRENT, is indicating 4 x 10-10 amps and is stable.
- NI36B, 1R2 CURRENT, is indicating 8 x 10-11 amps and is slowly lowering.
Which one of the following describes the operation of the Source Range Nuclear Instruments?
Nomenclature: N31, SOURCE RANGE N32, SOURCE RANGE A. N131 and N132 cannot be energized.
B. Both N131 and NI32 have automatically energized.
C. N132 has automatically energized and Nl31 is de-energized.
D. Both N131 and N132 will remain de-energized unless operator action is taken.
- 22. Unit 1 is at 50% power with the following conditions:
- A Loss of Service Water is in progress.
- The following trends are reported for the 1A RCP:
1000 1010 1020 1030 UPPER RADIAL BEARING 190°F 200°F 220°F 225°F UPPER ThRUST BRG 170°F 180°F 195°F 195°F LOWER THRUST BRG 140°F 150°F 160°F 165°F STATOR WINDING 225°F 250°F 310°F 350°F LOWER RADIAL BRG 170°F 180°F 195°F 195°F LOWER SEAL WATER BEARING 180°F 190°F 195°F 205°F SEAL WATER OUTLET 200°F 210°F 215°F 225°F Which one of the following is the earliest time 1A RCP must be secured?
A. 1000 B. 1010 C. 1020 D. 1030
- 23. Unit 1 is operating at 100% power and the following occurs:
The controlling channel, FT-487, lB SG FW, fails high.
Which one of the following completes the statements below?
Immediately after the failure, the 1 B SG FRV will start to (1)
Per AOP-100, Instrument Malfunction, the operator (2) required to place the 1 B SG STM FLOW SEL SWITCH to the non-affected channel.
A. (1) OPEN (2) is NOT B. (1) OPEN (2)IS C. (1) CLOSE (2) is NOT D. (1) CLOSE (2) IS
- 24. Unit 1 is operating at 100% when the following occurs:
At 1000:
- A Loss of all Offsite power occurs.
- The lB DG fails to start.
At 1010:
- A large steam break occurs in Containment.
- Containment pressure is 37 psig and rising.
- EEP-2, Faulted Steam Generator Isolation, is in progress.
Which one of the following completes the statements below?
At 1015, (1) CTMT cooler fan(s) automatically started in slow speed.
Containment pressure (2) exceed 54 psig.
(1) (2)
A. 1 WILL B. 2 WILL C. I will NOT D. 2 will NOT
- 25. Unit 1 is operating at 100% power with the following conditions:
- PRZR LVL CONT CH LS1459Z is in the I/Il (LT459/60) position.
Subsequently, LT-459, PRZR LVL, fails high.
Which one of the following describes the long term affect of the automatic response of the Pressurizer level control system?
Pressurizer level will Assume no operator action A. remain stable B. lower until a Low Pressure 31 ocurs C. initially rise and keep rising until a\Pressurizer High Level Reactor trip occurs D. initially lower then rise until a Press rizer High Level Reactor trip occurs B. lower until a Pressurizer Low Pressure SI occurs
- 26. A Reactor trip occurred on Unit 1 with the following conditions:
2 Control Rods failed to insert into the core.
- RCS Tavg is 535° F and stable.
Which one of the following completes the statements below?
Per ESP-0. I Reactor Trip Response, the operating crew is required to Emergency Borate a minimum of (1) gallons.
The reason for the requited amount of botation is to ensure (2)
A. (1) 5000 (2) adequate shutdown margin is established B. (1)5000 (2) cold shutdown boron concentration is achieved C. (1)5420 (2) adequate shutdown margin is established D. (1)5420 (2) cold shutdown boron concentration is achieved
- 27. The following conditions exist on Unit 1:
- The Unit is in Mode 5, drained to just above mid-loop.
RHR flow as indicated on FI-605A, is unstable.
1A RHR pump amps are oscillating.
- The Rad Side SO reports that the noise level of the 1A RHR pump has increased significantly from last observation.
Per ADP-12.O, Residual Heat Removal Malfunction, which one of the following describes the next required action(s) to be taken?
A. Initiate makeup to the RCS ONLY.
B. Slowly close HIK 603A, 1A RHR HX DISCH VLV.
C. Start the 1 B RHR pump and when running, stop the 1A RHR pump ONLY D. Initiate makeup to the RCS, then start the 1 B RHR pump and when running, stop the 1A RHR pump.
- 28. A Large Break LOCA has occurred on Unit 1 with the following conditions:
At 1000:
- Containment pressure is 22 psig and lowering.
- No ESF actuations have been Reset.
- CH4, RWST LVL A TRN LO-LO, is in alarm.
- CH5, RWST LVL B TRN LO-LO, is in alarm.
At 1001:
- MOV-8820A, 1A CS PUMP TO SPRAY HDR ISO, handswitch is taken to CLOSE and allowed to spring return to AUTO.
Which one of the following completes the statements below?
At 1000, MOV-8826A & 8827A, CTMT SUMP TO IA CS PUMP and MOV-8826B & 8827B, CTMT SUMP TO lB CS PUMP, (1) automatically open.
At 1005, after all valve motion is complete, MOV-8820A will be (2)
(1) (2)
A. will NOT closed B. WILL closed C. will NOT open D. WILL open
- 29. Unit 1 is in Mode 3 with the following conditions:
- 4160V F and G buses are 3800V and stable.
- The following annunciators are in alarm:
VE2, IG, 4KV BUS OV-OR-UV OR LOSS OF DC WE2, 1 F, 4KV BUS OV-OR-UV OR LOSS OF DC Which of the following completes the statements below?
The operating crew (1) required to enter a REQUIRED ACTION Statement of Technical Specification 3.3.5, Loss of Power (LOP) Diesel Generator (DG)
Start Instrumentation.
Per AOP-5.2, Degraded Grid, the operating crew is required to (2)
A. (1) IS (2) start the Diesel Generators in preparation for a loss of offsite power B. (1) is NOT (2) start the Diesel Generators in preparation for a loss of offsite power C. (1) IS (2) align the Diesel Generators for autostart D. (1) is NOT (2) align the Diesel Generators for autostart
- 30. Unit 1 is at 100% power with the following conditions:
- PT-444, PRZR PRESS, transmitter has failed low.
- Operators have entered AOP-100, Instrument Malfunction.
- PK-444A, PRZR PRESS REFERENCE, is in MANUAL and set at 35% demand.
- ALL Backup Heaters are in the ON position.
- RCS pressure is 2270 psig and stable.
Which one of the following will be effective in lowering RCS pressure?
A. Place PK-444C in AUTO.
B. Place PK-444A in AUTO.
C. Raise the demand on PK-444A to 57.5%.
D. Place PK-444D in MAN and lower the demand on the controller to 0%.
- 31. Which one of the following completes the statements below?
During the post LOCA recirculation phase, to maximize absorption of Iodine from the Containment atmosphere, the Containment Spray System sprays water with (1) added at a pH of approximately (2)
(1) (2)
A. Trisodium Phosphate 4.5 B. Sodium Hydroxide 7.5 C. Trisodium Phosphate 7.5 D. Sodium Hydroxide 10.5
- 32. The following conditions exists on Unit 1:
- FRP-S.1, Response to Nuclear Power Generation I ATWT, is in progress.
Subsequently, the Rover opened both Reactor Trip breakers locally.
- RCS Tavg is 560°F.
Which one of the following describes the direct effect of this action?
A. The MDAFW pumps automatically start.
B. Resets the High Steam flow setpointto 10%.
C. The Steam Dumps arm and the plant trip controller is enabled.
D. The Main FRV and FRV Bypass valves will interlock close immediately.
- 33. Unit 1 is operating at 40% power when the following occurs:
lB SG MSIV, QIN11HV3369B closes.
Which of the following completes the statements below?
An automatic Reactor trip (1) occur.
lB SG level initially (2)
(1) (2)
A. WILL rises B. will NOT rises C. WILL lowers D. will NOT lowers
At 1000:
- HIGHEST CORE EXIT TEMP CHAN A and B on the IPC, indicates 530°F.
- RCS cooldown is in progress.
4940
- The required RCS temperature is F.
At 1045:
- HIGHEST CORE EXIT TEMP CHAN A and B, on the IPC indicates 430°F.
Assume that the SGTR size and geometry remain constant Which one of the following completes the statements below?
The reason the RCS is initially cooled down is to (1)
Compared to the conditions at 1000, SG tube leakage rate at 1045 has (2)
A. (1) Prevent 1A SG Safeties from lifting (2) risen B. (1) Increase RCS subcooling for the subsequent RCS depressurization (2) risen C. (1) Prevent IA SG Safeties from lifting (2) lowered D. (1) Increase RCS subcooling for the subsequent RCS depressurization (2) lowered
-- 35. Unit 1 is at 12% power, and the following conditions exist:
- R-15B, TURB BLDG VNTL, is trending up but not in alarm.
Which one of the following completes the statements below?
(1) will be the first radiation monitor to alarm and provide indication that a SG tube leak exists.
After placing the SJAE Filtration System in service, R-15B, TURB BLDG VNTL, reading will (2)
Nomenclature: R-19, SGBD SAMPLE R-70A, 1A SG TUBE LEAK DET (1) (2)
A. R-19 lower B. R-19 continue rising C. R-70A lower D. R-70A continue rising
- 36. Unit I is in Mode 3 after a Reactor trip with the following conditions:
- An RCS cooldown is in progress.
- RCS Tavg is 520°F and slowly lowering.
- RCS pressure is 1900 psig and stable.
The Steam Dumps are in service in the STM PRESS mode with the following conditions:
- STM DUMP INTERLOCK A and B TRN switches are in ON after both switches were taken to BYP INTLK and released.
- All ESF blocks required for these conditions have been performed.
Which one of the following describes the effect of PT-464, STM HDR PRESS, pressure transmitter failing high?
A. The steam dump valves will immediately close resulting in a heat up transient of the RCS.
B. Some Steam Dumps will fully open and the RCS will experience a cooling transient which will continue until operator action is taken.
C. Closure of the MSIVs will occur due to high steam flow condition coincident with LO LO Tavg.
D. Some Steam Dumps will fully open and the RCS will experience a cooling transient which will be followed by a closure of the MSIVs due to low SG pressure.
The following conditions exist on Unit 1:
- 1 B SG is faulted and the operating crew is performing the actions of EEP-2, Faulted Steam Generator Isolation.
- The MSVR is not accessible.
- Only the TDAFW pump is running.
- Steam Generator narrow range levels are as follows:
- 1A=19%
- 1B=O%
- 1C=15%
Per EEP-2, which one of the following completes the statements below?
Airisrequiredtobefailedto (1)
HV-3235N3226 (2) required to be placed in LOCAL then STOP at the HSDP.
Nomenclature: HV-3235A, TDAFW STM SUPP FROM 1 B SG HV-3226, TDAFWP STM SUPP ISO HV-3235N3226, TDAFWP STM SUPP FROM 1 B SG (1) (2)
A. HV-3235A is NOT B. HV-3226 is NOT C. HV-3235A IS D. HV-3226 IS
- 38. Unit 2 is operating at 50% power with the following conditions:
At 1000:
- Condenser pressure starts to rise.
- KK1, TURB COND VAC LO, comes into alarm.
- AOP.-8.0, Partial Loss of Condenser Vacuum, is entered.
At 101 5:
- Power has been reduced to 37% and the unit is ramping down.
- KK2, TURB COND VAC LO LO, comes into alarm.
- Condenser pressure has risen to 3.9 psia.
Which one of the following completes the statements below At 1015?
The Main Turbine (1) automatically trip.
A manual Reactor trip (2) required.
(1) (2)
A. DID IS B. did NOT IS C. DID is NOT D. did NOT is NOT
- 39. The following conditions exist on Unit 1:
- FRP-H. 1, Response to Loss of Secondary Heat Sink, is in progress.
- All SG wide range levels are 40% and slowly lowering.
Which one of the following completes the statement below?
The operating crew is required to stop (1) to (2)
A. (1) ALL RCPs (2) minimize heat input to the RCS ONLY B. (1) ALL but one RCP (2) minimize heat input to the RCS while maintaining spray capability C. (1) ALL RCPs (2) minimize heat input to the RCS while preventing damage to RCP seals during pressure reduction D. (1) ALL but one RCP (2) minimize heat input to the RCS while maintaining forced flow cooling
- 40. A loss of all AC power has occurred on Unit 1 and the following conditions exist:
- The operating crew has completed the step in ECP-0.0, Loss Of All AC Power, to verify breakers for major loads OPEN.
- A Safety Injection occurs on Unit 1.
- The Shift Supervisor has directed operators to start the 2C DG and supply powerto Unit 1.
Which one of the following completes the statements below?
The 2C DG will be started from the EPB in (1) using the START pushbutton.
After the 2C DG is started, ESF loads (2)
A. 1)Mode2
- 2) will automatically start B. 1)Mode2
- 2) have to be manually aligned C. 1)Model
- 2) will automatically start D. 1)Model
- 2) have to be manually aligned
-- 41.A Loss of all Offsite Power has occurred on Unit 1 with the foHowing conditions:
- 1 B DG is Tagged Out.
- 1-2ADGfailedtoautostart.
- Operators are performing step 1 of ECP-O.O, Loss of All AC power.
Which one of the following completes the statement below?
Reactor trip and Bypass Breaker indication (1) available.
DRPI indication (2) available.
(1) (2)
A. IS is NOT B. is NOT IS C. IS IS D. is NOT is NOT
- 42. Unit 2 is operating at 100% power when a SG tube leak occurs and the following conditions exist:
- R-23B, SGBD TO DILUTION, alarms.
- No other radiation monitors are in alarm.
Which one of the following completes the statement below?
FCV-1 152, SGBD HX OUTLET FCV (1) automatically close as a direct result of R-23B alarming.
Per FH1, RMS HIGH RAD, the SGs (2) required to be sampled.
(1) (2)
A. will NOT ARE B. will NOT are NOT C. WILL ARE D. WILL are NOT
- 43. Unit 1 is operating at 33% power and the following conditions exist:
- IA and lB Condensate pumps are running.
Subsequently, the following conditions are observed:
KB4, SGFP SUCTION PRESS LOW, comes into alarm and the operating crew observes the following on PR4039, SGFP SUCT PRESS:
Time Osec lOsec 20sec 30sec 300 psig 275 psig 265 psig 300 psig Which one of the following completes the statements below?
At time 30 seconds, SGFP suction pressure improved because the (1)
Per AOP-13, Condensate and Feedwater Malfunction, the operating crew is required to (2)
A. (I) standby Condensate pump started (2) rapidly reduce Turbine load using AOP-17.1, Rapid Turbine Power Reduction, and ensure SGFP suction pressure stabilizes above 275 psig B. (1) standby Condensate pump started (2) check SGFP suction pressure stabilizes above 275 psig C. (1) 1A SGFP tripped (2) trip the Reactor and enter EEP-0, Reactor Trip or Safety Injection D. (1) lASGFPtripped (2) trip the Main Turbine and enter AOP-3.0, Turbine Trip Below P-9 Setpoint
- 44. Unit 1 is in MODE 4 with the following conditions:
- A heatup is in progress per UOP-1 .1, Startup of Unit from Cold Shutdown to Hot Standby.
- 1A MDAFW pump is running.
- SG NR Levels are being maintained at 61-69%.
Subsequently, the following annunciator alarms:
- JJ1, 1AMDAFWPOVERCURRENTTRIP Which one of the following completes the statements below?
The earliest time that the I B MDAFW will start is when (1)
MDAFW FCVs will (2) when the 1 B MDAFW auto starts.
A. (1) any two SG NR levels reach their Lo-Lo Level setpoint (2) remain throttled B. (1) any two SG NR levels reach their Lo-Lo Level setpoint (2) fully open C. (1) any one SG NR level reaches its Lo-Lo Level setpoint (2) remain throttled D. (1) any one SG NR level reaches its Lo-Lo Level setpoint (2) fully open
- 45. Unit I is performing a plant heatup with the following conditions:
IA RHR pump control power breaker is opened.
Which of the following completes the statements below?
IA RHR pump breaker, DF-09, (1) be locally closed without control power.
DF-09 indication (2) available at the MCB.
(1) (2)
A. CAN is NOT B. CANNOT is NOT C. CAN IS D. CANNOT IS
- 46. Unit 1 is operating at 100% when the following occurs:
- 1A Start Up transformer becomes de-energized.
- A Safety Injection occurs.
Which one of the following completes the statements below?
Per Attachment 3 of EEP-0, Reactor Trip or Safety Injection, MOV-51 5 &
MOV-517, SW TO TURB BLDG ISO A & B TRN are verified (1)
The purpose for MOV-515 & MOV-517 being in their current position isto (2)
A. (1) Closed (2) ensure adequate Service Water flow to safety related equipment during accident conditions B. (1) Closed (2) ensure a break in non-safety related piping will not result in loss of cooling during accident conditions C. (1) Throttled (2) ensure adequate Service Water flow the Service Air Compressors D. (1) Throttled (2) ensure adequate Service Water flow to lube oil coolers in the Turbine Building
- 47. Which one of the following completes the statement below?
An Undervoltage condition on the will directly result in the auto start of the 1-2A Diesel Generator.
A. lH4l6Ovoltbus B. lA4l6Ovoltbus C. lF4l6Ovoltbus D. JK4l6Ovoltbus
- 48. Which one of the following completes the statement below?
Each Aux Building Battery Charger is designed to restore the associated battery from fully discharged to fully charged in (1)
The method to ensure that only one DC bus at a time is supplied from the 1C Aux Building Battery Charger is the use of (2) interlocks.
A. (1)2hours (2) electrical B. (1) 2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br /> (2) key C. (1) 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> (2) electrical D. (1) 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> (2) key
- 49. Given the following conditions:
- The I B DG is being paralleled with the 1 G bus.
- The Synchroscope is turning fast in the FAST direction.
Which one of the following completes the statements below?
The (1) has the highest Frequency.
The (2) switch must be adjusted to slow the Synchroscope.
(1) (2)
A. I G Bus VOLTAGE ADJUST VOLTS/MVARS B. 1G Bus GOVERNOR MOTOR SPEED/MW C. I B DG VOLTAGE ADJUST VOLTS/MVARS D. 1BDG GOVERNOR MOTORSPEED/MW
- 50. Unit I is at 10% power with the following conditions:
At 1000:
- The UO is in the process of transferring from FRV Bypass to Main FRV:
- All Main Feed Regulating Valve controllers are in MAN.
- All Main Feed Regulating Valves Bypass controllers are in AUTO.
At 1005:
- The following MOB alarms are in alarm:
- Pl-4004B, INST AIR PRESS, reads 35 psig and lowering.
- All Main Feed Regulating Valves Bypass controller demands are rising.
- NR SGWL are all 35% and lowering.
Which of the following completes the statements below?
At 1005, per AOP-6.0, Loss of Instrument Air, a Reactor Trip (1) required.
When required, per AOP-6.0, a method the operating crew can use to control Pressurizer level is alternately cycling open and closed (2)
A. (1) IS (2) MOV-8107 or MOV-8108, CHG PUMPS TO REGENERATIVE HX B. (1) IS (2) MOV-8803A or MOV-8803B, HHSI TO ROS CL ISO
- 0. (1) is NOT (2) MOV-8107 or MOV-8108, CHG PUMPS TO REGENERATIVE HX D. (1) is NOT (2) MOV-8803A or MOV-8803B, HHSI TO RCS CL ISO
- 51. A VCT purge is in progress to the Waste Gas system with the following conditions:
- The Waste Gas H2 recombiners are bypassed.
- Gas concentrations in the Waste Gas System are currently as follows:
- Hydrogen Levels: 4%
- Oxygen Levels: 6%
Which of the following completes the statements below?
Under the current plant conditions, monitoring of hydrogen and oxygen concentration in the Waste Gas system is performed by (1)
PerTRM 13.12.3, Waste Gas Monitoring, operators are required to immediately (2)
A. (1) Chemistry sampling activities (2) place a Waste Gas H2 recombiner in service to lower H2 gas concentration B. (1) Chemistry sampling activities (2) secure the VCT purge to waste gas C. (1) an operator obtaining readings locally (2) place a Waste Gas H2 recombiner in service to lower H2 gas concentration D. (1) an operator obtaining readings locally (2) secure the VCT purge to waste gas
- 52. Unit 1 is in Mode 6 with the following conditions:
- Fuel movement preparations are in progress in the Unit I Spent Fuel Pool.
Which one of the following completes the following statement?
R-5 losing instrument power (1) cause an audible alarm in the SFP.
A REQUIRED ACTION of TR 13.3.4, Radiation Monitoring System, (2) required to be performed.
A. (1) wilINOT (2) is NOT B. (1) wilINOT (2) IS C. (1) WILL (2) is NOT D. (1) WILL (2) IS
- 53. Unit I is operating at 100% when the following condition occurs:
R-19, SGBD SAMPLE, fails HIGH.
Which one of the following completes the statements below?
(1) valves will automatically close.
Per SOP-45.0, Radiation Monitoring System, the actions required to allow the Shift Chemist to obtain a sample of the SGs is to (2)
A. 1) HV-3328, HV-3329 AND HV-3330, STEAM GEN lA/lB/iC SAMPLE ISO,
- 2) pull the INSTRUMENT power fuses for R-1 9 B. 1) HV-3328, HV-3329 AND HV-3330, STEAM GEN lA/lB/IC SAMPLE ISO,
- 2) place R-19 Operations Selector Switch to the RESET position C. 1) HV-3179A, 3l80A, AND 3181A, STEAM GEN lA/lB/iC LOWER BLOWDOWN,
- 2) pull the INSTRUMENT power fuses for R-19 D. I) HV-3179A, 3180A, AND 3181A, STEAM GEN IA/lB/iC LOWER BLOWDOWN,
- 2) place R-19 Operations Selector Switch to the RESET position
- 54. Which one of the following completes the statement below?
When directed by FRP-C.1, Response to Inadequate Core Cooling, all RCPs are stopped A. to enhance LHSI flow to the core B. to minimize heat input to the SGs allowing them to depressurize faster C. to increase subcooling margin by reducing heat input from RCPs D. in anticipation of a loss of RCP #1 seal \P requirements
- 55. The following condition exists on Unit 1:
DFO2-1, 1 F 4160 V bus tie to 1K 4160 V bus, has tripped.
Which one of the following completes the statement below?
The has lost Service Water cooling.
A. 600V LC 1 E Cooler B. 1A Instrument Air Compressor C. 1A Reactor Coolant Pump Motor Air Cooler D. 1C Component Cooling Water Heat Exchanger
- 56. Given the following condition on Unit 1:
Pl-4004B, INST AIR PRESS, reads 70 psi9 and stable.
Which one of the following completes the statement below?
KD2, IA PRESS LO, (1) in alarm.
V-901, SERVICE AIR HDR AUTO ISO, (2) closed.
(1) (2)
A. IS is NOT B. IS IS C. is NOT is NOT D. is NOT IS
- 57. Which one of the following completes the statements below?
(1) will isolate instrument air to the Turbine Building.
The highest pressure that will result in isolation of Instrument air to the Turbine Building is (2)
(1) (2)
A. V-903, ESSENTIAL IA HDR AUTO ISO 55 PSIG B. V-903, ESSENTIAL IA HDR AUTO ISO 45 PSIG C. V-904, NON-ESS IA HDR AUTO ISO 55 PSIG D. V-904, NON-ESS IA HDR AUTO ISO 45 PSIG
- 58. Which one of the following completes the statement below?
The capacity of each Fire Protection Storage Tank is (1) and the normal source of makeup is from (2)
(1) (2)
A. 500,000 gallons Service Water B. 300,000 gallons Service Water C. 500,000 gallons Well Water D. 300,000 gallons Well Water
- 59. A Large Break LOCA has occurred on Unit 2 and the following condition exists:
Containment pressure has risen to 18 psig and is stable.
Which one of the following completes the statements below?
R-11, CTMT PARTICULATE and R-12, CTMT GAS, (1) isolated.
MOV-8100, RCP SEAL WTR RTN ISO, (2) closed.
(1) (2)
A. ARE is NOT B. ARE IS C. are NOT is NOT D. are NOT IS
6O. Unit I is performing core offload.
Which one of the following completes the statements below?
Containment Main Purge (1) be running.
Per STP-18.4, the Maintenance Closure Response Team must be able to complete installation of the Equipment Hatch in a maximum of (2)
Nomenclature: STP-18.4, Containment Mid-Loop And/Or Refueling Integrity Verification And Containment Closure A. CANNOT 1 hr B. CANNOT 2hrs C. CAN lhr D. CAN 2hrs
- 61. Unit 1 is at 100% power with the following conditions:
- Multiple alarms have occurred.
- Performance of Immediate Operator Actions (IDAs) of AOP-100, Instrument Malfunction, is in progress.
Which one of the following completes the statements below?
When the operator makes the initial communication that they are performing lOAs, the Shift Supervisor (1) required to repeat back the communication.
If any subsequent alarms occur during performance of AOP-1 00, (2) must be announced.
(1) (2)
A. IS only significant alarms B. is NOT only significant alarms C. IS all alarms D. is NOT all alarms
- 62. Which one of the following completes the statements below?
The (1) has a relief valve that will direct its discharge directly to the (2)
A. PRT RCDT B. CCW Surge Tank Floor Drain Tank C. PRT Containment Sump D. COW Surge Tank Waste Holdup Tank
- 63. Both Units ate operating at 100% power with the following conditions:
- A non-licensed Fire Protection Administrator who is qualified as a Shift Communicator is on shift.
Which one of the following completes the statements below?
Per EIP-0.0, Emergency Organization, a minimum of (1) licensed Plant Operators are required to staff the current shift.
Pet Technical Specifications, if one of the required licensed Plant Operators goes home sick, a replacement must be provided within (2)
(1) (2)
A. 3 ihour B. 3 2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br /> C. 4 ihour D. 4 2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br />
- 64. Unit 1 isat 30% power and the following condftions exist:
- All SG NR levels are 65% and stable.
- The 1A SGFP is in service and in manual control.
- The following is observed:
P1 P1 464A 508 12 1%
1 12 08 1 08 - 0.8 0.4 08 P : : P x x
- I 0 - 10 0 02 I STM FW HDR HUR I PRESS PRESS L. ....
- The Main Feedwater Regulating Valves are approximately 25% demand and in AUTO.
- The Feedwater Bypass Valves are approximately 10% demand in MANUAL.
Which one of the following completes the statements below?
1A SGFP speed (1) required to be adjusted.
Per UOP-3.1, Power Operation, the Feedwater Bypass Valves are required to be closed prior to exceeding (2) Reactor power.
(1) (2)
A. is NOT 35%
B. is NOT 50%
C. IS 35%
D. IS 50%
- 65. The following plant conditions exist:
- Unit 1 is operating at 100% power.
- Unit2isinMode5.
Subsequently, the following conditions exist:
- All off-site transmission lines to the 230 KV switchyerd
- No other damage has been reported.
Which one of the following completes the statements below?
Unit 1 - REQUIRED ACTION(S) per LCO 3.8.1, AC Sources Operating, is (1)
Unit 2 - REQUIRED ACTION(S) per LCO 3.8.2, AC Sources Shutdown, is (2)
A. (1)NOTrequired (2) REQUIRED B. (1) REQUIRED (2) NOT required C. (1) NOT required (2) NOT required D. (1) REQUIRED (2) REQUIRED
- All 230KV offsite lines to the High Voltage Switchyard were knocked down.
- 66. Unit 1 has experienced a Steam Generator Tube Rupture on the 1C SG.
The operating crew is at the step in EEP-3, Steam Generator Tube Rupture, to isolate flow from the ruptured SG.
Which one of the following completes the statement below?
PC-3371C, IC MS ATMOS REL VLV, controller is requited to be verified in (1)
HV-3235B, TDAFWP STM SUPP FROM 1C SG (2) required to be placed in LOCAL and stopped at the HSDP.
A. (1) MANUAL and closed (2) is NOT B. (1) MANUAL and closed (2) IS C. (1) AUTO and set to approximately 1035 psig (2) is NOT D. (1) AUTO and set to approximately 1035 psig (2) IS
- 67. Which one of the following completes the statements below for operation of R-18, LIQ WASTE DISCH, radiation monitor?
Placing the OPERATION SELECTOR handswitch in the CHECK SOURCE position (1)
The CHECK SOURCE position is used to (2)
A. (1) exposes the detector to a known radioactive substance (2) verify proper monitor response B. (1) injects an electronic signal downstream of the detector (2) verify proper monitor response C. (1) exposes the detector to a known radioactive substance (2) provide a signal for monitor calibration D. (1) injects an electronic signal downstream of the detector (2) provide a signal for monitor calibration
- 68. Unit 1 has just experienced a Reactor Trip and Safety Injection, and the following conditions exist:
- The OATC and the Unit Operator UO are in the Control Room.
- The OATC is performing the Immediate Operator Actions (IOA5) of EEP-O, Reactor Trip or Safety Injection, from memory.
Which one of the following completes the statements below?
Per SOP-O.8, while the OATC is performing the IOAs from memory he (1) required to manually start CCW and AFW pumps.
The UO is required to (2)
Nomenclature: SOP-O.8, Transient Response Procedure Users Guide.
A. (1) IS (2) separately perform all IOAs B. (1) IS (2) ensure the OATC performs the lOAs correctly C. (1) is NOT (2) separately perform all IOAs D. (1) is NOT (2) ensure the OATC performs the lOAs correctly
- 69. Unit I is at 100% power with the following conditions:
At 1000:
- A malfunction has occurred affecting N141, POWER RANGE NI.
- The following annunciator windows are lit:
- FC1, PR HI FLUX-HI RNG RX TRIP ALERT
- FC3, PR HI FLUX RATE ALERT
- FD2, PR OVERPOWER AUTO/MAN ROD STOP At 1010:
- All annunciator windows on F Annunciator Panel have gone dark.
- The F Annunciator panel ONLY will not respond to the annunciator test pushbutton.
Which one of the following completes the statements below?
At 1010: Entry into AOP-35.0, Loss of Main Control Board Annunciators, (1) required.
To check the status of the associated annunciator cabinet, an operator must be dispatched to the (2)
(1) (2)
A. is NOT 1 39ft Aux Building Electrical Penetration Room B. IS l39ftAux Building Electrical Penetration Room C. is NOT Cable Spreading Room D. IS Cable Spreading Room
f 70. Unit 1 is Operating at 25% Reactor Power when the following condftions occur:
1000 1002 1003 1ASGNRLEVEL(%) 26 24 21 JBSGNRLEVELt%) 34 29 25 1CSGNRLEVEL(%) 34 31 27 JASGFP STATUS RUNNING TRIPPED TRIPPED 15 SGFP STATUS RUNNING TRIPPED TRIPPED Which one of the following completes the statements below?
The earliest time that an automatic Reactor trip should have occurred is (1)
The earliest time that all AFW pumps should have automatically started is (2)
(1) (2)
A. 1000 1002 B. 1002 1002 C. 1000 1003 D. 1002 1003
71 A Reactor Trip and Safety Injection occurred on Unit 1 and the following conditions exist:
- Containment Pressure is 17 psi9 and slowly lowering.
- Normal Charging has been established.
- Pressurizer level is 55% and lowering.
Following completion of the step in ESP-1 .1 to secure LHSI, the following conditions exist:
- Pressurizer Level indicates 35% and lowering.
- Charging flow is at maximum.
Which one of the following completes the statement below?
Per ESP-1.1, the operating crew is required to A. establish HHSI flow B. start an additional charging pump ONLY C. continue with the procedure and verify PHASE A CTMT ISO reset D. open pressurizer spray valves to reduce RCS pressure and refill the Pressurizer
- 72. Unit 1 tripped from 100% power with the following conditions:
A Steam Line break occurred in Containment.
FRP-H.1, Response To Loss Of Secondary Heat Sink, is in progress.
- Containment pressure is 40 psig and slowly lowering.
Which one of the following completes the statements below?
Bleed and Feed criteria is met as soon as two SG wide range levels are LESS THAN (1)
Phase B isolation is reset in FRP-H.1 to (2)
A. (1)12%
(2) restore CCW cooling to the RCPs B. (1) 12%
(2) restore Instrument Air to Containment C. (1)31%
(2) restore COW cooling to the RCPs D. (1)31%
(2) restore Instrument Air to Containment
- 73. A Reactor trip has occurred on Unit 1 and the following conditions exist:
At 0958:
- ESP-0.1, Reactor Trip Response, was entered.
- All SG NR levels are being maintained at 65%.
Subsequently, the following indications are observed on the JC SG:
Time 1CSG Pressure 1000 1035 psig 1010 1075 psig 1020 ll35psig 1030 1163 psig Which one of the following completes the statement below?
is the earliest time that parameters meet the requirements for entry into FRP-H.2, Response to Steam Generator Overpressure?
A. 1000 B. 1010 C. 1020 D. 1030
- 74. Unit 1 has the following conditions:
- Containment pressure is 29 psig and slowly lowering.
- Phase B failed to automatically actuate.
- FRP-Z.1, Response to High Containment Pressure, has just been entered.
Subsequently, The operating crew reaches the step to evaluate Containment Spray and the readings on the IPC as given on the next page:
Which one of the following completes the statements below?
Per FRP-Z.1, Phase B actuation (2) required.
When required, the operation of a minimum of (2) PHASE B CTMT ISO CS ACTUATION handswitchfes) will actuate Phase B Containment Isolation.
(1) (2)
A. IS one B. IS two C. is NOT one D. is NOT two
r database rnputs to a point POINT ID VALUE 1
I DESCRIP11ON Pagel oti
- 75. A Reactor Thp and Safety Injection has occurred on Unit 1 with the following conditions:
- RCS Pressure has stabilized at 1600 psig.
- The Containment CSF is YELLOW, all others are GREEN.
- Containment Pressure is 3 psig.
- R-2, CTMT 155 ft, is in HIHI alarm reading 2.4 R/HR and rising.
- R-7, SEAL TABLE, is in HIHI alarm reading 2.5 R/HR and rising.
Which of the following completes the statements below?
Adverse Containment values (1) required to be used for this event.
The applicable procedure is (2)
A. (1)areNOT (2) FRP-Z.2, Response to Containment Flooding.
B. (1) ARE (2) FRP-Z.2, Response to Containment Flooding.
C. (1) are NOT (2) FRP-Z.3, Response to High Containment Radiation.
D. (1) ARE (2) FRP-Z.3, Response to High Containment Radiation.
UNIT I FNP-1-ESP-O,1 REACTOR TRIP RESPONSE Revision 35.0 FIGURE 1 NO. 1 SEAL NORMAL OPERATING RANGE 2400 2250 2200 2000 1800 1600 No.1 Se1 1400 Di ft erential tress u r e (PSID, See 1200 oto 1) 1000 801) 600 400 200 0 .2 1 2 3 1 5 No. I Seal leak nate (6PM)
Note I [or No. I Seal Differential Pressures greater than 400 psid, use 1CS pressure in ps(g,
UNIT I FNP-1-ESP-0.l REACTOR TRIP RESPONSE Revision 35.0 FIGURE 2 RCP PRESSURE-TEMPERATURE OPERATING LIMITS 1800 1700 1600 1500 1400 1300 1200 1100 1000 RCS 900 Preure (p sig) 800 700 600 500 400 300 200 100 0
0 100 200 300 400 500 600 RGS Hot Leg Temperature fi
Answers
- 0 1 C 2 C 3 D 4 C 5 A 6 A 7 A 8 A 9 C 10 D 11 B 12 A 13 C 14 D 15 C 16 B 17 C 18 B 19 A 20 A 21 D 22 B 23 D 24 C 25 D 26 A 27 B 28 C 29 C 30 A 31 C 32 C 33 C 34 B 35 A 36 B 37 D 38 B 39 A 40 D 41 A 42 A 43 B 44 D 45 A 46 A 47 C 48 D 49 D 50 A
ANSWER KEY REPORT for RO-SRO KEY Test Form: 0 Answers
- 0 51 B 52 D 53 B 54 D 55 D 56 B 57 B 58 D 59 B 60 D 61 B 62 B 63 B 64 C 65 C 66 D 67 A 68 D 69 D 70 C 71 A 72 D 73 C 74 B 75 C 76 A 77 B 78 D 79 B 80 D 81 C 82 A 83 B 84 A 85 C 86 D 87 B 88 A 89 B 90 B 91 C 92 D 93 A 94 C 95 A 96 D 97 C 98 B
ANSWER KEY REPORT for RO-SRO KEY Test Form: 0 Answers
- 0 99 D 100 D