MONTHYEARML20217M2101999-10-19019 October 1999 Forwards NRC Rept Number 17, Requal Tracking Rept from Operator Licensing Tracking Sys.Rept Was Used by NRC to Schedule Requalification Exam for Operators & Record Requal Pass Dates ML18107A5601999-10-18018 October 1999 Submits 30-day Fuel Clad Temp Rept,Iaw 10CFR50.46.Rept Describes Changes to Calculated Peak Clad Temp (PCT) for Salem Generating Station Large & Small Break LOCA Analyses ML18107A5531999-10-0808 October 1999 Forwards Summary Rept of Plant Startup & Power Ascension Testing for Sgs,Unit 2 Cycle 11,per Requirements of TS 6.9.1.1 ML18107A5561999-10-0707 October 1999 Requests Relief Associated with Containment Examinations at Hope Creek & Salem Generating Stations.Attachment 1 Includes Proposed Alternatives & Supporting Justification for Relief Requests ML18107A5591999-10-0505 October 1999 Informs That Nj Dept of Environ Protection Has No Comments on License Change Request S99-07 for Sgs,Units 1 & 2 ML18107A5501999-10-0505 October 1999 Provides Current Status of Pse&G Actions Re GL 98-01, Y2K Readiness of Computer Sys at Npps, for Salem Nuclear Generating Station,Units 1 & 2 & Hope Creek Nuclear Generating Station ML18107A5521999-10-0505 October 1999 Encourages NRC to Support Abb Combustion Engineering Nuclear Power Request for Priority Review of Generic TR Re Crossflow Ultrasonic Flow Measurement Sys IR 05000272/19990071999-09-28028 September 1999 Forwards Insp Repts 50-272/99-07 & 50-306/99-07 on 990721- 0831.One Potentially Safety Significant Issue Identified Dealing with Control Room Special Ventilation System.Four Addl Issues of Low Safety Significance Identified ML18107A5341999-09-22022 September 1999 Provides Data Re Operator Licensing Exam for Salem & Hope Creek Station,In Response to NRC Form 536 (7-1999) ML18107A5421999-09-22022 September 1999 Forwards Discharge Monitoring Rept for Salem Generating Station for Aug 1999.Rept Is Required by & Prepared Specifically for EPA & Nj Dept of Environ Protection ML20212B3631999-09-14014 September 1999 Forwards Rev 13 to Salem - Hope Creek Security Plan,Iaw 10CFR50.54(p).Summary of Proposed Changes to Plan,Encl. Encl Withheld ML18107A5321999-09-13013 September 1999 Forwards Revised 10CFR50.92 Evaluation to Clarify Util Response to Question Number 1 Re Amend to Modify TS 3/4 8.1, AC Power Sources. ML18107A5351999-09-13013 September 1999 Informs That NRC Has Reviewed Pse&G Request Proposing to Modify TS Which Allow EDG to Be Operated for 24 Surveillance Test During Any Mode,Iaw 10CFR50.91(b) & Has No Comments ML18107A5331999-09-13013 September 1999 Provides Notification That PSEG Intends to Utilize ASME Code Case N-481 During Second ISI Interval at Sgs Units 1 & 2 ML18107A5221999-09-0808 September 1999 Requests Approval to Use ASME Code Case N546,which Provides Alternative Qualification Requirements That Allow Personnel Most Familiar with Walkdown of Plant Sys,Like License Operators to Perform VT-2 Examinations ML18107A5231999-09-0808 September 1999 Forwards Salem Generating Station Semiannual Radioactive Effluent Release Rept for Jan-June 1999. Rept Summarizes Liquid & Gaseous Releases & Solid Waste Shipments from Salem Generating Station for Period of Jan-June 1999 ML18107A4981999-08-26026 August 1999 Forwards Response to NOV That Resulted from Predecisional Enforcement Conference Conducted on 990624.Corrective Actions:Communications to Supervisors Reinforced Employee Right & Duty to Raise Nuclear Safety Issues ML18107A5181999-08-26026 August 1999 Forwards Ninety Day Rept for ISI Activities Conducted at Sgs,Unit 2 During Ninth Extended Outage & Tenth Refueling Outage.List of Encl,Provided ML18107A5061999-08-26026 August 1999 Provides First Feedback from Observation of NRC Insp Under Pilot Nuclear Power Plant Insp Program.Attached Are Completed Insp Feedback Forms for Procedure 71111, Attachment 21 & Procedure 71151 ML18107A5051999-08-24024 August 1999 Informs That Nj Dept of Environ Protection Bureau of Nuclear Engineering Has Reviewed Request IAW Requirements of 10CFR50.91(b) & Has No Comments Re Amend to FOL Change Request S99-02 to Modify TS Re Penetration Valves ML18107A4921999-08-23023 August 1999 Provides Suppl Info Re 971024 Amend Request to Modify TS 3/4 7.7, Auxiliary Bldg Exhaust Air Filtration Sys. Util Withdraws from Request All Proposed Changes Associated with Filter Testing,Per Issuance of GL 99-02 ML18107A4911999-08-20020 August 1999 Forwards Revised Plant Attribute Libraries for Salem & Hope Creek Generating Stations,Iaw 10CFR50,App E,Vi, Emergency Response Data Sys, 3.b.Changes Are Identified by Rev Bars ML18107A4861999-08-19019 August 1999 Forwards NPDES Discharge Monitoring Rept, for Salem Generating Station for Month of Jul 1999.Rept Required by & Prepared Specifically for EPA & Nj Dept of Environ Protection ML18107A4831999-08-18018 August 1999 Submits Licensee Comments on NRC 990730 Ltr Which Provided Notification of Close Out of TAC Numbers MA0567 & MA0568 Re GL 92-01,Rev 1,Suppl 1 ML18107A4801999-08-13013 August 1999 Requests That Pse&Gs Contact in NUREG-0383, Directory of Compliance for Radioactive Matl Packages, Be Changed ML18107A4751999-08-0505 August 1999 Forwards Fitness for Duty Performance Data Rept for Six Month Period Ending 990630 ML20210M7571999-08-0404 August 1999 Forwards Response to Requesting Addl Info Re Status of Decommissioning Funding for Lgs,Pbaps & Sngs. Attachment Provides Restatement of Questions Followed by Response ML18107A4531999-07-20020 July 1999 Forwards Discharge Monitoring Rept for Salem Generating Station, for June 1999.Rept Is Required by & Prepared for EPA & Nj Dept of Environ Protection ML18107A4431999-07-0606 July 1999 Informs That Nj Dept of Environ Protection Bureau of Nuclear Engineering Has Reviewed Pse&G License Change Request S98-17 Re Permissible Enrichment Values for New Fuel Storage & Has No Comments ML20196J6301999-07-0101 July 1999 Requests Addl Info Re Status of Decommissioning Funding for Limerick Generating Station,Units 1 & 2,Peach Bottom Atomic Power Station,Units 1,2 & 3 & Salem Nuclear Generating Station,Units 1 & 2 ML18107A4181999-06-30030 June 1999 Submits Response to NRC Request for Info Re Y2K Readiness at Npps,Per GL 98-01,suppl 1.Disclosure Encl ML20209B6751999-06-29029 June 1999 Ack Receipt of from Dr Powell in Response to NRC Re Fitness for Duty.Attachment 2 of Will Be Withheld from Public Disclosure,Per 10CFR2.790 ML18107A4131999-06-25025 June 1999 Provides Further Clarification of Licensing & Design Basis for 125 Vdc Battery Margins for Sgs & HCGS for Meeting Station SBO & Loca/Loop Loading Requirements,Per Util 990426 Ltr & Discussion with NRC ML18107A4091999-06-22022 June 1999 Forwards Discharge Monitoring Rept for May 1999,containing Info as Required by Permit NJ0005622.Rept Prepared Specifically for EPA & Nj Dept of Environ Protection ML18107A4061999-06-21021 June 1999 Provides Supplemental Info to Proposed License Amend, Modifying TS 3/4 7.7, Auxiliary Bldg Exhaust Air Filtration Sys. Info Re Acceptance Criterion Discussed ML18107A3691999-06-11011 June 1999 Forwards Corrected Monthly Operating Rept for Apr 1999 for Salem Generating Station,Unit 1.Original Submittal Contained Typo for year-to-date Value for Numbers of Hours Generator Was on Line (Service Hours) ML18107A3641999-06-0404 June 1999 Requests Enforcement Discretion for TS 3/4.6.2.3 Re Containment Cooling Sys for Salem Generating Station,Unit 1 ML18107A3561999-06-0303 June 1999 Informs That Nj Dept of Environ Protection Bureau of Nuclear Engineering Has Reviewed Pse&G License Change Request S99-05 & Has No Comments ML18107A3611999-05-27027 May 1999 Forwards Responses to NRC 990301 & 990323 RAIs for Salem & Hope Creek Generating Stations Relating to GL 96-05 ML18107A3301999-05-24024 May 1999 Forwards Suppl Info Re GL 95-07, Pressure Locking & Thermal Binding of Safety Related Power Operated Gate Valves. Encl Contains Methodology Used in Determination of Pressure Locking Susceptibility of PORVs Block Valves ML18107A3371999-05-21021 May 1999 Forwards NPDES Discharge Monitoring for Salem Generating Station for Apr 1999, Containing Info as Required by Permit NJ0005622 ML18107A3291999-05-20020 May 1999 Forwards Redacted Response to NRC 990322 RAI Re Notification of Licensed Operator That Tested Positive for Alcohol. Attachment 2 Withheld,Per 10CFR2.790(a)(6) ML18107A3031999-05-18018 May 1999 Provides Summary of Changes to NRC Commitments That Have Been Made But Not Reported by Other Means,Iaw with NEI Process for Managing NRC Commitments ML18107A2891999-05-13013 May 1999 Forwards Rev 36 to Pse&G Nuclear Business Unit Emergency Plan. Rev 36 Incorporates Changes to Section 1-3,6 & 7 & 9-17.Attached Copy Includes All Sections of EP for Completeness ML18107A2951999-05-12012 May 1999 Submits SG Tube Plugging Rept,Per Plant TS 4.4.6.5.a.Total of 47 Tubes Were Plugged During SG Tube Insps,Which Were Completed During Plant Tenth RFO ML18107A2861999-05-11011 May 1999 Forwards Rev 0 to NFS-0174, COLR for Salem Unit 2 Cycle 11. COLR Rept Was Received by Util as Part of Reload SE ML18107A2481999-04-29029 April 1999 Forwards 1998 Annual Radiological Environ Operating Rept for Salem & Hope Creek Generating Stations. Rept Summarizes Results of Radiological Environ Surveillance Program for 1998 ML18107A2511999-04-27027 April 1999 Submits 30-day Fuel Clad Temp Rept for Salem Generating Station,Units 1 & 2.Rept Describes Changes to Calculated Peak Clad Temp (PCT) for Plant Large & Small LOCA & Small Break LOCA Analyses ML18107A2631999-04-26026 April 1999 Provides Clarification on Licensing & Design Basis for 125 Vdc Battery Margins for Sgs & HCGS for Meeting SBO & Loca/ LOOP Loading Requirements ML18107A2371999-04-26026 April 1999 Forwards Corrected Response to NRC RAI Re Licensee Request for Change to TS Permissible Enrichment Values for New Fuel Storage.Incorrect Attachment Was Provided with Util 990412 Ltr to Nrc.Encl Supersedes 990412 Submittal 1999-09-08
[Table view] Category:INCOMING CORRESPONDENCE
MONTHYEARML18107A5601999-10-18018 October 1999 Submits 30-day Fuel Clad Temp Rept,Iaw 10CFR50.46.Rept Describes Changes to Calculated Peak Clad Temp (PCT) for Salem Generating Station Large & Small Break LOCA Analyses ML18107A5531999-10-0808 October 1999 Forwards Summary Rept of Plant Startup & Power Ascension Testing for Sgs,Unit 2 Cycle 11,per Requirements of TS 6.9.1.1 ML18107A5561999-10-0707 October 1999 Requests Relief Associated with Containment Examinations at Hope Creek & Salem Generating Stations.Attachment 1 Includes Proposed Alternatives & Supporting Justification for Relief Requests ML18107A5501999-10-0505 October 1999 Provides Current Status of Pse&G Actions Re GL 98-01, Y2K Readiness of Computer Sys at Npps, for Salem Nuclear Generating Station,Units 1 & 2 & Hope Creek Nuclear Generating Station ML18107A5521999-10-0505 October 1999 Encourages NRC to Support Abb Combustion Engineering Nuclear Power Request for Priority Review of Generic TR Re Crossflow Ultrasonic Flow Measurement Sys ML18107A5591999-10-0505 October 1999 Informs That Nj Dept of Environ Protection Has No Comments on License Change Request S99-07 for Sgs,Units 1 & 2 ML18107A5341999-09-22022 September 1999 Provides Data Re Operator Licensing Exam for Salem & Hope Creek Station,In Response to NRC Form 536 (7-1999) ML20212B3631999-09-14014 September 1999 Forwards Rev 13 to Salem - Hope Creek Security Plan,Iaw 10CFR50.54(p).Summary of Proposed Changes to Plan,Encl. Encl Withheld ML18107A5321999-09-13013 September 1999 Forwards Revised 10CFR50.92 Evaluation to Clarify Util Response to Question Number 1 Re Amend to Modify TS 3/4 8.1, AC Power Sources. ML18107A5331999-09-13013 September 1999 Provides Notification That PSEG Intends to Utilize ASME Code Case N-481 During Second ISI Interval at Sgs Units 1 & 2 ML18107A5351999-09-13013 September 1999 Informs That NRC Has Reviewed Pse&G Request Proposing to Modify TS Which Allow EDG to Be Operated for 24 Surveillance Test During Any Mode,Iaw 10CFR50.91(b) & Has No Comments ML18107A5231999-09-0808 September 1999 Forwards Salem Generating Station Semiannual Radioactive Effluent Release Rept for Jan-June 1999. Rept Summarizes Liquid & Gaseous Releases & Solid Waste Shipments from Salem Generating Station for Period of Jan-June 1999 ML18107A5221999-09-0808 September 1999 Requests Approval to Use ASME Code Case N546,which Provides Alternative Qualification Requirements That Allow Personnel Most Familiar with Walkdown of Plant Sys,Like License Operators to Perform VT-2 Examinations ML18107A5061999-08-26026 August 1999 Provides First Feedback from Observation of NRC Insp Under Pilot Nuclear Power Plant Insp Program.Attached Are Completed Insp Feedback Forms for Procedure 71111, Attachment 21 & Procedure 71151 ML18107A5181999-08-26026 August 1999 Forwards Ninety Day Rept for ISI Activities Conducted at Sgs,Unit 2 During Ninth Extended Outage & Tenth Refueling Outage.List of Encl,Provided ML18107A4981999-08-26026 August 1999 Forwards Response to NOV That Resulted from Predecisional Enforcement Conference Conducted on 990624.Corrective Actions:Communications to Supervisors Reinforced Employee Right & Duty to Raise Nuclear Safety Issues ML18107A5051999-08-24024 August 1999 Informs That Nj Dept of Environ Protection Bureau of Nuclear Engineering Has Reviewed Request IAW Requirements of 10CFR50.91(b) & Has No Comments Re Amend to FOL Change Request S99-02 to Modify TS Re Penetration Valves ML18107A4921999-08-23023 August 1999 Provides Suppl Info Re 971024 Amend Request to Modify TS 3/4 7.7, Auxiliary Bldg Exhaust Air Filtration Sys. Util Withdraws from Request All Proposed Changes Associated with Filter Testing,Per Issuance of GL 99-02 ML18107A4911999-08-20020 August 1999 Forwards Revised Plant Attribute Libraries for Salem & Hope Creek Generating Stations,Iaw 10CFR50,App E,Vi, Emergency Response Data Sys, 3.b.Changes Are Identified by Rev Bars ML18107A4831999-08-18018 August 1999 Submits Licensee Comments on NRC 990730 Ltr Which Provided Notification of Close Out of TAC Numbers MA0567 & MA0568 Re GL 92-01,Rev 1,Suppl 1 ML18107A4801999-08-13013 August 1999 Requests That Pse&Gs Contact in NUREG-0383, Directory of Compliance for Radioactive Matl Packages, Be Changed ML18107A4751999-08-0505 August 1999 Forwards Fitness for Duty Performance Data Rept for Six Month Period Ending 990630 ML20210M7571999-08-0404 August 1999 Forwards Response to Requesting Addl Info Re Status of Decommissioning Funding for Lgs,Pbaps & Sngs. Attachment Provides Restatement of Questions Followed by Response ML18107A4431999-07-0606 July 1999 Informs That Nj Dept of Environ Protection Bureau of Nuclear Engineering Has Reviewed Pse&G License Change Request S98-17 Re Permissible Enrichment Values for New Fuel Storage & Has No Comments ML18107A4181999-06-30030 June 1999 Submits Response to NRC Request for Info Re Y2K Readiness at Npps,Per GL 98-01,suppl 1.Disclosure Encl ML18107A4131999-06-25025 June 1999 Provides Further Clarification of Licensing & Design Basis for 125 Vdc Battery Margins for Sgs & HCGS for Meeting Station SBO & Loca/Loop Loading Requirements,Per Util 990426 Ltr & Discussion with NRC ML18107A4061999-06-21021 June 1999 Provides Supplemental Info to Proposed License Amend, Modifying TS 3/4 7.7, Auxiliary Bldg Exhaust Air Filtration Sys. Info Re Acceptance Criterion Discussed ML18107A3691999-06-11011 June 1999 Forwards Corrected Monthly Operating Rept for Apr 1999 for Salem Generating Station,Unit 1.Original Submittal Contained Typo for year-to-date Value for Numbers of Hours Generator Was on Line (Service Hours) ML18107A3641999-06-0404 June 1999 Requests Enforcement Discretion for TS 3/4.6.2.3 Re Containment Cooling Sys for Salem Generating Station,Unit 1 ML18107A3561999-06-0303 June 1999 Informs That Nj Dept of Environ Protection Bureau of Nuclear Engineering Has Reviewed Pse&G License Change Request S99-05 & Has No Comments ML18107A3611999-05-27027 May 1999 Forwards Responses to NRC 990301 & 990323 RAIs for Salem & Hope Creek Generating Stations Relating to GL 96-05 ML18107A3301999-05-24024 May 1999 Forwards Suppl Info Re GL 95-07, Pressure Locking & Thermal Binding of Safety Related Power Operated Gate Valves. Encl Contains Methodology Used in Determination of Pressure Locking Susceptibility of PORVs Block Valves ML18107A3291999-05-20020 May 1999 Forwards Redacted Response to NRC 990322 RAI Re Notification of Licensed Operator That Tested Positive for Alcohol. Attachment 2 Withheld,Per 10CFR2.790(a)(6) ML18107A3031999-05-18018 May 1999 Provides Summary of Changes to NRC Commitments That Have Been Made But Not Reported by Other Means,Iaw with NEI Process for Managing NRC Commitments ML18107A2891999-05-13013 May 1999 Forwards Rev 36 to Pse&G Nuclear Business Unit Emergency Plan. Rev 36 Incorporates Changes to Section 1-3,6 & 7 & 9-17.Attached Copy Includes All Sections of EP for Completeness ML18107A2951999-05-12012 May 1999 Submits SG Tube Plugging Rept,Per Plant TS 4.4.6.5.a.Total of 47 Tubes Were Plugged During SG Tube Insps,Which Were Completed During Plant Tenth RFO ML18107A2861999-05-11011 May 1999 Forwards Rev 0 to NFS-0174, COLR for Salem Unit 2 Cycle 11. COLR Rept Was Received by Util as Part of Reload SE ML18107A2481999-04-29029 April 1999 Forwards 1998 Annual Radiological Environ Operating Rept for Salem & Hope Creek Generating Stations. Rept Summarizes Results of Radiological Environ Surveillance Program for 1998 ML18107A2511999-04-27027 April 1999 Submits 30-day Fuel Clad Temp Rept for Salem Generating Station,Units 1 & 2.Rept Describes Changes to Calculated Peak Clad Temp (PCT) for Plant Large & Small LOCA & Small Break LOCA Analyses ML18107A2371999-04-26026 April 1999 Forwards Corrected Response to NRC RAI Re Licensee Request for Change to TS Permissible Enrichment Values for New Fuel Storage.Incorrect Attachment Was Provided with Util 990412 Ltr to Nrc.Encl Supersedes 990412 Submittal ML18107A2631999-04-26026 April 1999 Provides Clarification on Licensing & Design Basis for 125 Vdc Battery Margins for Sgs & HCGS for Meeting SBO & Loca/ LOOP Loading Requirements ML18107A2411999-04-22022 April 1999 Forwards Draft Revised Pages 4.1 & 4.2 of Nuclear Business Unit Emergency Plan for Hope Creek & Salem Generating Stations.Changes Are Noted in Italics ML18107A1841999-04-14014 April 1999 Forwards PSEG Annual Rept for 1998, & PECO Annual Rept for 1998. Stockholders Annual Rept of Each Owner & Cash Flow Statements Showing 1998 Actual & 1999 Projected Cash Flow with Explanation Encl ML18107A1981999-04-12012 April 1999 Responds to 990312 RAI Re Request for Change to TSs Permissible Enrichment Values for New Fuel Storage,Which Was Submitted on 990202 ML18107A1691999-04-12012 April 1999 Forwards Proprietary & non-proprietary Epips,Including Rev 17 to EPIP 807,rev 1 to NC.EP-EP.ZZ-0801(Q) & Rev 2 to NC.EP-EP.ZZ-0806(Q) & Revised EPIPs Table of Contents. Proprietary Info Withheld ML20205K4541999-04-0808 April 1999 Forwards Revised Info Re 990330 NRC Nuclear Power Reactor Licensee Financial Qualifications & Decommissioning Funding Assurance Status Rept ML18106B1491999-04-0505 April 1999 Forwards Drafts of Proposed Changes to Pages 4.1 & 4.2 of Emergency Plan,Which Are Contained on Page 4.2 & Noted in Italics & Underlined ML20205F8981999-03-31031 March 1999 Provides Info Re Status of Decommissioning Funding for LGS, Units 1 & 2,PBAPS,Units 1,2 & 3 & Sgs,Units 1 & 2,per Requirements of 10CFR50.75(f)(1) ML18106B1431999-03-31031 March 1999 Forwards Pse&G Rept on Financial Min Assurance for Period Ending 981231 for Hope Creek,Salem,Units 1 & 2 & Pbaps,Units 2 & 3,IAW 10CFR50.75 ML18107A2201999-03-30030 March 1999 Forwards Final Exercise Rept for 980303,full-participation Plume Exposure Pathway Exercise & 980505-07, full-participation Ingestion Pathway Exercise of Offsite Radiological Emergency Response for Salem & Hope Creek 1999-09-08
[Table view] |
Text
Public Service Electric and Gas Company Joseph J. Hagan Public Service Electric and Gas Company P.O. Box 236, Hancocks Bridge, NJ 08038 609-339-1200 Vice President - Nuclear Operations SEP 3 0 1993 NLR-N93123 LCR 87-07, Rev. 1, Supplement 3 United states Nuclear Regulatory Commission Document control Desk Washington, DC 20555 Gentlemen: ;./"'
SUPPLEMENT TO REQUEST FOR AMENDMENT SALEM GENERATING STATION UNIT NOS. 1 AND 2 FACILITY OPERATING LICENSES DPR-70 AND DPR-75 DOCKET NOS. 50-272 AND 50-311 In accordance with the requirements of 10CFR50.90, Public Service Electric and Gas Company (PSE&G) hereby transmits a request for amendment of Facility Operating Licenses DPR-70 and DPR-75 for Salem Generating Station (SGS) Unit Nos. 1 and 2. Pursuant to the requirements of 10CFR50.91(b) (1), a copy of this request for amendment has been sent to the State of New Jersey.
The attached pages supersede the revised SGS Technical Specification pages transmitted in our request for amendment dated April 28, 1993 (NLR-N93018). The changes from the previously submitted pages are in response to NRC staff_ comments on our April 28, 1993 letter, as discussed with the Salem Licensing Project Manager, Mr. J. c. stone. In addition, the acceptable voltage range for diesel surveillance testing would be revised to be consistent with our recently revised degraded grid voltage calculation.
Attachment 1 provides the NRC staff comments on our April 28, 1993 letter, and PSE&G's proposed resolution of those comments.
The changes described in Attachment 1 do not affect the determination of No Significant Hazards Consideration of our April 28, 1993 letter. Attachment 2 describes the changes relative to the Emergency Diesel Generator (EDG) voltage acceptance criteria. It also includes our determination of No Significant Hazards Consideration from the April 28, 1993 letter, revised to include the proposed changes to the EDG voltage criteria. Attachment 3 contains the proposed Technical Specification pages revised with pen and ink changes, including the changes proposed in our letters of March 6, 1991 and April 28, 1993.
Document Control Desk NLR-N93123 SEP 3 0 1993 PSE&G requests that the implementation date for Unit 1 be no later than within 30 days following restart from the first refueling outage subsequent to issuance of the approved License Amendment. This would allow mid-cycle implementation, to accomodate procedure revision and refueling outage planning required for the changes to the Unit 1 surveillance tests performed on an 18 month cycle. For Unit 2, implementation within 60 days of issuance of the License Amendment is requested.
Sincerely, c Mr. T. T. Martin, Administrator - Region I U. S. Nuclear Regulatory Commission 475 Allendale Road King of Prussia, PA 19406 Mr. J. C. Stone, Licensing Project Manager - Salem U. s. Nuclear Regulatory Commission One White Flint North 11555 Rockville Pike Rockville, MD 20852 Mr. s. Barr (S09)
USNRC Senior Resident Inspector, Acting Mr. K. Tosch, Manager, IV NJ Department of Environmental Protection Division of Environmental Quality Bureau of Nuclear Engineering CN 415 Trenton, NJ 08625
REF: NLR-N93123 STATE OF NEW JERSEY SS.
COUNTY OF SALEM Joseph J. Hagan, being duly sworn according to law deposes and says:
I am Vice President - Nuclear Operations of Public Service Electric and Gas Company, and as such, I find the matters set forth in our letter, NLR-N93123, concerning the Salem Generating Station, Unit Nos. 1 and 2, are true to the best of my knowledge, information and belief.
1993 SHERRY L. CAGLE My Commission expires on NOTARY _PUBLIC qF NEWJER~~
H CemR11:0~100 ~v,mres.MJ!JJ::h 5, 7
NLR-N93123 ATTACHMENT 1 RESPONSE TO NRC COMMENTS PSE&G previously requested Salem EDG Technical Specification changes via letter dated April 28 ,. 1993 (NLR-N93018). The following is PSE&G's proposed resolution of comments received on our April 28, 1993 letter. *Attachment 3 contains the marked up Technical Specification pages as modified by the proposed comment resolution.
Diesel Testing While ih an Action Statement The April 28, 1993 amendment request proposed to revise Action b.
for LCO 3.8.1.1, to allow a diesel to be declared inoperable for preplanned preventive maintenance or pre-test inspection without having to start the other two diesels. This change would facilitate pre-test inspections for fluid accumulation in the engine cylinders which would avoid diesel engine damage due to hydraulic lockup, as described in NRC Information Notice 91-62.
NRC Comment: Adding "Pre-test inspection" to the Action Statement is not necessary, because the more general "preventive maintenance" would include pre-test inspections. Either "pre-test inspection" should be deleted, or the test requirements of the Improved Standard Technical Specifications should be proposed.
PSE&G Response: Because preventive maintenance includes preplanned maintenance activities, and would include pre-test inspections to detect fluid accumulation in the cylinders, "preplanned" and "pre-test inspection" are being withdrawn from the proposal.
Use of the Footnote for Testing per Manufacturer Recommendations The April 28, 1993 amendment request proposed to place an "*"
following each surveillance Requirement calling for a diesel start. The "*" note reads:
- Surveillance testing shall be conducted in accordance with the manufacturer's recommendations regarding engine prelube, warm-up and loading (unless loading times are specified in the individual Surveillance Requirements) .
This change was proposed in response to an NRC staff comment on our March 6, 1991 request, which proposed to use "*" as a general note applying to periodic testing to demonstrate diesel operability. The NRC staff had requested the footnote specifically identify each test where manufacturer's recommendations are followed. Because the footnote would apply to all diesel starts required by Technical Specifications, the
"*" was added to each Surveillance Requirement calling for a diesel start.
,--~
NIB-N93123 2 of 3 Attachment 1 NRC Comment: The "*" should be removed from proposed Surveillance Requirement 4.8.1.1.2.c (six month test), because it is a start from ambient conditions and calls for fast loading.
PSE&G Response: PSE&G proposes to retain the proposed "*" for the six month test. The footnote states that manufacturer's recommendations are followed "unless loading times are specified in the*individual Surveillance Requirements." Because ambient
- conditions specified for the six month test would be defined consistent with normal operation of the diesel auxiliary systems, the proposed six month test follows manufacturer's recommendations with the exception of the fast loading.
Therefore, the note applies to the proposed six month test.
Service Water Pump Motor Load for Load Rejection Test The April 28, 1993 amendment request proposed to revise the load used for the single largest load rejection test of proposed Surveillance Requirement 4.8.l.1.2:d.2, .to "a load greater than or equal to the maximum service water pump motor load.n This would have allowed flexibility in~th.e surveillance test criteria to reflect changes in the actual limiting motor .load (e.g~, as a result of pump impeller changes). The*April 28, 1993 letter also included a commitment to verify the maximum pump load every 18 months.
NRC Comment: The proposed change is unacceptable because it does not include a specific value for the pump motor.
PSE&G Response: ."the maximum service water pump motor load."
would be replaced with 11 820 kw." This proposed test value exceeds the present maximum pump motor load of 809 kw.
Review of Auto-Connected Loads The April 28, 1993 amendment request included a commitment for engineering to review design changes every 18 months to verify the Salem EDG auto-connected loads per the loading calculation do not exceed 2860 kw, per proposed Surveillance Requirement 4.8.1.1.2.d.8.
NRC Comment: How will the 18 month review be tracked as a surveillance requirement? Because Surveillance Requirements are generally tracked and performed by operations, the NRC staff would like assurance that a surveillance performed by engineering will be properly tracked and communicated to operations.
PSE&G Response: The review will be tracked in the Managed Maintenance Information System (MMIS) and will be a requirement in the 18 month surveillance procedures. Surveillance procedures will be revised to prompt operations to verify the engineering review has been completed. Engineering will be assigned a periodic task to perform the review.
_ _J
T NLR-N93123 3 of 3 Deletion of Footnote for Shutdown Technical Specifications The April 28, 1993 amendment request deleted the footnote for diesel starts in MODES 5 and 6, which defined valid and non-valid starts relative to loaded runs. However, the 11
- 11 corresponding to the note was not deleted.
NRC Comment: The "*" should be removed if the note is being removed.
PSE&G Response: The proposed change has been revised to remove the 11
NLR-N93123 ATTACHMENT 2 EDG VOLTAGE CRITERIA CHANGE I. DESCRIPTION OF PROPOSED CHANGE TO EDG VOLTAGE CRITERIA Revise the acceptable Emergency Diesel Generator (EDG) voltage, from 4160 +/- 420 volts to ~ 3950 and 5 4580 volts, for the following Salem Unit 1 and Unit 2 Surveillance Requirements:
4.8.1.1.2.a.2 4.8.1.1.2.c 4.8.1.1.2.d.2 4.8.1.1.2.d.3.b 4.8.1.1.2.d.4 4.8.1.1.2.d.6.b 4.8.1.1.2.d.7 II. REASON AND JUSTIFICATION FOR THE PROPOSED CHANGE The affected Surveillance Requirements include an acceptable EDG voltage range in response to various loading conditions~ The present range of 4160 +/- 420 volts is based on the Standard Technical Specification range of plus/minus 10% of the nominal voltage, consistent with a minimum operating voltage of 90%. A recent review of the Salem degraded grid calculations was performed as part of a self-assessment program. During this review, the minimum vital bus recovery voltage was calculated to be 93.2%. This recovery voltage ensures that the vital bus loads would remain operable under degraded voltage conditions.
The proposed minimum allowable EDG voltage is being increased to 3950 volts, which is 95% of nominal. This value would require EDG surveillance testing to demonstrate the voltage is above the minimum needed to ensure operability of the vital bus loads (i.e.
93.2%), within the time specified by the surveillance requirement. The proppsed val.ue is more. restrictive than that allowed by the present- Techrtical Specifications.
III. DETERMINATION OF NO SIGNIFICANT HAZARDS CONSIDERATION The following is applicable to the changes proposed in our letters dated March 6~ 1991, September 20, 1991 and April 28, 1993, as well as the changes proposed in this *document.
The proposed changes to Technical Specifications 3/4.8.1.1 and 3/4.8.1.2 for Salem Unit Nos. 1 and 2:
(1) do not involve a significant increase in the probability or consequences of an accident previously evaluated. Reducing the test frequency while in an action statement and modifying Emergency Diesel Generator (EDG) starting and loading requirements is intended to enhance diesel reliability by minimizing repetitive testing and
I NLR-N93123 Attachment 2 facilitating testing in accordance with the manufacturer's recommendations. The proposal to eliminate Action Statement operability testing for a diesel inoperable because of preventive maintenance or pre-test inspection will facilitate the performance of activities to enhance overall EDG reliability.
The proposed changes to EDG test loads will continue to demonstrate the ability of the EDG's to respond to loading conditions, consistent with the manufacturer's ratings.
Using the proposed basis for determining test frequency according to individual diesel generator performance will prevent overtesting of the diesels because it would increase the test frequency of only those diesels which have an increase in failure rate.
The changes proposed to make the Unit 1 EDG surveillance requirements identical to that of Unit 2 is a conservative change; it will provide Unit 1 with a more comprehensive testing program. The proposed changes will continue to assure availability of the diesels and should serve to enhance EDG reliability and consequently the overall safe operation of the Salem Generating station.
The proposed minimum voltage limit for surveillance testing is more restrictive than.the present Technical Specification limit. It would require EDG voltage to be above the minimum value needed to ensure operability of the vital bus loads, within the time specified by the surveillance test criteria.
(2) do not create the p6ssibility?of a new or different kind of accident from any accident previously evaluated. The proposed changes affect testing .f.requency, starting and loading practices only and hav~* no impact on the accident analysis. No new operating modes or. equipment are introduced which could initiate or aff-ect the progression of
(3) do not involve a significant reduction in a margin of safety. The changes in the testing requirements do not adversely affect the capability of the diesels to perform their required function. The purpose of the proposed changes is to increase the overall reliability of the diesels. In adopting many of the suggestions identified in GL 84-15, the requested change would implement actions which have been determined by the NRC to reduce the risk of core damage from station blackout events.
Therefore, PSE&G has concluded that the changes proposed herein do not involve a Significant Hazards Consideration.
NLR-N93123 ATTACHMENT 3