Category:Emergency Preparedness-Emergency Plan Implementing Procedures
MONTHYEARDCL-22-077, Independent Spent Fuel Storage Installation Emergency Plan Implementing Procedure Update2022-09-28028 September 2022 Independent Spent Fuel Storage Installation Emergency Plan Implementing Procedure Update DCL-19-093, Independent Spent Fuel Storage Installation - Emergency Plan Facilities and Equipment Update, Section 72019-11-18018 November 2019 Independent Spent Fuel Storage Installation - Emergency Plan Facilities and Equipment Update, Section 7 DCL-19-068, Independent Spent Fuel Storage Installation, Emergency Plan Implementing Procedure Update2019-09-12012 September 2019 Independent Spent Fuel Storage Installation, Emergency Plan Implementing Procedure Update DCL-19-014, Independent Spent Fuel Storage Installation Emergency Plan Implementing Procedure Update2019-02-14014 February 2019 Independent Spent Fuel Storage Installation Emergency Plan Implementing Procedure Update DCL-19-002, Emergency Plan Implementing Procedure Update2019-01-15015 January 2019 Emergency Plan Implementing Procedure Update DCL-18-095, Independent Spent Fuel Storage Installation Emergency Plan Implementing Procedure Update2018-11-14014 November 2018 Independent Spent Fuel Storage Installation Emergency Plan Implementing Procedure Update DCL-18-094, Independent Spent Fuel Storage Installation Emergency Plan Implementing Procedure Update2018-11-13013 November 2018 Independent Spent Fuel Storage Installation Emergency Plan Implementing Procedure Update DCL-18-082, Independent Spent Fuel Storage Installation Emergency Plan Implementing Procedure Update2018-10-15015 October 2018 Independent Spent Fuel Storage Installation Emergency Plan Implementing Procedure Update DCL-18-077, Independent Spent Fuel Storage Installation - Appendix D, Revision 5.00, Emergency Action Level Technical Basis Manual2018-10-0404 October 2018 Independent Spent Fuel Storage Installation - Appendix D, Revision 5.00, Emergency Action Level Technical Basis Manual ML18276A2492018-09-26026 September 2018 Enclosure 1 - Diablo Canyon Power Plant Emergency Plan Revision Numbers for Emergency Plan Sections and Appendices DCL-18-063, Emergency Plan Implementing Procedure Update2018-08-23023 August 2018 Emergency Plan Implementing Procedure Update DCL-18-056, Independent Spent Fuel Storage Installation Emergency Plan Implementing Procedure Update2018-07-25025 July 2018 Independent Spent Fuel Storage Installation Emergency Plan Implementing Procedure Update DCL-18-029, Independent Spent Fuel Storage Installation - Emergency Plan Implementing Procedure Update2018-04-11011 April 2018 Independent Spent Fuel Storage Installation - Emergency Plan Implementing Procedure Update L-17-014, Independent Spent Fuel Storage Installation Emergency Plan Implementing Procedure Update2017-12-21021 December 2017 Independent Spent Fuel Storage Installation Emergency Plan Implementing Procedure Update L-17-008, ISFSI - Emergency Plan Implementing Procedure Update2017-09-0707 September 2017 ISFSI - Emergency Plan Implementing Procedure Update DCL-17-016, Independent Spent Fuel Storage Installation - Submittal of Emergency Plan Implementing Procedures Update2017-03-0101 March 2017 Independent Spent Fuel Storage Installation - Submittal of Emergency Plan Implementing Procedures Update ML17047A5442017-02-16016 February 2017 Diablo Canyon Independent Spent Fuel Storage Installation Emergency Plan Implementing Procedures Update DCL-16-120, Independent Spent Fuel Storage Installation - Emergency Plan Implementing Procedures Updates2016-11-17017 November 2016 Independent Spent Fuel Storage Installation - Emergency Plan Implementing Procedures Updates DCL-16-109, Independent Spent Fuel Storage Installation - Revision to Emergency Plan Implementing Procedure Updates2016-10-19019 October 2016 Independent Spent Fuel Storage Installation - Revision to Emergency Plan Implementing Procedure Updates DCL-16-092, ISFSI Emergency Plan Implementing Procedure Update2016-09-21021 September 2016 ISFSI Emergency Plan Implementing Procedure Update DCL-16-076, Submittal of ISFSI Emergency Plan Implementing Procedure Update2016-07-26026 July 2016 Submittal of ISFSI Emergency Plan Implementing Procedure Update DCL-16-026, ISFSI - Emergency Plan Implementing Procedure Update, Including Revision 33 to EP R-2, Release of Airborne Radioactive Materials Initial Assessment2016-03-0303 March 2016 ISFSI - Emergency Plan Implementing Procedure Update, Including Revision 33 to EP R-2, Release of Airborne Radioactive Materials Initial Assessment DCL-16-004, Diablo Canyon, Units 1 and 2 - Submittal of Emergency Plan and Emergency Plan Implementing Procedure Updates (Enclosures 1, 2 & 3)2016-01-0606 January 2016 Diablo Canyon, Units 1 and 2 - Submittal of Emergency Plan and Emergency Plan Implementing Procedure Updates (Enclosures 1, 2 & 3) DCL-16-004, Submittal of Emergency Plan and Emergency Plan Implementing Procedure Updates (Enclosures 1, 2 & 3)2016-01-0606 January 2016 Submittal of Emergency Plan and Emergency Plan Implementing Procedure Updates (Enclosures 1, 2 & 3) ML16021A2812016-01-0606 January 2016 Revisions to Emergency Plan Implementing Procedure Updates (Enclosures 11 and 12) DCL-09-020, Updated Emergency Plan Implementing Procedures2009-03-30030 March 2009 Updated Emergency Plan Implementing Procedures DCL-08-096, Emergency Plan Implementing Procedure Update2008-11-19019 November 2008 Emergency Plan Implementing Procedure Update DCL-08-097, Submittal of Revision 4 to Emergency Plan Update2008-11-19019 November 2008 Submittal of Revision 4 to Emergency Plan Update DCL-04-032, Emergency Plan Implementing Procedure Update2004-03-29029 March 2004 Emergency Plan Implementing Procedure Update DCL-03-145, Emergency Plan Implementing Procedure Update2003-11-10010 November 2003 Emergency Plan Implementing Procedure Update DCL-03-128, Emergency Plan Implementing Procedure Update2003-10-13013 October 2003 Emergency Plan Implementing Procedure Update DCL-03-073, Emergency Plan Implementing Procedure Update2003-06-19019 June 2003 Emergency Plan Implementing Procedure Update DCL-03-024, Emergency Plan Implementing Procedure Update2003-03-0505 March 2003 Emergency Plan Implementing Procedure Update DCL-02-140, Emergency Plan Implementing Procedure Update2002-12-0606 December 2002 Emergency Plan Implementing Procedure Update DCL-02-130, Emergency Plan Implementing Procedure Update2002-11-0808 November 2002 Emergency Plan Implementing Procedure Update DCL-02-122, Emergency Plan Implementing Procedure Update2002-10-14014 October 2002 Emergency Plan Implementing Procedure Update DCL-02-056, Revision 31 to EP G-1, Emergency Classification and Emergency Plan Activation.2002-05-0303 May 2002 Revision 31 to EP G-1, Emergency Classification and Emergency Plan Activation. DCL-02-013, Emergency Plan Implementing Procedure Update2002-02-0808 February 2002 Emergency Plan Implementing Procedure Update DCL-00-124, Units I and 2 - Emergency Plan Implementing Procedure Update2000-09-29029 September 2000 Units I and 2 - Emergency Plan Implementing Procedure Update 2022-09-28
[Table view] Category:Letter type:DCL
MONTHYEARDCL-24-075, Response to Request for Additional Information for License Amendment Request 23-02, Application to Adopt 10 CFR 50.69, “Risk-Informed Categorization and Treatment of Structures, Systems and Components for Nuclear Power React2024-08-0808 August 2024 Response to Request for Additional Information for License Amendment Request 23-02, Application to Adopt 10 CFR 50.69, “Risk-Informed Categorization and Treatment of Structures, Systems and Components for Nuclear Power React DCL-24-070, License Amendment Request 24-03 Revision to Technical Specification 5.5.16 for Permanent Extension of Type a and Type C Leak Rate Test Frequencies2024-07-31031 July 2024 License Amendment Request 24-03 Revision to Technical Specification 5.5.16 for Permanent Extension of Type a and Type C Leak Rate Test Frequencies DCL-24-071, Core Operating Limits Report for Unit 2 Cycle 252024-07-22022 July 2024 Core Operating Limits Report for Unit 2 Cycle 25 DCL-2024-523, Submittal of Report on Discharge Self-Monitoring2024-07-18018 July 2024 Submittal of Report on Discharge Self-Monitoring DCL-2024-527, Sea Turtle Stranding Report (Loggerhead Sea Turtle) Diablo Canyon Power Plant2024-07-0101 July 2024 Sea Turtle Stranding Report (Loggerhead Sea Turtle) Diablo Canyon Power Plant DCL-24-066, Request to Extend the Nrg Approval of Alternative for Use of Full Structural Weld Overlay, REP-RHR-SWOL2024-06-27027 June 2024 Request to Extend the Nrg Approval of Alternative for Use of Full Structural Weld Overlay, REP-RHR-SWOL DCL-24-052, Responses to NRC Requests for Additional Information on the Diablo Canyon Power Plant License Renewal Application Environmental Report2024-05-16016 May 2024 Responses to NRC Requests for Additional Information on the Diablo Canyon Power Plant License Renewal Application Environmental Report DCL-24-051, One Hundred Eighty Day Steam Generator Report for Twenty-Fourth Refueling Outage2024-05-0808 May 2024 One Hundred Eighty Day Steam Generator Report for Twenty-Fourth Refueling Outage DCL-24-049, 2023 Annual Radiological Environmental Operating Report2024-05-0101 May 2024 2023 Annual Radiological Environmental Operating Report DCL-24-047, 2023 Annual Non-radiological Environmental Operating Report2024-05-0101 May 2024 2023 Annual Non-radiological Environmental Operating Report DCL-24-048, O CFR 50.59 and 1 O CFR 72.48 Summary Report for the Period of January 1, 2022, Through December 31, 20232024-04-30030 April 2024 O CFR 50.59 and 1 O CFR 72.48 Summary Report for the Period of January 1, 2022, Through December 31, 2023 DCL-24-027, 2023 Annual Radioactive Effluent Release Report2024-04-28028 April 2024 2023 Annual Radioactive Effluent Release Report DCL-24-045, Annual Report of Occupational Radiation Exposure for 20232024-04-24024 April 2024 Annual Report of Occupational Radiation Exposure for 2023 DCL-24-042, Response to NRC Regulatory Issue Summary 2024-01, Preparation and Scheduling of Operator Licensing Examinations2024-04-17017 April 2024 Response to NRC Regulatory Issue Summary 2024-01, Preparation and Scheduling of Operator Licensing Examinations DCL-24-022, Notification of Changes to Decommissioning Schedule2024-04-0202 April 2024 Notification of Changes to Decommissioning Schedule DCL-24-023, Revised Certification of Permanent Cessation of Power Operations2024-04-0202 April 2024 Revised Certification of Permanent Cessation of Power Operations DCL-24-031, Decommissioning Funding Report2024-03-27027 March 2024 Decommissioning Funding Report DCL-24-032, 2024 Annual Statement of Insurance for Pacific Gas and Electric Company’S Diablo Canyon Power Plant2024-03-27027 March 2024 2024 Annual Statement of Insurance for Pacific Gas and Electric Company’S Diablo Canyon Power Plant DCL-24-028, Request for Enforcement Discretion Regarding Compliance with Technical Specification 3.0.3, Limiting Condition for Operation Applicability2024-03-21021 March 2024 Request for Enforcement Discretion Regarding Compliance with Technical Specification 3.0.3, Limiting Condition for Operation Applicability DCL-24-018, License Amendment Request 24-01 Revision to Technical Specification 5.6.6, Reactor Coolant System (RCS) Pressure and Temperature Limits Report (PTLR)2024-02-28028 February 2024 License Amendment Request 24-01 Revision to Technical Specification 5.6.6, Reactor Coolant System (RCS) Pressure and Temperature Limits Report (PTLR) DCL-2024-507, 2023 Annual Report on Discharge Self-Monitoring2024-02-27027 February 2024 2023 Annual Report on Discharge Self-Monitoring DCL-24-020, Nuclear Material Transaction Report for New Fuel2024-02-21021 February 2024 Nuclear Material Transaction Report for New Fuel DCL-24-014, Owners Activity Report for Unit 1 Twenty-Fourth Refueling Outage2024-02-12012 February 2024 Owners Activity Report for Unit 1 Twenty-Fourth Refueling Outage DCL-24-013, Nuclear Material Transaction Report for New Fuel2024-02-0707 February 2024 Nuclear Material Transaction Report for New Fuel DCL-24-010, Nuclear Material Transaction Report for New Fuel2024-01-29029 January 2024 Nuclear Material Transaction Report for New Fuel DCL-2024-502, 2023 Annual Sea Turtle Report for Diablo Canyon Power Plant (DCPP)2024-01-25025 January 2024 2023 Annual Sea Turtle Report for Diablo Canyon Power Plant (DCPP) DCL-2024-501, Sea Turtle Stranding Report (Green Sea Turtle)2024-01-24024 January 2024 Sea Turtle Stranding Report (Green Sea Turtle) DCL-2024-500, Transmittal of the 4th Quarter of 2023 Report on Discharge Self-Monitoring2024-01-18018 January 2024 Transmittal of the 4th Quarter of 2023 Report on Discharge Self-Monitoring DCL-24-009, Nuclear Material Transaction Report for New Fuel2024-01-17017 January 2024 Nuclear Material Transaction Report for New Fuel DCL-24-008, Schedule Considerations for Review of the DCPP License Renewal Application2024-01-17017 January 2024 Schedule Considerations for Review of the DCPP License Renewal Application DCL-24-004, Supplement to License Amendment Request 23-01 Revision to Technical Specifications to Adopt Risk-Informed Completion Times TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 4b2024-01-15015 January 2024 Supplement to License Amendment Request 23-01 Revision to Technical Specifications to Adopt Risk-Informed Completion Times TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 4b DCL-23-129, Nuclear Material Transaction Report for New Fuel2023-12-27027 December 2023 Nuclear Material Transaction Report for New Fuel DCL-23-122, Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation2023-12-14014 December 2023 Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation DCL-23-128, Emergency Plan Update2023-12-13013 December 2023 Emergency Plan Update DCL-23-125, Core Operating Limits Report for Unit 1 Cycle 252023-12-0606 December 2023 Core Operating Limits Report for Unit 1 Cycle 25 DCL-23-121, Supplement to License Amendment Request 23-03, Revision to Technical Specification3.7.8, Auxiliary Saltwater System2023-11-16016 November 2023 Supplement to License Amendment Request 23-03, Revision to Technical Specification3.7.8, Auxiliary Saltwater System DCL-23-120, License Amendment Request 23-03 Revision to Technical Specification 3.7.8, Auxiliary Saltwater (Asw) System2023-11-14014 November 2023 License Amendment Request 23-03 Revision to Technical Specification 3.7.8, Auxiliary Saltwater (Asw) System DCL-23-118, License Renewal Application2023-11-0707 November 2023 License Renewal Application DCL-2023-520, Discharge Self-Monitoring at Diablo Canyon Power Plant (DCPP)2023-10-19019 October 2023 Discharge Self-Monitoring at Diablo Canyon Power Plant (DCPP) DCL-23-103, Independent Spent Fuel Storage Installation - Withdrawal of License Amendment Request 22-01, Request for Approval of Alternative Security Measures for Early Warning System2023-10-13013 October 2023 Independent Spent Fuel Storage Installation - Withdrawal of License Amendment Request 22-01, Request for Approval of Alternative Security Measures for Early Warning System DCL-23-092, Material Status Report for the Period Ending August 31, 20232023-09-28028 September 2023 Material Status Report for the Period Ending August 31, 2023 DCL-23-077, License Amendment Request 23-02 Application to Adopt 10 CFR 50.69, Risk-Informed Categorization and Treatment of Structures, Systems and Components for Nuclear Power Reactors2023-09-27027 September 2023 License Amendment Request 23-02 Application to Adopt 10 CFR 50.69, Risk-Informed Categorization and Treatment of Structures, Systems and Components for Nuclear Power Reactors DCL-23-083, Upcoming Meeting with Nuclear Security and Incident Response Staff2023-09-13013 September 2023 Upcoming Meeting with Nuclear Security and Incident Response Staff DCL-23-078, Nuclear Material Transaction Report for New Fuel2023-09-0606 September 2023 Nuclear Material Transaction Report for New Fuel DCL-23-070, Withdrawal of Request Regarding Senior Reactor Operator License Application2023-08-16016 August 2023 Withdrawal of Request Regarding Senior Reactor Operator License Application DCL-23-068, Nuclear Material Transaction Report for New Fuel2023-08-0909 August 2023 Nuclear Material Transaction Report for New Fuel DCL-23-066, Nuclear Material Transaction Report for New Fuel2023-08-0303 August 2023 Nuclear Material Transaction Report for New Fuel DCL-23-065, Letter DCL-23-065 Request That Exam Material Be Withheld from Public Disclosure2023-07-27027 July 2023 Letter DCL-23-065 Request That Exam Material Be Withheld from Public Disclosure DCL-23-064, Nuclear Material Transaction Report for New Fuel2023-07-26026 July 2023 Nuclear Material Transaction Report for New Fuel DCL-23-054, License Amendment Request 23-01 Revision to Technical Specifications to Adopt Risk-Informed Completion Times TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 4b2023-07-13013 July 2023 License Amendment Request 23-01 Revision to Technical Specifications to Adopt Risk-Informed Completion Times TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 4b 2024-08-08
[Table view] |
Text
Pacific Gas and Electric Company ,
Michael A. Ginn Diablo Canyon Power Plant Manager P.O. Box 56 Emergency Planning Avila Beach, CA 93424 805.545.3446 Internal: 691.3446 Fax: 805.545.6265 April11, 2018 PG&E Letter DCL-18-029 PG&E Letter DIL-18-006 U.S. Nuclear Regulatory Commission 10 CFR 50.54, 10 CFR 72.32 ATTN: Document Control Desk Washington, DC 20555-0001 Docket No. 50-275, OL-DPR-80 Docket No. 50-323, OL-DPR-82 Diablo Canyon Units 1 and 2 Docket No. 72-26, Materials License No. SNM-2511 Diablo Canyon Independent Spent Fuel Storage Installation Emergency Plan Implementing Procedure Update
Dear Commissioners and Staff:
In accordance with 10 CFR 50.54(q)(5) and the requirements of 10 CFR 72.32, Pacific Gas and Electric Company (PG&E) is providing a summary of the analysis of changes to Emergency Plan (E-Pian) Implementing Procedure EP RB-8, "Instructions for Field Monitoring Teams."
The associated enclosures are listed below:
- Enclosure 2 - Summary of the Analysis of Changes to Emergency Plan Implementing Procedure EP RB-8, Revision 29, "Instructions for Field Monitoring Teams" PG&E evaluated the changes for a reduction in effectiveness, as defined in 10 CFR 50.54(q), and concluded that the changes do not reduce the effectiveness of the E-Pian. The E-Pian continues to meet the requirements in Appendix E of 10 CFR 50 and the planning standards of 10 CFR 50.47(b). Therefore, prior NRC approval of the associated changes was not required.
This update does not contain any privacy and proprietary information in accordance with NRC Generic Letter 81-27, "Privacy and Proprietary Material in Emergency Plans."
A member of the STARS Alliance Callaway
Document Control Desk PG&E Letter DCL-18-029 April11, 2018 PG&E Letter DIL-18-006 Page 2 PG&E makes no new or revised regulatory commitments (as defined by NEI 99-04) in this letter.
If there are questions regarding this update, please contact me at (805) 545-3446.
Sincerely, JA -.__[)__ A. G Michael A. Ginn Emergency Planning Manager armb/4 743/50970254 Enclosures cc/enc: William C. Allen, NMSS Project Manager Kriss M. Kennedy, NRC Region IV Administrator Christopher W. Newport, NRC Senior Resident Inspector Balwant K. Singal, NRC Senior Project Manager Senior Emergency Preparedness Inspector (RGN-IV/DR)
A member of the STARS Alliance Callaway
Enclosure 1 PG&E Letter DCL-18-029 PG&E Letter DIL-18-006 DIABLO CANYON POWER PLANT EMERGENCY PLAN IMPLEMENTING PROCEDURES Revision Numbers for Emergency Plan Implementing Procedures
Enclosure 1 PG&E Letter DCL-18-029 PG&E Letter Dl L-18-006 DIABLO CANYON POWER PLANT EMERGENCY PLAN IMPLEMENTING PROCEDURES Proc. No. Rev. Title OM10.1D1 17 Maintaining Emergency Preparedness OM10.DC1 9 Emergency Preparedness Drills and Exercises EP G-1 44 Emergency Classification and Emergency Plan Activation EP G-2 50 Interim Emergency Response Organization EP G-3 59 Emergency Notification of Off-Site Agencies EP G-4 30 Assembly and Accountability EP G-5 14 Evacuation of Non-Essential Site Personnel EP OR-3 10 Emergency Recovery EP RB-1 8 Personnel Dosimetry EP RB-2 8 Emergency Exposure Guides EP RB-3 7 Stable Iodine Thyroid Blocking EP RB-4 5 Access to and Establishment of Controlled Areas Under Emergency Conditions EP RB-5 8 Alternate Personnel Decontamination Facilities EP RB-8 29* Instructions for Field Monitoring Teams EP RB-9 15 Calculation of Release Rate EP RB-10 19 Protective Action Recommendations EP RB-11 14 Emergency Offsite Dose Calculations EP RB-12 11 Plant Vent Iodine and Particulate Sampling During Accident Conditions EP RB-14 9 Core Damage Assessment Procedure EP RB-14A 2 Initial Detection of Fuel Cladding Damage EP RB-15 15 Post Accident Sampling System EP RB-16 14 Operating Instructions for the EARS Computer Program EP R-2 34 Release of Airborne Radioactive Materials Initial Assessment EP R-3 9 Release of Radioactive Liquids EP R-7 17 Off-Site Transportation Accidents EP EF-1 53 Activation and Operation of the Technical Support Center EP EF-2 40 Activation and Operation of the Operational Support Center EP EF-3 44 Activation and Operation of the Emergency Operations Facility EP EF-4 21 Activation of the Off-Site Emergency Laboratory EP EF-9 12 Backup Emergency Response Facilities EP EF-10 17 Activation and Operation of the Joint Information Center EP EF-11 2 Alternate Emergency Response Facilities I Incident Command Post (ICP)
- Revised Document Page 1 of 1
Enclosure 2 PG&E Letter DCL-18-029 PG&E Letter DIL-18-006 Summary of the Analysis of Changes to Emergency Plan Implementing Procedure EP RB-8, Revision 29, "Instructions for Field Monitoring Teams"
Enclosure 2 PG&E Letter DCL-18-029 PG&E Letter DIL-18-006 Summary of the Analysis of Changes to Emergency Plan Implementing Procedure EP RB-8, Revision 29 Type of Change and Reason for Original Content Description of Content Change Change N/A- Added new content Step 2.9 Change #1 - Added new content.
The intent of Attachment 9, "FMT Checklist" is that it be Add a checklist as an aid to the FMT used in lieu of the Section 6 step-by-step detailed members to be used in lieu of Section 6 guidance. The procedure Section 6 detailed instructions step-by-step instructions, streamlining are designed for field monitoring team (FMT) members the completion of FMT tasks, while who are not ANSI qualified radiation protection (RP) reducing the chance of human error.
technicians; trained and qualified to perform these functions , but with less proficiency because their daily jobs do not provide them with opportunity to develop these skills to a high level. ANSI RP technicians and FMT members with a long history of participating as FMTs are able to complete all of the field monitoring RP functions of No additional evaluation is required.
this procedure by following the more direct, simplified checklist. The checklist references the Section 6 step(s) to obtain additional guidance, not provided in the checklist, if needed by the user.
Step 3.2 Step 3.2 Change #2 - Modified existing content.
The FMT Communicator at the The FMT Communicator at the Emergency Operations Corrected a typographical error.
EOF is responsible for Facility (EOF) is responsible for providing the on-site FMT providing the on-site FMT tailboard, assignment of the FMT leader, and dispatch tailboard, assignment of the command and control. In the absence of the FMT FMT leader, and dispatch Communicator, the Radiological Manager at the EOF may command and control . In the assign the FMT leader and provide the on-site FMT absence of the FMT tailboard.
Communicator tor, the Radiological Manager at the EOF may assign the FMT No additional evaluation is required.
leader and provide the on-site 1 of 7
Enclosure 2 PG&E Letter DCL-18-029 PG&E Letter DIL-18-006 Summary of the Analysis of Changes to Emergency Plan Implementing Procedure EP RB-8, Revision 29 Type of Change and Reason for Original Content Description of Content Change Change FMT tailboard.
Step 3.3 Step 3.3 Change #3 - Modified existing content.
The EOF FMT Coordinator at The FMT Coordinator at the EOF is responsible for Removed repetitive information .
the EOF is responsible for providing the off-site FMT tailboard and dispatch command providing the off-site FMT and control. In the absence of the FMT Coordinator, the tailboard and dispatch Radiological Manager may provide the off-site FMT I command and control. In the tailboard . I absence of the FMT Coordinator, the Radiological Manager may provide the No additional evaluation is required.
off-site FMT tailboard .
N/A - Added new content Note 1 after step 6.2.2: Change #4 - Added new content.
Steps 6.2.3 through 6.2.13 are written in a logical order Provide direction on which activities in based on the current/standard FMT pre-deployment these steps of the procedure are allowed process; however, these steps can be performed out of to be performed in any order during the order as needed to accommodate rapid deployment of a normal process of pre-deployment and team to intercept a plume from a release in progress. infield surveying and sampling so that the mission time in the radioactive plume can be minimized .
No additional evaluation is required.
N/A - Added new content Note 2 after step 6.2.2: Change #5 - Added new content.
Attachment 9, "FMT Checklist" is a user aid that includes Add a checklist as an aid to the FMT all actions directed by Section 6 of this procedure. The members to be used in lieu of Section 6 checklist references Section 6 step(s) for additional step-by-step instructions, streamlining the completion of FMT tasks, while 2 of 7
Enclosure 2 PG&E Letter DCL-18-029 PG&E Letter DIL-18-006 Summary of the Analysis of Changes to Emergency Plan Implementing Procedure EP RB-8, Revision 29 Type of Change and Reason for Original Content Description of Content Change Change guidance if needed by the user. reducing the chance of human error.
No additional evaluation is required.
N/A - Added new content Step 6.2.10 Change #6 - Added new content.
Obtain an air sample stand . Directs the FMT members to obtain an air sample stand prior to deployment.
No additional evaluation is required.
Note 1 after step 6.3.1 Note 1 after step 6.3.1 Change #7 - Modified existing content.
The steps in this section are Steps 6.3.2 through 6.3.8 are written in a logical order Clarified steps that can be performed in written in a logical order based based on the currenUstandard FMT pre-deployment any order.
on the currenUstandard FMT process; however, these steps can be performed out of pre-deployment process; order as needed to accommodate rapid deployment of a however, these steps can be team to intercept a plume from a release in progress.
performed out of order as needed to accommodate rapid deployment of a team to intercept a plume from a No additional evaluation is required.
release in progress.
N/A - Added new content Step 6.3.4 Change #8 - Added new content.
Obtain an air sample stand . Reference Change #6 .
No additional evaluation is required.
3 of7
Enclosure 2 PG&E Letter DCL-18-029 PG&E Letter DIL-18-006 Summary of the Analysis of Changes to Emergency Plan Implementing Procedure EP RB-8, Revision 29 Type of Change and Reason for Original Content Description of Content Change Change Step 6.4.1.g Step 6.4.1 .g Change #9 - Modified existing content.
Wrap the dose rate probe with Sleeve the dose rate instrument, cable, and probe with Added direction to provide contamination plastic wrap to protect it from plastic to protect them from contamination . control for the dose rate instrument.
contamination. Reworded to allow the use of both plastic sleeving material and plastic wrap as necessary.
No additional evaluation is required.
N/A - Added new content Step 6.4.2.h Change #1 0 - Added new content.
Sleeve the count rate instrument and cable with plastic to Added direction to provide contamination protect them from contamination . control for the count rate instrument.
Reworded to allow the use of both plastic sleeving material and plastic wrap as necessary.
No additional evaluation is required.
4 of7
Enclosure 2 PG&E Letter DCL-18-029 PG&E Letter DIL-18-006 Summary of the Analysis of Changes to Emergency Plan Implementing Procedure EP RB-8, Revision 29 Type of Change and Reason for Original Content Description of Content Change Change N/A -Added new content Step 6.4.7 Change #11 - Added new content.
Set up the FMT vehicle for contamination control. Enhanced contamination control instructions regarding field monitoring vehicles for consistent performance and decreased redeployment preparation time for the next in-plume monitoring mission.
No additional evaluation is required.
Note before section 6.6 Note moved to before step 6.6.2 Change #12 - Modified existing content.
The following Steps 6.6.2 through 6.6.5 correspond to the order of Moved to precede the applicable steps sections correspond to the radiological data entry on the Field Data Sheet and clarified that the steps can be order of radiological data entry (Attachment 7); however, the various samples and surveys performed in any order.
on the Field Data Sheet can be done in any order, or concurrently as the situation (Attachment 7); however, the dictates, or as prioritized by the FMT Communicator.
various samples and surveys can be done in any order or No additional evaluation is required.
concurrently as the situation dictates or as prioritized by the FMT Communicator.
5 of?
Enclosure 2 PG&E Letter DCL-18-029 PG&E Letter DIL-18-006 Summary of the Analysis of Changes to Emergency Plan Implementing Procedure EP RB-8, Revision 29 Type of Change and Reason for Original Content Description of Content Change Change N/A - Added new content Step 6.10.1 Change #13 - Added new content.
Provided additional detail for accessing PIC#3 in the Added direction to access PIC #3 if PG&E switchyard near the Morro Bay Power Plant during directed to read PIC #3 locally.
normal working hours and after hours.
No additional evaluation is required. : Attachment 5: Change #14 - Modified existing content.
PIC #2 SSW Corner of Target PIC #2 SSW Corner of Target Range (near on-site field Corrected a typographical error.
Range (near on-site field monitoring location, SE,B).
No additional evaluation is required.
monitoring location, (SE ,B). : Attachment 5: Change #15 - Modified existing content.
PIC #3 Morro Bay Power PIC #3 Morro Bay Power Plant (in the switchyard at the Changed to reflect the new location of Plant, near front. base of the microwave tower) . PIC#3.
See 50.54(q) 2017-40 for further information on this change. : Attachment 5: Change #16 - Modified existing content.
PIC #4 Montana de Oro State PIC #4 Montana de Oro State Park (at the Park Ranger's Changed format for consistency.
Park. At the Park Ranger's residence, adjacent to the siren) .
No additional evaluation is required.
residence, adjacent to the siren .
6 of 7
~
Enclosure 2 PG&E Letter DCL-18-029 PG&E Letter DIL-18-006 Summary of the Analysis of Changes to Emergency Plan Implementing Procedure EP RB-8, Revision 29 Type of Change and Reason for Original Content Description of Content Change Change #5 Attachment 7 #5 Change #17 - Modified existing content.
Skyline Skyshine Corrected a typographical error.
No additional evaluation is required.
N/A - Added new content Attachment 9 FMT Checklist Change #18 - Added new content.
Added a checklist for FMT actions, categorized by major Add a checklist as an aid to the FMT actions, such as "Prepare to be dispatched" and "At FMT members. This streamlines the monitoring location" to be used in lieu of step by step completion of FMT tasks, while reducing instructions in Section 6. the chance of human error.
No add_!!:!!>nal evaluati~n is reguir~~~-
7 of 7