|
---|
Category:Drawing
MONTHYEARML23181A1702023-06-30030 June 2023 2 to Updated Final Safety Analysis Report, Figures ML23181A1692023-06-30030 June 2023 2 to Updated Final Safety Analysis Report, Figures ML23181A1682023-06-30030 June 2023 2 to Updated Final Safety Analysis Report, Figures ML23181A1672023-06-30030 June 2023 2 to Updated Final Safety Analysis Report, Figures ML21201A2652021-06-30030 June 2021 Updated Final Safety Analysis Report, Revision 21, Chapter 10 Through Chapter 19, Figures (Redacted) ML21201A2612021-06-30030 June 2021 Updated Final Safety Analysis Report, Revision 21, Chapter 2.5 Through Chapter 3, Figures (Redacted) ML21201A2662021-06-30030 June 2021 Updated Final Safety Analysis Report, Revision 21, Chapter 4 Through Chapter 9, Figures (Redacted) ML19205A2202019-06-30030 June 2019 Updated Final Safety Analysis Report, Revision 20, Figures, Chapter 1 Thru Chapter 2.4 (Redacted) ML19205A2222019-06-30030 June 2019 Updated Final Safety Analysis Report, Revision 20, Figures, Chapter 4 Thru Chapter 9 (Redacted) ML19205A2232019-06-30030 June 2019 Updated Final Safety Analysis Report, Revision 20, Figures, Chapter 10 Thru Chapter 19 (Redacted) ML19205A2212019-06-30030 June 2019 Updated Final Safety Analysis Report, Revision 20, Figures, Chapter 2.5 Thru Chapter 3 (Redacted) ML18277A3032018-09-21021 September 2018 Third 10-Year Interval Inservice Inspection Program Update, Part 2 of 7 ML18194A0952018-08-0606 August 2018 Log of Boring PV-45 ML18193A8982018-08-0606 August 2018 Figure 9.2-4, Demineralized Water System Water Pretreatment Subsystem. ML18194A0872018-08-0606 August 2018 Log of Boring PV-62 ML18193A8992018-08-0606 August 2018 Figure 9.2-5, Demineralized Water System Water Demineralizer Subsystem. ML18194A0942018-08-0606 August 2018 Log of Boring PV-44 ML18192B8852018-07-30030 July 2018 Map 3-2, Proposed Palo Verde-Devers Transmission Line, Summary of Anticipated Impacts Kofa. ML18192B8872018-07-30030 July 2018 Map 3-4, Proposed Palo Verde-Devers 500KV Transmission Line, Vegetation Impacts ML18192B8862018-07-30030 July 2018 Map 3-3, Proposed Palo Verde-Devers 500KV Transmission Line, Geotechnical Sensitivity Excluding Soils. ML18192B8892018-07-30030 July 2018 Map 3-6, Proposed Palo Verde-Devers 500KV Transmission Line, Recreation Impacts. ML18193A0792018-07-30030 July 2018 Figure 10.4-8, Basic Flow Diagram Feedwater System. ML18193A0822018-07-30030 July 2018 Figure 11.2-2 P&I Diagram Liquid Radwaste System. ML18192B8922018-07-30030 July 2018 Map 3-9, Proposed Palo Verde-Devers 500kv Transmission Line, Cultural Resource Impacts. ML18192B8902018-07-30030 July 2018 Map 3-7, Proposed Palo Verde-Devers 500KV Transmission Line, Wilderness Impacts. ML18193A0802018-07-30030 July 2018 Figure 10.4-9, Auxiliary Feedwater System. ML18192B8912018-07-30030 July 2018 Map 3-8, Proposed Palo-Verde 500KV Transmission Line, Visual Impacts. ML18192B8882018-07-30030 July 2018 Map 3-5, Proposed Palo Verde-Devers 500 Kv Transmission Line, Land Use Impacts. ML18192C0052018-07-18018 July 2018 Drawing 13-E-ZJC-034, Rev. 0, Control Bldg Conduit Arrangement Plan at El 74ft Level Ab. ML18192B8372018-07-18018 July 2018 Figure 1, Red Lake Canyon - Mohave, Bridge Canyon Country Estates, Alternative Segments. ML18194A2582018-07-13013 July 2018 Drawing, Unit 3 Power Block Excavation, Vertical Projection of Map Area, 44. ML18194A1552018-07-13013 July 2018 Log of Boring PV-2 ML18194A3672018-07-13013 July 2018 Figure 2E-2, Geomorphic Profiles, A-A' and B-B'. ML18194A2542018-07-13013 July 2018 Drawing, Unit 3 Power Block Excavation, Vertical Projection of Map Area, 37. ML18194A0702018-07-13013 July 2018 Log of Boring PV-64 ML18194A2772018-07-13013 July 2018 Drawing, Unit 3 Power Block Excavation, Vertical Projection of Map Areas, 1 + 2. ML18194A1562018-07-13013 July 2018 Log of Boring PV-3 ML18194A0522018-07-13013 July 2018 Site Property ML18194A0692018-07-13013 July 2018 Log of Boring PV-63 ML18194A1582018-07-13013 July 2018 Log of Boring PV-5 ML18194A3692018-07-13013 July 2018 Figure 2E-5, Location of Gila River Terraces and Major Photo Lineaments. ML18194A0582018-07-13013 July 2018 Figure 2.5-8, Sections Through Site Vicinity. ML18194A1612018-07-13013 July 2018 Log of Boring PV-1 ML18194A2602018-07-13013 July 2018 Drawing, Unit 3 Power Block Excavation, Vertical Projection of Map Area, 32. ML18194A2612018-07-13013 July 2018 Drawing, Unit 3 Power Block Excavation, Vertical Projection of Map Area, 33 + 34. ML18194A1572018-07-13013 July 2018 Log of Boring PV-4 ML18194A1602018-07-13013 July 2018 Log of Boring PV-7 ML18194A0452018-07-13013 July 2018 Figure 2.5-27, Palo Verde Hills, Profile 3-4 ML18194A0462018-07-13013 July 2018 Figure, Profile 1-2. ML18194A0672018-07-13013 July 2018 Figure 2.5-86, Location of Gila River Terraces in Relation to Lineaments. 2023-06-30
[Table view] |
Text
KAIPAROWITS TO PG 8 E (1981)
(1980)
~ (1982) To APS SAN JOAQUIN (1987) 1
//
I II BIG CREEK AREA TO
// HOOVER M I D WAY 0 tt LADWP McCULLOUGH
( DWP) // MOENKOPI To MAGUNDEN MEAD PGB E ELDORADO 0 To FOUR CORNERS (1982) To CI MA APS MO HAVE PI SGAH
/I (1981) 0 RED LAKE CANYON (1981)
To BONNEVILLE CA MINO //
LUCERNE VALLEY /l C TC) APS PALO VERDE)
EDMONSTON (1980 1985) //rv GENE 9 ~// q>
PASTOR I A To rr
~r r6>>
LUGO rr ()9+
// ( 1987)
IRON MTN.
////
lll/
BQ'0 V/8 EAGLE MTN
/ill
/l 74 DEVERS J HINDS (76> ~) To To Ml RA LOMA 1987 ~~~ // USBR TO SERRANO BLYTHE (1983)
BA L E Y I
ANTELOPE VINCENT (1977) COOLWATER 0
PEAR BLOSSOM (1977)
PARDEE VICTOR To V I CTOR V IL L E (1986) (DWP)
GOLETA (ONE NEW 500KV VONE CONVERTED To 500KV )
OPERATION l L)RO
/ /
TO DWP
/
SANTA SYLMAR CLARA MOORPARK ( (1980)
GOULD MANDALAY (1986)
SANDSTONE Il (1981)
I
/
II EAGLE ROCK I/ PADUA ETIWANDA l SAN BERNARDINO GOODRICH RIO HONDO ORMOND BEACH 500 KV OPERATION (1986 )
LA CI E NEGA MESA WA L NUT
/ II I
(1979 )
V I STA 8X I
CHINO 0 I II (1983)1 I
EL NIDO LAGUNA r//ll~
1 MIRA LOMA (1979)
To I
BELL I EL SEGUNDO CENTER OLI NDA L (1987)
JURUPA (1979 )
DEVERS SU B STAT I ON
~ rr LA FRESA (SEE INSERT)
(19801 LIGHTHIPE DEVERS I975 I 988 REDONDO BEACH n,p//
/ DEL L EW IS (1987)
(198O) (SEE INSERT) g// AMO (1984)
BARR E LEGEND HINSON VILLAPAR K POST
( 1985) SERRANO (1980) (1980) To DEVERS EX I ST I N G NEW 197 5 1988 (1983) (SEE INSERT)
ALAMITOS (1977) JOHANNA GE N ERAT ION PL ANTS SANTIAGO VALLEY LONG BEACH TRANSMISSION SUBSTATION (1983)
ELLI S 22O KV O 500 KV 0 H UN TI N G To N BEACH TRANSMI SS ION LINES 220 KV 500 KV D.C. LINE - 'll I'I UTILITY ABBREVIATIONS SCE SOUTHERN CALIFORNIA EDISON SDGBE SAN DIEGO GAS AND ELECTRIC A PS AR IZO N A PUBLIC SERVI C E LADWP LOS AN GE LES DEPARTMENT OF WATER AND POWER PG 8 E PAC IFIC GAS AND ELECTRIC USBR UNITED STATES BUREAU OF RECLAMATION SCE BULK POWER Xi r SYSTEM Figure 1.1-1 PROPOSED ADDITIONS SAN ONOFRE To SDGBE