MONTHYEARML19249B7812019-08-29029 August 2019 Enclosure 7 - Millstone, Units 2 and 3 and ISFSI; North Anna, Units 1 and 2 and ISFSI; and Surry, Units 1 and 2 and ISFSI - Summary of Calculations ML19249B7762019-08-29029 August 2019 Enclosure 6 - Millstone, Units 2 and 3 and ISFSI; North Anna, Units 1 and 2 and ISFSI; and Surry, Units 1 and 2 and ISFSI - Summary of Calculations ML19011A1832019-01-0404 January 2019 Enclosure 7 - Attachment 6 - Post-Accident Letdown Radiation Monitor Response ML19011A1822019-01-0404 January 2019 Enclosure 7 - Attachment 5 - Post-Accident Radiation Monitor Response for Core Uncovery ML19011A1812019-01-0404 January 2019 Enclosure 7 - Attachment 4 - Post-Accident Radiation Response for Primary Sample Line ML19011A1802019-01-0404 January 2019 Enclosure 7 - Attachment 3 - Detector Response to an RCS Sample ML19011A1792019-01-0404 January 2019 Enclosure 7 - Attachment 2 - Calculations for Containment High Range Radiation Monitor Responses to a LOCA ML19011A1772019-01-0404 January 2019 Enclosure 7 - Attachment 1 - Calculation RP-18-08, MPS1 Abnormal Rad Release Gaseous EAL Thresholds Based on NEI 99-01, Revision 6. ML19011A1762019-01-0404 January 2019 Enclosure 7 - Summary of Calculations ML0801600702008-01-10010 January 2008 Proposed License Amendment Request Increased Maximum Service Water Temperature Limit Request for Additional Information (RAI) ML0414800892004-05-0505 May 2004 Calculation SM-1442, Response to NRC Request for Additional Information on Surry ESGR Phase 3 SDP Comments ML19093B0361978-04-0707 April 1978 Enclosed New LOCA-ECCS Analysis with New Fq Limits to Ensure LOCA-ECCS Acceptance Criteria Delineated in 10 CFR 50.46 Is Met ML19093A9701977-10-14014 October 1977 Letter to Discuss Overpressure Protection System & to Forward Copies of Mitigating Systems Transient Analysis Results of 07/1977 & Copies of Supplement of September 1977 2019-08-29
[Table view] Category:Letter
MONTHYEARML24248A1712024-09-0303 September 2024 Proposed License Amendment Request - Temporary Service Water Supply to the Component Cooling Heat Exchangers IR 05000280/20240052024-08-26026 August 2024 Updated Inspection Plan for Surry Power Station, Units 1 and 2 (Report 05000280/2024005 and 05000281-2024005), Rev 1 ML24164A0012024-08-12012 August 2024 Proposed Alternative Relief Request V-1 Inservice Testing of Pressure Isolation Valves (EPID l-2023-LLR-0060) IR 05000280/20240022024-08-0101 August 2024 Integrated Inspection Report 05000280/2024002 and 05000281/2024002 ML24165A2782024-07-17017 July 2024 Issuance of Amendment Nos. 318 and 318, Reclassification of Regulatory Guide 1.97 Variable for Low Head Safety Injection ML24165A1232024-07-17017 July 2024 Proposed Alternative Relief Request P-1, P-2 Inservice Testing of Residual Heat and Containment Spray Pumps (EPID l-2023-LLR-0058) ML24190A4192024-07-0808 July 2024 Inservice Testing (IST) Program for Pumps and Valves Revised Sixth IST Interval Start Date and Updated Technical Specifications References for Alternative Request V-1 ML24179A2932024-07-0101 July 2024 Notification of Inspection and Request for Information for NRC Problem Identification and Resolution Inspection ML24178A2422024-06-25025 June 2024 2023 Annual Report of Emergency Core Cooling System (ECCS) Model, Changes Pursuant to the Requirements of 10 CFR 50.46 ML24177A2792024-06-20020 June 2024 Preparation and Scheduling of Operator Licensing Examinations ML24166A0622024-06-18018 June 2024 – Proposed Alternative Relief Request P-3, P-4 Inservice Testing of Boric Acid, Component Cooling Water Pumps ML24157A0542024-06-13013 June 2024 Audit Summary in Support of License Amendment Request for Proposed Reclassification of Low Head Safety Injection Flow Instrumentation Related to Regulatory Guide 1.97 ML24143A1622024-06-12012 June 2024 – Correction to Issuance of Amendment Nos. 297 and 280 and Surry Units 1 and 2, Correction to Issuance of Amendment Nos. 317 and 317, to Change Emergency Plan Staff Augmentation Times ML24170B0532024-06-10010 June 2024 DOM-NAF-2-P/NP-A, Revision 0.5, Reactor Core Thermal-Hydraulics Using the VIPRE-D Computer Code IR 05000280/20244032024-05-22022 May 2024 Information Request for the Cyber Security Baseline Inspection, Notification to Perform Inspection 05000280/2024403 and 05000281- 2024403 ML24141A2512024-05-20020 May 2024 Proposed License Amendment Request - Reclassification of Low Head Safety Injection Flow Indication Regulatory Guide 1.97 Variable - Supplemental Information ML24141A0482024-05-17017 May 2024 EN 56958_1 Ametek Solidstate Controls, Inc ML24136A2302024-05-13013 May 2024 Core 1 Cycle 33 Pattern Mdr Revision 0 ML24130A2032024-05-0909 May 2024 Proposed License Amendment Request Application to Revise Technical Specifications to Adopt TSTF-577, Revised Frequencies for Steam Generator Tube Inspections Supplemental Information ML24130A2492024-05-0909 May 2024 Submittal of Information in Support of Surry Power Station Unit 1 Thermal Shield Flexure Replacement Campaign ML24130A1192024-05-0707 May 2024 Inservice Test Program for Pumps and Valves Sixth Interval Update and Associated Relief and Alternative Requests - Response to Request for Additional Information Regarding Alternative Request V-1 IR 05000280/20240012024-04-30030 April 2024 Integrated Inspection Report 05000280-2024001 and 05000281-2024001 ML24142A3852024-04-30030 April 2024 2023 Annual Radioactive Effluent Release Report ML24122C6522024-04-30030 April 2024 Annual Radiological Environmental Operating Report IR 05000280/20244022024-04-29029 April 2024 Security Baseline Inspection Report 05000280/2024402 and 05000281/2024402 ML24122B3032024-04-29029 April 2024 Associated Independent Spent Fuel Storage Installation, Revision to Emergency Plan Report of Change IR 05000280/20240112024-04-24024 April 2024 Notification of Surry Power Station Comprehensive Engineering Team Inspection - U.S. NRC Inspection Report 05000280/2024011 and 05000281/2024011 ML24054A0142024-04-22022 April 2024 Issuance of Amendment Nos. 297 and 280, and Surry Power Station Unit Nos. 1 and 2, Issuance of Amendment Nos. 317 and 317, to Change Emergency Plan Staff Augmentation Times ML24108A1812024-04-15015 April 2024 Proposed License Amendment Request - Reclassification of Low Head Safety Injection Flow Indication Regulatory Guide 1.97 Variable Supplemental Information ML24095A2172024-04-12012 April 2024 – Review of the Spring 2023 Steam Generator Tube Inspection Report ML24088A2482024-03-26026 March 2024 Inservice Testing Program for Pumps and Valves Sixth Interval Update and Associated Relief and Alternative Requests- Response to Request for Additional Information ML24087A2082024-03-22022 March 2024 Proposed License Amendment Request Addition of Containment Limiting Condition for Operation and Surveillance Requirements ML24078A2642024-03-21021 March 2024 – Regulatory Audit in Support of License Amendment Request to Proposed Reclassification of Regulatory Guide 1.97 Variable for Low Head Safety Injection Flow Instrumentation ML24087A1522024-03-18018 March 2024 Annual Changes, Tests, and Experiments Report Regulatory Commitment Evaluation Report ML24023A5762024-03-0808 March 2024 Correction to Issuance of Amendment Nos. 315 and 315, Regarding Revised Emergency Plan for Relocation of the Technical Support Center IR 05000280/20230062024-02-28028 February 2024 Annual Assessment Letter for Surry Power Station, Units 1 and 2 - NRC Inspection Reports 05000280/2023006 and 05000281/2023006 ML24032A4712024-02-20020 February 2024 Exemption from Select Requirements of 10 CFR Part 73 - Security Notifications, Reports, and Recordkeeping and Suspicious Activity Reporting ML24057A0612024-02-19019 February 2024 and Virgil C. Summer Power Nuclear Stations - Nuclear Property Insurance Coverage ML24051A1782024-02-19019 February 2024 Proposed License Amendment Request - Application to Revise Technical Specifications to Adopt TSTF-577, Revised Frequencies for Steam Generator Tube Inspections IR 05000280/20230042024-02-0909 February 2024 Integrated Inspection Report 05000280/2023004 and 05000281/2023004 IR 05000280/20244012024-02-0606 February 2024 Security Baseline Inspection Report 05000280/2024401, 05000281/2024401 and 07200002/2024401 ML23312A1922024-01-18018 January 2024 Issuance of Amendment Nos. 316 & 316 Regarding a Risk Informed Approach for Tornado Classification of the Fuel Handling Trolley Support Structure IR 05000280/20230102024-01-18018 January 2024 Age Related Degradation Inspection Report 05000280-2023010 and 05000281-2023010 ML24003A9022024-01-0303 January 2024 Stations, Units 1 and 2, Emergency Plan Revision - Relocation of the Technical Support Center (TSC) - Editorial Correction IR 05000280/20233012023-12-28028 December 2023 NRC Operator License Examination Report 05000280/2023301 and 05000281/2023301 ML23283A3052023-12-20020 December 2023 Review of Appendix F to DOM-NAF2, Qualification of the Framatome ORFEO-GAIA and ORFEO-NMGRID CHF Correlations in the Dominion Energy VIPRE-D Computer Code (EPID L-2022-LLT-0003) (Nonproprietary) ML23352A3692023-12-18018 December 2023 Associated Independent Spent Fuel Storage Installation, Revision to Emergency Plan Report of Change ML23334A2342023-11-30030 November 2023 Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation ML23242A2292023-11-0707 November 2023 Issuance of Amendment Nos. 315 and 315, Regarding Emergency Procedure Relocation of the Technical Support Center ML23200A2622023-11-0202 November 2023 Issuance of Amendment Nos. 314 and 314, Regarding Technical Specification and Spent Fuel Pool Criticality Change 2024-09-03
[Table view] |
Text
e e
-~vepco_
April 7, 1978 t/j;:;;
, *. - L...-.- ** J~
. . ~; ~~:~,~~;; *,
Mr. -Edson G. -Case Serial No::~;1~7 ~;,. *
-office. of _Nuclear Reactor ~gulati~n :
Attn: Mr. Albert Schwencer, : Chief Docket Nos. ..z:; -
50-2802 Operating_Reactors Branch No~ 1 so..:.2s1 *
..
- Division of Reactor Licensing License*.Nos~ DPR-32 U~ S. Nuclear Regulatory_Commission* DPR'."'37 Was-hington; D. C.- - 20555.
_ Pursuant to the provisions of.the Surry Units.No. 1 and 2 Technical Specifications, the. NRC ~gion II 'Was notified on March 23, : 1978 of an error ..
in the *currently applicable ._LOCA..:.Eccs analysis. The* error foµnd was in -the *
._ representation of the heat reiease froni the metai-water react'ion in the NRC approved Westinghouse* LOCA-ECCS evaluation -*model. The. impact of this* error
- is-to- increase the ,peak _clad_ tempera.ture ob-tained during a* postulated LOCA _
over -that* reported in the currently applicable LOCA-ECCS an~lysier. _ -To con-*
- servati_vely accommodate the impact of this error, the LOCA-ECCS limiting, -
- heat _ .flux hot channel £_actor - (F~) has been administratively *reduced from-its -'present Technical* Specifications_ limit* of 1. 85 to 1. 81 (or to 1.79 when
. additionaLsteam_ generator tube pluggiJ,'lg is required). - These new FQ .limits have b'een conservatively selected* in order to ensure that the LOCA;..ECCS.
,acc*eptailce criteria delineat~d _in. 10 CFR 50. 46. is met. The -bases . for the
.: *,new* Fq t~nd ts _a_r~ .provided _* i11 -the Attachment *.
- -* * * :_ *compliance w:i.th the new FQ limit will be *eils~~ed by the _performance of axial power distribution mo_nitor!ng (APDM) as described iri-.th~ 'l'echni_cal
- Specif'ica.~ions.* A~ministrative instructions.have been implemented that.require APD~f shrveillance for power- operation above-:_ 82% -for Unit. *1 and 85% -for Unit 2 *.
Additiorially, the~I operating 111.mitei (for operation-outside*of the constant axial'offset*control target* banci) have been revised in order-to ensure a: con-sistent basis between constant axial offset control of* the core: and' the "*Jl'.Q sur..:.- _-
veillanc~ requirements. These administrative restrictions will *remain in effect* -
until*a new LOCA-ECCS analysis :and associated changes-to the Technical Specifica-tions. are approved. - .
. The new LOCA-ECCS analysis wil.i -be performed as soon as possible with an *acceptable Westinghouse LOCA-ECCS' evaluation .modei. This new_ analysis will -
be in compliancewith 10 CFR 50, Appendix Kand meet the acceptance criteria of 10: CFR 50.46. .
. \
~00
.Y' '7 \\
\.
Should' you h~ve *questions, we would iike. **t.o meet with you at. your earliest convenience.
'cc: l-h". 'Jams P. - O'Reilly~ Director.*
Office of >In.spection .and Enforcement**
Re.g:i.on II ..
i I
I 1*
e ATTACHMENT 1
e TABLE 1 CALCULATION OF FQ LIMIT FOR SURRY UNITS NO. 1 AND 2 : ....
Current Fq LIMIT 1.85 IMPACT OF CODE ERROR (~FQ) -0.2 (See Note 1)
ADDITIONAL CREDITS (~Fq) +o.158 (See Note 2) or +0.135*
NEW Fq LIMIT 1. 81 or 1. 79*
- Value contingent upon steam generator plugging level exceeding current limiting level unless additional analysis is performed.
NOTE 1 EXPLANATION OF METAL-WATER REACTION PENALTY A code error involving a logic inconsistency has been found in tw_o of the computer codes used in the Westinghouse LOCA-ECCS Evaluation Model.
This logic inconsistency involves the interface between the zirconium-water reaction heat generation calculation and the heat conduction equation. Both the zirconium-water reaction equation (Baker-Just) and the heat conduction equation are solved correctly. However, the heat conduction equation uses a volumetric heat flux from the zirconium-water reaction calculation. The output of the zirconium-water reaction calculation is a surface heat flux.
This surface heat flux is modified by dividing by the thickness of the radial mesh size between the surface temperature node and the first node inside the clad to obtain a volumetric heat flux. It is this calculation which was performed incorrectly. The inconsistency underestimates the volumetric heat flux due to zirconium-water reaction by a factor of 2. The effect of this error has been assesed and it has been determined that a penalty of 0.20 in Fq conservatively bounds the impact.
. e NOTE 2 EXPLANATION OF CREDITS Several credits have been identified to offset. the adverse effects of the corrected metal-water reaction heat release. The individual components com-prising the total credit are discussed below.
- 1) 15 X 15 FLECHT Heat Transfer Correlation - The FLECHT heat transfer correlation is used during the reflood portion of a postulated LOCA. New 15 X 15 heat transfer test data has been incorporated with the original FLECHT data, and the resulting modified FLECHT heat transfer correlation has been used in generic (Surry was the analyzed plant) sensitivity studies. These studies indicate that the modified correlation conservatively results in a benefit in FQ of at least 0.06. *
- 2) Margin to Peak Clad Temperature - The current LOCA-ECCS analysis for the Surry plants (see Vepco to NRC letter, Serial No. 372 dated August 26, 1977) results* in a peak clad temperature of 2177°F. Westinghouse generic sensitivity studies indicate that the 230F margin to the PCT LOCA limit of 2200°F represents a conservative benefit in FQ of at least 0.02.
- 3) Containment Back Pressure Margin - Essentia'lly all of the surfaces, in the containment building, with the exception of stainless steel surfaces, are painted. The paint acts as an additional thermal resistance for the heat flow to the containment heat sinks which results in higher containment back pressure and a benefit for the LOCA-ECCS analysis. Westinghouse sensitivity studies for steam cooling plants (i.e. Surry) on the effect of painted surfaces in the contain-.
ment building indicate a conservative benefit in FQ.of at least 0.03.
- 4) Steam Generator Tube Plugging - The current LOCA-ECCS analysis assumed a steam generator tube plugging level of 25%. Consequently, the margin between the actual steam generator tube plugging level and the level assumed i~
the current analysis represents a potential benefit. This benefit was conserva-tivel~ determined by Westingho~se to.rep:esent 0.023 in F0 for the lim~tin~ ~c~ual plugging level of the Surry units which is currently 20.8?o. Should this limiting actual plugging level be exceeded in the future, the steam generator plugging credit will be deleted (or revised based on additional.analysis).
- 5) Fuel Pellet Temperature Margin - The current LOCA-ECCS analysis initial stored energy conditions were based on limiting generic fuel pellet tempera-tures. The as~built Surry fuel parameters are less limiting than the values assumed for the generic case. Consequently, the actual Surry fuel pellet temperatures are less than the temperatures assumed in the current analysis which results in a con-servative benefit in FQ of at least 0.025.